Attachment_C_-_DFRC_wireless.pdf

PDF 11 MB Posted

Attached to
Network Cabling Upgrade Federal contract opportunity
Solicitation number
AG-32SC-S-17-0027
Issued by
Department of Agriculture Agricultural Research Service Central Program Planning Coordination and Support

About this file

Attachment C - Wireless Floor Plan

View the file

Other files for this federal contract opportunity

Other files attached to Network Cabling Upgrade, newest first.
File Type Posted
PFOIL_342_Material_Submittal.docx DOCX document
Amendment_2.pdf PDF
Questions&Answers2.pdf PDF
Amendment_1.pdf PDF
Building_Telecommunications_Cabling_System_Specifications.pdf PDF
Attachment_B_-_0096_Dairy_Forage_Research_Center_-_Fiber_Riser_Diagram.pdf PDF
General_Specifications.pdf PDF
Attachment_J_-_Scaled_DFRC_Floorplans.pdf PDF
Attachment_E_-_UW_Installation_Guidelines_for_Wireless_Access_Point_Moun....pdf PDF
Attachment_F_-_Wireless_Installation_Example.pdf PDF
Attachment_I_-_DFRC_Ceiling_tile_removal_and_replacement.pdf PDF
Attachment_H_-_CPI_wall_mounted_racks.pdf PDF
Attachment_G_-_Rack_Layout_USDA_DFRC.PDF PDF
Questions&Answers.pdf PDF
Asbestos_Report.pdf PDF
SOW_Revised_27MAR2017.pdf PDF
Attachment_A_-_2017-04-05_DFRC_floor_plans_for_network_cabling_upgrade_-....pdf PDF
Attachment_D_-_2017-03-23_DFRC_network_cabling_numbers.pdf PDF
General_Specifications.pdf PDF
Attachment_B_-_0096_Dairy_Forage_Research_Center_-_Fiber_Riser_Diagram.pdf PDF
Past_Performance.pdf PDF
AG-32SC-S-17-0027.pdf PDF
Hot_Work_Permit.pdf PDF
of0306.pdf PDF
ARS371.pdf PDF
Building_Telecommunications_Cabling_System_Specifications.pdf PDF
PII_Sheet.pdf PDF
Daily_Inspection_Form.pdf PDF
ARS372.pdf PDF
Attachment_A_-_DFRC_Floorplans_Updated_March.pdf PDF
SOW_DFRC_Network_Cabling_Upgrade.pdf PDF
Wage_Determination.pdf PDF
AD-1197.pdf PDF
Show all 33

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

New location: Pull dual building-standard cabling and terminate in outlet box in suspended ceiling tile or open hard ceiling.

If hard ceiling is cluttered or inaccessible place box below obstructions or terminate as wall outlet on adjacent wall (ush or surface mount) at least 12” to center below nished ceiling, ducts, pipes, or tray.

* Proposed wireless locations for cabling infrastructure upgrade.

New location: Pull dual building-standard cabling and terminate in outlet box in suspended ceiling tile or open hard ceiling.

If hard ceiling is cluttered or inaccessible place box below obstructions or terminate as wall outlet on adjacent wall

New location: Pull dual building-standard cabling and terminate in outlet box in suspended ceiling tile or open hard ceiling.

If hard ceiling is cluttered or inaccessible place box below obstructions or terminate as wall outlet on adjacent wall

New location: Pull dual building-standard cabling and terminate in outlet box in suspended ceiling tile or open hard ceiling.

If hard ceiling is cluttered or inaccessible place box below obstructions or terminate as wall outlet on adjacent wall

New location: Pull dual building-standard cabling and terminate in outlet box in suspended ceiling tile or open hard ceiling.

If hard ceiling is cluttered or inaccessible place box below obstructions or terminate as wall outlet on adjacent wall

DFRC_wireless_1st
DFRC_wireless_2nd
DFRC_wireless_3rd
DFRC_wireless_1st_p2
DFRC_wireless_2nd_p2

File details come from the government source that posted it. Updated .