Amendment_1.pdf

PDF 458 KB Posted

Attached to
Network Cabling Upgrade Federal contract opportunity
Solicitation number
AG-32SC-S-17-0027
Issued by
Department of Agriculture Agricultural Research Service Central Program Planning Coordination and Support

About this file

SF-30

View the file

Other files for this federal contract opportunity

Other files attached to Network Cabling Upgrade, newest first.
File Type Posted
PFOIL_342_Material_Submittal.docx DOCX document
Amendment_2.pdf PDF
Questions&Answers2.pdf PDF
Building_Telecommunications_Cabling_System_Specifications.pdf PDF
Attachment_B_-_0096_Dairy_Forage_Research_Center_-_Fiber_Riser_Diagram.pdf PDF
General_Specifications.pdf PDF
Attachment_J_-_Scaled_DFRC_Floorplans.pdf PDF
Attachment_H_-_CPI_wall_mounted_racks.pdf PDF
Attachment_G_-_Rack_Layout_USDA_DFRC.PDF PDF
Questions&Answers.pdf PDF
Asbestos_Report.pdf PDF
SOW_Revised_27MAR2017.pdf PDF
Attachment_A_-_2017-04-05_DFRC_floor_plans_for_network_cabling_upgrade_-....pdf PDF
Attachment_D_-_2017-03-23_DFRC_network_cabling_numbers.pdf PDF
Attachment_E_-_UW_Installation_Guidelines_for_Wireless_Access_Point_Moun....pdf PDF
Attachment_F_-_Wireless_Installation_Example.pdf PDF
Attachment_I_-_DFRC_Ceiling_tile_removal_and_replacement.pdf PDF
Attachment_C_-_DFRC_wireless.pdf PDF
General_Specifications.pdf PDF
Attachment_B_-_0096_Dairy_Forage_Research_Center_-_Fiber_Riser_Diagram.pdf PDF
Past_Performance.pdf PDF
PII_Sheet.pdf PDF
Daily_Inspection_Form.pdf PDF
ARS372.pdf PDF
Attachment_A_-_DFRC_Floorplans_Updated_March.pdf PDF
SOW_DFRC_Network_Cabling_Upgrade.pdf PDF
Wage_Determination.pdf PDF
AD-1197.pdf PDF
AG-32SC-S-17-0027.pdf PDF
Hot_Work_Permit.pdf PDF
of0306.pdf PDF
ARS371.pdf PDF
Building_Telecommunications_Cabling_System_Specifications.pdf PDF
Show all 33

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

AG-32SC-S-17-0027

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

ARS-EBSC-0325-05-P

PEORIA IL 61604

1815 N UNIVERSITY ST

ARS EBSC Contracting, Acquisition, ARS EBSC Contracting, Acquisition, 04/12/2017000001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

03/16/2017

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is as follows:

1. Add option 1 to remove and replace ceiling tiles, subject to the availability of funds.

2. Incorporate the following revised documents:

-Attachment A - Floor Plans

-Attachment B - Fiber Riser Diagram

-Attachment 2 - Statement of Work

-Building Telecommunications Cabling System Specifications

-General Specifications

3. Incorporate the following additional documents:

-Asbestos Report

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

JOSHUA J. DOBEREINER

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

04/12/2017

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 29

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

AG-32SC-S-17-0027/000001

-Attachment C - Wireless Floor Plan

-Attachment D - Network Cabling Numbers

-Attachment E - University of Wisconsin

Installation Guidelines for Wireless Access Point

Mounting

-Attachment F - Wireless Installation Example

-Attachment G - Rack Layout Diagram

-Attachment H - Wall Mounted Rack Cut Sheet

-Attachment I - Ceiling Tile Removal and

Replacement Floor Plans

-Attachment J - Scaled Floor Plans

4. Update the magnitude of construction to between $100,000 and $250,000.

5. Update the proposal response date to May 15, 2017 at 1:00 PM Central Daylight Time.

6. Announce new site visit scheduled for April

20, 2017 at 10:00 AM Central Daylight Time.

Delivery: 21 Days After Notice to Proceed

Delivery Location Code: ARS-MWA-3655-03

DAIRY FORAGE RESEARCH CENTER

1925 LINDEN DR.

MADISON WI 53706 US

FOB: Destination

Period of Performance: 06/01/2017 to 07/31/2017

002 Ceiling Tile Removal and Replacement

(Option Line Item)

30 Days After Award

Product/Service Code: Z2AA

Product/Service Description: REPAIR OR ALTERATION

OF OFFICE BUILDINGS

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

SOLICITATION AG-32SC-S-17-0027

Madison, WI

Network Cabling Upgrade

B - SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS

B.1 SCOPE OF CONTRACT

B.2 SCHEDULE OF ITEMS

B.3 PERFORMANCE TIME

C - SECTION C – DESCRIPTION/SPECIFICATION/WORK STATEMENT

C.1 DESCRIPTION OF WORK

C.2 CONTRACT CLAUSES INCLUDED BY FULL TEXT:

D - SECTION D – PACKAGING AND MARKING

E - SECTION E – INSPECTION AND ACCEPTANCE

E.1 CONTRACT CLAUSES INCLUDED BY FULL TEXT:

E.2 CONTRACT CLAUSES INCLUDED BY REFERENCE:

E.3 FINAL INSPECTION

E.4 FINAL ACCEPTANCE

F - SECTION F – DELIVERIES OR PERFORMANCE

F.1 CONTRACT CLAUSES INCLUDED BY FULL TEXT:

F.2 CONTRACT CLAUSES INCLUDED BY REFERENCE:

G - SECTION G – CONTRACT ADMINISTRATION DATA

G.1 CONTRACTING OFFICER'S REPRESENTATIVE

G.2 CONTRACTOR PERFORMANCE INFORMATION AND CONTRACTOR PERFORMANCE

ASSESSMENT REPORTING SYSTEM (CPARS)

G.3 INVOICE PREPARATION AND SUBMISSION

H - SECTION H – SPECIAL CONTRACT REQUIREMENTS

H.1 CONTRACT CLAUSES INCLUDED BY FULL TEXT:

H.2 CONTRACT CLAUSES INCLUDED BY REFERENCE:

H.3 CONSTRUCTION PROGRESS AND PAYMENT SCHEDULE

H.4 UTILITIES OUTAGE

H.5 COOPERATION WITH OTHER CONTRACTORS

H.6 SUBMITTALS AND SHOP DRAWINGS

H.7 LIST OF MATERIALS

H.8 PROPERTY DAMAGE LIABILITY INSURANCE

H.9 SUBCONTRACTORS, OUTSIDE ASSOCIATES, AND CONSULTANTS

I - SECTION I – CONTRACT CLAUSES/PROVISIONS

I.1 CONTRACT CLAUSES INCLUDED BY FULL TEXT:

I.2 CLAUSES INCORPORATED BY REFERENCE

J - SECTION J – LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

NOTICES

K - SECTION K – REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF

OFFERORS

K.1 CONTRACT CLAUSES INCLUDED BY FULL TEXT:

K.2 CONTRACT PROVISIONS INCLUDED BY REFERENCE:

K.3 CONTRACT CLAUSE INCLUDED BY REFERENCE:

K.4 DUPLICATION OF COST

L - SECTION L – INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR

RESPONDENTS

L.1 CONTRACT PROVISIONS INCLUDED BY FULL TEXT:

L.2 CONTRACT PROVISIONS INCLUDED BY REFERENCE:

L.3 CONTRACT CLAUSE INCLUDED BY REFERENCE:

L.4 INSTRUCTIONS FOR THE PREPARATION OF PROPOSALS

M - SECTION M – EVALUATION FACTORS FOR AWARD

M.1 CONTRACT PROVISIONS INCLUDED BY REFERENCE

M.2 CRITERIA FOR EVALUATING PROPOSALS

M.3 BASIS FOR AWARD

Network Cabling Upgrade

B - SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS

B.1 SCOPE OF CONTRACT

The Contractor shall furnish all labor, materials, equipment, supplies, transportation, utilities, and supervision for complete construction of network cabling upgrade in accordance with the clauses, specifications, drawings, attachments, and other terms and conditions set forth herein.

B.2 SCHEDULE OF ITEMS

Item # Description Price/Cost

1 Installation of new CAT6 network cabling, data $ jacks and patch panels, and removal of existing cabling.

2 OPTION – Removal and replacement of ceiling tiles $_____________

B.3 PERFORMANCE TIME

60 calendar days after Notice to Proceed is issued.

If option is exercised, 21 calendar days will be added to the period of performance.

Network Cabling Upgrade

C - SECTION C – DESCRIPTION/SPECIFICATION/WORK STATEMENT

C.1 DESCRIPTION OF WORK

Contractor shall install new CAT6 network cabling, data jacks and patch panels, and remove existing cabling at the Dairy Forage Research Center in Madison, WI.

OPTION – Contractor shall remove the existing tongue in groove ceiling tile and replace with new USG Ceilings Model 76775, 2 x 2 x 3/4" white acoustical ceiling tile panel, or approved equal.

C.2 CONTRACT CLAUSES INCLUDED BY FULL TEXT:

AGAR 452.211-72 STATEMENT OF WORK/SPECIFICATIONS (Feb 1988)

The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.

(End of Clause)

AGAR 452.211-73 ATTACHMENTS TO STATEMENTS OF WORK/SPECIFICATIONS (Feb 1988)

The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.

(End of Clause)

AGAR 452.211-74 PERIOD OF PERFORMANCE (Feb 1988)

The period of performance of this contract is from June 1, 2017 through July 31, 2017.

Network Cabling Upgrade

D - SECTION D – PACKAGING AND MARKING

(For this Solicitation, there are NO Clauses in this Section)

Network Cabling Upgrade

E - SECTION E – INSPECTION AND ACCEPTANCE

E.1 CONTRACT CLAUSES INCLUDED BY FULL TEXT:

AGAR 452.246-70 -- INSPECTION AND ACCEPTANCE (FEB 1988)

(a) The Contracting Officer or the Contracting Officer's duly authorized representative will inspect and accept the supplies and/or services to be provided under this contract.

(b) Inspection and acceptance will be performed at Madison, WI.

(End of clause)

E.2 CONTRACT CLAUSES INCLUDED BY REFERENCE:

FAR 52.246-12 Inspection of Construction (Aug 1996)

E.3 FINAL INSPECTION

(a) A final inspection shall be made only when all the materials have been furnished, all the work has been performed, and all the construction provided for by the contract in accordance with the terms has been completed. If, upon examination by the Contracting Officer and/or Government inspection personnel, the project is determined not sufficiently completed to have warranted a final inspection, the contractor may be charged with any additional cost of re-inspection when material and workmanship are not ready at the time specified by the Contractor for its inspection.

(b) The contractor shall give the Contracting Officer ten (10) calendar days advance notice, in writing, of the date the work will be fully completed and ready for final inspection.

(c) The Contractor's request for final inspection will not be approved unless all documentation required below and all other contract requirements have been provided to the Contracting Officer:

-Guarantees and warranty schedule and contacts -Certified payroll records for all prime and subcontractor employees

(d) As soon as practicable following final inspection, the Contracting Officer will inform the contractor, in writing, of any discrepancies and/or omissions noted at the final inspection. The Contracting Officer shall also state the time allowable for replacement of material and performance or re-performance of any unsatisfactory work necessary for final acceptance.

E.4 FINAL ACCEPTANCE

Upon written notification that all deficiencies identified during the final inspection have been corrected, the Contracting Officer will schedule a final acceptance inspection of the work. If all construction required by the contract is determined to be complete and all requisite contract deliverables (e.g., certified payroll records, as-built drawings, warranty documents, etc.) have been submitted and approved by the Government, the Contracting Officer shall notify the Contractor in writing of such acceptance. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government’s rights under any warranty or guarantee.

Network Cabling Upgrade

F - SECTION F – DELIVERIES OR PERFORMANCE

F.1 CONTRACT CLAUSES INCLUDED BY FULL TEXT:

FAR 52.211-10 – COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR

1984)

The Contractor shall be required to

(a) commence work under this contract within 5 calendar days after the date the Contractor receives the notice to proceed,

(b) prosecute the work diligently, and

(c) complete the entire work ready for use not later than 60 calendar days after the date the Contractor receives the notice to proceed. The time state for completion shall include final cleanup of the premises.

(End of Clause)

F.2 CONTRACT CLAUSES INCLUDED BY REFERENCE:

FAR 52.242-14 Suspension of Work (Apr 1984) FAR 52.242-15 Stop-Work Order (Aug. 1989)

Network Cabling Upgrade

G - SECTION G – CONTRACT ADMINISTRATION DATA

G.1 CONTRACTING OFFICER'S REPRESENTATIVE

A Contracting Officer's Representative (COR) may be designated after contract award. The contractor will be notified by letter of the name and duties of the COR.

G.2 CONTRACTOR PERFORMANCE INFORMATION AND CONTRACTOR

PERFORMANCE ASSESSMENT REPORTING SYSTEM (CPARS)

(a) General. Past performance evaluations shall be prepared at least annually and at the time the work under a contract or order is completed. Past performance evaluations are required for contracts and orders as specified in paragraphs (b) through (f) of this section, including contracts and orders performed outside the United States. These evaluations are generally for the entity, division, or unit that performed the contract or order. Past performance information shall be entered into CPARS, the Government wide evaluation reporting tool for all past performance reports on contracts and orders. Instructions for submitting evaluations into CPARS are available at http://www.cpars.gov/

(b) Past performance evaluations shall be prepared for each construction contract of $700,000 or more, and for each construction contract terminated for default regardless of contract value. Past performance evaluations may also be prepared for construction contracts below $700,000.

G.3 INVOICE PREPARATION AND SUBMISSION

Based upon acceptance of required contract deliverables, the contractor shall submit an original invoice to josh.dobereiner@ars.usda.gov. The contractor shall include the following information on each invoice in order to be considered a proper invoice:

1. Name and address of contractor.

2. Invoice number and Invoice date.

3. Contract number.

4. Description of work and period of performance.

5. Name, title, phone number, and complete mailing address of official to whom payment is to be sent.

6. Name, title, phone number, and complete mailing address of person to notify in the event of a defective invoice.

7. Taxpayer Identification Number (TIN) and DUNS Number.

8. Invoices must be submitted with ARS-371 and ARS-372, along with certified payroll records, Contractor Certification, and updated CPM Schedule.

Once the paper invoice has been approved by the Contracting Officer, the Contractor shall submit the invoice electronically through the Invoice Processing Platform (IPP) at www.ipp.gov.

http://www.cpars.gov/ mailto:josh.dobereiner@ars.usda.gov http://www.ipp.gov/

Network Cabling Upgrade

H - SECTION H – SPECIAL CONTRACT REQUIREMENTS

H.1 CONTRACT CLAUSES INCLUDED BY FULL TEXT:

AGAR 452.228-71 -- INSURANCE COVERAGE - ALT 1 (NOV 1996)

Pursuant to FAR clause 52.228-5, Insurance-Work on a Government Installation, the Contractor will be required to present evidence to show, as a minimum, the amounts of insurance coverage indicated below:

(a) Workers Compensation and Employer's Liability. The Contractor is required to comply with applicable Federal and State workers' compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer's liability section of the insurance policy, except when contract operations are so commingled with a Contractor's commercial operations that it would not be practical to require this coverage. Employer's liability coverage of at least $100,000 shall be required, except in States with exclusive or monopolistic funds that do not permit worker's compensation to be written by private carriers.

(b) General Liability.

(1) The contractor shall have bodily injury liability insurance coverage written on a comprehensive form of policy of at least $500,000 per occurrence.

(2) The Contractor shall have property damage liability insurance in the amount of $500,000 per occurrence.

(c) Automobile Liability. The Contractor shall have automobile liability insurance written on a comprehensive form of policy. The policy shall provide for bodily injury and property damage covering the operations of all automobiles used in connection with performing the contract. Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage or loss.

(d) Aircraft Public and Passenger Liability. When aircraft are used in connection with performing the contract, the Contractor shall have aircraft public and passenger liability insurance. Coverage shall be at least $200,000 per person and $500,000 per occurrence for bodily injury, other than passenger injury. Coverage for passenger injury shall be at least $200,000 multiplied by the number of seats or passengers, whichever is greater.

(End of Clause)

AGAR 452.236-72 -- USE OF PREMISES (NOV 1996)

(1) Before any camp, quarry, borrow pit, storage, detour, or bypass site, other than shown on the drawings, is opened or operated on USDA land or lands administered by the USDA, written permission shall be obtained through the Contracting Officer. A camp is interpreted to include the camp site or trailer parking area of any employee working on the project for the Contractor.

(b) Unless excepted elsewhere in the contract, the Contractor shall(i)provide and maintain sanitation facilities for the workforce at the site and (ii) dispose of solid waste in accordance with applicable Federal, State and local regulations.

(End of Clause)

AGAR 452.237-74 -- KEY PERSONNEL (FEB 1988)

(a) The contractor shall assign to this contract the following key personnel:

Site Superintendent

(b) During the first ninety (90) days of performance, the contractor shall make no substitutions of key personnel unless the substitution is necessitated by illness, death, or termination of employment. The contractor shall notify the Contracting Officer within 15 calendar days after the occurrence of any of these events and provide the information required by paragraph (c) below. After the initial 90-period, the contractor shall submit the information required by paragraph (c) to the Contracting Officer at least 15 days prior to making any permanent substitutions.

(c) The contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any additional information requested by the Contracting Officer. Proposed substitutes should have comparable qualifications to those of the person(s) being replaced. The Contracting Officer will notify the contractor within 15 calendar days after receipt of all required information of the decision on substitutions. The contract will be modified to reflect any approved

Network Cabling Upgrade changes of key personnel.

H.2 CONTRACT CLAUSES INCLUDED BY REFERENCE:

FAR 52.236-2 Differing Site Conditions (Apr 1984) FAR 52.236-3 Site Investigation and Conditions Affecting the Work (Apr 1984) FAR 52.236-5 Material and Workmanship (Apr 1984) FAR 52.236-6 Superintendence by the Contractor (Apr 1984) FAR 52.236-7 Permits and Responsibilities (Nov 1991) FAR 52.236-8 Other Contracts -- (Apr 1984) FAR 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and

Improvements (Apr 1984) FAR 52.236-10 Operations and Storage Areas (Apr 1984) FAR 52.236-11 Use and Possession Prior to Completion (Apr 1984) FAR 52.236-12 Cleaning Up (Apr 1984) FAR 52.236-13 Accident Prevention (Nov 1991) FAR 52.236-14 Availability and Use of Utility Services (APR 1984) FAR 52.236-21 Specifications and Drawings for Construction (FEB 1997)

H.3 CONSTRUCTION PROGRESS AND PAYMENT SCHEDULE

(a) Within 14 days after the date of receipt of award, the contractor shall prepare and submit to the Contracting Officer for approval, the original copy of ARS Form 371, Construction Progress and Payment Schedule. This form will serve as a Schedule of Estimates, Progress Schedule, and when used with ARS Form 372, it will be the basis for Requests for Partial Payment. The values employed in making the schedule will be used only for determining partial payments and will not be considered as establishing a basis for additions to or deductions from the contract. A copy of the approved schedule will be returned to the contractor.

(b) Samples of both ARS Forms 371 and 372 are available upon request. A supply of these forms together with instruction for completion of ARS Form 371 will be mailed to the contractor with the Notice of Award.

(c) ARS Form 371 is required even though progress or partial payments are not requested.

(d) The need by an offeror for partial or progress payments, when authorized in the payment provisions of this request for proposals, will not be treated as a handicap in making the award.

H.4 UTILITIES OUTAGE

Any interruption of utilities or services that would interfere with the operation of the facility will be permitted only with prior written approval from the Contracting Officer. Any utilities or service connections made at other than normal working hours will be at no additional cost to the Government. Permission to make such an interruption shall be requested in writing to the Contracting Officer, at least three (3) days prior to the day of interruption. Failure by the Contractor to comply with this requirement will cause the Contractor to be subject to liability for actual damages.

H.5 COOPERATION WITH OTHER CONTRACTORS

During the period of construction for the work covered by this contract, other contractors performing work for the Government may be operating concurrently at the site. To minimize interference and delay to the construction progress of all concerned, all contractors shall cooperate with each other and coordinate their construction operations to the fullest extent. As far as practicable, all contractors performing work for the Government at the site shall have equal rights to the use of all referenced facilities. In a dispute regarding the use of such facilities, the matter shall be referred to the Contracting Officer.

H.6 SUBMITTALS AND SHOP DRAWINGS

(a) The Contractor shall submit for approval shop drawings of all manufactured products required in the construction for which such drawings are hereinafter required. When approved, one set will be retained, one set forwarded to the Government representative on the job, and two sets forwarded to the Contractor. When changes or corrections are necessary, two sets will be returned to the Contractor with such corrections noted thereon and he shall resubmit revised prints.

Network Cabling Upgrade

(b) Shop drawings shall be marked with the contract number and Work Order Number, project description, name of the Contractor, and accompanied by a letter of transmittal. If the shop drawings show variations from the contract requirements because of standard shop practice or other reason, the Contractor shall make specific mention of such variations in his letter of transmittal.

(c) Approval of shop drawings will be general and will not relieve the Contractor from the responsibility of furnishing material and work required by the contract.

(d) Shop drawings shall be submitted for approval in ample time to permit checking of the drawings, allow the Contractor to make any corrections, and resubmit drawings prior to the time construction is started on work covered by any drawings.

(e) Nonapproval of equipment due to failure to meet specifications or nonapproval of the Contractor’s drawings due to submission of incomplete or incorrect information cannot be considered as a basis for extension of time for completion of the contract.

(f) The quantity of shop drawings required are subject to change. This will occur only when the Government is under contract with an A-E firm to approve shop drawings. In this respect, A-E will coordinate final quantity required between all interested parties.

H.7 LIST OF MATERIALS

(a) The Contractor shall submit for approval a complete list, in duplicate, of brands, type, and make of various equipment and materials proposed to be used. If the Contractor fails to submit such a list or names of equipment which does not comply with the specifications or if the manufacturers named are unsatisfactory, the Government reserves the right to reject same and to select satisfactory substitute materials. This selection shall be final and finding upon the Contractor, and the work shall be installed on this basis without change in contract price.

(b) In order to properly identify and to prove compliance with the requirements of the specifications, the Contractor shall give the following data for each product included in the list of materials.

Section heading of the specifications under which material is specified.

Manufacturer’s name and address.

Grade, type, trade or catalog number.

Size, capacity, and other pertinent data.

(c) All materials, fixtures, and equipment furnished and installed under this contract shall be new and of the best quality; shall be standard cataloged products or reputable manufacturers products or of special manufacture, satisfying completely the contract requirements.

(d) Similar items, unless otherwise specified herein or approved by the Contracting Officer, shall be the product of the same manufacturer, and those fulfilling the same requirements as to size and construction shall be identical.

(e) Substitutions and/or Approved Equal: Where particular make, brand or type of material or equipment is mentioned in these specifications, it is to denote quality standard of article desired, but does not restrict contractor to brand specified; however, any substitution must be met with approval of the Contracting Officer.

Other products comparable in type, quality, utility, and price are acceptable if approved by the Contracting Officer. Burden of proof of equality shall rest with the Contractor. The Contracting Officer shall be sole judge of paralleled quality.

H.8 PROPERTY DAMAGE LIABILITY INSURANCE

The Contractor shall ensure that the property damage liability insurance policy (or rider) required by FAR 52.228-5, Insurance-Work on a Government Installation, is in full compliance with all the terms and conditions of this contract. The policy shall not contain any exclusions or exceptions that would limit or adversely affect the Government’s rights and remedies under any other clause in this contract or other Federal regulation or law.

Should there be any exclusions or exceptions contained in the policy that limits or adversely affects the Government’s rights, the Contractor shall be responsible for the full amount of any damages that occur to the immediate facilities, adjacent facilities/property, and other Government property under the control of the Contractor due to fraud, negligence, vandalism, willful misconduct, or violation of Federal, state, or local safety regulations, building codes and laws. The Contractor shall have full responsibility and is liable for these facilities and properties until the Government has accepted the contract as being completed in full and a release from claims has been received from the Contractor.

Network Cabling Upgrade

For those areas where the Government has taken "beneficial occupancy" prior to completion and acceptance of the whole contract, the contractor shall not be responsible for those specific areas under Government control, except in such instances where damage occurs to those areas as a result of negligence, fraud, vandalism, willful misconduct, or violation of Federal, state, or local safety regulations, building codes, or laws in those areas under the control of the Contractor.

This liability and responsibility includes the activities of all the Contractor’s personnel, their subcontractors, and suppliers.

H.9 SUBCONTRACTORS, OUTSIDE ASSOCIATES, AND CONSULTANTS

Any subcontractors, outside associates, or consultants required by the Contractor in connection with the services covered by the contract will be limited to individuals or firms that were specifically identified at time of award or agreed upon during negotiations. The Contractor shall obtain the Contracting Officer’s written consent before making any substitution for these individuals or firms.

Network Cabling Upgrade

I - SECTION I – CONTRACT CLAUSES/PROVISIONS

I.1 CONTRACT CLAUSES INCLUDED BY FULL TEXT:

FAR 52.217-7 -- OPTION FOR INCREASED QUANTITY-SEPARATELY PRICED LINE ITEM

(MAR 1989)

The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within 30 days of award.

(End of Clause)

FAR 52.222-36 -- EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUL 2014)

(a) Equal opportunity clause. The Contractor shall abide by the requirements of the equal opportunity clause at 41 CFR 60.741.5(a), as of March 24, 2014. This clause prohibits discrimination against qualified individuals on the basis of disability, and requires affirmative action by the Contractor to employ and advance in employment qualified individuals with disabilities.

(b) Subcontracts. The Contractor shall include the terms of this clause in every subcontract or purchase order in excess of $15,000 unless exempted by rules, regulations, or orders of the Secretary, so that such provisions will be binding upon each subcontractor or vendor. The Contractor shall act as specified by the Director, Office of Federal Contract Compliance Programs of the U.S. Department of Labor, to enforce the terms, including action for noncompliance. Such necessary changes in language may be made as shall be appropriate to identify properly the parties and their undertakings.

FAR 52.225-9 -- BUY AMERICAN-CONSTRUCTION MATERIALS (MAY 2014)

(a) Definitions. As used in this clause-- “Commercially available off-the-shelf (COTS) item”—

(1) Means any item of supply (including construction material) that is—

(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.

“Component” means an article, material, or supply incorporated directly into a construction material.

“Construction material” means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

“Cost of components” means--

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

“Domestic construction material” means—

(1) An unmanufactured construction material mined or produced in the United States;

(2) A construction material manufactured in the United States, if—

(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or

Network Cabling Upgrade

(ii) The construction material is a COTS item.

“Foreign construction material” means a construction material other than a domestic construction material.

“United States” means the 50 States, the District of Columbia, and outlying areas.

(b) Domestic preference.

(1) This clause implements the 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.

(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows: None

(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that

(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;

(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or

(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.

(c) Request for determination of inapplicability of the Buy American statute.

(1)

(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including--

(A) A description of the foreign and domestic construction materials;

(B) Unit of measure;

(C) Quantity;

(D) Price;

(E) Time of delivery or availability;

(F) Location of the construction project;

(G) Name and address of the proposed supplier; and

(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.

(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.

(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).

(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.

(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.

(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.

(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:

Foreign and Domestic Construction Materials Price Comparison Construction material description Unit of measure Quantity Price (dollars) * Item 1 Foreign construction material Domestic construction material Item 2

Network Cabling Upgrade

Foreign construction material Domestic construction material

[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.] [Include other applicable supporting information.] [*Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).]

(End of Clause)

FAR 52.228-13 -- ALTERNATIVE PAYMENT PROTECTIONS (JUL 2000)

(a) The Contractor shall submit one of the following payment protections:

Irrevocable letter of credit, or Payment Bond

(b) The amount of the payment protection shall be 100 percent of the contract price.

(c) The submission of the payment protection is required within 5 days of contract award.

(d) The payment protection shall provide protection for the full contract performance period plus a one-year period.

(e) Except for escrow agreements and payment bonds, which provide their own protection procedures, the Contracting Officer is authorized to access funds under the payment protection when it has been alleged in writing by a supplier of labor or material that a nonpayment has occurred, and to withhold such funds pending resolution by administrative or judicial proceedings or mutual agreement of the parties.

(End of Clause)

FAR 52.252-2 -- CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this address(es):

http://farsite.hill.af.mil/vffara.htm

AGAR 452.209-71 -- ASSURANCE REGARDING FELONY CONVICTION OR TAX DELINQUENT

STATUS FOR CORPORATE APPLICANTS (FEB 2012)

(a) This award is subject to the provisions contained in sections 738 and 739 of the Agriculture, Rural Development, Food and Drug Administration, and Related Agencies appropriations Act, 2012, P. L. No. 112- 55, Division A, as amended and / or subsequently enacted, regarding corporate felony convictions and corporate federal tax delinquencies. Accordingly, by accepting this award the contractor acknowledges that it:

(1) does not have a tax delinquency, meaning that it is not subject to any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability, and

(2) has not been convicted (or had an officer or agent acting on its behalf convicted) of a felony criminal violation under any Federal or State law within 24 months preceding the award, unless a suspending and debarring official of the United States Department of Agriculture has considered suspension or debarment of the awardee, or such officer or agent, based on these convictions and/or tax delinquencies and determined that suspension or debarment is not necessary to protect the interests of the Government.

(b) If the awardee fails to comply with these provisions, USDA, ARS may terminate this contract for default and may recover any funds the awardee has received in violation of sections 738 or 739, as amended and/or subsequently enacted.

http://farsite.hill.af.mil/vffara.htm

Network Cabling Upgrade

AGAR 452.232-70 -- REIMBURSEMENT FOR BOND PREMIUMS--FIXED-PRICE

CONSTRUCTION CONTRACTS (NOV 1996)

The Contract Price includes the total amount for premiums that the Contractor attributes to the furnishing of performance and payment bonds required by the contract. Reimbursement for bond premiums under the clause at FAR 52.232-5, Payments Under Fixed-Price Construction Contracts, shall not cover any amount therefor not included in the contract price.

(End of clause)

I.2 CLAUSES INCORPORATED BY REFERENCE

FAR 52.204-9 Personal Identity Verification of Contractor Personnel (Jan 2011) FAR 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (Oct 2016) FAR 52.204-13 System for Award Management Maintenance (Oct 2016) FAR 52.204-22 Alternative Line Item Proposal (Jan 2017) FAR 52.209-6 Protecting the Government’s Interest When Subcontracting with Contractors

Debarred, Suspended, or Proposed for Debarment (Oct 2015) FAR 52.209-10 Prohibition on Contracting With Inverted Domestic Corporations (Nov 2015) FAR 52.215-8 Order of Precedence -- Uniform Contract Format (Oct 1997) FAR 52.219-6 Notice of Total Small Business Set-Aside (NOV 2011) FAR 52.219-28 Post-Award Small Business Program Rerepresentation (Jul 2013) FAR 52.222-3 Convict Labor (June 2003) FAR 52.222-6 Construction Wage Rate Requirements (May 2014) FAR52.222-7 Withholding of Funds (May 2014) FAR 52.222-8 Payrolls and Basic Records (May 2014) FAR 52.222-9 Apprentices and Trainees (Jul 2005) FAR 52.222-10 Compliance with Copeland Act Requirements (Feb 1988) FAR 52.222-11 Subcontracts (Labor Standards) (May 2014) FAR 52.222-12 Contract Termination -- Debarment (May 2014) FAR 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations

(May 2014) FAR 52.222-14 Disputes Concerning Labor Standards (Feb 1988) FAR 52.222-15 Certification of Eligibility (May 2014) FAR 52.222-21 Prohibition of Segregated Facilities (Apr 2015) FAR 52.222-26 Equal Opportunity (Sep 2016) FAR 52.222-27 Affirmative Action Compliance Requirements for Construction (Apr 2015) FAR 52.222-50 Combating Trafficking in Persons (Mar 2015) FAR 52.222-55 Minimum Wages Under Executive Order 13658 (Dec 2015) FAR 52.222-62 Paid Sick Leave Under Executive Order 13706 (JAN 2017) FAR 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction

Contracts (Sep 2013) FAR 52.223-5 Pollution Prevention and Right-to-Know Information. (May 2011) FAR 52.223-6 Drug-Free Workplace (May 2001) FAR 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving (Aug 2011) FAR 52.225-13 Restriction on Certain Foreign Purchases (Jun 2008) FAR 52.227-1 Authorization and Consent (Dec 2007) FAR 52.227-4 Patent Indemnity – Construction Contracts (Dec 2007) FAR 52.228-5 Insurance-Work on a Government Installation (Jan 1997) FAR 52.228-14 Irrevocable Letter of Credit (Nov 2014) FAR 52.232-5 Payments under Fixed-Price Construction Contracts (May 2014) FAR 52.232-16, Alt I Progress Payments (Apr 2012) FAR 52.232-23 Assignment of Claims (May 2014) FAR 52.232-27 Prompt Payment for Construction Contracts (Jan 2017) FAR 52.232-33 Payment by Electronic Funds Transfer-- System for Award Management (Jul. 2013) FAR 52.232-39 Unenforceability of Unauthorized Obligations (Jun 2013) FAR 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (Dec 2013) FAR 52.233-1 Disputes (May 2014) FAR 52.233-3 Protest after Award (Aug. 1996) FAR 52.233-4 Applicable Law For Breach Of Contract Claim (OCT 2004) FAR 52.236-26 Preconstruction Conference (FEB 1995) https://www.acquisition.gov/?q=/browse/far/52

Network Cabling Upgrade

FAR 52.243-5 Changes and Changed Conditions (Apr 1984) FAR 52.244-6 Subcontracts for Commercial Items (Jan 2017) FAR 52.246-21 Warranty of Construction (MAR 1994) FAR 52.249-2, Alt I Termination for Convenience of the Government (Fixed-Price) (APR 2012) FAR 52.249-10 Default (Fixed-Price Construction) (APR 1984) FAR 52.253-1 Computer Generated Forms (JAN 1991)

Network Cabling Upgrade

J - SECTION J – LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

ATTACHMENT NO. TITLE #OF PAGES

1 * Wage Determination WI170005, dated 02/17/2017 8 2 Statement of Work 4

3 ARS 371 2

4 ARS 372 1

5 Past/Present Performance Evaluation Form 2 6 Asbestos Report 2 A Floor Plans 5 B Fiber Riser Diagram 1 C Wireless Floor Plan 5 D Network Cabling Numbers 2 E University of Wisconsin Installation Guidelines for Wireless Access Point Mounting 1 F Wireless Installation Example 1 G Rack Layout Diagram 1 H Wall Mounted Rack Cut Sheet 1 I Ceiling Tile Removal and Replacement Floor Plans 6 J Scaled Floor Plans 5

NOTICES

* Attachment 1: If any of the Department of Labor (DOL) wage rates are below the Federal Minimum Wage, Fair Labor Standards Act (FLSA) rate, the FLSA rate shall take precedence.

Network Cabling Upgrade

K - SECTION K – REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF

OFFERORS

K.1 CONTRACT CLAUSES INCLUDED BY FULL TEXT:

FAR 52.204-8 -- ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2017)

(a)

(1) The North American Industry classification System (NAICS) code for this acquisition is 238210.

(2) The small business size standard is $15.0 Million.

(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.

(b)

(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph

(d) of this provision applies.

(2) If the provision at 52.204-7 is not included in this solicitation, and the offeror is currently registered in the System for Award Management (SAM), and has completed the Representations and Certifications section of SAM electronically, the offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certification in the solicitation. The offeror shall indicate which option applies by checking one of the following boxes:

[X] (i) Paragraph (d) applies.

[ ] (ii) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.

(c)

(1) The following representations or certifications in SAM are applicable to this solicitation as indicated:

(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless—

(A) The acquisition is to be made under the simplified acquisition procedures in Part 13;

(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures;

or

(C) The solicitation is for utility services for which rates are set by law or regulation.

(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. This provision applies to solicitations expected to exceed $150,000.

(iii) 52.203–18, Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements— Representation. This provision applies to all solicitations.

(iv) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the provision at 52.204-7, System for Award Management.

(v) 52.204-5, Women-Owned Business (Other Than Small Business). This provision applies to solicitations that—

(A) Are not set aside for small business concerns;

(B) Exceed the simplified acquisition threshold; and

(C) Are for contracts that will be performed in the United States or its outlying areas.

(vi) 52.209-2, Prohibition on Contracting with Inverted Domestic Corporations—Representation.

(vii) 52.209-5; Certification Regarding Responsibility Matters. This provision applies to solicitations where the contract value is expected to exceed the simplified acquisition threshold.

(viii) 52.209-11, Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law. This provision applies to all solicitations.

(ix) 52.214-14, Place of Performance--Sealed Bidding. This provision applies to invitations for bids except those in which the place of performance is specified by the Government.

(x) 52.215-6, Place of Performance. This provision applies to solicitations unless the place of performance is specified by the Government.

(xi) 52.219-1, Small Business Program Representations (Basic & Alternate I). This provision applies to solicitations when the contract will be performed in the United States or its outlying areas.

(A) The basic provision applies when the solicitations are issued by other than DoD, NASA, and the Coast Guard.

(B) The provision with its Alternate I applies to solicitations issued by DoD, NASA, or the Coast Guard.

Network Cabling Upgrade

(xii) 52.219-2, Equal Low Bids. This provision applies to solicitations when contracting by sealed bidding and the contract will be performed in the United States or its outlying areas.

(xiii) 52.222-22, Previous Contracts and Compliance Reports. This provision applies to solicitations that include the clause at 52.222-26, Equal Opportunity.

(xiv) 52.222-25, Affirmative Action Compliance. This provision applies to solicitations, other than those for construction, when the solicitation includes the clause at 52.222-26, Equal Opportunity.

(xv) 52.222-38, Compliance with Veterans' Employment Reporting Requirements. This provision applies to solicitations when it is anticipated the contract award will exceed the simplified acquisition threshold and the contract is not for acquisition of…