AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
CONTRACT ID CODE PAGE 1 OF 4 PAGES
2 AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
5/13/2014
4. REQUISITION/PUCHASE REQ. NO. 5. PROJECT NO.(IF APPLICABLE)
6. ISSUE BY CODE 7.ADMINISTERED BY (if other than item 6) CODE
Ochoco National Forest
3160 NE 3
rd Street
Prineville, OR 97754
8.NAME AND ADDRESS OF CONTRACTOR(No., street, county, State and ZIP Code) 9A.Amend Solicitation. AG-04GG-S-14-0001
* 9B.Dated 3/27/2014
* 10A.Mod Contract/Order #
* 10B.Dated (see Item 13) code facility code
11. THIS ITEM APPLIES ONLY TO AMENDMENT OF SOLICITATION
[x] The above numbered solicitation is amended as set forth in the item 14. The hour and date specified for receipt of Offers [X] is extended [] is not extended. Offerors must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15 and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted, or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE
RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegam or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting and Appropriation Data (if required)
13. THIS ITEM APPLIES ONLY TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. This change order is issued pursuant to; (specifiy authority) The changes set forth in item 14 are made in the Contract/Order # in item 10A.
B. The above numbered Contract/Order is modified to reflect the administrative changes (such as changes in paying office, appropriation date, etc.) set forth in item 14, pursuant to the authority of FAR 43.103(b)..
C. This supplemental agreement is entered into pursuant to authority of:
D Other: (Specify type of modification and authority):
E. IMPORTANT: Contractor [ ] is not [ ] is required to sign this document and return _ Original to the issuing office.:
14. DESCRIPTION OF AMENDMENT/MODIFICATION Project Name and Location: CRESCENT DISTRICT OFFICE AND SITE
IMPROVEMENT PROJECT
This amendment addresses the following (see attached addendum)
1. Revisions to Specifications, Drawings, and Bid Schedule (see attached)
2. Pre-Bid Inquiries (PBI’s) and Requests for Information (RFI’s)
3. Proposal due date is extended to May 20, 2014 4:30pm COB PST
By signature in Block 15B Contractor releases the Government from all claims relating to this modification. This settlement is complete accord and satisfaction. Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A.NAME AND TITLE OF SIGNER (Type or print)
16A.NAME AND TITLE OF CONTRACTING OFFICER
Contracting Officer
15B.CONTRACTOR/OFFEROR
By ______________________________ (Signature of person authorized to sign)
15C.DATE SIGNED 16B.UNITED STATES OF AMERICA
By______________________________ (Signature of Contracting Officer)
16C.DATE SIGNED
Standard Form 30 Prescribed by GSA FAR (48CFR) 53.243
Addendum to Amendment 5
REVISIONS, PRE-BID INQUIRIES, REQUESTS FOR INFORMATION CRESCENT DISTRICT OFFICE AND SITE
IMPROVEMENT PROJECT
REVISIONS
REV-045
Sheet A102
ADD key note 19 to Site Plan detail 1 near Main Street as indicated by delta 5.
ADD key note 19 to Keynotes to read, “Provide 12-inch x 60-inch white traffic paint stripes delineating accessible path across access drive and Main Street.”
REV-046
Sheet A103
ADD key note 35 to Site Plan detail 1 near Main Street as indicated by delta 5. ADD key note 35 to Keynotes to read, “Provide 12-inch x 60-inch white traffic paint stripes delineating accessible path across access drive near accessible parking stall.”
REV-047
Specification 23 52 00, Drawing Sheets A-P501, A-P702, A-H701 and A-H702
BOILER: REVISE Specification 23 52 00.2.01A to read: “1.Hydrotherm KN, 2. Laars NTH, and 3. Fulton Cal”
BOILER: REVISE Drawing Sheet A-P501, Gas Calculations as indicated by delta 5.
BOILER: REVISE Drawing Sheet A-P702, Gas Piping Riser Diagram as indicated by delta 5.
BOILER: REVISE Drawing Sheet A-H701, Detail 8 modified to show new basis of design boiler as indicated by delta 5.
BOILER: REVISE Drawing Sheet A-H702, Detail 3 modified to show new layout of piping and flues for B-1 and B-2 as indicated by delta 5.
REV-048
Specification 28 23 00, Drawing Sheet A-E104
Network Switch: Specification 28 23 00, ADD section 2.09 Network PoE Switch as shown on attached revised specification.
Operator Interface: Specification 28 23 00, ADD section 2.10 Operator Interface as shown on attached revised specification.
REV-049
Drawing Sheet A-E501
Revise generator bid alternate requirements and see revised feeder schedule for feeder 1004 definition.
REV-050
Drawing Sheets C203 and E101
Add demo of existing electrical equipment as identified by keynote 14 on C203 and keynote 15 on E101, both indicated by delta 5.
REV-051
Bid Schedule
The generator transfer switches, conduit and control wiring to generator and internal annunciator are to be included in the base bid. Bidders are NOT to include these items in bid option 5. Revise Bid Option 5 to read “Bid Option 5 – Generator”.
See attached, Revised Bidders Schedule. Also, see attached sheet A-E501 key note 9 for Bid alternate definition.
Requests for Information (RFI’s) for Plans and Specifications
RFI-005 – UPDATE
There are no stop signs, No Parking signs, Red Curb, Walkway Bars or Thermoplastic units scheduled? Should there be?
Stop signs: Not required. DELETE stop sign detail 1/ A107.
“No Parking”signs: A102: ADD Key note 41 to read, “No Parking Fire Lane Sign – see detail 2/A107” Typical 5 locations.
Red Curb: Fire lanes are indicated in documents – see key notes 34 and 35 /A103.
Walkway Bars: See REV-045 and REV-046 above.
Thermoplastic units: It is unclear if the term “thermoplastic units” is referring to tactile warning strips at curb ramp assemblies. If so, they are shown on detail 5/C603 and Sheet A103
RFI-024 – UPDATE
Specification 28 23 00, Will the camera network power switches (PoE) be provided by the Forest Service?
No, all camera network power switches (PoE) will be supplied by the Contractor. Video Surveillance system does NOT tie into the FS local area network. See revised section 28 23 00 and A-E104.
RFI-026
See spec paragraph 07 21 00.2.02.B. You will not be able to achieve the desired flame spread of 25 feet or less with the Type II , Class I facer that is called out. That facer is not one that is generally used in that application and I am assuming that the flame spread section takes precedence over the facer type as you are probably needing to pass NFPA 285.
REVISE paragraph 07 21 00.2.02.B to read, “B. Polyisocyanurate Board Insulation - exterior walls: Rigid cellular foam, complying with
ASTM C1289; Type I, Class 1, closed-cell polyisocyanurate insulation with glass fiber reinforced foil facer on each side;
Grade 1.”
RFI-027
Not Used
RFI-028
There is a conflict between the glazing specified and the vinyl windows specified. Glazing section (088000) calls for 1” overall thickness but the vinyl windows are manufactured for ¾” or 7/8” overall glass. Please advise.
08 80 00: REPLACE sub-paragraphs that read, “Total Thickness: 1 inch.” to “Total Thickness: 7/8 inch.” at the following locations; 08 80 00.2.01.A.4., 08 80 00.2.01.B.4., and 08 80 00.2.01.E.3.b.
The Glazing section (088000) calls for “Green” tint. There are many types of green tint available but none of them meet the performance specifications listed. Please be more specific on the green tint. The PPG Ideascapes website may be helpful in determining the color.
08 80 00: REPLACE sub-paragraphs that read, “Tint: Green.” To “Tint: Clear.” at the following locations; 08 80
00.2.01.A.2.a, 08 80 00.2.01.B.2.a, 08 80 00.2.01.C.3, 08 80 00.2.01.D.3, and 08 80 00.2.01.E.2.a
Pricing Option 6 calls for Kawneer 451UT, front glazed in lieu of vinyl windows. The 451UT products is only available in a center glazed configuration. Please confirm 451UT center glazed is the intended system.
Yes, 451UT center glazed is the intended system (basis of design).
01 23 00 Options: REVISE sub-paragraph 01 23 00.1.04.F.b. to read, “Section Configuration Style: Centered glazed.
RFI-029
I’m inquiring about the Green Tint specified in section 2.01 Glazing Types for the Crescent District Office. Occasionally when I ask the architect the reason for the tint, the intention is to reduce the Solar Heat Gain. An alternative to the tint are the better performing spectrally selective Low-E coatings with two layers of Low-E, such as Cardinal’s Low-E sq., on surface two of an insulated glass unit. The vinyl windows with Cardinal Low-E2, Argon Gas filled, insulated glass units and no green tint, would provide a better solar heat gain rating than what is specified at a reduced cost.
See Reponses to RFI-028
RFI-030
Detail 3-A, B/A-A502 shows the shower enclosure without any indication or clarification of the material to be used, please clarify.
See Plumbing Fixture Schedule, sheet A-P502; fixture SH-1 indicates basis of design Fiber Fab 60H1LP with description.
Some shower accessories are defined in paragraph 10 28 00.2.05 of the project manual.
RFI-031
Specification 10 14 00 - The drawings do not include an interior signage schedule so it is not clear how many and where interior room signage is required. Please provide a schedule showing room names/numbers to receive signs.
1. Room and Door signs, Cut Vinyl Letters:
a. Base Bid: See door schedule and door schedule notes; items 13 and 14 on sheet A-A801. See key notes 7 and 9 on sheet A-A202 near elevator door.
b. Bid Option 1: See door schedule and door schedule notes; items 13 and 14 on sheet B-A801.
2. Emergency exiting signs: See sheets A-A601 and A-A602 for Exit Luminaire designation. See Sheets A-E201 and A-E202 for exit signage quantity via reference luminaire “X”. Luminaire “X” is defined on sheet E004; Luminaire Schedule.
3. Sheet B-E201: ADD three luminaire “X” signs as indicated on delta 5.
RFI-032
Specification 09 21 16 - It is not clear from the paint schedule and finish schedule the level of drywall finish that is desired (3.06, A) at the various rooms within the building. Can you please identify what rooms specifically get a Level 5 finish?
Semi-gloss paint is defined in sub-paragraph 09 90 00.2.03.A.4 defining locations at metal doors, Frames, and Restroom
Walls & Ceilings. Level 5 drywall finish was intended to be located in the restroom walls & Ceilings. However, restroom ceilings at the administration building are assembly type B; acoustical lay-in ceiling tile. Therefore, Level 5 drywall finish is at the walls only for restroom 102, Men 122, Women 124, Men 208, Women 209 (Base Bid); walls and ceiling only at Future restroom 104 at the Fire Engine Bay (Option 1).
Additionally can the finish at the mechanical attic/lofts be Level 1?
No, Mechanical attic 301 walls are to receive paint per key note 11/ A-A203 therefore they are to receive a drywall finish level 4 per sub-paragraph 09 21 16.3.06.A.1.
RFI-033
Sheets C605, C604 - The plans and specifications for the new septic tanks do not appear to provide for any form of ballasting or anchorage to keep the tanks from floating as a result of the high groundwater table. Can the civil engineer please provide direction regarding this and if any special precautions are necessary? This concern should be taken into consideration for all sub-grade tanks and vaults.
ADD note to detail 6/C604 as indicated by delta 5.
RFI-034
Sheets A401 and A402 - The 1x16 belly band trim as noted on keynote #6 is not available. Can this be a 1x12?
REVISE Key note 6 to read, “1 x 12 trim with stain ST-2 unless noted otherwise.”
RFI-035
Sheets A401 and A402 - Please verify the locations of the fascia details #2 (18”) and #6 (10”) on the elevation sheets. We cannot determine the locations/extent of where these occur.
CLARIFICATION: See detail reference 6/ A-A702 on section 1/ A-A302. The 10-inch fascia is located on the east entrance framing immediately east of Grid E. The 18-inch fascias are as indicated by other references in the wall sections.
RFI-036
Detail 12/A702, Sheets C402, C404 - What does the footing drain tie into on the civil plans?
Architectural - 12/ A702: ADD note to read,”See sheets C401 and C402 for storm drain connection locations.”
Civil - See revisions to C402 and C404 as indicated by delta 5.
RFI-037
Specification 08 53 13 - The vinyl window glazing specifications do not meet the specified performance standards. Please advise if it is acceptable to submit the bid utilizing the glazing specifications as the basis of bid?
See Responses to RFI-028