A5_Revised_Bidders_Schedule_05132014.pdf

PDF 78 KB Posted

Attached to
CRESCENT DISTRICT OFFICE AND SITE IMPROVEMENT PROJECT Federal contract opportunity
Solicitation number
AG-04GG-S-14-0001
Issued by
Department of Agriculture Forest Service R6-Pacific Northwest Region

About this file

Revised Bidders Schedule

View the file

Other files for this federal contract opportunity

Other files attached to CRESCENT DISTRICT OFFICE AND SITE IMPROVEMENT PROJECT, newest first.
File Type Posted
A5_Revised_MechPumbing_05132014.pdf PDF
Amendment5.pdf PDF
A5_Revised_Elec_05132014.pdf PDF
23_52_00_IEI-Heating_Boilers.pdf PDF
A5_Revised_Arch_05132014.pdf PDF
A5_Revised_Civil_05132014.pdf PDF
28_23_00_IEI-Video_Surveillance.pdf PDF
A4_Revised_HVAC_05062014.pdf PDF
A4_Revised_Civil_05062014.pdf PDF
A4_-_HAZMAT_Survey_Map.pdf PDF
Amendment4.pdf PDF
A4_Revised_Plumbing_05062014.pdf PDF
A4_Revised_26_09_00_IEI-Controls_and_Instrumentation.pdf PDF
A4_Revised_Electrical_05062014.pdf PDF
A4_Revised_Arch_05062014.pdf PDF
Amendment3.pdf PDF
A2_CDO_Soils_FinalReport.pdf PDF
A2_CDO_Hazmat_FinalReport.pdf PDF
A2_Revised_Electrical_04222014.pdf PDF
A2_CDO_Pre-proposal_Sign_In_04152014.pdf PDF
A2_Revised_Spec_333200_WASTEWATER_PUMPING_STATION.pdf PDF
A2_Revised_Plumbing_04222014.pdf PDF
Amendment2.pdf PDF
A2_Revised_HVAC_04222014.pdf PDF
A2_Revised_Civil_04222014.pdf PDF
Amendment1.pdf PDF
A1_RevisedBiddersSchedule_04092014.pdf PDF
A1_Spec_Revisions.pdf PDF
A1_Drawing_Revisions.pdf PDF
Drawings_Volume1.pdf PDF
Drawings_Volume2.pdf PDF
Bidders_Package.pdf PDF
CDO-Schedule-FINAL.pdf PDF
Specifications_Volume1.pdf PDF
Specifications_Volume2.pdf PDF
Fire_Protection_and_Suppresion.pdf PDF
CrescentRFP.pdf PDF
Show all 37

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5/13/2014

METHOD OF

ITEM NO. CSI NO. DESCRIPTION MEASURE QUAN. UNIT UNIT PRICE TOTAL

BASE BID ITEMS

A1 01 00 00 GENERAL CONDITIONS Lump Sum 1 L.S.Q

A2 02 00 00 EXISTING CONDITIONS Lump Sum 1 L.S.Q

A3 03 00 00 CONCRETE Lump Sum 1 L.S.Q

A4 04 00 00 MASONRY Lump Sum 1 L.S.Q

A5 05 00 00 METALS Lump Sum 1 L.S.Q

A6 06 00 00 WOOD & PLASTICS Lump Sum 1 L.S.Q

A7 07 00 00 THERMAL & MOISTURE PROTECTION Lump Sum 1 L.S.Q

A8 08 00 00 DOORS & WINDOWS Lump Sum 1 L.S.Q

A9 09 00 00 FINISHES Lump Sum 1 L.S.Q

A10 10 00 00 SPECIALTIES Lump Sum 1 L.S.Q

A11 11 00 00 EQUIPMENT Lump Sum 1 L.S.Q

A12 12 00 00 FURNISHINGS Lump Sum 1 L.S.Q

A13 14 00 00 CONVEYING SYSTEMS Lump Sum 1 L.S.Q

A14 21 00 00 FIRE SUPPRESSION Lump Sum 1 L.S.Q

A15 22 00 00 PLUMBING Lump Sum 1 L.S.Q

A16 23 00 00 HVAC Lump Sum 1 L.S.Q

A17 26 00 00 ELECTRICAL Lump Sum 1 L.S.Q

A18 27 00 00 COMMUNICATIONS Lump Sum 1 L.S.Q

A19 28 00 00 ELECTRONIC SAFETY AND SECURITY Lump Sum 1 L.S.Q

A20 31 00 00 SITEWORK Lump Sum 1 L.S.Q

A21 32 00 00 EXTERIOR IMPROVEMENTS Lump Sum 1 L.S.Q

A22 33 00 00 UTILITIES Lump Sum 1 L.S.Q

TOTAL BASE ITEMS

Name of Offeror or Contractor

SCHEDULE OF ITEMS

SECTION B - SUPPLIES OR SERVICES AND PRICES SCHEDULE OF ITEMS

OPTIONAL BID ITEMS

BID OPTION 1 ‐ FIRE ENGINE BAY

O1.1 01 00 00 GENERAL CONDITIONS Lump Sum 1 L.S.Q.

O1.2 02 00 00 EXISTING CONDITIONS Lump Sum 1 L.S.Q

O1.3 03 00 00 CONCRETE Lump Sum 1 L.S.Q

O1.4 04 00 00 MASONRY Lump Sum 1 L.S.Q

O1.5 05 00 00 METALS Lump Sum 1 L.S.Q

O1.6 06 00 00 WOOD & PLASTICS Lump Sum 1 L.S.Q

O1.7 07 00 00 THERMAL & MOISTURE PROTECTION Lump Sum 1 L.S.Q

O1.8 08 00 00 DOORS & WINDOWS Lump Sum 1 L.S.Q

O1.9 09 00 00 FINISHES Lump Sum 1 L.S.Q

O1.10 10 00 00 SPECIALTIES Lump Sum 1 L.S.Q

O1.11 12 00 00 FURNISHINGS Lump Sum 1 L.S.Q

O1.12 22 00 00 PLUMBING Lump Sum 1 L.S.Q

O1.13 23 00 00 HVAC Lump Sum 1 L.S.Q

O1.14 26 00 00 ELECTRICAL Lump Sum 1 L.S.Q

O1.15 27 00 00 COMMUNICATIONS Lump Sum 1 L.S.Q

O1.16 28 00 00 ELECTRONIC SAFETY AND SECURITY Lump Sum 1 L.S.Q

O1.17 31 00 00 SITEWORK Lump Sum 1 L.S.Q

O1.18 32 00 00 EXTERIOR IMPROVEMENTS Lump Sum 1 L.S.Q

O1.19 33 00 00 UTILITIES Lump Sum 1 L.S.Q

BID OPTION 1 TOTAL

BID OPTION 2 ‐ NATURAL STONE BASE AT MAIN BUILDING

O2 04 00 00 BID OPTION 2 TOTAL Lump Sum 1 L.S.Q

BID OPTION 3A ‐ 50% LANDSCAPING

O3A 32 00 00 BID OPTION 3A TOTAL Lump Sum 1 L.S.Q

BID OPTION 3B ‐ 75% LANDSCAPING

O3B 32 00 00 BID OPTION 3B TOTAL Lump Sum 1 L.S.Q

BID OPTION 4 ‐ SOLAR TUBE IN CONFERENCE ROOM

O4 08 00 00 BID OPTION 4 TOTAL Lump Sum 1 L.S.Q

BID OPTION 5 ‐ GENERATOR

O5 26 00 00 BID OPTION 5 TOTAL Lump Sum 1 L.S.Q

BID OPTION 6 ‐ STOREFRONT WINDOW FRAMES

O6 08 00 00 BID OPTION 6 TOTAL Lump Sum 1 L.S.Q

File details come from the government source that posted it. Updated .