Addendum No. 2.pdf

PDF 8 MB Posted

Attached to
Rathskellar Kitchen Renovation - 247-181082
Solicitation number
55606
Issued by
Fairfax County, Fairfax City, Virginia

About this file

This document is an Addendum No. 2 issued by George Mason University (GMU) for the Rathskellar Kitchen Renovation project on the Fairfax, Virginia campus, Project Code 247-181082. The project generally entails renovations to the Rathskellar food service space to provide a combination retail/residential dining venue with hot and cold meals as well as a grab and go component. The bid submission deadline is 2:00 PM on February 12, 2024, and bids will be opened on February 13, 2024. An optional pre-bid meeting is scheduled for January 17, 2024, and bidder questions are due by January 24, 2024. The project award date is February 23, 2024, with a substantial completion date of July 15, 2024 and final completion within 30 days thereafter.

The bid form includes a base bid with three parts: Part A for the overall renovation, Part B for the Siemens controls work at a fixed price of $16,273, and Part C for an estimated quantity of six 4'x9' FRP wall panels to be replaced. Bidders must also submit a schedule of values, project schedule, and acknowledge any addenda issued. GMU has established a 50% SWaM participation goal for this project.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Facilities

10402 Rivanna River Way Fairfax, VA 22030

Phone: (703) 993-2520

ADDENDUM NO. 2

Project No: 247-181082 Project: Rathskellar Kitchen Renovation

George Mason University Purchasing & Fiscal Services Facilities Administration Building 4400 University Drive – MSN 1E4 Fairfax, Virginia 22030-4444

Date: 31 January 2024

From: Michele Kelly, VCCO

Contract Specialist 703.993.4019

To: All Potential Bidders

Addendum No. 2 is being issued to provide all bidders with the following project clarifications and/or revisions:

• CannonDesign Addendum No. 2 Narrative dated 30 January 2024

• Bidders Questions w/Responses

• Revised Specification Section 000110 - Table of Contents dated 30 January 2024

• Specification Section 012200 – Unit Prices dated 20 January 2024

• Revised Specification Section 095133 – Acoustical Metal Pan Ceilings dated 30 January 2024

• Revised Drawing A1021 – Finishes & Door Details dated 30 January 2024

• Revised Drawing A1231 – Finish Plan dated 30 January 2024

• Revised Drawing PO101 – Level 01 Plumbing New Work Plan – Sanitary & Vent dated 30 January 2024

• WBA Architecture Food Service Renovation Project Record Drawings - 03.23.2012

• Mason SUB 1 Tele-Data Room Floor Plan - 01.30.24

• Addendum No. 2 - Invitation for Bid - Rathskellar Kitchen Renovation

• Addendum No. 2 - Standard Bid Form - Rathskellar Kitchen Renovation

• Attachment K - Siemens Scope of Work - 01.28.24

• Attachment L - HECO-12 - Schedule of Values w/o Excel Marcos

• Revised Bid Submission Date: 12 February 2024

• Revised Bid Opening Date: 13 February 2024

• Revised Project Award Date: 23 February 2024

Bidders must acknowledge receipt of Addendum No. 2 with their Bid Submission. Revised Bid Submission Due Date is 12 February 2024 by 2:00pm.

Except as amended or clarified herein, all terms, conditions and provisions of the original Invitation for Bid (IFB) remains unchanged, and all changes and clarifications stated above and within this Addendum are hereby made part of the IFB Requirements and Contract Documents, and shall be taken into account in the preparation of the bid submission and the execution of all work.

Acknowledgment

(signature) (date)

(company)

Addendum No. 002 01/30/2024 Page 1 of 1

ADDENDUM

No. 002 Date: 1/30/2024

Project No. GMU # 181082; CD # 6193.03 Attention: George Mason University

Project Name: GMU Rathskellar “Eaterie” Renovation Address: Facilities Administration

4400 University Drive MS1E4

Fairfax, VA 22030

Issued By: Carrie Parker, CannonDesign

Distribution: Bidders

This Addendum forms a part of the Bidding and Contract Documents and modifies the original issued

Bidding Documents (Working Drawings R3 dated 11/22/2023, permit stamp dated 12/11/2023), for the above titled project, as indicated below, and is hereby incorporated into the Contract Documents as part thereof.

Bidders are required to acknowledge receipt of this Addendum in the space provided on the Proposal/Bid

Form.

ATTACHMENTS: The following is a list of the modified documents and a brief description of what has been modified.

ADMINISTRATIVE DOCUMENTS:

A. Rathskellar Kitchen Renovation_QA_Responses

SPECIFICATIONS:

A. Incorporate the following revised Section(s) are reissued in their entirety as attachment(s) to this Addendum:

1. 000110 – TABLE OF CONTENTS

2. 012200 – UNIT PRICES

3. 095133 – ACOUSTICAL METAL PAN CEILINGS

DRAWINGS:

ARCHITECTURAL:

A. Incorporate the following revised Drawing(s) reissued as attachment(s) to this Addendum:

1. A1021 – FINISHES & DOOR DETAILS

2. A1231 – FINISH PLAN

PLUMBING:

A. Incorporate the following revised Drawing(s) reissued as attachment(s) to this Addendum:

1. P0101 - LEVEL 01 - PLUMBING NEW WORK PLAN - SANITARY & VENT

This Addendum consists of 19 pages (including ALL attachments).

# Bidder Name Date Asked Subject Question Response Response Date

1 HENLEY CONSTRUCTION CO. 1/12/2024 Spec Section 035416 Sealed concrete topping (CONC-1) references spec section 035416 on the Finish Legend A1021; we assume this is meant to be 035300. Please confirm if this product is to be coated, polished, or left neat for a matte look. Is STONHARD an acceptable alternative manufacturer?

Correct, reference 035300. Design intent is for a sealed concrete appearance using Mapei Ultratop Natural in Natural Gray. This will be sealed, not polished.

The design team recommends a topping that will provide a smooth, cleanable finish for a food service area. The existing slab is likely to be damaged due to removal of finishes and trenching. Mapei has been engaged and will provide guidance to the GC for installation and finishing. Per Div. 1 substitutions in bidding are not allowed. Substitutions may be considered during the submittal process at a credit to GMU.

1/31/2024

2 Juniper Construction Company, Inc 1/22/2024 BAS Control Vendor for Mechanical Units Hello, Could you please confirm the BAS control vendor for mechanical units?

Thank you

Refer to Attachment K - Siemens Scope of Work - 01.28.24 & Addendum No. 2 - Standard Bid Form - Rathskellar Kitchen Renovation documents of the solicitation and PART B of the Bid Scope within e-Builder

1/31/2024

3 HENLEY CONSTRUCTION CO. 1/22/2024 Schedule of Value Can we get the excel schedule of values spreadsheet. Once downloaded Microsoft is blocking the macros from running stating the source file is untrusted.

Please advice

This document was created by the Commonwealth of Virginia and includes Macros for entering required data and information. Mason will provide this document as an "excel" spreadsheet without the Macros

1/31/2024

4 PBS Contracting Inc 1/24/2024 Tile Setting Bed Please confirm that new tile should be assumed to be installed in a mortar bed to maintain face alignment per A5 of A0800.

Correct, new floor tile should strive to be flush with existing floor finishes. 1/31/2024

5 PBS Contracting Inc 1/24/2024 1201A Floor Removal The extent of floor tile demolition in the renovated kitchen 1201A does not match what is called out on A1231. Please confirm the existing quarry tile should be removed back to the existing cased openings.

This will be corrected in an Addendum. See area 1201A on D0201. Existing quarry tile should remain. Porcelain tile in front of existing servery should be replaced with quarry tile.

1/31/2024

6 PBS Contracting Inc 1/24/2024 FRP Replacement Please provide the quantity of assumed replacement FRP panels required per A1231 note 13.

Refer to Specification Section 012200 - Unit Prices incorporated into Addendum No. 2 and PART C of Addendum No. 2 - Standard Bid Form - Rathskellar Kitchen Renovation & PART C of the Bid Scope in e-Builder

1/31/2024

7 PBS Contracting Inc 1/24/2024 Topping Concrete depth Please provide the assumed depth required for the concrete topping slab.

Typical quarry tile can range from 3/4" to over 2" depending on the mud bed.

Our assumed intend is that the adjacent surfaces will all align, but the concrete topping pricing varies significantly dependent upon the depth of the installation.

Floor tile investigated is 6x6” in a 3/16" - 1/4” mortar bed on a concrete slab, and tile is 3/8" thick. Corret assumption that adjacent surfaces should align.

1/31/2024

8 PBS Contracting Inc 1/24/2024 Gypsum board demolition Per F11 on D0201 please confirm that all wainscot and gypsum substrates should be removed back to the studs to facilitate new finishes.

Confirmed. Refer also to Note 16 on A1011 for stud types required at tiled locations.

1/31/2024

9 PBS Contracting Inc 1/24/2024 Metal Ceiling Pans A1021 finish schedule specifies "Design solution - Illusions" panels while the specifications call out "Celebration Snap-in" panels. Please clarify which product is the intended basis of design. Additionally, please confirm the intent is for solid panels for AMPC-1 and that the pattern on floor pan A0701 is strictly for clarity of the symbols.

Drawings reflect the preferred product. Specs will be corrected in an Addendum.

Majority of ceiling panels are to be solid per Virginia Health Department. Few panels with Note 21 on A0701 are indicated to be perforated as they are below exhaust locations.

1/31/2024

10 PBS Contracting Inc 1/24/2024 Card Readers T0101 Shows a card reader near the existing kitchen. This is not identified in the door hardware schedule or elsewhere in the drawings. Please advise if this is required.

Card reader is required. Door hardware set will be updated in an addendum. 1/31/2024

11 PBS Contracting Inc 1/24/2024 Existing DPL Loads Please confirm the existing panel feeders shall be re-terminated in Panel DPL and that the intent is not to install need feeders to these (8) panels.

Per E0521 New Work Riser Notes: Note 10. All existing feeders to be re-terminated in New Panel DPL.

1/31/2024

12 PBS Contracting Inc 1/24/2024 PVC Beverage Conduit Please confirm PVC is acceptable in this application. PVC is typically not acceptable within a plenum. 6" EMT is normally utilized in this application or a fire wrapped lineset.

PVC is not acceptable in this application. Piping routed within a plenum has to be plenum rated and PVC is not Plenum rated. The sprinkler piping shall be schedule 40 black steel.

1/31/2024

13 PBS Contracting Inc 1/24/2024 Siemens Scope of Work Has a scope of work been developed with GMU and Siemens for this project?

M0101 shows relocation of thermostats, a new thermostat and a motorized damper, all of which typically requires their support.

Refer to Attachment K - Siemens Scope of Work - 01.28.24 & Addendum No. 2 - Standard Bid Form - Rathskellar Kitchen Renovation documents of the solicitation and PART B of the Bid Scope within e-Builder

1/31/2024

14 PBS Contracting Inc 1/24/2024 Mechanical As-Builts Please provide mechanical as-builts to determine the extent of grease duct cleaning associated with demolition note 6 on M0101.

Refer to WBA Architecture Food Service Renovation Project Record Drawings - 03.23.2012

1/31/2024

15 PBS Contracting Inc 1/24/2024 Sprinkler coverage Please confirm FX0101 New Work plan accounts for the concrete T style ceiling in exposed ceiling area.

That's correct. The design takes into account the concrete T style ceiling in exposed ceiling area.

1/31/2024

16 PBS Contracting Inc 1/24/2024 AC0101 Please provide the location for the head end where 1" conduit needs to be routed. Please confirm if (1) 1" conduit home run needs to be run to the head end per camera or how many/what size conduit can facilitate this infrastructure.

Location of head end equipment is located in the tele/data room on the first floor. Refer to Mason SUB 1 Tele Dat Room Floor Plan - 01.30.24. Confirmed 1 each 1" conduit home run.

1/31/2024

17 PBS Contracting Inc 1/24/2024 Atlantic Coordination Please confirm that per Prebid Conference the GC/Contractor's responsibilities are limited to final connections of owner furnished (food service vendor) equipment. With the exception of the items noted existing to relocate/modify.

GC is not responsible for receipt of owner furnished food service equipment, removing from pallets, assembly, installation, etc.

GC responsibilities relative to food service equipoment are limited to final connections. Atlantic will remove and relocate the existing walk-in cooler. A new condensate line for the walk-in will be added in an addendum.

1/31/2024

George Mason University – Rathskellar Renovation Revised and Reissued: January 30, 2024 Fairfax Campus Addendum 002 CannonDesign Project No. 006193.03 GMU Project No. 181082

TABLE OF CONTENTS 000110 - 1

TABLE OF CONTENTS - LEGENDS

Author Legend

Abbreviation Firm Discipline

CD CannonDesign Architectural/MEP

GMU George Mason University Owner

A Allegion Door Hardware

Issue Legend

Package Abbreviation

Title Date Issued

ADD Addendum 002 January 30, 2024 Addendum 002

WD R3 Working Drawings November 22, 2023 Working Drawings Revision 3

WD R2 Working Drawings October 20, 2023 Working Drawings Revision 2

WD R1 Working Drawings September 13, 2023 Working Drawings Revision 1

WD Working Drawings August 4, 2023 Final

Appendix 1 – Asbestos and Lead Based Paint Survey Report

***All project forms can be found on Mason's Facilities Website by utilizing this link -https://facilities.gmu.edu/resources/heco-dgs-forms/***

Notes:

1. Sections without a date will be included in a future issuance.

2. Bold section number, title, and author indicates a revised section.

3. Bold date is the most recent issuance.

https://facilities.gmu.edu/resources/heco-dgs-forms/***

TABLE OF CONTENTS 000110 - 2

TABLE OF CONTENTS

Section # Section Title Author Date

000107 Seals Page CD 11/22/2023

000110 Table of Contents CD 01/30/2024

DIVISION 00 - PROCUREMENT AND CONTRACTING

REQUIREMENTS

DIVISION 01 – GENERAL REQUIREMENTS

011000 Summary CD 10/20/2023

012200 Unit Prices CD 01/30/2024

012500 Substitution Procedures CD 10/20/2023

012500.1 Substitution Request Form CD 10/20/23

013100 Project Management and Coordination CD 08/04/23

013100.1 Request for Information (RFI) Form CD 08/04/23

013200 Construction Progress Documentation CD 08/04/23

013233 Photographic Documentation CD 08/04/23

013300 Submittal Procedures CD 08/04/23

013300.1 Submittal Identification Sheet CD 08/04/23

013300.2 Contractor Certification Letter CD 08/04/23

013573 Delegated Design Procedures CD 08/04/23

014000 Quality Requirements CD 08/04/23

014110 Special Inspections and Testing CD 08/04/23

014200 References CD 08/04/23

016000 Product Requirements CD 08/04/23

016000.1 Substitution Request Form CD 08/04/23

017300 Execution CD 08/04/23

017329 Cutting and Patching CD 08/04/23

017700 Closeout Procedures CD 08/04/23

017823 Operation and Maintenance Data CD 08/04/23

017839 Project Record Documents CD 08/04/23

017900 Demonstration and Training CD 08/04/23

DIVISION 02 – EXISTING CONDITIONS

024119 Selective Demolition CD 10/02023

DIVISION 03 – CONCRETE

033540 Concrete Densifier/Sealer Treatment CD 08/04/23

035300 Concrete Topping CD 09/13/23

DIVISION 05 - METALS

055000 Metal Fabrications CD 08/04/23

TABLE OF CONTENTS 000110 - 3

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

061000 Rough Carpentry CD 08/04/23

062023 Interior Finish Carpentry CD 08/04/23

064023 Interior Architectural Woodwork CD 10/20/2023

DIVISION 07 – THERMAL AND MOISTURE PROTECTION

072100 Thermal Insulation CD 08/04/23

078413 Penetration Firestopping CD 08/04/23

079200 Joint Sealants CD 08/04/23

DIVISION 08 - OPENINGS

081113 Hollow Metal Doors and Frames CD 08/04/23

081216 Aluminum Frames CD 08/04/23

083113 Access Doors and Frames CD 08/04/23

083326 Overhead Coiling Grilles CD 08/04/23

083800 Traffic Doors CD 08/04/23

084113 Aluminum Frames CD 08/04/23

087100 Door Hardware A 08/04/23

088000 Glazing CD 08/04/23

DIVISION 09 - FINISHES

090561.13 Moisture Vapor Emission Control CD 10/20/2023

092216 Non-Structural Metal Framing CD 08/04/23

092900 Gypsum Board CD 08/04/23

093000 Tiling CD 08/04/23

093500 Chemical-Resistant Tiling CD 08/04/23

095113 Acoustical Panel Ceilings CD 08/04/23

095133 Acoustical Metal Pan Ceiling CD 01/30/2024

08/04/23

096513 Resilient Base and Accessories CD 08/04/23

097750 Sanitary Wall Panel Systems CD 08/04/23

098100 Acoustic Insulation and Sealants CD 08/04/23

099123 Interior Painting CD 08/04/23

099600 High-Performance Coatings CD 08/04/23

DIVISION 10 - SPECIALTIES

102600 Wall and Door Protection CD 08/04/23

104416 Fire Extinguishers CD 08/04/23

DIVISION 20 – COMMON WORK RESULTS

200525 Common Work Results, Division 21 – 28 CD 08/04/23

200530 Functional Performance Testing CD 08/04/23

TABLE OF CONTENTS 000110 - 4

200535 Systems Certification Common Work Results CD 08/04/23

DIVISION 21 – FIRE SUPPRESSION

210500 Common Work Results for Fire Suppression CD 08/04/23

211000 Water-Based Fire Suppression Systems CD 09/13/23

DIVISION 22 - PLUMBING

220500 Common Work Results for Plumbing CD 08/04/23

220523 General Duty Valves CD 08/04/23

220529 Hangers and Supports CD 08/04/23

220553 Identification for Plumbing Piping and Equipment CD 08/04/23

220700 Plumbing Insulation CD 08/04/23

221116 Domestic Water Piping CD 08/04/23

221119 Domestic Water Piping Specialties CD 08/04/23

221316 Sanitary Waste, Storm, and Vent Piping CD 08/04/23

221319 Sanitary Waste and Storm Piping Specialties CD 08/04/23

DIVISION 23 – HEATING, VENTILATING, AND AIR

CONDITIONING

230030 Electrical Requirements for Mechanical Equipment CD 08/04/23

230050 Basic Mechanical Materials and Methods CD 08/04/23

230130 HVAC Air Duct Cleaning CD 08/04/23

230500 Common Work Results for HVAC CD 08/04/23

230513 Common Motor Requirements for HVAC Equipment CD 08/04/23

230593 Testing, Adjusting, and Balancing for HVAC CD 08/04/23

230700 HVAC Insulation CD 08/04/23

233113 Metal Ducts CD 08/04/23

233300 Air Duct Accessories CD 08/04/23

233423 HVAC Power Ventilators CD 08/04/23

233713 Diffusers, Registers, and Grilles CD 10/20/2023

DIVISION 26 - ELECTRICAL

260011 Selective Removals, Relocations, and Rearrangements CD 10/20/23

260500 Common Work Results for Electrical CD 08/04/23

260505 Electrical Inspections and Testing CD 08/04/23

260519 Low Voltage Electrical Power Conductors and Cables CD 08/04/23

260523 Control Voltage Electrical Power Cables CD 08/04/23

260526 Grounding and Bonding CD 08/04/23

260533 Raceways CD 08/04/23

260535 Boxes and Cabinets CD 08/04/23

260553 Electrical Identification CD 08/04/23

260573 Protective Devices Coordination Studies CD 08/04/23

TABLE OF CONTENTS 000110 - 5

260923 Automatic Lighting Control Devices CD 08/04/23

262200 Low Voltage Transformers CD 08/04/23

262416 Panelboards CD 08/04/23

262800 Protective Devices CD 08/04/23

265119 Interior Lighting - LED CD 08/04/23

DIVISION 27 - COMMUNICATIONS

270000 General Communications Provisions CD 08/04/23

270500 Common Work Results for Communications CD 08/04/23

270526 Grounding and Bonding for Communications Systems GMU 08/04/23

270528 Conduit and Backboxes for Com Systems v5 GMU 08/04/23

271500 Non-Dorm Inside Plant Communications Systems duplex GMU 08/04/23

276013 Wireless Access Points for Data Communications GMU 08/04/23

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

280011 Selective Removals, Relocations, and Rearrangements CD 08/04/23

280500 Common Work Results for Electronic Safety and Security CD 08/04/23

283105 Fire Alarm System Extension CD 10/20/2023

END OF TABLE OF CONTENTS

TABLE OF CONTENTS 000110 - 6

THIS PAGE INTENTIONALLY LEFT BLANK

George Mason University - Rathskellar Renovation Issued: January 30, 2024 Fairfax Campus Addednum 002 CannonDesign Project No. 006193.03

SECTION 012200 - UNIT PRICES

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes administrative and procedural requirements for unit prices.

1.2 DEFINITIONS

A. Unit price is an amount incorporated into the Agreement, applicable during the duration of the Work as a price per unit of measurement for materials, equipment, or services, or a portion of the Work, added to or deducted from the Contract Sum by appropriate modification, if the scope of Work or estimated quantities of Work required by the Contract Documents are increased or decreased.

1.3 PROCEDURES

A. Unit prices include all necessary material, plus cost for delivery, installation, insurance, applicable taxes, overhead, and profit.

B. Measurement and Payment: See individual Specification Sections for work that requires establishment of unit prices. Methods of measurement and payment for unit prices are specified in those Sections.

C. Owner reserves the right to reject Contractor's measurement of work-in-place that involves use of established unit prices and to have this work measured, at Owner's expense, by an independent surveyor acceptable to Contractor.

D. If unit prices are stated in the Contract Documents or subsequently agreed upon, and if quantities originally contemplated are materially changed so that application of such unit prices to the actual quantities causes substantial inequity to the Owner or Contractor, the applicable unit prices shall be equitably adjusted.

E. Quantity Allowances: Coordinate unit prices with allowance adjustments in Section 012600 "Contract Modification Procedures."

F. List of Unit Prices: A schedule of unit prices is included in Part 3. Specification Sections referenced in the Part 3 "Schedule of Unit Prices" Article contain requirements for materials described under each unit price.

PART 2 - PRODUCTS (NOT USED)

PART 3 - EXECUTION

3.1 SCHEDULE OF UNIT PRICES

A. Unit Price No. 1:

1.

2.

END OF SECTION 012200

UNIT PRICES 012200 - 1

Description: Sanitary Wall Panel Systems: Account for six (6) each 4’ x 9’ existing FRP panels to be replaced. Exact quantity and location should be field verified with Client before and after installation of food service equipment.

Unit of Measurement: per panel.

George Mason University - Rathskellar Renovation Revised and Reissued: January 30, 2024

CannonDesign Project No. 006193.03

SECTION 095133 - ACOUSTICAL METAL PAN CEILINGS

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Acoustical metal pans and associated suspension system for interior ceilings.

B. Products furnished, but not installed, under this Section include anchors, clips, and other ceiling attachment devices to be cast in concrete.

1.2 PREINSTALLATION MEETINGS

A. Preinstallation Conference: Conduct conference at Project site.

1.3 ACTION SUBMITTALS

A. Product Data: For each type of product. Include procedure for cutting metal pans.

1. Include documentation indicating that product contains no urea formaldehyde in compliance with California Air Resources Board (CARB) regulations.

B. Samples for Initial Selection: For units with factory-applied finishes.

C. Samples for Verification: For each component indicated and for each exposed finish required, prepared on Samples of size indicated below:

1. Metal Pans: Set of 6-inch- square Samples of each type, finish, color, pattern, and texture. Show pan edge profile.

2. Exposed Suspension-System Members, Moldings, and Trim: Set of 6-inch- long Samples of each type, finish, and color.

3. Sound Absorber: Sample of each type matching size of Sample metal pan.

1.4 INFORMATIONAL SUBMITTALS

A. Coordination Drawings: Reflected ceiling plans, drawn to scale, on which the following items are shown and coordinated with each other, using input from installers of the items involved:

1. Suspended ceiling components.

2. Structural members to which suspension systems will be attached.

3. Size and location of access modules for acoustical panels.

4. Items penetrating finished ceiling including the following:

a. Lighting fixtures.

b. Air outlets and inlets.

c. Speakers.

d. Sprinklers.

e. Access panels.

5. Perimeter moldings.

B. Qualification Data: For testing agency.

C. Product Test Reports: For each acoustical metal pan ceiling, for tests performed by manufacturer and witnessed by a qualified testing agency.

D. Evaluation Reports: For each acoustical metal pan ceiling suspension system and anchor and fastener type.

E. Field quality-control reports.

ACOUSTICAL METAL PAN CEILINGS 095133 - 1

CannonDesign Project No. 006193.03

1.5 CLOSEOUT SUBMITTALS

A. Maintenance Data: For finishes to include in maintenance manuals.

1.6 MAINTENANCE MATERIAL SUBMITTALS

A. Furnish extra materials that match products installed and that are packaged with protective covering for storage and identified with labels describing contents.

1. Acoustical Metal Pans with Sound Absorber: Full-size units equal to 2 percent of quantity installed.

2. Suspension-System Components: Quantity of each grid, exposed molding, and trim equal to 2 percent of quantity installed.

3. Hold-Down Clips: Equal to 2 percent of quantity installed.

1.7 QUALITY ASSURANCE

A. Testing Agency Qualifications: Qualified according to NVLAP for testing indicated.

B. Mockups: Build mockups to verify selections made under Sample submittals, to demonstrate aesthetic effects, and to set quality standards for materials and execution.

1. Build mockup of typical ceiling area as indicated on Drawings.

2. Subject to compliance with requirements, approved mockups may become part of the completed Work if undisturbed at time of Substantial Completion.

1.8 DELIVERY, STORAGE, AND HANDLING

A. Deliver acoustical metal pans, suspension-system components, and accessories to Project site in original, unopened packages and store them in a fully enclosed, conditioned space where they are protected against damage from moisture, humidity, temperature extremes, direct sunlight, surface contamination, and other causes.

B. Handle acoustical metal pans, suspension-system components, and accessories carefully to avoid damaging units and finishes in any way.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS

A. Surface-Burning Characteristics: Comply with ASTM E84; testing by a qualified testing agency.

Identify products with appropriate markings of applicable testing agency.

1. Flame-Spread Index: Comply with ASTM E1264 for Class A materials.

2. Smoke-Developed Index: 450 or less.

2.2 ACOUSTICAL METAL PANS, GENERAL

A. Recycled Content of Aluminum Components: Postconsumer recycled content plus one-half of preconsumer recycled content not less than 50 percent.

B. Sound-Absorbent Fabric Layer: Provide fabric layer, sized to fit concealed surface of pan, and consisting of black, nonwoven, nonflammable, sound-absorbent material with surface-burning characteristics for flame-spread index of 25 or less and smoke-developed index of 50 or less, as determined by testing according to ASTM E84.

1. Bond fabric layer to panels in the factory with manufacturer's standard nonflammable adhesive.

ACOUSTICAL METAL PAN CEILINGS 095133 - 2

CannonDesign Project No. 006193.03

2.3 ALUMINUM PANS FOR ACOUSTICAL METAL PAN CEILING

A. Basis of Design: Provide Ceilings Plus Design Solutions IllusionsCelebration Snap-In Metal Panels by USG Corporation, or subject to compliance with requirements, provide products by one of the following:

1. American Decorative Ceilings (ADC).

2. Armstrong Ceiling & Wall Solutions.

3. Certainteed; SAINT-GOBAIN.

4. Gage Corporation International (The).

5. Lindner AG.

6. Rockfon (Rockwool International).

B. Classification: Units complying with ASTM E1264 for Type VII, perforated aluminum facing (pan) with mineral- or glass-fiber-base backing.

1. Pattern A: (Perforated, regularly spaced large holes), arranged in diagonal alignment to pan edge with uniform perforations of dimension, holes per square foot or inch, and percent open area as 39 percent.

2. Pattern: unperforated.

C. Pan Fabrication: Manufacturer's standard units of size, profile, and edge treatment indicated, formed from metal indicated and finished to comply with requirements indicated.

1. Torsion-Spring-Hinged Pans: Designed to be securely retained in preslotted, exposed suspension grid by torsion springs provided by manufacturer.

D. Pan Thickness: Not less than 0.019 inch.

E. Pan Edge Detail: Manufacturer's standard edge detail.

F. Pan Joint Detail: Butt.

G. Pan Size: 24 by 48 inches.

H. Pan Face Finish: Painted in color selected from manufacturer's full range.

2.4 METAL SUSPENSION SYSTEMS, GENERAL

A. Metal Suspension System Standard: Provide manufacturer's standard metal suspension systems of types, structural classifications, and finishes indicated that comply with applicable ASTM C635/C635M requirements.

B. Suspension Systems: Provide systems complete with carriers, runners, splice sections, connector clips, alignment clips, leveling clips, hangers, molding, trim, retention clips, load-resisting struts, and other suspension components required to support ceiling units and other ceiling-supported construction.

C. Attachment Devices: Size for 5 times the design load indicated in ASTM C635/C635M, Table 1, Direct Hung, unless otherwise indicated. Comply with seismic design requirements.

D. Expansion Anchors: Fabricated from corrosion-resistant materials, with allowable load or strength design capacities calculated according to ICC-ES AC193 and ACI 318 greater than or equal to the design load, as determined by testing per ASTM E488/E488M conducted by a qualified testing agency.

E. Wire Hangers, Braces, and Ties: Provide wires complying with the following requirements:

1. Zinc-Coated, Carbon-Steel Wire: ASTM A641/A641M, Class 1 zinc coating, soft temper.

2. Stainless Steel Wire: ASTM A580/A580M, Type 304, nonmagnetic.

3. Nickel-Copper-Alloy Wire: ASTM B164, nickel copper alloy for UNS No. N04400 alloy.

4. Size: Select wire diameter so its stress at 3 times the hanger design load indicated in

ASTM C635/C635M, Table 1, Direct Hung, is less than yield stress of wire, but provide not less than 0.135-inch- diameter wire.

ACOUSTICAL METAL PAN CEILINGS 095133 - 3

http://www.specagent.com/LookUp/?uid=123457219345&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457219390&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457219506&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457219349&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457219354&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457219348&mf=04&src=wd

CannonDesign Project No. 006193.03

F. Exposed Metal Edge Moldings and Trim: Provide exposed members as indicated or as required to comply with seismic requirements of authorities having jurisdiction, to conceal edges of and penetrations through ceiling, to conceal edges of pans and runners, for fixture trim and adapters, for fasciae at changes in ceiling height, and for other conditions; of metal and finish matching acoustical metal pan ceiling units unless otherwise indicated.

1. For Circular Penetrations of Ceiling: Fabricate edge moldings to diameter required to fit penetration exactly.

2.5 METAL SUSPENSION SYSTEM FOR ACOUSTICAL, STANDARD-GRID METAL PAN

CEILING

A. Basis of Design: Provide Ceilings Plus Design Solutions IllusionsCelebration Torsion Spring System by USG Corporation, or subject to compliance with requirements, provide products by one of the following:

1. Armstrong Ceiling & Wall Solutions.

2. Certainteed; SAINT-GOBAIN.

3. Rockfon (Rockwool International).

4. USG Corporation.

B. Suspension System: For torsion-spring-hinged pans.

1. Suspension System for Torsion-Spring-Hinged Metal Pans: Provide runners with factory-cut slots fabricated to accept torsion-spring-hinged attachment.

2.6 METAL SUSPENSION SYSTEM FOR ACOUSTICAL SNAP-IN METAL PAN CEILING

A. Manufacturers: Subject to compliance with requirements, provide products by snap-in metal pan ceiling manufacturer.

B. Indirect-Hung, Snap-Tee System: Designed to support metal pans that snap into main runners, consisting of main runners connected to carrying channels that are attached by hangers to building structure, and complying with the following requirements:

1. Main Runners: Formed from the following metal:

a. Aluminum Sheet: Alloy and temper recommended by aluminum producer and finisher for type of use indicated and manufacturer's standard finish, complying with ASTM B209.

b. Electrolytic Zinc-Coated Steel Sheet: ASTM A879/A879M, with not less than 08Z zinc coating.

c. Hot-Dip Galvanized Steel: ASTM A653/A653M, with not less than G60 zinc coating.

d. Stainless Steel Sheet: ASTM A240/A240M or ASTM A666, Type 302 or Type 304, stretcher leveled, with cold-rolled mill finish.

e. Metal Sheet: Metal as standard with ceiling system manufacturer, with factory-applied protective finish complying with ASTM C635/C635M.

2. Carrying Channels:

a. Same member and metal as indicated for main runners.

2.7 ACOUSTICAL SEALANT

A. See section 098100 - Acoustic Insulation and Sealants.

2.8 GENERAL FINISH REQUIREMENTS

A. Protect mechanical finishes on exposed surfaces from damage by applying a strippable, temporary protective covering before shipping.

ACOUSTICAL METAL PAN CEILINGS 095133 - 4

http://www.specagent.com/LookUp/?uid=123457219392&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457219380&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457219381&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457219382&mf=04&src=wd

CannonDesign Project No. 006193.03

B. Appearance of Finished Work: Noticeable variations in same piece are not acceptable.

Variations in appearance of adjoining components are acceptable if they are within the range of approved Samples and are assembled or installed to minimize contrast.

C. High-Humidity Finish: Comply with ASTM C635/C635M requirements for "Coating Classification for Severe Environment Performance" where high-humidity finishes are indicated.

2.9 ALUMINUM FINISHES

A. Color-Coated Finish: Manufacturer's standard baked paint complying with coating manufacturer's written instructions for surface preparation, pretreatment, application, baking, and minimum dry film thickness.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine substrates, areas, and conditions, including structural framing to which acoustical metal pan ceilings attach or abut, with Installer present, for compliance with requirements specified in this and other Sections that affect ceiling installation and anchorage and with requirements for installation tolerances and other conditions affecting performance of acoustical metal pan ceilings.

B. Prepare written report, endorsed by Installer, listing conditions detrimental to performance of the Work.

C. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 PREPARATION

A. Measure each ceiling area and establish layout of acoustical metal pans to balance border widths at opposite edges of each ceiling. Avoid using less-than-half-width pans at borders, and comply with layout shown on reflected ceiling plans and coordination drawings.

3.3 INSTALLATION

A. General: Install acoustical metal pan ceiling assemblies to comply with ASTM C636/C636M and manufacturer's written instructions.

B. Suspend ceiling hangers from building's structural members and as follows:

1. Install hangers plumb and free from contact with insulation or other objects within ceiling plenum that are not part of supporting structure or of ceiling suspension system.

2. Splay hangers only where requiredto miss obstructions; offset resulting horizontal forces by bracing, countersplaying, or other equally effective means.

3. Where width of ducts and other construction within ceiling plenum produces hanger spacings that interfere with location of hangers at spacings required to support standard suspension-system members, install supplemental suspension members and hangers in form of trapezes or equivalent devices.

4. Secure wire hangers to ceiling suspension members or carrying channels and to supports above with a minimum of three tight turns. Connect hangers directly either to structures or to inserts, eye screws, or other devices that are secure and appropriate for substrate and that do not deteriorate or otherwise fail due to age, corrosion, or elevated temperatures.

5. Secure flat, angle, channel, and rod hangers to ceiling suspension members or carrying channels and to structure, including intermediate framing members, by attaching to inserts, eye screws, or other devices that are secure and appropriate for both structure to which hangers are attached and the type of hanger involved. Install hangers in a manner that does not cause them to deteriorate or fail due to age, corrosion, or elevated temperatures.

ACOUSTICAL METAL PAN CEILINGS 095133 - 5

CannonDesign Project No. 006193.03

6. Do not support ceilings directly from permanent metal forms or floor deck. Fasten hangers to cast-in-place hanger inserts, postinstalled mechanical or adhesive anchors, or power-actuated fasteners that extend through forms into concrete.

7. When steel framing does not permit installation of hanger wires at spacing required, install carrying channels or other supplemental support for attachment of hanger wires.

8. Do not attach hangers to steel deck tabs.

9. Do not attach hangers to steel roof deck. Attach hangers to structural members.

10. Space hangers not more than 48 inches o.c. along each member supported directly from hangers unless otherwise indicated; provide hangers not more than 8 inches from ends of each member.

11. Size supplemental suspension members and hangers to support ceiling loads within performance limits established by referenced standards and publications.

C. Secure bracing wires to ceiling suspension members or carrying channels and to supports with a minimum of four tight turns. Suspend bracing from building's structural members as required for hangers, without attaching to permanent metal forms, steel deck, or steel deck tabs. Fasten bracing wires into concrete with cast-in-place or postinstalled anchors.

D. Install edge moldings and trim of type indicated at perimeter of acoustical ceiling area and where necessary to conceal edges of acoustical metal pans.

1. Apply acoustical sealant in a continuous ribbon concealed on back of vertical legs of moldings before they are installed.

2. Screw attach moldings to substrate at intervals not more than 16 inches o.c. and not more than 3 inches from ends, leveling with ceiling suspension system to a tolerance of 1/8 inch in 12 feet. Miter corners accurately and connect securely.

3. Do not use exposed fasteners, including pop rivets, on moldings and trim.

E. Install suspension-system runners so they are square and securely interlocked with one another. Remove and replace dented, bent, or kinked members.

F. Cut acoustical metal pan units for accurate fit at borders and at interruptions and penetrations by other work through ceilings. Stiffen edges of cut units as required to eliminate evidence of buckling or variations in flatness exceeding referenced standards for stretcher-leveled metal sheet. Cut and treat edges to comply with manufacturer's written instructions.

G. Install acoustical metal pans in coordination with suspension system and exposed moldings and trim. Comply with manufacturer's installation tolerances.

1. For pans, position pans according to manufacturer's written instructions.

2. Align joints in adjacent courses to form uniform, straight joints parallel to room axis in both directions unless otherwise indicated.

3. Fit adjoining units to form flush, tight joints.

4. Install directionally patterned or textured metal pans in directions indicated.

H. Install sound attenuation panels in areas indicated by reflected ceiling plans or room finish schedules. Lay panels directly on ceiling system and close major openings to form complete coverage in required areas. Lay second sound-absorbent pads on sound attenuation panels.

I. Install hold-down clips where indicated.

3.4 FIELD QUALITY CONTROL

A. Special Inspections: Engage a qualified special inspector to perform the following special inspections:

1. Seismic design compliance.

B. Testing Agency: Engage a qualified testing agency to perform tests and inspections.

ACOUSTICAL METAL PAN CEILINGS 095133 - 6

CannonDesign Project No. 006193.03

C. Perform the following tests and inspections of completed installations of acoustical metal panel ceiling hangers, anchors, and fasteners in successive stages. Do not proceed with installations of acoustical metal panel ceiling hangers for the next area until test results for previously completed installations show compliance with requirements.

1. Extent of Each Test Area: When installation of ceiling suspension systems on each floor has reached 20 percent completion, but no panels have been installed.

a. Within each test area, testing agency selects one of every 10 power-actuated fasteners and postinstalled anchors used to attach hangers to concrete and tests them for 200 lbf of tension; it also selects one of every two postinstalled anchors used to attach bracing wires to concrete and tests them for 440 lbf of tension.

b. When tested fasteners and anchors do not comply with requirements, testing agency tests those fasteners and anchors not previously tested until 20 pass consecutively and then resumes initial testing frequency.

D. Acoustical metal panel ceiling hangers, anchors, and fasteners will be considered defective if they do not pass tests and inspections.

E. Prepare test and inspection reports.

3.5 CLEANING

A. Clean exposed surfaces of acoustical metal pan ceilings, including trim and edge moldings, after removing strippable, temporary protective covering, if any. Comply with manufacturer's written instructions for stripping of temporary protective covering, cleaning, and touchup of minor finish damage. Remove and replace ceiling components that cannot be successfully cleaned and repaired to permanently eliminate evidence of damage, including dented and bent units.

END OF SECTION 095133

ACOUSTICAL METAL PAN CEILINGS 095133 - 7

T H

R O

A T

D

IM

E

Q U

A L S

P A

R T

IT

IO

N

T H

IC

K

N E

S S

P

L U

S

/8

(T Y

P

/1

V A

R

IE

S

2" 5/8"

PARTITION (TYP) UNO

4" @ PERPENDICULAR

00F

DOOR PANEL TYPES DOOR FRAME CONFIGURATIONS

B1/A1021

B1/A1021

B1/A1021

PANEL KEY

PANEL A

TYPE

PANEL B

TYPE

OPENING WIDTH

PANEL A

WIDTH

PANEL B

WIDTH

OPENING

WIDTH

H E

IG

H

T

FG-1 F

4" 4"

STANDARD FRAME

GL

CLEAR ACRYLIC

M

A X

ANV-2 OHCG

STOREFRONT SYSTEM W/HINGED

DOUBLE H.M. DOOR W/FULL LITE,

SIDELITE AND ARCHED TRANSOM

DOUBLE ACTING DOOR

W/ 9"x14" CLR. ACRYLIC

VISION LITE

OVERHEAD

COILING GRILLE

TEMPERED GLAZING

5" 6"

9"

NV-1

3"8"

GL A3/A1021 B4/A1021

A4/A1021

A5/A1021

SSTL

SSTL

INTEGRAL

INTEGRAL

SSTL

SSTL

FRAME ALUM BLACK

DOOR HARDWARE

PROJECT SPECIFIC

1. SEE INTERIOR ELEVATIONS A0601, A0602 AND REFLECTED CEILING PLAN (SHEET

A0701 FOR SPECIFIC LOCATIONS OF WALL AND CEILING FINISHES.

2. ALL GYPSUM BOARD TO BE 5/8" THICK TAPED, SPACKLED, SANDED AND READY FOR

FINISH AS SPECIFIED.

3. INSTALL 5/8" CEMENT BOARD AT ALL LOCATIONS SCHEDULED TO RECEIVE WALL

TILE.

4. ALL THRESHOLDS TO BE ADA COMPLIANT (1/2" MAX HEIGHT)

5. REFER SHEET A1021 FOR FINISHES SPECIFICATIONS.

6. REFER SHEET A0800 FOR DETAILS.

7. ALL OUTSIDE CORNER TRIM (FRP) TO BE 1-1/2"x1-1/2" TYPE, TYPICAL, UNLESS

NOTED OTHERWISE.

8. CONTRACTOR SHALL INSTALL MOISTURE RESISTANT GYP. BD. ON ALL INTERIOR

SURFACES OF THE KITCHEN.

9. FRP TO STOP AT THE TOP OF TILE BASE. DO NOT EXTEND FRP BEHIND QUARRY

TILE BASE.

10. PATCH FLOORS WHERE NECESSARY PRIOR TO APPLYING SELF-LEVELING

CONCRETE TOPPING.

11. INTERIOR FINISH REQUIREMENTS SHALL CONFORM TO APPLICABLE BUILDING

CODES FOR THIS USE GROUP (A-2) AS FOLLOWS.

12. GC TO FIELD COORDINATE WITH OWNER QUANTITY AND LOCATION OF FRP PANELS

TO BE REPLACED PRIOR TO, AND AFTER INSTALLATION OF FOOD SERVICE

EQUIPMENT.

ROOMS AND ENCLOSED SPACES:CLASS C

1. GC TO PROVIDE ALL MATERIAL CERTIFICATIONS TO INSPECTORS.

2. GC TO PROVIDE SUBMITTALS OF ALL FINISHES TO BE INSTALLED IN THE SPACE TO

THE ARCHITECT FOR APPROVAL PRIOR TO PURCHASE.

3. GC TO FURNISH 5% EXTRA FOR ALL MATERIALS SPECIFIED TO THE OWNER FOR

STORAGE.

4. MATERIAL SOURCES ARE FOR REFERENCE. GC MAY PROVIDE EQUAL SOURCES

FOR ALL FINISH MATERIALS. PROVIDE SUBMITTALS TO THE ARCHITECT FOR

APPROVAL PRIOR TO ORDERING.

1. EACH SUB-TRADE SHALL BE RESPONSIBLE FOR REVIEWING ENTIRE SET OF

DRAWINGS, VISITING JOB SITE AND NOTING HIS/HER WORK AS APPLICABLE.

WORK INDICATED OR INFERRED IN DRAWING SHALL BE DEEMED UNDERSTOOD

AND SHALL BE INCLUDED IN SUBCONTRACTOR'S COST. SAME SHALL APPLY TO

GENERAL CONTRACTOR.

2. ANY DISCREPANCIES REQUIRING FURTHER COORDINATION OR CORRECTION

FOUND DURING CONTRACTOR'S DRAWING REVIEW ARE TO BE BROUGHT TO

ARCHTECT'S ATTENTION IN WRITING.

3. FABRICATOR/MILLWORKER OF ALL MILLWORK DOORS & CABINETRY TO FURNISH

AND INSTALL ALL NECESSARY HARDWARE NOT SPECIFIED ON DRAWINGS AND TO

SUBMIT CATALOG CUTS & SAMPLES OF ALL HARDWARE FOR ARCHITECT'S

APPROVAL.

4. TOP OF CONCRETE FLOOR SLAB IS REFERENCE DATUM FOR DOOR FRAME AND

CEILING HEIGHTS.

5. FLOOR SLAB AT DOOR OPENING TO BE LEVEL, PLUMB & TRUE WITHIN A

TOLERANCE LEVEL OF 0" TO 1/16". FLASH PATCH AS REQUIRED TO MAINTAIN

LEVEL DOOR SWEEP.

6. REINFORCE ALL NEW DOORS & FRAMES TO RECEIVE HARDWARE AS SPECIFIED

ON DOOR HARDWARE SCHEDULE.

7. ALL HOLLOW METAL FRAMES SHALL BE 16 GA. WELDED WITH FOUR JAMB CLIPS

PER SIDE. ALL WELDS TO BE GRIND DOWN TO A SMOOTH FINISH & PRIMED TO

RECEIVE PAINT FINISH (U.O.N.). USE OF KNOCK DOWN FRAMES WITH MITERED

CORNERS TO BE APPROVED BY CLIENT & ARCHITECT. REINFORCE & PREPARE

FRAMES AT HARDWARE LOCATIONS AS SPECIFIED ON DOOR HARDWARE

SCHEDULE.

8. HOLLOW METAL FRAMES, DOORS & HARDWARE IN FIRE RATED PARTITIONS HAVE

TO BE FIRE RATED. FRAMES HAVE TO BE WELDED AND DOORS TO BE UL

LABELED.

9. FURNISH & INSTALL DOUBLE STUDS, FULL HEIGHT WITH DIAGONAL BRACING AT

BOTH JAMB SIDES OF DOOR FRAME & DOOR FRAME HEADER.

10. ALL DOORS SHALL BE INSTALLED 6" AWAY FROM ADJACENT PARTITION TO CLEAR

DAYLIGHT/FACE OF ADJACENT JAMB (UNLESS OTHERWISE NOTED ON PLAN).

11. ALL NEW FLUSH HOLLOW METAL DOORS SHALL BE 18 GA. (U.O.N.). ALL EDGES

WELDS TO BE GRIND DOWN TO A SMOOTH FINISH, SHOP PRIMED, AND FIELD

PAINTED AS SPECIFIED ON FINISH PLAN, U.O.N.

12. ALL MECHANICAL ROOM DOORS TO BE SOUND PROOF (U.O.N.).

13. FOR TYPES OF ALL DOOR HARDWARE, SEE HARDWARE SCHEDULE. DOOR

HARDWARE AND RELATED METAL FINISH ACCESSORIES SHALL HAVE US 626

FINISH (U.O.N.).

14. ALL HARDWARE INDICATED IS PER ONE LEAF (U.O.N.).

15. ALL NEW DOORS UP TO 3'-0"W x 7'-0"H (U.O.N.) TO RECEIVE 1-1/2 PAIR OF HINGES

(BUTTS). ALL LARGER DOORS TO RECEIVE 2 PAIRS OF HINGES.

16. NEW DOOR CLOSERS TO BE ADJUSTED TO BE 90 DEGREES IN OPEN POSITION.

17. NEW INTEROR SWING, SLIDING OR FOLDING DOORS WITH EXCEPTION OF FIRE

RATED DOORS SHALL HAVE PUSH/PULL OPENING FORCE OF 5.0 POUNDS

MAXIMUM. THIS FORCE DOES NOT APPLY TO FORCE REQUIRED TO RETRACT

LATCH BOLTS OR DISENGAGE OTHER DEVICES THAT HOLD DOOR IN CLOSED

POSITION.

18. FURNISH & INSTALL STRIKE PLATES WITH STRIKE BOXES AT EVERY NEW DOOR

JAMB AS PART OF LATCHSET, LOCKSET AND DEADBOLT. ALL ACCESSORIES TO

MATCH LOCKSET.

19. KEYS & KEYING TO BE DONE ACCORDING TO BUILDING AND CLIENT'S

REQUIREMENTS. A COMPLETE KEYING SCHEDULE IS TO BE PROVIDED TO CLIENT.

COORDINATE WITH BUILDING MANAGEMENT FOR KEYING VENDOR

REQUIREMENTS.

20. SAVE AND REUSE EXISTING ACCESSORIES AS FEASIBLE.

21. ALL DOORS MUST OPEN TO A FULL 90 (OR 180 WHERE INDICATED).

22. MAINTAIN A 3" MINIMUM (UNLESS OTHERWISE SHOWN IN PLAN) BETWEEN DOOR

JAMB AND ADJACENT PARTITION.

23. ALL GLASS DOOR LITES, GLASS SIDELITES, AND GLASS TRANSOMS TO HAVE

TEMPERED GLASS.

24. HAND ACTIVATED DOOR OPENING HARDWARE SHALL BE CENTERED BETWEEN 30

INCHES AND 44 INCHES ABOVE THE FLOOR.

25. FIELD VERIFY EXISTING WALL FOR THROAT DIMENSION OF FRAME WHERE A NEW

DOOR IS INSTALLED IN AN EXISTING WALL.

26. PROVIDE AND INSTALL DOOR HARDWARE AS INDICATED ON DOOR SCHEDULE.

ALL HARDWARE TO BE ADA COMPLIANT.

27. ALL NEW LOCKS SHALL BE KEYED INDIVIDUALLY. ALL NEW LOCKS TO BE KEYED

TO BUILDING MASTER.

28. CLOSERS SHALL HAVE AN OPENING FORCE NOT EXCEEDING 5 LBS.

29. THRESHOLDS SHALL NOT BE GREATER THAN 1/2" IN TOTAL HEIGHT WITH THE

LEADING EDGES BEVELED OR SLOPED AT AN ANGLE NOT EXCEEDING 45

DEGREES SO THAT NO SINGLE VERTICAL CHANGE OF ELEVATIONS EXCEEDS 1/4".

30. GENERAL CONTRACTOR AND HARDWARE SUPPLIER SHALL BE RESPONSIBLE FOR

COORDINATING ALL LOCKING, LATCHING AND KEYING REQUIREMENTS FOR

TENANT USE AND SECURITY WITH OWNER REPRESENTATIVE PRIOR TO

PURCHASE AND INSTALLATION.

31. ALL LOCKSETS SHALL BE KEYED IN ACCORDANCE WITH THE OWNER

REQUIREMENTS. KEYS ARE TO BE DELIVERED TO OWNER PROPERLY TESTED

AND/OR TAGGED. THE NUMBER OF MASTER AND PASS KEYS SHALL BE

COORDINATED WITH THE OWNER.

32. ALL NEW DOORS ARE TO BE PROVIDED WITH THE MANUFACTURERS' WARRANTY.

33. PROVIDE AND INSTALL DOOR HARDWARE AS INDICATED ON DOOR SCHEDULE.

ALL HARDWARE TO BE ADA COMPLIANT.

OWNER CORE REQUIREMENTS

1. LOCKSETS AND LATCHES SHALL BE BASIS OF DESIGN BEST 9K EXTRA HEAVY-

DUTY CYLINDRICAL WITH BEST 7-PIN INTERCHANGEABLE CORE TO MATCH

EXISTING PRODUCT THROUGHOUT THE CAMPUS. LOCKSET AND CORES TO BE OF

THE SAME MANUFACTURER TO MAINTAIN COMPLETE LOCKSET WARRANTY.

1.

DOORS GENERAL NOTES

FINISHES GENERAL NOTES

1. ALL FINISHES SHOWN ON DRAWINGS AND DESCRIBED IN NOTES AND LEGENDS

MUST BE MAINTAINTED. ANY DISCREPANCY MUST BE IDENTIFIED IMMEDIATELY TO

ARCHITECT FOR APPROVAL AND FIELD ADJUSTMENT PRIOR TO INSTALLATION OF

ANY PERMANENT WORK.

2. REFER TO FINISH LEGEND, FINISH PLANS, ARCHITECTURAL PLANS, REFLECTED

CEILING PLANS, ELEVATIONS, DETAILS, AND PROJECT MANUAL FOR ADDITIONAL

INFORMATION.

3. A FINISH TAG IN THE CENTER OF A ROOM INDICATES THAT ALL WALLS AND/OR

FLOOR SURFACES ARE TO RECEIVE SAME FINISH U.N.O.

4. DIMENSIONS ARE TAKEN FROM CENTERLINE OF STRUCTURE, OR FINISHED FACE

OF PARTITIONS U.N.O. SEE PARTITION TYPES SHEETS (A1000 SERIES) FOR

PARTITION THICKNESS AND MATERIALS.

5. PROVIDE CLEAR SILICONE SEALANT JOINTS AT JUNCTION OF ALL PLUMBING

FIXTURES AND COUNTERTOPS TO A WALL SURFACE.

6. ALL PAINTED DRYWALL SURFACES TO RECEIVE A MINIMUM OF ONE COAT PRIMER

AND TWO COATS OF PAINT PER FINISH STATED U.N.O.

7. PAINT FINISHES FOR ALL: CEILING AND SOFFITS = FLAT, GYP WALLS AND

COLUMNS = EGGSHELL, METAL WOOD SURFACES & TOILET WALLS = SEMIGLOSS

8. PRIOR TO PAINTING EXISTING METAL DOOR FRAMES, SCRAPE, SAND, FILL VOIDS,

AND SPOT PRIME WHERE PAINT HAS BEEN PREVIOUSLY CHIPPED OFF, WHERE

HARDWARE HAS BEEN REMOVED, AND WHERE DENTED, TO PROVIDE A SMOOTH

FINISH SURFACE.

9. HOLLOW METAL FRAMES SCHEDULED TO RECEIVE PAINT FINISH SHALL RECEIVE

A PRIMER COAT AND TWO COATS OF LOW-LUSTER ENAMEL.PROVIDE FINISH AT

ALL WALLS THAT ARE EXPOSED TO VIEW BEHIND APPLIED MILLWORK, PANELS,

ETC. DUE TO REVEALS, JOINTS, AND OTHER CONDITIONS.

10. PROVIDE FINISH AT ALL WALLS THAT ARE EXPOSED TO VIEW BEHIND APPLIED

MILLWORK, PANELS, ETC. DUE TO REVEALS, JOINTS, AND OTHER CONDITIONS.

11. DUCTWORK BEHIND GRILLES, REGISTERS, DIFFUSERS, ETC WHICH ARE EXPOSED

TO VIEW THROUGH THE UNITS, TO RECEIVE ONE COAT PRIMER AND ONE FINISH

COAT OF FLAT WHITE PAINT.

12. FACE OF GRILLES, DIFFUSERS, ACCESS PANELS, ETC. TO BE PAINTED TO MATCH

ADJACENT SURFACE. CONTRACTOR TO COORDINATE WITH ARCHITECT FOR

COLOR APPROVAL.

13. ALL HOLLOW METAL DOOR FRAMES TO RECEIVE PAINTABLE CAULKING AROUND

FRAME AND DRYWALL JOINT.

14. FEATHER UP ALL DISSIMILAR MATERIALS TO ALIGN FLOORING MATERIAL, REFER

TO PROJECT MANUAL FOR MORE INFORMATION.

15. ALL EXPOSED CONCRETE FLOORS TO BE SEALED U.N.O. REFER TO PROJECT

MANUAL FOR MORE INFORMATION.

16. CONTRACTOR TO PROVIDE EPOXY GROUT AT ALL FLOOR AND WALL TILE

17. ALL EXPOSED SCREW HEADS, GRILLES, REGISTERS, ACCESS PANELS, SPEAKERS,

FIRE EQUIPMENT, COVER PLATES, SPRINKLER CAPS, ETC TO MATCH ADJACENT

FINISH WHEN POSSIBLE OR U.N.O. CONFIRM FINISH WITH ARCHITECT IF

ADJACENT COLOR MATCH NOT POSSIBLE.

/8

/8

-3

/4

F .O

F .H

. D .L

.O

4" .

D.L.O F.W.

F.O.

3/8". 1-3/4".

/8

-3 /4

4".

1-3/4".

17/32".

4".

3/32".

1-3/4".

-1

/8

-3

/4

1-3/4".

3/32".

4".

17/32".

-3

/4

-1

/8

-3

/4

/8

4".

D .O H

/1

/2

/3

3" = 1'-0" B1

HM PROFILE

Checked by:Project No.:

Drawing Title:

© 2022 The Cannon Corporation.

T h e C a n n o n C o rp o ra ti o n

A ll ri g h ts r e s e rv e d N o p a rt o f th is d o c u m e n t m a y b e r e p ro d u c e d o r u ti liz e d i n a n y f o rm w it h o u t p ri o r w ri tt e n a u th o ri z a ti o n b y T h e C a n n o n C o…