Addendum No. 1 - Pre-Bid Meeting Documents.pdf
PDF 3 MB Posted
- Attached to
- Rathskellar Kitchen Renovation - 247-181082
- Solicitation number
- 55606
- Issued by
- Fairfax County, Fairfax City, Virginia
About this file
This document is an Addendum No. 1 to the Invitation for Bid (IFB) for the GMU Rathskellar "Eaterie" Renovation project, issued by George Mason University Facilities Administration. The addendum provides project clarifications and revisions, including details on the pre-bid meeting agenda and minutes, bid and project schedule, bidding requirements, and site logistics. The project involves renovations to the Rathskellar dining venue in the Student Union Building, with the renovated space to offer hot and cold meals as well as a grab-and-go component. The bid submission deadline is February 8, 2024, with a contract award and notice to proceed scheduled for February 19, 2024. Substantial completion is targeted for July 15, 2024. The addendum also covers details on material storage, work hours, site cleanliness, shutdowns, inspections, parking, and coordination with other contractors.
The project is not subject to prevailing wages, and George Mason University's tax-exempt status does not extend to contractors. Bidders must be registered with eVA, the Commonwealth's procurement portal, and are responsible for any associated fees. The addendum includes several attachments, such as the pre-bid meeting minutes and sign-in sheets, as well as site photos to provide additional context for the project.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Facilities 10402 Rivanna River Way
Fairfax, VA 22030 Phone: (703) 993-2520
ADDENDUM NO. 1
Project No: 247-181082 Project: Rathskellar Kitchen Renovation
George Mason University Purchasing & Fiscal Services Facilities Administration Building 4400 University Drive – MSN 1E4 Fairfax, Virginia 22030-4444
Date: 19 January 2024
From: Michele Kelly, VCCO Contract Specialist 703.993.4019
To: All Potential Bidders
Addendum No. 1 is being issued to provide all bidders with the following project clarifications and/or revisions:
• CannonDesign Addendum No. 1 Narrative dated 19 January 2024
• Optional Pre-Bid Meeting Agenda
• Optional Pre-Bid Meeting Minutes
Bidders must acknowledge receipt of Addendum No. 1 with their Bid Submission. Bid Submission Due Date is 08 February 2024 by 2:00pm.
Except as amended or clarified herein, all terms, conditions and provisions of the original Invitation for Bid (IFB) remains unchanged, and all changes and clarifications stated above and within this Addendum are hereby made part of the IFB Requirements and Contract Documents, and shall be taken into account in the preparation of the bid submission and the execution of all work.
Acknowledgment
(signature) (date)
(company)
Addendum No. 001 01/19/2024 Page 1 of 1
ADDENDUM
No. 001 Date: 1/19/2024
Project No. GMU # 181082; CD # 6193.03 Attention: George Mason University
Project Name: GMU Rathskellar “Eaterie” Renovation Address: Facilities Administration
4400 University Drive MS1E4
Fairfax, VA 22030
Issued By: Carrie Parker, CannonDesign
Distribution: Bidders
This Addendum forms a part of the Bidding and Contract Documents and modifies the original issued
Bidding Documents (Working Drawings R3 dated 11/22/2023, permit stamp dated 12/11/2023), for the above titled project, as indicated below, and is hereby incorporated into the Contract Documents as part thereof.
Bidders are required to acknowledge receipt of this Addendum in the space provided on the Proposal/Bid
Form.
ATTACHMENTS: The following is a list of the modified documents and a brief description of what has been modified.
ADMINISTRATIVE DOCUMENTS:
A. PRE-BID-Eaterie Meeting Minutes 1.17.24 r1 (17 pages)
B. Pre-bid sign in sheets Rathskeller renovation 181082 (2 pages)
This Addendum consists of 20 pages (including ALL attachments).
Agenda Purpose Pre-Bid Meeting Agenda – Rathskeller Renovation Project #181082 Date 17 January 2024 Time 11:00 AM Location Facilities Administration Building – Conference Room 102
Item
NEW BUSINESS
24.1.17.01 Project Contacts Information
George Mason Team
A/E Team – Cannon Design Dining Team & Sodexo
24.1.17.02 Project Scope Information
This project is generally described as renovations of the Rathskeller dining venue. The renovated space is to have offerings including hot and cold meals as well as a grab and go component. The space to be renovated is located in the basement level of the Student Union Building (SUB-1). Kitchen equipment as shown on the kitchen equipment plans prepared by Atlantic are Owner furnished and “set-in place”. Contractor to provide all MEP connections.
24.1.17.03 Bid and Project Schedule Information
1/08/2024 Solicitation Date
1/17/2024 Optional Pre-Bid Meeting 1/24/2024 Questions from Bidders Due by COB. All questions must be submitted through eBuilder!
1/29/2024 Response to Questions 2/8/2024 Bids Due at 2:00pm 2/19/2024 Contract Award and Notice to Proceed 6/10/2024 Interim Milestone to have the space ready for the installation of the kitchen equipment & food service stations.
7/15/2024 Substantial Completion
24.1.17.04 Project Documents Information
Approved for Construction Drawings and Specifications / Project
Manual dated 12/11/23) are available on eVA and through e-Builder.
Kitchen equipment plans dated 9/26/23 are included for reference
The sign in sheet and notes from this meeting will be issued as an Addendum
24.1.17.05 Bid Bonds and Performance and Material Bonds Information Project bonding requirements are incorporated into the Invitation for Bid on Page 1
24.1.17.06 Bid Form
Bids are to be submitted through e-Builder. Bids will not be accepted through email, fax, courier or hand delivery. Mason encourages contractors to register ahead of time and not wait until right before the bid deadline to submit bids
Facilities 4400 University Drive, MS 1E4, Fairfax, Virginia 22030 Phone: 703-993-2520; Fax: 703-993-2521
181082 – Rathskeller Renovation January 16, 2024
Please refer to the instructions in the Invitation for Bid as to what forms are required to be submitted with the bid (Schedule of Values, Project Schedule, etc are to be included with the bid submission)
24.1.17.07 Sales Tax Information
Contractors are to pay Sales Tax on Materials, equipment, etc. GMU’s tax exemption status does not extend to contractors. Refer to Article 16 in the Instructions to Bidders form HECO-7A-EB
24.1.17.08 Material Storage/ Dumpster/Staging Information
Material Storage and Staging – to be coordinated with the successful contractor. On site storage is limited to the project footprint. Keep the loading dock, driveways, sidewalks, and areas adjacent to the premises clear and available for use by the Owner and the Owner’s employees at all times. Do not use these areas for parking or storage of materials. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on site.
24.1.17.09 Wage Scale Information
Project is NOT subject to Prevailing Wages
24.1.17.10 Restroom Locations Information
Restrooms shall be Contractor furnished.
24.1.17.11 Work Hours Information
Work is to be conducted between the hours of 7:00am and 5:00pm.
For work conducted outside of these hours, coordinate with the project manager for approval.
Refer to Attachments I & J for Holiday information and Academic Calendar. Take special note of the exam and quiet hour period, where any noise producing construction may be limited or prohibited.
24.1.17.12 Site Cleanliness Information
Areas outside of the work site are to be kept clean and free from damage. Floor and wall protection should be used to prevent damage to existing finishes as appropriate to the work being conducted. It is recommended that the contractor photograph the existing conditions prior to starting work.
24.1.17.13 Shutdown Notice and Fire Watch Responsibility Information If building shutdowns are required, provide a minimum of one week of notice prior to the anticipated shutdown date. Outages that may impact occupant use (such as the relocation of panel KILN and its associated circuits) will need to be scheduled at a time that is least impactful to occupants and may require off hours work. The Contractor is responsible for providing a fire watch during outages of the sprinkler system and/or fire alarm system. Refer to Mason’s EHS Guidelines -https://public.huddle.com/b/KndMpB/index.html
24.1.17.14 Testing & Inspection Information
GMU will provide the third-party inspector for any special material inspections required, such as concrete testing.
https://public.huddle.com/b/KndMpB/index.html
All other inspections will be performed by the OUBO office with the exception of Fairfax County Health Department inspections.
24.1.17.15 Parking
Parking on the campus is regulated for all visitors, students, faculty and staff. Refer to the Invitation for Bid, Page 3 for Parking and Permit Information / Guidelines
24.1.17.16 Authority Having Jurisdiction
The authority having jurisdiction for this project is the Office of the
University Building Official for the building permit. There is no fee for the building permit.
Separately, the successful contractor will be responsible for the permit with Fairfax County Health Department and any fees associated with that permit
The OUBO will require shop drawings for both Fire Alarm and Sprinkler that will include calculations. Site reviews to determine existing circuit loads for the Fire Alarm system will required as part of the calculations.
24.1.17.17 EVA Fees
Contractors must be registered with eVA in order to be awarded the project. In lieu of permit fees, the Commonwealth charges a fee to the successful contractor. Link to fee schedule:
https://dgs.virginia.gov/globalassets/business-units/dps/documents/billing/Current-eVA-Fees-Effective-07-01- 2014.pdf
24.1.17.18 Coordination
There will be other contractors working on the project for the food equipment installation and graphic signage.
The adjacent dining space for Chick-fil-A will be operational during the renovation of the Rathskeller space
There is an existing office that faces the renovation space that contains a safe used by Sodexo. Sodexo may require access to that office space during the project.
24.1.17.19 Site Visit/Items Discussed/Site Photos:
https://dgs.virginia.gov/globalassets/business-units/dps/documents/billing/Current-eVA-Fees-Effective-07-01-2014.pdf https://dgs.virginia.gov/globalassets/business-units/dps/documents/billing/Current-eVA-Fees-Effective-07-01-2014.pdf https://dgs.virginia.gov/globalassets/business-units/dps/documents/billing/Current-eVA-Fees-Effective-07-01-2014.pdf
Existing Dining Area 1200 Hallway looking North
Existing Dining Area 1200 Hallway looking South
Dining Area 1200 windows for removal/replacement and brick for salvage
Existing entrance into existing Rathskeller
Existing south wall at entrance to Rathskeller area 1210 bordering adjacent 1201B space
Millwork slated for demolition
Existing bar schedule for removal (note M3 on D0201)
Interior of Rathskeller 1210 & bar area
NE end of Rathskeller area
Exterior storefront doors to remain
Coffered ceiling (faux wood beams and ACT scheduled for removal)
Drywall ceiling scheduled for removal (note: second concealed ceiling of plaster and lathe under the visible ceiling that is also scheduled for removal)
Corridor 1208
Storage closets scheduled for demo off corridor 1208
Entrance to kitchen 1201B
Existing Kitchen 1201B
East end of Existing Kitchen 1201B with service counter millwork and OH grille scheduled for demolition
Existing hood in kitchen 1201B – contractor to clean hood and grease duct per notes on M0101
Underside of kitchen 1201B hood
Ansul system wall mounted box near ceiling
Disconnect and transformer to be removed
Panel KILN to be relocated
Panel DPL to be removed
Panel DPL disconnect to be removed
Loading dock area
| Addendum No. 1 |
| GMU Rathskellar Eaterie_Addendum 001 |
| Pre-bid sign in sheets Rathskeller renovation 181082 |
| PRE-BID-Eaterie Meeting Minutes 1.17.24 |
File details come from the government source that posted it. Updated .