Addendum_2_RFB DOS 2025-03.pdf
PDF 99 KB Posted
- Attached to
- IPOC BUILDING UPS REPLACEMENT State and local contract opportunity
- Solicitation number
- RFB DOS 2025-03
- Issued by
- Merrimack County, New Hampshire
About this file
This is Addendum 2 to RFB DOS 2025-03 for the IPOC Building UPS Replacement project for the New Hampshire Department of Safety. The document consists of questions and answers relating to a 200kVA UPS system installation project. An optional site visit is scheduled for December 9 at 10am, where bidders are expected to gather necessary technical information about the facility's electrical infrastructure. The state has not engaged an engineer for project design specifications, instead requiring vendors to assess requirements during the site walkthrough.
The document addresses technical specifications including distribution cabinet options (single output, panelboard with breakers, or adjustable subfeeds), power requirements of 208/120V, and load capacity of 480 VAC. The state expects vendors to propose their best solution based on site visit findings. Out-of-state corporations can bid after registering as a Foreign Corporation in New Hampshire, and contractors must meet New Hampshire electricians board license requirements (available at oplc.nh.gov/electricians-board-license-requirements).
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| Addendum_3_RFB DOS 2025-03.pdf | ||
| Addendum_1_RFB DOS 2025-03.pdf | ||
| Addendum_2_RFB DOS 2025-03.pdf | ||
| RFB DOS 2025-03.pdf | ||
| Addendum_3_RFB DOS 2025-03.pdf | ||
| RFB DOS 2025-03.pdf | ||
| Addendum_1_RFB DOS 2025-03.pdf | ||
| addendum-1-rfb-dos-2025-03.pdf | ||
| rfb-dos-2025-03.pdf | ||
| addendum-2-rfb-dos-2025-03.pdf | ||
| RFB DOS 2025-03.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFB DOS 2025-03
ADDENDUM 2
Questions and Answers
RFB DOS 2025-03 Page 1
# Page No. Section No. QUESTION ANSWER 1 General Question I am curious to know if these are the only docs that have been prepared so far? For instance, if an engineer was engaged for project design typically, they would provide a full spec which lays out all the needs in detail. Additionally, there is typically a one line diagram of the building power so we can start to understand the current electrical infrastructure of the facility and determine what may be needed to accommodate a 200kVA UPS system.
No engineer was engaged. The state believes this information can be determined during the on-site walkthrough.
2 General Question I understand that there is an optional open site visit scheduled for 12/9 at 10am. Is the expectation that all potential bidders will obtain any necessary information on that day?
Yes
3 General Question How many breakers are required, and what size should they be?
We are expecting 208/120V from the distribution cabinet.
This can be determined during the on-site walkthrough.
4 General Question Regarding the distribution cabinets, we have three available options. Could you please confirm which of the following options would the customer prefer?
Option 1: Single output, single block wired to terminal in building (no panels, no subfeeds).
Option 2: Panelboard that can be populated (a panel with breakers; an electrician will run the circuits from breakers to rack level).
Option 3: Subfeeds only, adjustable from 100A to 250A (up to 4 subfeeds available).
The state expects the vendor to propose what they believe is the best solution. The state believes vendors can determine what option is best during the on-site
RFB 2025-03
Questions and Answers
RFB 2025-03 Page 2
# Page No. Section No. QUESTION ANSWER 5 General Question Please confirm whether each breaker will power a panel downstream.
This can be determined during the on-site
6 General Question We are interested in submitting a bid for the UPS Replacement project at the New Hampshire Department of Safety (RFB DOS 2025-03). As a California Corporation, we would like to confirm if we can submit our bid after registering as a Foreign Corporation in the State of New Hampshire.
Yes
7 General Question Are there any contractor’s state license requirements? If so, what are they?
https://www.oplc.nh.gov/electricians-board-license-requirements
8 General Question What is the capacity of the load (in W) that this UPS will be supporting? (Will use for runtime requirement)
480 VAC
https://www.oplc.nh.gov/electricians-board-license-requirements https://www.oplc.nh.gov/electricians-board-license-requirements