addendum-1-rfb-dos-2025-03.pdf

PDF 92 KB Posted

Attached to
IPOC BUILDING UPS REPLACEMENT State and local contract opportunity
Solicitation number
RFB DOS 2025-03
Issued by
Merrimack County, New Hampshire

About this file

This Addendum 1 document contains questions and answers for RFB DOS 2025-03, issued by the State of New Hampshire, Department of Safety, Division of Emergency Services and Communications, regarding the IPOC Building UPS Replacement project. The procurement seeks a new 200 kVA modular UPS device with supporting infrastructure, including batteries, two independently maintainable cabinets, and a wall-mounted bypass switch. Key technical specifications clarified in this addendum include an input voltage requirement of 480V and output voltage of 208V, with a 15-minute runtime specification for battery backup duration. An optional on-site visit was scheduled for December 9, 2024, at 10:00 AM to allow potential bidders to gather necessary project information. The final bid submission deadline is January 10, 2025, at 2:00 PM Eastern Time, with the contract term extending from April 1, 2025, through April 1, 2030.

The addendum clarifies that no vendor preference exists between Eaton and APC systems, provided the selected device meets all specified requirements. Bidders are expected to propose complete turnkey solutions including disconnection and disposal of the existing UPS system, with installation requiring less than 8 hours of downtime. The contract includes a three-year hardware warranty (excluding batteries) and five-year maintenance service. Pricing must remain firm throughout the entire contract period, with payment processed via ACH or Procurement Card under net 30-day terms. Vendors must maintain general liability insurance of $1,000,000 per occurrence and $2,000,000 aggregate, along with workers' compensation insurance as required by New Hampshire law. Award will be granted to the qualified vendor offering the lowest total cost meeting all specifications.

View the file

Other files for this state and local contract opportunity

Other files attached to IPOC BUILDING UPS REPLACEMENT, newest first.
File Type Posted
RFB DOS 2025-03.pdf PDF
Addendum_1_RFB DOS 2025-03.pdf PDF
Addendum_2_RFB DOS 2025-03.pdf PDF
Addendum_3_RFB DOS 2025-03.pdf PDF
Addendum_1_RFB DOS 2025-03.pdf PDF
Addendum_2_RFB DOS 2025-03.pdf PDF
Addendum_3_RFB DOS 2025-03.pdf PDF
RFB DOS 2025-03.pdf PDF
addendum-2-rfb-dos-2025-03.pdf PDF
rfb-dos-2025-03.pdf PDF
RFB DOS 2025-03.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFB DOS 2025-03

ADDENDUM 1

Questions and Answers

RFB DOS 2025-03 Page 1

# Page No. Section No. QUESTION ANSWER 1 General Question What input voltage is required?

2 General Question What about output voltage?

3 General Question What are the runtime requirements? (Will use to determine battery type/quantity)

Are there specific runtime requirements that will help us determine the exact number of batteries needed?

If available, could you provide guidance on the expected backup duration, or if there is a specific battery configuration?

(e.g., Eaton or APC 9Ah modules) already identified?

15 Minutes

4 General Question Is there any preference for either Eaton or APC systems, or should we proceed by offering both options for your evaluation?

No vendor preference if the device meets the specifications.

5 General Question I understand that there is an optional open site visit scheduled for 12/9 at 10am.

Is the expectation that all potential bidders will obtain any necessary information on that day?

Yes