Addendum_1_RFB DOS 2025-03.pdf

PDF 92 KB Posted

Attached to
IPOC BUILDING UPS REPLACEMENT State and local contract opportunity
Solicitation number
RFB DOS 2025-03
Issued by
Merrimack County, New Hampshire

About this file

This is Addendum 1 to RFB DOS 2025-03 for the IPOC Building UPS Replacement project in Merrimack County, New Hampshire. The addendum provides questions and answers regarding technical specifications for the UPS system, including confirmation that the required input voltage is 480V and output voltage is 208V. The runtime requirement is specified as 15 minutes, which will determine battery type and quantity needed. An optional open site visit is scheduled for December 9 at 10am, where bidders are expected to obtain necessary information.

The addendum clarifies that there is no vendor preference between Eaton, APC, or other systems as long as the device meets the specifications. This appears to be a competitive bid with multiple potential vendors able to supply the UPS system. No pricing terms, set-asides, or funding requirements are discussed in this addendum.

View the file

Other files for this state and local contract opportunity

Other files attached to IPOC BUILDING UPS REPLACEMENT, newest first.
File Type Posted
Addendum_3_RFB DOS 2025-03.pdf PDF
Addendum_1_RFB DOS 2025-03.pdf PDF
Addendum_2_RFB DOS 2025-03.pdf PDF
RFB DOS 2025-03.pdf PDF
Addendum_2_RFB DOS 2025-03.pdf PDF
Addendum_3_RFB DOS 2025-03.pdf PDF
RFB DOS 2025-03.pdf PDF
addendum-1-rfb-dos-2025-03.pdf PDF
rfb-dos-2025-03.pdf PDF
addendum-2-rfb-dos-2025-03.pdf PDF
RFB DOS 2025-03.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFB DOS 2025-03

ADDENDUM 1

Questions and Answers

RFB DOS 2025-03 Page 1

# Page No. Section No. QUESTION ANSWER 1 General Question What input voltage is required?

2 General Question What about output voltage?

3 General Question What are the runtime requirements? (Will use to determine battery type/quantity)

Are there specific runtime requirements that will help us determine the exact number of batteries needed?

If available, could you provide guidance on the expected backup duration, or if there is a specific battery configuration?

(e.g., Eaton or APC 9Ah modules) already identified?

15 Minutes

4 General Question Is there any preference for either Eaton or APC systems, or should we proceed by offering both options for your evaluation?

No vendor preference if the device meets the specifications.

5 General Question I understand that there is an optional open site visit scheduled for 12/9 at 10am.

Is the expectation that all potential bidders will obtain any necessary information on that day?

Yes