This is Addendum 1 to RFB DOS 2025-03 for the IPOC Building UPS Replacement project in Merrimack County, New Hampshire. The addendum provides questions and answers regarding technical specifications for the UPS system, including confirmation that the required input voltage is 480V and output voltage is 208V. The runtime requirement is specified as 15 minutes, which will determine battery type and quantity needed. An optional open site visit is scheduled for December 9 at 10am, where bidders are expected to obtain necessary information.
The addendum clarifies that there is no vendor preference between Eaton, APC, or other systems as long as the device meets the specifications. This appears to be a competitive bid with multiple potential vendors able to supply the UPS system. No pricing terms, set-asides, or funding requirements are discussed in this addendum.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| Addendum_3_RFB DOS 2025-03.pdf | ||
| Addendum_1_RFB DOS 2025-03.pdf | ||
| Addendum_2_RFB DOS 2025-03.pdf | ||
| RFB DOS 2025-03.pdf | ||
| Addendum_2_RFB DOS 2025-03.pdf | ||
| Addendum_3_RFB DOS 2025-03.pdf | ||
| RFB DOS 2025-03.pdf | ||
| addendum-1-rfb-dos-2025-03.pdf | ||
| rfb-dos-2025-03.pdf | ||
| addendum-2-rfb-dos-2025-03.pdf | ||
| RFB DOS 2025-03.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFB DOS 2025-03
ADDENDUM 1
Questions and Answers
RFB DOS 2025-03 Page 1
# Page No. Section No. QUESTION ANSWER 1 General Question What input voltage is required?
2 General Question What about output voltage?
3 General Question What are the runtime requirements? (Will use to determine battery type/quantity)
Are there specific runtime requirements that will help us determine the exact number of batteries needed?
If available, could you provide guidance on the expected backup duration, or if there is a specific battery configuration?
(e.g., Eaton or APC 9Ah modules) already identified?
15 Minutes
4 General Question Is there any preference for either Eaton or APC systems, or should we proceed by offering both options for your evaluation?
No vendor preference if the device meets the specifications.
5 General Question I understand that there is an optional open site visit scheduled for 12/9 at 10am.
Is the expectation that all potential bidders will obtain any necessary information on that day?
Yes