Addendum_1_RFB DOS 2025-03.pdf

PDF 92 KB Posted

Attached to
IPOC BUILDING UPS REPLACEMENT State and local contract opportunity
Solicitation number
RFB DOS 2025-03
Issued by
Merrimack County, New Hampshire

About this file

This is Addendum 1 to RFB DOS 2025-03 for the IPOC Building UPS Replacement project in Merrimack County, New Hampshire. The addendum provides answers to five general questions regarding technical specifications and site visit information. A site visit is scheduled for December 9 at 10am, where potential bidders are expected to obtain necessary information.

The technical specifications clarified in the addendum include an input voltage requirement of 480V, output voltage of 208V, and runtime requirement of 15 minutes for battery backup. The agency confirms there is no vendor preference between Eaton or APC systems as long as the device meets specifications. The battery configuration must support a 15-minute runtime, though specific battery type/quantity details are left to the vendor to determine based on this requirement.

View the file

Other files for this state and local contract opportunity

Other files attached to IPOC BUILDING UPS REPLACEMENT, newest first.
File Type Posted
Addendum_2_RFB DOS 2025-03.pdf PDF
RFB DOS 2025-03.pdf PDF
Addendum_3_RFB DOS 2025-03.pdf PDF
Addendum_1_RFB DOS 2025-03.pdf PDF
Addendum_2_RFB DOS 2025-03.pdf PDF
Addendum_3_RFB DOS 2025-03.pdf PDF
RFB DOS 2025-03.pdf PDF
addendum-1-rfb-dos-2025-03.pdf PDF
rfb-dos-2025-03.pdf PDF
addendum-2-rfb-dos-2025-03.pdf PDF
RFB DOS 2025-03.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFB DOS 2025-03

ADDENDUM 1

Questions and Answers

RFB DOS 2025-03 Page 1

# Page No. Section No. QUESTION ANSWER 1 General Question What input voltage is required?

2 General Question What about output voltage?

3 General Question What are the runtime requirements? (Will use to determine battery type/quantity)

Are there specific runtime requirements that will help us determine the exact number of batteries needed?

If available, could you provide guidance on the expected backup duration, or if there is a specific battery configuration?

(e.g., Eaton or APC 9Ah modules) already identified?

15 Minutes

4 General Question Is there any preference for either Eaton or APC systems, or should we proceed by offering both options for your evaluation?

No vendor preference if the device meets the specifications.

5 General Question I understand that there is an optional open site visit scheduled for 12/9 at 10am.

Is the expectation that all potential bidders will obtain any necessary information on that day?

Yes