ADDENDUM #1.pdf
PDF 129 KB Posted
- Attached to
- Snowden Training Center Mechanical Upgrades
- Solicitation number
- ANC-C-25-0011
- Issued by
- Anchorage Municipality, Alaska
About this file
This document is Addendum #1 for the Snowden Training Center Mechanical Upgrades project (Project No. ANC-C-25-0011), issued by the Alaska Court System on May 1, 2025. The addendum modifies the original invitation to bid by changing the submittal date to May 14, 2025 at 12:00 PM and clarifying a specific requirement regarding permit drawings. The key modification addresses a contractor question about stamped drawings for three (3) unit heaters in the warehouse, with the response confirming that the contractor shall be responsible for providing the stamped permit drawings for the unit heater replacements.
The addendum maintains all other terms and conditions of the original bid document unchanged, requiring bidders to acknowledge the amendment in the Bid Schedule. This modification is part of a broader mechanical upgrade project for the Snowden Training Center, which involves replacing unit heaters and associated mechanical systems. The change in submittal date provides potential bidders with additional time to prepare and submit their proposals, ensuring they can meet the detailed technical requirements for the mechanical upgrade project.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM #1
Snowden Training Center Mechanical Upgrades Project No. ANC-C-25-0011
Date: May 1, 2025
To All Plan Holders:
The following changes, additions, clarifications, and/or deletions are hereby made a part of the Contract Documents for the above noted project, fully and completely as if the same were fully contained therein. All other terms, conditions, and specifications of the original Invitation to Bid remain unchanged.
This amendment must be acknowledged in the space provided on the Bid Schedule.
The Submittal Date and Time is CHANGED. New Submittal Date is: May 14, 2025 at 12:00 PM
The modifications directed by this Addendum #1 are described on this page.
Addendum #1
Questions Concerning Stamped drawings for the three (3) unit heaters in the warehouse – Is the contractor responsible for stamped permit drawings:
Response: Contractor shall be responsible for providing stamped permit drawings for the replacement of the three (3) unit heaters.
End of Addendum #1