ACS Training Ctr Htg Piping Replacement- Permit Dwgs 5-16-24 rev1.pdf.crdownload

CRDOWNLOAD file 3 MB Posted

Attached to
Snowden Training Center Mechanical Upgrades
Solicitation number
ANC-C-25-0011
Issued by
Anchorage Municipality, Alaska

About this file

The document is a set of mechanical and electrical permit drawings for the Anchorage Court System (ACS) Training Center Heating Piping Replacement project, prepared by Adams, Morgenthaler & Co., Inc. (AMC Engineers) in Anchorage, Alaska. The drawings, dated May 1, 2024, with a revision on May 16, 2024, cover mechanical and electrical plans for a heating piping replacement project, including demolition plans, piping layouts for Levels 1 and 2, heating system diagrams, and detailed mechanical and electrical specifications. The project involves replacing heating piping, with drawings showing existing system demolition and proposed new piping configurations, including details for fintube piping, VAV-5 reheat coil piping, and wall-mounted heating units.

The permit drawings are part of a broader invitation to bid for the Snowden Training Center Mechanical Upgrades, with a bid submission deadline of May 7, 2025, at 12:00 PM. The project requires on-site work to commence no later than June 23, 2025, with substantial completion expected within 3 months. A mandatory pre-bid meeting and site inspection is scheduled for April 22, 2025, at 12 pm, with all questions to be submitted to Eddie Hebert, the Facilities Project Manager, by April 30, 2025. The contractor must invoice the Alaska Court System by October 20, 2025, for all services and materials, and the procurement is conducted under the Alaska Court System Procurement Guidelines adopted in September 2013.

Text of this file

PLUMBING PIPINGABBREVIATIONS GENERAL

HYDRONIC PIPINGGENERAL PIPING

MONITORING AND CONTROLS

VENTILATION

PLUMBING PIPINGABBREVIATIONS GENERAL

HYDRONIC PIPINGGENERAL PIPING

MONITORING AND CONTROLS

VENTILATION

P

LO

TT

E

D

FI

LE

N A

M E x:

\2 tr ai nh ea t\D w gs

\M dw g\ sh ee t f ile s\

- M

0.

1.

dw g ep ag ul ay an

/1 6/

:1

P

M

1 INCH AT FULL SIZE

IF NOT 1 INCH,

SCALE ACCORDINGLY

1" ACTUAL

Revisions No. Date Description

A N

C H

O R

A G

E C

O U

R T

SY

ST

EM

TR

A

IN

IN

G

C

EN

TE

R

H

EA

TI

N

G P

IP

IN

G R

EP

LA

C

EM

EN

T

C www.amc-engineers.com Adams, Morgenthaler & Co., Inc.

C.A.N.: AECC342 - 907.257.9100

701 E. Tudor Rd. Suite 250 Anchorage, AK 99503

24801

Sheet Title

Sheet Number

Date:

Checked by:

Designed by:

Project Phase

AMC Project: 24801

05/01/2024

PERMIT DRAWINGS

CRH

TDH

Tamara D. Hamler

ME-9981

REG IST ER ED PR O FE S S IO NA L ENGINEER05/16/2024

5/16/241 RM 603 HT

M0.1

MECHANICAL

LEGEND AND

ABBREVIATIONS

DRAWING INDEX

MECHANICAL SPECIFICATIONS

EXPANSION TANK SCHEDULE

HEATING COIL SCHEDULE

TERMINAL HEATING UNIT SCHEDULE

MISCELLANEOUS EQUIPMENT SCHEDULE

PUMP SCHEDULE

P

LO

TT

E

D

FI

LE

N A

M E x:

\2 tr ai nh ea t\D w gs

\M dw g\ sh ee t f ile s\

- M

0.

2.

dw g ep ag ul ay an

/1 6/

:1

P

M

1 INCH AT FULL SIZE

IF NOT 1 INCH,

SCALE ACCORDINGLY

1" ACTUAL

Revisions No. Date Description

A N

C H

O R

A G

E C

O U

R T

SY

ST

EM

TR

A

IN

IN

G

C

EN

TE

R

H

EA

TI

N

G P

IP

IN

G R

EP

LA

C

EM

EN

T

C www.amc-engineers.com Adams, Morgenthaler & Co., Inc.

C.A.N.: AECC342 - 907.257.9100

701 E. Tudor Rd. Suite 250 Anchorage, AK 99503

24801

Sheet Title

Sheet Number

Date:

Checked by:

Designed by:

Project Phase

AMC Project: 24801

05/01/2024

PERMIT DRAWINGS

CRH

TDH

Tamara D. Hamler

ME-9981

R EG IS T ER ED P R O F E S S IO NA L ENGINEER05/16/2024

5/16/241 RM 603 HT

M0.2

MECHANICAL SHEET

SPECIFICATIONS

AND SCHEDULES

SCALE:

M1.1

LEVEL 1 PLAN - PIPING DEMOLITION

1/8" = 1'-0" SCALE:

M1.1

LEVEL 2 PLAN - PIPING DEMOLITION

1/8" = 1'-0"

DEMOLITION NOTES

GENERAL NOTES

P

LO

TT

E

D

FI

LE

N A

M E x:

\2 tr ai nh ea t\D w gs

\M dw g\ sh ee t f ile s\

- M

1.

1.

dw g ep ag ul ay an

/1 6/

:1

P

M

1 INCH AT FULL SIZE

IF NOT 1 INCH,

SCALE ACCORDINGLY

1" ACTUAL

Revisions No. Date Description

A N

C H

O R

A G

E C

O U

R T

SY

ST

EM

TR

A

IN

IN

G

C

EN

TE

R

H

EA

TI

N

G P

IP

IN

G R

EP

LA

C

EM

EN

T

C www.amc-engineers.com Adams, Morgenthaler & Co., Inc.

C.A.N.: AECC342 - 907.257.9100

701 E. Tudor Rd. Suite 250 Anchorage, AK 99503

24801

Sheet Title

Sheet Number

Date:

Checked by:

Designed by:

Project Phase

AMC Project: 24801

05/01/2024

PERMIT DRAWINGS

CRH

TDH

Tamara D. Hamler

ME-9981

REG I ST ER ED P R O F E S S IO NA L ENGINEER05/16/2024

5/16/241 RM 603 HT

M1.1

LEVEL 1 AND 2 PLAN

- PIPING DEMOLITION

M2.1

LEVEL 1 PLAN - PIPING

1/8" = 1'-0" SCALE:

M2.1

LEVEL 2 PLAN - PIPING

1/8" = 1'-0"

GENERAL NOTES

SHEET NOTES

P

LO

TT

E

D

FI

LE

N A

M E x:

\2 tr ai nh ea t\D w gs

\M dw g\ sh ee t f ile s\

- M

2.

1.

dw g ep ag ul ay an

/1 6/

:1

P

M

1 INCH AT FULL SIZE

IF NOT 1 INCH,

SCALE ACCORDINGLY

1" ACTUAL

Revisions No. Date Description

A N

C H

O R

A G

E C

O U

R T

SY

ST

EM

TR

A

IN

IN

G

C

EN

TE

R

H

EA

TI

N

G P

IP

IN

G R

EP

LA

C

EM

EN

T

C www.amc-engineers.com Adams, Morgenthaler & Co., Inc.

C.A.N.: AECC342 - 907.257.9100

701 E. Tudor Rd. Suite 250 Anchorage, AK 99503

24801

Sheet Title

Sheet Number

Date:

Checked by:

Designed by:

Project Phase

AMC Project: 24801

05/01/2024

PERMIT DRAWINGS

CRH

TDH

Tamara D. Hamler

ME-9981

REG I ST ER ED P R O F E S S IO NA L ENGINEER05/16/2024

5/16/241 RM 603 HT

M2.1

LEVEL 1 AND 2 PLAN

- PIPING

M3.1

DIAGRAM - DEMOLITION - HEATING SYSTEM

NONE

SCALE:

M3.1

DIAGRAM - REVISED - HEATING SYSTEM

NONE SCALE:

M3.1

DETAIL - FINTUBE PIPING

NONE

SCALE:

M3.1

DETAIL - VAV-5 REHEAT COIL PIPING

NONE

P

LO

TT

E

D

FI

LE

N A

M E x:

\2 tr ai nh ea t\D w gs

\M dw g\ sh ee t f ile s\

- M

3.

1.

dw g ep ag ul ay an

/1 6/

:1

P

M

1 INCH AT FULL SIZE

IF NOT 1 INCH,

SCALE ACCORDINGLY

1" ACTUAL

Revisions No. Date Description

A N

C H

O R

A G

E C

O U

R T

SY

ST

EM

TR

A

IN

IN

G

C

EN

TE

R

H

EA

TI

N

G P

IP

IN

G R

EP

LA

C

EM

EN

T

C www.amc-engineers.com Adams, Morgenthaler & Co., Inc.

C.A.N.: AECC342 - 907.257.9100

701 E. Tudor Rd. Suite 250 Anchorage, AK 99503

24801

Sheet Title

Sheet Number

Date:

Checked by:

Designed by:

Project Phase

AMC Project: 24801

05/01/2024

PERMIT DRAWINGS

CRH

TDH

Tamara D. Hamler

ME-9981

REG I ST ER ED P R O F E S S IO NA L ENGINEER05/16/2024

5/16/241 RM 603 HT

M3.1

DIAGRAMS -

HEATING

M3.2

DETAIL - WALL MOUNTED CUH

NONE

P

LO

TT

E

D

FI

LE

N A

M E x:

\2 tr ai nh ea t\D w gs

\M dw g\ sh ee t f ile s\

- M

3.

2.

dw g ep ag ul ay an

/1 6/

:1

P

M

1 INCH AT FULL SIZE

IF NOT 1 INCH,

SCALE ACCORDINGLY

1" ACTUAL

Revisions No. Date Description

A N

C H

O R

A G

E C

O U

R T

SY

ST

EM

TR

A

IN

IN

G

C

EN

TE

R

H

EA

TI

N

G P

IP

IN

G R

EP

LA

C

EM

EN

T

C www.amc-engineers.com Adams, Morgenthaler & Co., Inc.

C.A.N.: AECC342 - 907.257.9100

701 E. Tudor Rd. Suite 250 Anchorage, AK 99503

24801

Sheet Title

Sheet Number

Date:

Checked by:

Designed by:

Project Phase

AMC Project: 24801

05/01/2024

PERMIT DRAWINGS

CRH

TDH

Tamara D. Hamler

ME-9981

REG I ST ER ED P R O F E S S IO NA L ENGINEER05/16/2024

5/16/241 RM 603 HT

M3.2

DETAILS - HEATING

PL

O

TT

ED

FI

LE

N

AM

E:

x:

\2 tr ai nh ea t\D w gs \E dw g\ sh ee t f ile s\

- E 0.

1.

dw g ttr em on t 5 /1

/2

2:

P

M

1 INCH AT FULL SIZE

IF NOT 1 INCH,

SCALE ACCORDINGLY

1" ACTUAL

Revisions No. Date Description

A N

C H

O R

A G

E C

O U

R T

SY

ST

EM

TR

A

IN

IN

G

C

EN

TE

R

H

EA

TI

N

G P

IP

IN

G R

EP

LA

C

EM

EN

T

C www.amc-engineers.com Adams, Morgenthaler & Co., Inc.

C.A.N.: AECC342 - 907.257.9100

701 E. Tudor Rd. Suite 250 Anchorage, AK 99503

24801

Sheet Title

Sheet Number

Date:

Checked by:

Designed by:

Project Phase

AMC Project: 24801

05/01/2024

PERMIT DRAWINGS

TJT

ASJ

Aaron S. Jordan

EE-12624

REG IST ER ED P R O F E S S IO NA L ENGINEER05/01/2024

E0.1

ELECTRICAL LEGEND,

ABBREVIATIONS, SHEET

SPECIFICATIONS &

SCHEDULE

GENERAL NOTES

SHEET NOTES

SCALE:

E2.1

LEVEL 1 PLAN - ELECTRICAL

1/8" = 1'-0" SCALE:

E2.1

LEVEL 2 PLAN - ELECTRICAL

1/8" = 1'-0"

PL

O

TT

ED

FI

LE

N

AM

E:

x:

\2 tr ai nh ea t\D w gs \E dw g\ sh ee t f ile s\

- E 2.

1.

dw g ttr em on t 5 /1

/2

2:

P

M

1 INCH AT FULL SIZE

IF NOT 1 INCH,

SCALE ACCORDINGLY

1" ACTUAL

Revisions No. Date Description

A N

C H

O R

A G

E C

O U

R T

SY

ST

EM

TR

A

IN

IN

G

C

EN

TE

R

H

EA

TI

N

G P

IP

IN

G R

EP

LA

C

EM

EN

T

C www.amc-engineers.com Adams, Morgenthaler & Co., Inc.

C.A.N.: AECC342 - 907.257.9100

701 E. Tudor Rd. Suite 250 Anchorage, AK 99503

24801

Sheet Title

Sheet Number

Date:

Checked by:

Designed by:

Project Phase

AMC Project: 24801

05/01/2024

PERMIT DRAWINGS

TJT

ASJ

Aaron S. Jordan

EE-12624

REG IST ER ED P R O F E S S IO NA L ENGINEER05/01/2024

E2.1

LEVELS 1 AND 2

PLAN

M0.1 - MECHANICAL LEGEND AND ABBREVIATIONS
M0.2 - MECHANICAL SHEET SPECIFICATIONS AND SCHEDULES
M1.1 - LEVEL 1 AND 2 PLAN - PIPING DEMOLITION
M2.1 - LEVEL 1 AND 2 PLAN - PIPING
M3.1 - DIAGRAMS - HEATING
M3.2 - DETAILS - HEATING
E0.1- ELECTRICAL LEGEND, ABBREVIATIONS, SHEET SPECIFICATIONS & SCHEDUL
E2.1 LEVELS 1 AND 2 PLAN

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .