A2.01 - REFLECTED CEILING PLAN.pdf

PDF 427 KB Posted

Attached to
Construction: CFMO Building 1707 HVAC Renovations
Solicitation number
CRFQ 0603 ADJ2600000022 5
Issued by
Kanawha County, West Virginia

About this file

This is a Reflected Ceiling Plan architectural drawing prepared by The Thrasher Group, Inc. for the West Virginia Army National Guard's CFMO Building 1707 HVAC Renovations project located at 1285 Aviation Drive, Williamstown, West Virginia 26187. The construction documents, dated June 2026, detail the ceiling work required as part of the HVAC renovation project. The primary scope involves removing all existing acoustical ceiling tile and grid systems and installing new acoustical tile ceiling and grid at the same height as the removed materials. Additionally, the contractor must remove all acoustic ceiling-mounted items including lights, detectors, security equipment, fire alarm devices, and other ceiling-mounted components for reinstallation in their existing locations.

The contractor is required to coordinate the ceiling work with the location of new ductwork and HVAC equipment and devices as detailed in the Mechanical, Electrical, and Plumbing (MEP) drawings. No specific pricing information, contract terms, bid due dates, or award details are contained within this architectural drawing document. The plan serves as a technical specification sheet to guide construction execution and ensure proper integration of the ceiling system with the broader HVAC renovation scope of work.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

No. 5742

COOK

WILLIAM R.

S T A T E

O F W E S T

V

I R G I N I A

A R C H I T E

C T

SHEET No.

C

AD

F

IL

E:

PROJECT No.

DRAWN:

CHECKED:

DATE:

DATE:

LA

YO

U T

TA

B:

PL

O

T D

AT

E/

TI

M

E:

U

SE

R

P (304) 624-4108

600 WHITE OAKS BLVD.

P.O. BOX 940

BRIDGEPORT, WV 26330

www.thethrashergroup.com

F (304) 624-7831

N O

BY

D

AT

E D

ES

C

R

IP

TI

O

N

THE INFORMATION CONTAINED HEREIN IS

THE SOLE PROPERTY OF THE THRASHER

GROUP, INC. REPRODUCTION OF THESE

DOCUMENTS IN WHOLE, OR IN PART FOR

ANY REASON WITHOUT PRIOR WRITTEN

PERMISSION IS STRICTLY PROHIBITED.

COPYRIGHT © 2025

THE THRASHER GROUP, INC.

W

IL

L

IA

M S

T O

W N

A A

S F

A

V

IA

T

IO

N D

R

IV

E

W

IL

L

IA

M S

T O

W N

W

V

T60-11321

6/

/2

8:

:1

AM

Au to de sk

D oc s:

//W

VA

N

G C

FM

O

B

LD

G

H

VA

C R

EN

O

/2

5.

.0

- W

VA

N G

H

VA

C R en o

- E C

R

VT

_C O

PY

.rv t

J U

N E

Au th or

C O

N S

T R

U C

T

IO

N D

O C

U M

E N

T S

A2.01

R

EF

LE

C

TE

D

C

EI

LI

N

G P

LA

N

Author 06/22/26

REFLECTED CEILING

PLAN

Checker 06/22/26

W E

S T

V

IR

G

IN

IA

A

R M

Y N

A T

IO

N

A L G

U A

R D

NOTE:

1. CONTRACTOR TO REMOVE ALL EXISTING ACOUSTICAL CEILING TILE AND GRID. CONTRACTOR TO

INSTALL NEW ACOUTICAL TILE CEILING AND GRID AT SAME HEIGHT AS REMOVED CEILING.

2. CONTRACTOR TO REMOVE ALL ACOUSTIC CEILING MOUNTED LIGHTS, DETECTORS, SECURITY, FIRE ALARM, AND ALL OTHER CEILING MOUNTED ITEMS FOR REINSTALLATION. EXISTING DEVICES TO BE

REINSTALLED IN SAME LOCATION AS EXISTING.

3. CONTRACTOR TO COORDINATE WITH LOCATION OF NEW DUCTWORK AND HVAC EQUIPMENT AND

DEVICES. REFER TO MEP DRAWINGS.

Sheets
A2.01 - REFLECTED CEILING PLAN

File details come from the government source that posted it. Updated .