9) Interim Life Safety Measures (ILSM).pdf

PDF 135 KB Posted

Attached to
Z1DZ--EHRM Training and Admin Space - Construction Phase 1 - Hines, IL (VA-21-00027896)
Solicitation number
36C77621B0006
Issued by

About this file

This document provides details for an upcoming federal construction contract opportunity. The Department of Veterans Affairs intends to solicit bids and award a firm-fixed-price contract for renovations to the building enclosure and selective interior demolition of Building 20 at the Hines VA Medical Center in Hines, Illinois. The scope of work involves all labor, management, and materials necessary to renovate the building enclosure and perform selective demolition of the interior in preparation for a future interior renovation contract. The solicitation will be issued as an Invitation for Bid on or around February 22, 2021, with a response deadline of 90 days. The period of performance is approximately 120 calendar days from notice to proceed. The contract is set aside exclusively for Service-Disabled Veteran-Owned Small Businesses and has an estimated value between $1,000,000 and $2,000,000.

View the file

Other files

File Type Posted
578-21-703 sign in pre bid.pdf PDF
36C77621B0006 0004.docx DOCX document
36C77621B0006 0003.docx DOCX document
21) Revised 578-21-703 Specification Book r20210317.pdf PDF
36C77621B0006 0002.docx DOCX document
Attachment 26 - Hines Underground Utility Plan.pdf PDF
S05 - Technical Question and Answers Hines IFB 36C77621B0006.docx DOCX document
36C77621B0006 0001.docx DOCX document
Attachment 24 - SOW 578-21-703 EHRM Training and Admin Space Support - Phase 1 - Hines IL 2020-12-30.docx DOCX document
Attachment 27 - Inspection Summary Report Bldg 20 - 2010.pdf PDF
Attachment 25 - 578-21-703 ASK-01 Metal Panel Detail.pdf PDF
Attachment 28 - BLDG 20 R2010.xls XLS spreadsheet
Attachment 20 Revised - 578-21-703 Combined Drawing Set.pdf PDF
S02 - Solicitation 36C77621B0006 Final Released.docx DOCX document
23) Wage Determination DBA - Cook County.pdf PDF
2) Hines Underground Utility Plan.pdf PDF
1) Hines VA Campus Site Plan.pdf PDF
15) Infection Control Barrier Sample.pdf PDF
19) 578-21-703 Photos of Current Conditions.pdf PDF
3) Pre-Construction Checklist.pdf PDF
21) 578-21-703 Specification Book.pdf PDF
12) Contractor Parking.pdf PDF
18) Hines COVID-19 Guidelines.pdf PDF
7) Above Ceiling Entry and Wall Construction Permits.pdf PDF
5) Cutting Welding and Other Hot Work.pdf PDF
36C77621B0006.docx DOCX document
14) No Smoking Policy 10-1-19.pdf PDF
6) Dig Permit SOP Form.pdf PDF
11) Contractor PIV Instructions and Form.pdf PDF
20) 578-21-703 Combined Drawing Set.pdf PDF
16) Building 20 Renovation from 1989.pdf PDF
13) OIT Horizontal Cable Requirements.pdf PDF
8) Pre-Construction Risk Assessment (PCRA).pdf PDF
17) Building 20 Asbestos Survey 2011.pdf PDF
4) Safety and Health During Construction Activities.pdf PDF
22) CONTRACTOR SAFETY AND ENVIRONMENTAL RECORD EVALUATION FORM.docx DOCX document
10) Infection Control Risk Assessment (ICRA).pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EDWARD HINES JR. VA HOSPITAL

FACILITIES MANAGEMENT SERVICE

INTERIM LIFE SAFETY MEASURES

OCCUPANT IMPACT EVALUATION WORKSHEET

DESCRIPTION OF LSC DEFICIENCY OR CONSTRUCTION PROJECT:

578-21-703

SIGNAGE

1. Will the above described LSC deficiency or construction project hinder the occupants in the immediate area from effectively implementing RESCUE?

NO

If YES is checked above, will the condition described exist for more than one working day?

N/A

If the condition will exist for more than one working day, signage must be prepared and posted informing the occupants of the compromise of safety and directing a higher level of awareness of fire hazards.

SIGNS POSTED BY: DATE:

2. Will the above described LSC deficiency or construction project hinder the occupants in the immediate area from effectively activating a pull station fire ALARM?

NO

If YES is checked above after question 2, will the condition described exist for more than one working day?

N/A

If the condition will exist for more than one working day, signage must be prepared and posted informing the occupants that the fire alarm pull station is out of service and instructing the occupants to call the Hines Police Department by telephone at extension 22323 to report a fire.

SIGNS POSTED BY: DATE:

3. Will the above described LSC deficiency or construction project hinder the ability of the occupants in the immediate area to CONFINE a fire?

NO

If YES is checked above, will the condition described exist for more than one working day?

N/A

If the condition will exist for more than one working day, signage must be prepared and posted informing the occupants of the condition and listing alternative actions to be taken until the condition is remediated.

SIGNS POSTED BY: DATE:

4. Will the above described LSC deficiency or construction project reduce or hinder the ability of the occupants in the immediate area or the community Fire Department to EXTINGUISH a fire?

NO

If YES is checked above, will the condition described exist for more than one working day?

N/A

If the condition will exist for more than one working day, signage must be prepared and posted informing the occupants of the condition and listing alternative actions to be taken until the condition is remediated. Additionally, the community Fire Department will develop a contingency firefighting tactical plan for the area. In the case of construction projects, that contingency plan must be approved and in place prior to permitting any work to start at the job site.

SIGNS POSTED BY: DATE:

5. Will the above described LSC deficiency or construction project hinder the occupants' ability to EVACUATE the building or area?

NO

If YES is checked above, will the condition described exist for more than one working day?

N/A

If the condition will exist for more than one working day, signage must be prepared and posted advising the occupants of the condition and describing alternate routes of egress.

SIGNS POSTED BY: DATE:

TRAINING

6. Does the ILSM signage pertaining to RESCUE provide sufficient information and instruction in itself to ensure proper occupant response during an emergency incident?

N/A

If the signage is determined to be inadequate to ensure proper occupant response, Safety will provide the personnel affected with additional instruction and training as necessary. Such training will be documented.

TRAINING CONDUCTED BY: DATE:

7. Does the ILSM signage pertaining to ALARM provide sufficient information and instruction in itself to ensure proper occupant response during an emergency incident?

N/A

If the signage is determined to be inadequate to ensure proper occupant response, Safety will provide the personnel affected with additional instruction and training as necessary. Such training will be documented.

TRAINING CONDUCTED BY: DATE:

8. Does the ILSM signage pertaining to CONFINE provide sufficient information and instruction in itself to ensure proper occupant response during an emergency situation?

N/A

If the signage is determined to be inadequate to ensure proper occupant response, Safety will provide the personnel affected with additional instruction and training as necessary. Such training will be documented.

TRAINING CONDUCTED BY: DATE:

9. Does the ILSM signage pertaining to EVACUATE provide sufficient information and instruction in itself to ensure proper occupant response during an emergency situation?

N/A

SI NATURE OF SAFETY STAFF

If the signage is determined to be inadequate to ensure proper occupant response, Project/Planning will provide the personnel affected with additional instruction and training as necessary. Such training will be documented.

TRAINING CONDUCTED BY: DATE:

FIRE DRILLS

10. Will the above described LSC deficiency or construction project necessitate altering staff response to RESCUE, ALARM, CONFINEMENT, EXTINGUISHMENT and/or

EVACUATION?

N/A

If YES is checked above, will condition exist for more than sixty days?

N/A

If staff response to Rescue, Alarm, Confinement, Extinguishment and/or Evacuation will be altered for more than sixty days, the Safety Section will increase the frequency of scheduled fire drills in the area affected to two per shift per quarter.

ADDITIONAL FIRE DRILLS SCHEDULED BY: DATE:

INSPECTION

If evaluation indicates that one or more ILSMs must be used for this deficiency or project, daily inspection of the site by Safety and Police personnel will be required. Each inspection must be documented on the ILSM High Hazard Inspection Report.

INSPECTION REQUIRED: NO

INSPECTION SCHEDULED BY: DATE: