This document provides details for an upcoming federal construction contract opportunity. The Department of Veterans Affairs intends to solicit bids and award a firm-fixed-price contract for renovations to the building enclosure and selective interior demolition of Building 20 at the Hines VA Medical Center in Hines, Illinois. The scope of work involves all labor, management, and materials necessary to renovate the building enclosure and perform selective demolition of the interior in preparation for a future interior renovation contract. The solicitation will be issued as an Invitation for Bid on or around February 22, 2021, with a response deadline of 90 days. The period of performance is approximately 120 calendar days from notice to proceed. The contract is set aside exclusively for Service-Disabled Veteran-Owned Small Businesses and has an estimated value between $1,000,000 and $2,000,000.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EDWARD HINES JR. VA HOSPITAL
FACILITIES MANAGEMENT SERVICE
INTERIM LIFE SAFETY MEASURES
OCCUPANT IMPACT EVALUATION WORKSHEET
DESCRIPTION OF LSC DEFICIENCY OR CONSTRUCTION PROJECT:
578-21-703
SIGNAGE
1. Will the above described LSC deficiency or construction project hinder the occupants in the immediate area from effectively implementing RESCUE?
NO
If YES is checked above, will the condition described exist for more than one working day?
N/A
If the condition will exist for more than one working day, signage must be prepared and posted informing the occupants of the compromise of safety and directing a higher level of awareness of fire hazards.
SIGNS POSTED BY: DATE:
2. Will the above described LSC deficiency or construction project hinder the occupants in the immediate area from effectively activating a pull station fire ALARM?
NO
If YES is checked above after question 2, will the condition described exist for more than one working day?
N/A
If the condition will exist for more than one working day, signage must be prepared and posted informing the occupants that the fire alarm pull station is out of service and instructing the occupants to call the Hines Police Department by telephone at extension 22323 to report a fire.
SIGNS POSTED BY: DATE:
3. Will the above described LSC deficiency or construction project hinder the ability of the occupants in the immediate area to CONFINE a fire?
NO
If YES is checked above, will the condition described exist for more than one working day?
N/A
If the condition will exist for more than one working day, signage must be prepared and posted informing the occupants of the condition and listing alternative actions to be taken until the condition is remediated.
SIGNS POSTED BY: DATE:
4. Will the above described LSC deficiency or construction project reduce or hinder the ability of the occupants in the immediate area or the community Fire Department to EXTINGUISH a fire?
NO
If YES is checked above, will the condition described exist for more than one working day?
N/A
If the condition will exist for more than one working day, signage must be prepared and posted informing the occupants of the condition and listing alternative actions to be taken until the condition is remediated. Additionally, the community Fire Department will develop a contingency firefighting tactical plan for the area. In the case of construction projects, that contingency plan must be approved and in place prior to permitting any work to start at the job site.
SIGNS POSTED BY: DATE:
5. Will the above described LSC deficiency or construction project hinder the occupants' ability to EVACUATE the building or area?
NO
If YES is checked above, will the condition described exist for more than one working day?
N/A
If the condition will exist for more than one working day, signage must be prepared and posted advising the occupants of the condition and describing alternate routes of egress.
SIGNS POSTED BY: DATE:
TRAINING
6. Does the ILSM signage pertaining to RESCUE provide sufficient information and instruction in itself to ensure proper occupant response during an emergency incident?
N/A
If the signage is determined to be inadequate to ensure proper occupant response, Safety will provide the personnel affected with additional instruction and training as necessary. Such training will be documented.
TRAINING CONDUCTED BY: DATE:
7. Does the ILSM signage pertaining to ALARM provide sufficient information and instruction in itself to ensure proper occupant response during an emergency incident?
N/A
If the signage is determined to be inadequate to ensure proper occupant response, Safety will provide the personnel affected with additional instruction and training as necessary. Such training will be documented.
TRAINING CONDUCTED BY: DATE:
8. Does the ILSM signage pertaining to CONFINE provide sufficient information and instruction in itself to ensure proper occupant response during an emergency situation?
N/A
If the signage is determined to be inadequate to ensure proper occupant response, Safety will provide the personnel affected with additional instruction and training as necessary. Such training will be documented.
TRAINING CONDUCTED BY: DATE:
9. Does the ILSM signage pertaining to EVACUATE provide sufficient information and instruction in itself to ensure proper occupant response during an emergency situation?
N/A
SI NATURE OF SAFETY STAFF
If the signage is determined to be inadequate to ensure proper occupant response, Project/Planning will provide the personnel affected with additional instruction and training as necessary. Such training will be documented.
TRAINING CONDUCTED BY: DATE:
FIRE DRILLS
10. Will the above described LSC deficiency or construction project necessitate altering staff response to RESCUE, ALARM, CONFINEMENT, EXTINGUISHMENT and/or
EVACUATION?
N/A
If YES is checked above, will condition exist for more than sixty days?
N/A
If staff response to Rescue, Alarm, Confinement, Extinguishment and/or Evacuation will be altered for more than sixty days, the Safety Section will increase the frequency of scheduled fire drills in the area affected to two per shift per quarter.
ADDITIONAL FIRE DRILLS SCHEDULED BY: DATE:
INSPECTION
If evaluation indicates that one or more ILSMs must be used for this deficiency or project, daily inspection of the site by Safety and Police personnel will be required. Each inspection must be documented on the ILSM High Hazard Inspection Report.
INSPECTION REQUIRED: NO
INSPECTION SCHEDULED BY: DATE:
17 . C 9
DATE
| Page 1 |
| Page 2 |
| Page 3 |
| Page 4 |
File details come from the government source that posted it. Updated .