3) Pre-Construction Checklist.pdf

PDF 107 KB Posted

Attached to
Z1DZ--EHRM Training and Admin Space - Construction Phase 1 - Hines, IL (VA-21-00027896)
Solicitation number
36C77621B0006
Issued by

About this file

This document contains a pre-solicitation notice for construction services. The Department of Veterans Affairs intends to solicit bids and award a firm-fixed-price contract to renovate the building enclosure and perform selective interior demolition of Building 20 at the Hines VA Medical Center in Hines, Illinois. The period of performance is approximately 120 calendar days from notice to proceed. The solicitation will be issued as an invitation for bid and evaluated in accordance with FAR Part 14. The North American Industry Classification System code is 236220 with a size standard of $39.5 million. The solicitation response date is on or around February 22, 2021 and will be set aside for Service-Disabled Veteran-Owned Small Businesses. Questions must be submitted in writing by the specified date to the point of contact provided.

View the file

Other files

File Type Posted
578-21-703 sign in pre bid.pdf PDF
36C77621B0006 0004.docx DOCX document
36C77621B0006 0003.docx DOCX document
21) Revised 578-21-703 Specification Book r20210317.pdf PDF
36C77621B0006 0002.docx DOCX document
Attachment 26 - Hines Underground Utility Plan.pdf PDF
S05 - Technical Question and Answers Hines IFB 36C77621B0006.docx DOCX document
36C77621B0006 0001.docx DOCX document
Attachment 24 - SOW 578-21-703 EHRM Training and Admin Space Support - Phase 1 - Hines IL 2020-12-30.docx DOCX document
Attachment 27 - Inspection Summary Report Bldg 20 - 2010.pdf PDF
Attachment 25 - 578-21-703 ASK-01 Metal Panel Detail.pdf PDF
Attachment 28 - BLDG 20 R2010.xls XLS spreadsheet
Attachment 20 Revised - 578-21-703 Combined Drawing Set.pdf PDF
S02 - Solicitation 36C77621B0006 Final Released.docx DOCX document
23) Wage Determination DBA - Cook County.pdf PDF
2) Hines Underground Utility Plan.pdf PDF
1) Hines VA Campus Site Plan.pdf PDF
15) Infection Control Barrier Sample.pdf PDF
19) 578-21-703 Photos of Current Conditions.pdf PDF
21) 578-21-703 Specification Book.pdf PDF
12) Contractor Parking.pdf PDF
9) Interim Life Safety Measures (ILSM).pdf PDF
18) Hines COVID-19 Guidelines.pdf PDF
7) Above Ceiling Entry and Wall Construction Permits.pdf PDF
5) Cutting Welding and Other Hot Work.pdf PDF
36C77621B0006.docx DOCX document
14) No Smoking Policy 10-1-19.pdf PDF
6) Dig Permit SOP Form.pdf PDF
11) Contractor PIV Instructions and Form.pdf PDF
20) 578-21-703 Combined Drawing Set.pdf PDF
16) Building 20 Renovation from 1989.pdf PDF
13) OIT Horizontal Cable Requirements.pdf PDF
8) Pre-Construction Risk Assessment (PCRA).pdf PDF
17) Building 20 Asbestos Survey 2011.pdf PDF
4) Safety and Health During Construction Activities.pdf PDF
22) CONTRACTOR SAFETY AND ENVIRONMENTAL RECORD EVALUATION FORM.docx DOCX document
10) Infection Control Risk Assessment (ICRA).pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRECONSTRUCTION CHECKLIST

PROJECT:

DATE: CONTRACT:

I. AUTHORITY OF GOVERNMENT PERSONNEL:

); a. The Contracting Officer is the only person authorized to bind the U.S. Government, and then only to the extent of the authority invested in him/her by the appointment.

) b. The VA Project Manager is designated as the Contracting Officer's representative for the purpose of technical supervision and acceptance. The VA Project Manager is responsible for the inspection of the work called for in the contract schedules, including related specifications and contract terms regarding on-site work requirements. Pursuant to the delegation of authority (attached), the Project Manager does not have the authority to make changes to the contract in amount or time.

c. The VA Project Manager for this project is j'd. No other office or individual has the authority to act in any manner on behalf of the U.S. Government in the performance of this contract. The VA Project Manager will refer any changes or questions regarding this contract to the Contracting Officer.

2. CONTRACT PROGRESS SCHEDULES AND REPORTS:

( )d.. The Contractor shall submit a schedule of cost to the Contracting Officer within 10 calendar days after date of receipt of the Notice to Proceed, The approved cost schedule will be one of the bases for determining progress payments for work completed. In accordance with FAR 52.236-1, Performance of Work by the Contractor, the schedule must indicate what portion(s) of the work the contractor intends to perform with his/her own workforce to meet the -15% requirement.

( )1). The Contractor shall submit a progress chart, within 10 calendar days after issuance of a Notice to Proceed, which indicates the anticipated installation of work versus the elapsed contract time, which shall be represented in the form of a bar graph. The starting date of the schedule shall be the date of the Notice to Proceed and the ending date shall be the original contract completion date.

t. Submittals, samples and shop drawings. Project Engineer will explain distribution procedures

3. PAYMENT REQUESTS: ( )Payments shall be made monthly by the VA according to the value of completed work from the Contractor's approved Schedule of Costs. All invoices should be submitted to Austin Texas as outlined in the contract. In accordance with the Prompt Payment Act, the fourteen (14) day timettame for payment shall commence on the date a proper invoice is received by the C.O. Included with the pay request shall be the payroll sheets for the Contractor and Subcontractors.

5. PROTECTION OF SURROUNDING AREA:

(' a. In performing this contract, the Contractor shall provide for protecting the lives and health of employees and other persons; preventing damage to property, materials, supplies, and equipment and avoiding work interruptions.

( )1), Any damage caused by the Contractor or his personnel will be restored and repaired at the expense of the Contractor.

6.DAILY LOGS: ( ) The Contractor shall provide the VA Project Manager with daily logs. Project Engineer will explain frequency. The daily log shall identify the number of laborers, supervisors and each branch of work and will be used to verify payrolls submitted.

7. SAFETY( ) The VA Safety Officer has the authority to stop work if a serious safety violatiOn is being committed,

8. CHANGES:

a. The Contractiniz'Officer, from information furnished by the COTR may, by a written order, make changes to the drawings and/or specifications that are within the general scope of the contract. No other person is authorized to make revisions, changes, or deletions from the contract.

( )1.p, Proposals for changes in work shall be submitted to the Contracting Officer according to the requirements contained in Clauses 52.243-4 and 852.236-88 of the General Conditions. Proposals in excess of $1,000 must include:

1. Itemized breakdown of labor and material costs.

2. List of subcontractors performing the work,

3. Overhead & Profit percentages.

() c. Change Orders (Proceed Orders): There may be some instances (as described in Clause 52.343-4 of the General Conditions) where the need to proceed with a change in work is absolutely necessary. In these cases, written authorization will be issued by the Contracting Officer to proceed with the work. An equitable adjustment will be negotiated within 30 calendar days.

9. SUBCONTRACTORS: ( )The Contractor shall submit a list of subcontractors which will include names and addresses and the nature of work involved (SF 1413). The Contracting Officer reserves the right to disapprove any proposed Subcontractor who has had prior record of unsatisfactory work at this site, or any Federal or non-Federal Agency.

10. LABOR STANDARDS PROVISIONS AND PAYROLLS:

( )9, A copy of the rates and wages shall be posted by the Contractor in a prominent place at the work site, )6 Apprentices will be permitted to work only under a Bona Fide apprenticeship program. Concurrent with or prior to the first payroll listing, certificates of apprenticeship from a recognized council shall be submitted to the Contracting Officer.

11. CORRESPONDENCE:

All correspondence from the Contractor shall bear: (a) Contract Number, (b) Project Title, and (c) Project Name..

13. OTHER TOPICS SPECIFIC TO THIS PROJECT:

(Signature of Contracting Officer) (Date)

(Signature of Project Manager, COR) (Date)

(Signature of Contractor) (Date)