8) Pre-Construction Risk Assessment (PCRA).pdf

PDF 288 KB Posted

Attached to
Z1DZ--EHRM Training and Admin Space - Construction Phase 1 - Hines, IL (VA-21-00027896)
Solicitation number
36C77621B0006
Issued by

About this file

This document contains a presolicitation notice and project description for a construction contract opportunity with the Department of Veterans Affairs. The contractor will be required to provide professional services to renovate the building enclosure and perform selective interior demolition of Building 20 at the Hines VA Medical Center in Hines, Illinois. The scope of work includes labor, management, and materials for renovations to the building enclosure and interior demolition. The solicitation will be issued as an Invitation for Bid on or around February 22, 2021, with an anticipated period of performance of 120 calendar days from notice to proceed. The solicitation will be set aside as a total Service-Disabled Veteran-Owned Small Business opportunity.

View the file

Other files

File Type Posted
578-21-703 sign in pre bid.pdf PDF
36C77621B0006 0004.docx DOCX document
36C77621B0006 0003.docx DOCX document
21) Revised 578-21-703 Specification Book r20210317.pdf PDF
36C77621B0006 0002.docx DOCX document
Attachment 26 - Hines Underground Utility Plan.pdf PDF
S05 - Technical Question and Answers Hines IFB 36C77621B0006.docx DOCX document
36C77621B0006 0001.docx DOCX document
Attachment 24 - SOW 578-21-703 EHRM Training and Admin Space Support - Phase 1 - Hines IL 2020-12-30.docx DOCX document
Attachment 27 - Inspection Summary Report Bldg 20 - 2010.pdf PDF
Attachment 25 - 578-21-703 ASK-01 Metal Panel Detail.pdf PDF
Attachment 28 - BLDG 20 R2010.xls XLS spreadsheet
Attachment 20 Revised - 578-21-703 Combined Drawing Set.pdf PDF
S02 - Solicitation 36C77621B0006 Final Released.docx DOCX document
23) Wage Determination DBA - Cook County.pdf PDF
2) Hines Underground Utility Plan.pdf PDF
1) Hines VA Campus Site Plan.pdf PDF
15) Infection Control Barrier Sample.pdf PDF
19) 578-21-703 Photos of Current Conditions.pdf PDF
3) Pre-Construction Checklist.pdf PDF
21) 578-21-703 Specification Book.pdf PDF
12) Contractor Parking.pdf PDF
9) Interim Life Safety Measures (ILSM).pdf PDF
18) Hines COVID-19 Guidelines.pdf PDF
7) Above Ceiling Entry and Wall Construction Permits.pdf PDF
5) Cutting Welding and Other Hot Work.pdf PDF
36C77621B0006.docx DOCX document
14) No Smoking Policy 10-1-19.pdf PDF
6) Dig Permit SOP Form.pdf PDF
11) Contractor PIV Instructions and Form.pdf PDF
20) 578-21-703 Combined Drawing Set.pdf PDF
16) Building 20 Renovation from 1989.pdf PDF
13) OIT Horizontal Cable Requirements.pdf PDF
17) Building 20 Asbestos Survey 2011.pdf PDF
4) Safety and Health During Construction Activities.pdf PDF
22) CONTRACTOR SAFETY AND ENVIRONMENTAL RECORD EVALUATION FORM.docx DOCX document
10) Infection Control Risk Assessment (ICRA).pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Policy Memorandum 578-12-138A-076 (R1)

April 11, 2014

Attachment A

Pre-Construction/Safety Risk Assessment

Location of Construction (Bldg. No. /Room No.):20 Project No.: 578-21-703

Project Title: EHRM Training and Admin Space Support - Phase 1 -Hines IL

Project Coordinator: John Robertson Project Start Date:3/1/2020

Contractor Performing Work: Estimated Duration:1/30/2020

Supervisor: Telephone: 708-202-8387 ext. 22605

Description of Project: Selective interior and exterior demolition and exterior renovation in order to facilitate the rapid renovation of Building 20 for EHRM Training.

Construction Activities

The following projects do not require completion of the Pre-Construction/Safety Risk Assessment form:

1. Painting and installation of new wallpaper in business offices and non-patient areas.

2. Painting in a patient room, if closed for painting and less than 3 square feet of wall area is to be patched and painted. Contractor shall replace the air filter for the room’s air conditioning unit upon completion of painting.

3. Installation of a soap dispenser/needle box/paper towel holder in a patient room

4. Repair of a window blind.

5. Ceiling tile replacement for areas less than ten (10) 2’ x 2’ tiles, if not in business offices and non-patient areas.

6. Ceiling tile replacement for areas less than five (5) 2’ x 2’ tiles in a patient area, if patient is out of the immediate area and clean up can be accomplished before patient returns.

7. Minimal repair of Nurse Call System/TV/Bed/Telephone.

8. Checking or replacing of electric outlet.

9. Replacing a light bulb.

10. Unstopping sink/commode with no water on floor.

11. Unstopping commode when water on floor requires maintenance to have Housekeeping clean area immediately.

12. Repair of a medical gas outlet. (Front Body)

13. Taking air balance measurement readings.

14. Checking air conditioning unit/system.

15. Intermediate jobs that create a moderate amount of dust inside the room with negative air pressure maintained in the room via use of HEPA-equipped unit with minimum 10 ACH and all air discharged outside. The

HEPA unit must continue running 2 hours after completion of job and Housekeeping must clean room before the HEPA unit is removed from room. All work and use of HEPA unit must be documented and copies forwarded to Infection Prevention and Safety. NOTE: All duct vents to be sealed off during work!

Yes No

X

Will there be noise generated that will impact a department adjacent to, above, or below the construction area?

a. If so, these departments must be notified.

b. How are you going to reduce the noise to an acceptable level?

Yes No X

Will there be vibration generated that will impact a department adjacent to, above, or below the construction area?

a. If so, these departments must be notified each time this type of work will be performed.

b. How are you going to reduce the vibration to an acceptable level?

Yes No Are Emergency Procedures in place and posted on each job for accidental events that could greatly impact Patient Care or Life Safety to the facility?

X Typically included items in these procedures are:

• Emergency telephone numbers of key departments.

• A contingency plan describing the location of main valves, switches, and controls.

• A contingency plan for unexpected outages.

Environment

Yes No Are any of the following environmental hazards present?

X Will hazardous chemicals be used on this project? How will fumes and odors be controlled? Material

Safety Data Sheets (MSDS) are required.

Reference: Hazard Communication Program 578-03-001-034 (R-1) dated January 13, 2012

X Is asbestos abatement required on this job? If so, notify Safety at the Pre-Construction Meeting.

Reference: Asbestos Management Program 578-03-001-046 (R-1) dated January 30, 2012

X Will there be hot work (welding, brazing, soldering) done on this project? If so, then a Hot Work

Permit must be posted on the job site. All hot work must have a fire watch assigned to each area while the hot work is being performed.

Reference: Cutting, Welding, and other Hot work Policy 578-03-001-089 (R-2)

X Will there be work performed above the ceiling? Will repair/construction activities involve penetration in to existing walls, ceilings, door frames, or doors? If so, must apply for an Above Ceiling Entry and

Wall Construction Permit.

Reference: Above Ceiling Entry and Wall Construction Permits 578-07-001-102 (R-2) dated December

27, 2011

X Will confined space entry be required on this project? If so, the VAMC Confined Space Entry Program must be followed.

Reference: Confined Space Program 578-12-138S-047 dated May 2, 2012

Utility Failures

Yes No Will any of the following systems be out of service at any time during the project?

X • Fire alarm (For outages greater than 4 hours, Interim Life Safety Measures must be implemented.)

X • Sprinkler (For outages greater than 4 hours, Interim Life Safety Measures must be implemented.)

X • Electrical

X • Domestic water (For outages greater than 2 weeks, affected domestic water systems will be flushed 5 times the plumbing volume to ensure no residual contaminants i.e. Legionella.)

X • Oxygen X • Sewage

X • HVAC

* The contractor must provide the COR a minimum of 3 weeks’ notice prior to a scheduled utility outage.

X Will there be any work that will require activation of the Interim Life Safety Measures (ILSM) during this project? Other work may require ILSMs, but typical work requiring ILSM implementation are:

• Any construction that impacts an exit or stairs

• Any construction that impacts major breaches in a fire or smoke wall

• Taking the main fire protection system out of service (sprinkler)

• Taking the main fire alarm system out of service

• Taking the “area” fire or fire alarm systems out of service for more than 4 hours within a 24-hour period

Implementation of the ILSM requires a fire watch and the ILSM forms to be completed.

Additional Safety Concerns

X Will construction affect exit routes from occupied areas adjacent to construction site?

X Will the project affect traffic patterns in area? If yes, explain plan.

Fencing will be provided to prevent access. Fencing will allow exiting during construction

X Will the project involve the deployment of a crane to deliver equipment over occupied facilities?

• Must submit a Lift Safety Plan and the Hines VA Hospital Planned Critical Lift Plan & Crane Permit to the Safety Office for approval a minimum of 3 weeks prior to the arrival of the crane on Hines VA

Hospital. Follow the Safety Office’s Lift Safety Plan format and include the following information:

crane specifications, crane inspection list, and crane staff training record/certification. Contractors shall maintain and present the following items prior to crane start (items can be kept in crane cab): crane certifications, crane registration, fire extinguisher, and crane operating and safety manual.

The following must be completed prior to any construction activities:

• Construct separation walls prior to project start.

• Fire protection systems must remain intact.

• Provide extra fire extinguishers in work areas.

• Maintain exit lights in work area.

• Maintain negative air pressure in construction area (24/7) throughout project duration.

• Maintain means to monitor and ensure negative pressure via barometer / magnahelix.

• There cannot be any return air from within the construction area to the rest of the building.

• Redirect egress routes; do not allow egress routes to pass through construction areas.

• Provide and maintain “Construction Area-Do No Enter” signs on doors leading into the construction area.

• Maintain up-to-date daily logs and maintain a current Hot Work Permit.

• Provide and install no-slip mats at doors exiting construction area.

• All debris removal must be by covered cart.

• Maintain a clean and orderly work area.

• Determine how, if at all, this project will affect the departments above, below, and adjacent to this project?

Air Quality and Infection Prevention

Construction activity types are defined by the amount of dust that is generated, the duration of the activity, and the amount of shared HVAC systems. Contact Hines VA’s Safety and Infection Prevention Departments if any activity is questionable under these guidelines.

Yes No

X Will dust be generated during this project?

If yes, explain location of and plan for interim dust barriers or attach floor plan with barriers clearly marked.

X Is work occurring in an area defined by Infection Control as being at risk for Tuberculosis?

If yes, explain location of and plan for notification of floor staff and PPE for assigned contractors, attach floor plan with barriers clearly marked.

X Will debris removal be necessary? If yes, explain plan for debris removal and control.

Concrete, Masonry and roofing debris removal.

X Negative airflow ventilation and filtration in place and assessed for effectiveness.

X Exhaust fans in-place and functioning.

X Air supply duct to area closed and HEPA filtration unit in-place and functioning in adjacent patient care area?

X Will work be done in a sterile area? If so, how will sterile atmosphere be maintained (to include access in/out of the work area)?

Type A Inspections and Non-Invasive Activities or Small Scale/Short Duration Activities. (Refer to Infection Control Risk Assessment for Type Selection)

Yes No x Removal of ceiling tiles for visual inspection (limited to 1 tile per 50 square feet) x Painting (excludes sanding) x Wall covering—Describe work to be done:

x Electrical trim work. Describe:

x Minor plumbing. Describe:

Type B Small Scale, Short Duration Activities that create minimal dust. ( Refer to Infection Control Risk

Assessment for Type Selection)

Yes No

X Installation of telephone and computer cabling X Access to chase spaces X Sanding of walls for painting or wall covering (minor repairs—excludes sanding for drywall finishing)

Type C Any work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies. (Refer to Infection Control Risk Assessment for Type Selection)

Yes No

Sanding of walls--drywall finishing Removal of floor coverings ceiling tiles casework Describe:

Cutting of walls or ceiling. Describe:

New wall construction Minor ductwork or electrical work above ceilings Major cabling activities Activity cannot be completed within a single work shift

Type D Major demolition and Construction Projects. (Refer to Infection Control Risk Assessment for

Type Selection)

Yes No

Will require heavy demolition or removal of a complete ceiling system New construction

Contractor Signature COR / CSO Signature Safety Signature

Date: Date: Date:

Safety Service Recommendations (as needed):