10) Infection Control Risk Assessment (ICRA).pdf

PDF 1 MB Posted

Attached to
Z1DZ--EHRM Training and Admin Space - Construction Phase 1 - Hines, IL (VA-21-00027896)
Solicitation number
36C77621B0006
Issued by

About this file

This document provides details for a federal construction contract opportunity. The Department of Veterans Affairs will solicit bids and award a firm-fixed-price contract for renovation work at the Hines VA Medical Center in Hines, Illinois. The project scope involves renovating the building enclosure and performing selective interior demolition of Building 20. The solicitation will be issued as an Invitation for Bid on February 22, 2021. The performance period is approximately 120 calendar days from notice to proceed. The contract value is estimated between $1 million and $2 million. The NAICS code is 236220 and size standard is $39.5 million. The opportunity is set aside as a total Service-Disabled Veteran-Owned Small Business set-aside. Questions must be submitted in writing by the specified deadline.

View the file

Other files

File Type Posted
578-21-703 sign in pre bid.pdf PDF
36C77621B0006 0004.docx DOCX document
36C77621B0006 0003.docx DOCX document
21) Revised 578-21-703 Specification Book r20210317.pdf PDF
36C77621B0006 0002.docx DOCX document
Attachment 26 - Hines Underground Utility Plan.pdf PDF
S05 - Technical Question and Answers Hines IFB 36C77621B0006.docx DOCX document
36C77621B0006 0001.docx DOCX document
Attachment 24 - SOW 578-21-703 EHRM Training and Admin Space Support - Phase 1 - Hines IL 2020-12-30.docx DOCX document
Attachment 27 - Inspection Summary Report Bldg 20 - 2010.pdf PDF
Attachment 25 - 578-21-703 ASK-01 Metal Panel Detail.pdf PDF
Attachment 28 - BLDG 20 R2010.xls XLS spreadsheet
Attachment 20 Revised - 578-21-703 Combined Drawing Set.pdf PDF
S02 - Solicitation 36C77621B0006 Final Released.docx DOCX document
23) Wage Determination DBA - Cook County.pdf PDF
2) Hines Underground Utility Plan.pdf PDF
1) Hines VA Campus Site Plan.pdf PDF
15) Infection Control Barrier Sample.pdf PDF
19) 578-21-703 Photos of Current Conditions.pdf PDF
3) Pre-Construction Checklist.pdf PDF
21) 578-21-703 Specification Book.pdf PDF
12) Contractor Parking.pdf PDF
9) Interim Life Safety Measures (ILSM).pdf PDF
18) Hines COVID-19 Guidelines.pdf PDF
7) Above Ceiling Entry and Wall Construction Permits.pdf PDF
5) Cutting Welding and Other Hot Work.pdf PDF
36C77621B0006.docx DOCX document
14) No Smoking Policy 10-1-19.pdf PDF
6) Dig Permit SOP Form.pdf PDF
11) Contractor PIV Instructions and Form.pdf PDF
20) 578-21-703 Combined Drawing Set.pdf PDF
16) Building 20 Renovation from 1989.pdf PDF
13) OIT Horizontal Cable Requirements.pdf PDF
8) Pre-Construction Risk Assessment (PCRA).pdf PDF
17) Building 20 Asbestos Survey 2011.pdf PDF
4) Safety and Health During Construction Activities.pdf PDF
22) CONTRACTOR SAFETY AND ENVIRONMENTAL RECORD EVALUATION FORM.docx DOCX document
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Infection Control Risk Assessment for Construction / Renovation Projects Project Name: EHRM Training and Admin Space Support - Phase 1 Project or Work-Order Number: 578-21-703

Project Manager or COR: John Robertson Extension: 22605

Building Number: 20 Floor(s)/Room(s): All

Start date: 3/1/2021 Projected completion date: 1/30/222

Construction Activity Infection Control Risk Group

☐ TYPE A: DUST LEVEL Low

Non-invasive activity, low noise, no vibration.

☒ GROUP 1: LOW

Office areas, FMS areas, all non-patient care areas.

☒ TYPE B: DUST LEVEL: Moderate to High

Small scale, short duration, low-moderate noise, low-moderate vibration.

☐ GROUP 2: MEDIUM

All other patient care areas including general medicine floors, ultrasound, Rehab, Occupational Therapy.

☐ TYPE C: DUST LEVEL Moderate to High

Requires more than one work shift (independent of working days) to complete, low-moderate noise, moderate–high vibration

☐ GROUP 3: MEDIUM/HIGH

ED, Radiology/MRI, admissions, food service areas, laboratories.

☐ TYPE D: DUST LEVEL High

Major demolition and construction activities. Requires consecutive work shifts, moderate-high noise, moderate-high vibration

☐ GROUP 4: HIGHEST

Operating rooms, SPS, ICU’s, Outpatient areas, oncology, anesthesia, post anesthetic recovery, all endoscope areas, Pharmacy, Renal Dialysis

Project Class Determination Matrix Construction Activity Type

Risk Group

Type

“A”

Type

“B”

Type

“C”

Type

“D”

Group 1 I II II III

Group 2 I II III IV

Group 3 I III III IV

Group 4 III IV IV IV Contractors Actions by Project Class

All personnel will have Emergency Preparedness training/posting/ID card.

CLASS

I

1. Execute work to minimize air-borne dust dispersed into atmosphere from construction operations.

2. Immediately replace any ceiling tile displaced for visual inspection.

3. Contain construction waste before transport in tightly-covered containers.

4. Clean work area upon completion of task including wiping surfaces with disinfectant.

5. Contact EMS for appropriate preparation for return to operation(s).

CLASS

II

In addition to above:

6. Post the signed ICRA at the entrance.

7. Isolate work area from patients/staff. Use appropriate temporary barriers and more permanent containment methods (i.e., seal holes in walls, tape gaps in doors, etc.)

8. Water mist work surfaces to control dust while cutting.

9. Block off and seal supply air vents. Place filter over return/exhaust vents.

10. Place dust mat or wipe feet at entrance/exit of work area.

11. Wet mop and/or vacuum w/HEPA filtered vacuum before leaving work areas.

CLASS

III

In addition to above:

12. Install barriers to create a negative pressure ante room and/or workroom.

13. Maintain negative air pressure in work area at all times until completion utilizing HEPA-equipped air filtration units.

14. Vacuum personnel with HEPA vacuum before leaving. Or, Don-Doff coveralls each time leaving work site. All wear shoe covers changed each time exiting the area.

15. Vacuum the entire work area with HEPA vacuums or wet mop with disinfectant at the completion of project.

16. Do not remove barriers until completed project is inspected by Safety, IC-Team, EMS, and Area Manager.

17. Carefully remove barriers to minimize spread of dirt and debris. Contact EMS for final clean.

CLASS

IV

In addition to above:

18. Provide a disinfectant wipe down of any tool carts or waste transports prior to leaving the containment area.

19. Do not remove barriers until terminal clean is performed inside work zone and barriers are included in the cleaning process.

20. Perform 2nd terminal cleaning after removal of barriers. Contact EMS for final clean.

Signatures Date

Contractor’s Signature:

(Projects Only)

Project Planner or

Maintenance Worker Signature:

Supervisor Signature:

Infection Control:

VHAHINDoyleL Typewritten Text 12/15/20

2020-12-15T13:53:45-0600
JOHN H. ROBERTSON 3478266
2020-12-15T15:54:55-0600
LAWRENCE P DOYLE 233105
2020-12-16T10:12:18-0600
Sylvia R. Suarez-Ponce 1805905

File details come from the government source that posted it. Updated .