IFB_80MSFC18B0003,_Amendment_4.pdf

PDF 326 KB Posted

Attached to
Central Steam Distribution Replacement Phase 2 Federal contract opportunity
Solicitation number
80MSFC18B0003
Issued by
National Aeronautics and Space Administration Marshall Space Flight Center

About this file

IFB 80MSFC18B0003, Amendment 4

View the file

Other files for this federal contract opportunity

Other files attached to Central Steam Distribution Replacement Phase 2, newest first.
File Type Posted
Abstract_of_Bids,_80MSFC18B0003.pdf PDF
IFB_80MSFC18B0003,_Posted_Copy,_Aug_9,_2018_REVISED_BLOCK_13.pdf PDF
IFB_80MSFC18B0003,_Amendment_4,_REVISED_BLOCKS_11_&_13.pdf PDF
IFB_80MSFC18B0003,_Posted_Copy,_Aug_9,_2018.pdf PDF
33_16_15_-_Thermal_Energy_Storage_Tank_Specification,_Amendment_4.pdf PDF
Army_and_NASA_Site_Access_Control_Boundaries_Map.pdf PDF
Revised_Plans,_FAC-5071,_80MSFC18B0003.pdf PDF
IFB_80MSFC18B0003,_Amendment_3.pdf PDF
Bid_Instructions_for_IFB_80MSFC18B0003,_Amendment_3.pdf PDF
Attendees_at_Site_Visit,_June_20,_2018,_IFB_80MSFC18B0003.pdf PDF
IFB_80MSFC18B0003,_Amendment_2.pdf PDF
IFB_80MSFC18B0003,_Posted_Copy,_July_20,_2018.pdf PDF
Specifications_FAC-M5066,_80MSFC18B0003.pdf PDF
Plans,_FAC-5066,_80MSFC18B0003.pdf PDF
Bldg_4776_Asbestos_Survey_Report_Final.pdf PDF
Bldg_4464_Asbestos_Survey_Report_Final.pdf PDF
Bldg_4727_Asbestos_Survey_Report_Final.pdf PDF
Bldg_4704_Asbestos_Survey_Report_Final.pdf PDF
Bldg_4483_Asbestos_Survey_Report_Final.pdf PDF
IFB_80MSFC18B0003,_Posted_Copy,_June_26,_2018.pdf PDF
80MSFC18B003,_Amendment_1.pdf PDF
Bldg_4711_Asbestos_Survey_Report_Final.pdf PDF
Bldg_4493_Asbestos_Survey_Report_Final.pdf PDF
Bldg_4777_Asbestos_Survey_Report_Final.pdf PDF
Bldg_4705_Asbestos_Survey_Report_Final.pdf PDF
Bldg_4738_Asbestos_Survey_Report_Final.pdf PDF
Bldg_4485_Asbestos_Survey_Report_Final.pdf PDF
Bldg_4702_Asbestos_Survey_Report_Final.pdf PDF
Bldg_4715_Asbestos_Survey_Report_Final.pdf PDF
Bldg_4312_Asbestos_Survey_Report_Final.pdf PDF
Bldg_4723_Asbestos_Survey_Report_Final.pdf PDF
Bldg_4732_Asbestos_Survey_Report_Final.pdf PDF
Bldg_4491_Asbestos_Survey_Report_Final.pdf PDF
Bldg_4306_Asbestos_Survey_Report_Final.pdf PDF
Bldg_4733_Asbestos_Survey_Report_Final.pdf PDF
Bldg_4747_Asbestos_Survey_Report_Final.pdf PDF
Specifications_FAC-M5071,_80MSFC18B0003.pdf PDF
Plans,_80MSFC18B0003.pdf PDF
IFB_80MSFC18B0003.pdf PDF
Bid_Instructions_for_IFB_80MSFC18B0003.pdf PDF
Show all 40

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

2. AMENDMENT/MODIFICATION NUMBER

00000

Brian A. Speer, Contract Specialist

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment to IFB 80MSFC18B0003, Central Steam Distribution Replacement Phase 2, is to make revision to the solicitation.

Amendment continued on the following page.

NASA, George C. Marshall Space Flight Center Office of Procurement Building 4260, Room 145,Attn: PS32 / Brian A. Speer Huntsville, AL 35812

NASA, George C. Marshall Space Flight Center Office of Procurement Building 4260, Room 145, Attn: PS32 / Brian A. Speer Huntsville, AL 35812

4200666560

80MSFC18B0003

1 2

08/0 /2018

06/08/2018

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES

NAME OF OFFEROR OR CONTRACTOR

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

The purpose of this amendment to IFB 80MSFC18B0003, Central Steam Distribution Replacement Phase 2, is to make revisions to the solicitation.

The following changes are made to IFB 80MSFC18B0003:

Specifications FAC-M5066, 80MSFC18B0003.

Section 33 16 15 – Thermal Energy Storage Tank Specification from the document “Specifications FAC-M5066, 80MSFC18B0003” is now revised and should be disregarded; this specification is replaced with Section 33 16 15 – Thermal Energy Storage Tank Specification, Amendment 4. The nature of the revision is to provide clarifying details specific to the system performance of the tank. The revisions are in bbold and italics fonts so that contractors can easily locate the revisions. This document is now included as part of the solicitation package and has been uploaded to FedBizOpps (https://www.fbo.gov/).

Standard Form 1442, Page 1 of IFB 80MSFC18B0003:

Extension of Bid Opening Date. The bid opening date listed in Block 10 under Description of Work is revised to Friday, August 17, 2018. The bid opening date listed in Block 13 is revised to 08/17/2018. Additional contractor questions WILL NOT BE ACCEPTED in spite of the statement under

2. of the Bid Instructions. The last day for contractor questions was July 10, 2018.

The following page of the solicitation is revised or added by his action. The revised/added page is attached with this amendment. A sidebar on the page indicates a change.

Page(s) Deleted Page(s) Revised/Added

Page 1 of SF 1442 Page 1 of SF 1442 Amendment 2 Amendment 4

A posted version of IFB 80MSFC18B0003, which is one with the revised pages already included in the solicitation, will be uploaded to FedBizOpps (https://www.fbo.gov/).

As a result of this amendment, the date for bids is extended.

Bids are now due on Friday, August 17, 2018, at 10:00 A.M CST at NASA, MSFC, Building 4260, Room 157.

IFB 80MSFC18B0003, Amendment 4 Page 2 of 2

2. TYPE OF SOLICITATION

NEGOTIATED (RFP)

PAGE OF PAGES3. DATE ISSUED1. SOLICITATION NO.SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

6. PROJECT NUMBER5. REQUISITION/PURCHASE REQUEST NUMBER4. CONTRACT NO.

8. ADDRESS OFFER TO7. ISSUED BY CODE

9. FOR INFORMATION

CALL

b. TELEPHONE NO. (INCLUDE AREA CODE) (NO COLLECT CALLS)a . NAME

SOLICITATION

NOTE: IN SEALED BID SOLICITATIONS "OFFER" AND "OFFEROR" MEAN "BID" AND "BIDDER"

11. The contractor shall begin performance within calendar days and complete within calendar days after receiving

(seenotice to proceed. This performance period isaward, mandatory negotiable.

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "Yes" indicate within how many calendar days after award in item 12b.)

12b. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

NOYES

STANDARD FORM 1442 (REV. 8/2014)

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (TITLE, IDENTIFYING NO., DATE):

is, SEALED BID (IFB)

80MSFC18B0003

X

06/08/2018 1 2

BRIAN A. SPEER (256) 544-3038

10 730

X

X Ten Calendar Days after notification by Contracting Officer

1 14:00:00

08/17/2018

Prescribed by GSA - FAR (48 CFR) 53.236-1(d)

a. Sealed offers in original and local time copies to perform the work required are due at the place specified in Item 8 by (hour)

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

b. An offer guarantee is not required.

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

X

National Aeronautics and Space Administration George C. Marshall Space Flight Center Office of Procurement Attn: PS32/Brian A. Speer/Building 4260, Room 145 Huntsville, AL 35812

4200666560TO BE DETERMINED

X

PROJECT TITLE: Central Steam Distribution Replacement Phase 2 DESCRIPTION OF WORK: NASA/MSFC is issuing an Invitation for Bids (IFB) for the requirement “Central Steam Distribution Replacement Phase 2.” The work to be performed under this project consists of providing the labor, equipment, and materials to convert twenty-five (25) buildings from a central steam distribution system to local natural gas fired boilers at the Marshall Space Flight Center in Huntsville, Alabama. See Attachment J-1 and Bid Schedule for complete project description.

THE BID OPENING WILL BE HELD AT NASA, MARSHALL SPACE FLIGHT CENTER (MSFC), BUILDING 4260, ROOM 157, ON FRIDAY, August 17, 2018, AT 10:00 A.M. CENTRAL STANDARD TIME (CST). BUILDING 4260 IS LOCATED ON RIDEOUT ROAD AND IS HIGHLIGHTED IN YELLOW ON THE MAP IN THE BID INSTRUCTIONS. If you need access to MSFC, contact Pam Davis at (256) 544-7861 for information related to accessing Marshall Space Flight Center. Her e-mail is:

pamela.s.davis@nasa.gov.

It is highly recommended that you allow ample time (at least two hours) for processing through the gate at Redstone Arsenal. Offerors are informed that badging services are only available at the Redstone Arsenal Visitor’s Centers located at Gate 1 on Martin Road and Gate 9 on Rideout Road. Visitor Center personnel will require unbadged personnel to present a valid driver’s license, vehicle registration, and proof of vehicle insurance or lease agreement to obtain badges. No escorts will be provided.

NOTE: BIDDER MUST COMPLETE AND RETURN

ONE COPY OF STANDARD FORM 1442 WITH BID

SCHEDULE, SECTION K, BID BOND, EXPERIENCE

MODIFICATION RATING (EMR), AND BE

REGISTERED AND ACTIVE IN SAM DATABASE.

Standard Form 30, Am 4, IFB 80MSFC18B0003, Unsigned
Optional Form 336, Am 4, 80MSFC18B0003, Page 2
SF 1442, IFB 80MSFC18B0003, Am 4, August 9, 2018
SF 1442, IFB 80MSFC18B0001, from PPS, Feb 22, 2018
2018-08-09T13:21:54-0500
BRIAN SPEER

File details come from the government source that posted it.