Bldg_4306_Asbestos_Survey_Report_Final.pdf

PDF 6 MB Posted

Attached to
Central Steam Distribution Replacement Phase 2 Federal contract opportunity
Solicitation number
80MSFC18B0003
Issued by
National Aeronautics and Space Administration Marshall Space Flight Center

About this file

Bldg 4306 Asbestos Survey Report Final

View the file

Other files for this federal contract opportunity

Other files attached to Central Steam Distribution Replacement Phase 2, newest first.
File Type Posted
Abstract_of_Bids,_80MSFC18B0003.pdf PDF
IFB_80MSFC18B0003,_Posted_Copy,_Aug_9,_2018_REVISED_BLOCK_13.pdf PDF
IFB_80MSFC18B0003,_Amendment_4,_REVISED_BLOCKS_11_&_13.pdf PDF
IFB_80MSFC18B0003,_Posted_Copy,_Aug_9,_2018.pdf PDF
33_16_15_-_Thermal_Energy_Storage_Tank_Specification,_Amendment_4.pdf PDF
IFB_80MSFC18B0003,_Amendment_4.pdf PDF
Army_and_NASA_Site_Access_Control_Boundaries_Map.pdf PDF
Revised_Plans,_FAC-5071,_80MSFC18B0003.pdf PDF
IFB_80MSFC18B0003,_Amendment_3.pdf PDF
Bid_Instructions_for_IFB_80MSFC18B0003,_Amendment_3.pdf PDF
Attendees_at_Site_Visit,_June_20,_2018,_IFB_80MSFC18B0003.pdf PDF
IFB_80MSFC18B0003,_Amendment_2.pdf PDF
IFB_80MSFC18B0003,_Posted_Copy,_July_20,_2018.pdf PDF
Bldg_4777_Asbestos_Survey_Report_Final.pdf PDF
Bldg_4705_Asbestos_Survey_Report_Final.pdf PDF
Bldg_4738_Asbestos_Survey_Report_Final.pdf PDF
Bldg_4485_Asbestos_Survey_Report_Final.pdf PDF
Bldg_4702_Asbestos_Survey_Report_Final.pdf PDF
Bldg_4715_Asbestos_Survey_Report_Final.pdf PDF
Specifications_FAC-M5066,_80MSFC18B0003.pdf PDF
Plans,_FAC-5066,_80MSFC18B0003.pdf PDF
Bldg_4776_Asbestos_Survey_Report_Final.pdf PDF
Bldg_4464_Asbestos_Survey_Report_Final.pdf PDF
Bldg_4727_Asbestos_Survey_Report_Final.pdf PDF
Bldg_4704_Asbestos_Survey_Report_Final.pdf PDF
Bldg_4483_Asbestos_Survey_Report_Final.pdf PDF
IFB_80MSFC18B0003,_Posted_Copy,_June_26,_2018.pdf PDF
80MSFC18B003,_Amendment_1.pdf PDF
Bldg_4711_Asbestos_Survey_Report_Final.pdf PDF
Bldg_4493_Asbestos_Survey_Report_Final.pdf PDF
Bldg_4312_Asbestos_Survey_Report_Final.pdf PDF
Bldg_4723_Asbestos_Survey_Report_Final.pdf PDF
Bldg_4732_Asbestos_Survey_Report_Final.pdf PDF
Bldg_4491_Asbestos_Survey_Report_Final.pdf PDF
Bldg_4733_Asbestos_Survey_Report_Final.pdf PDF
Bldg_4747_Asbestos_Survey_Report_Final.pdf PDF
Specifications_FAC-M5071,_80MSFC18B0003.pdf PDF
Plans,_80MSFC18B0003.pdf PDF
IFB_80MSFC18B0003.pdf PDF
Bid_Instructions_for_IFB_80MSFC18B0003.pdf PDF
Show all 40

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Asbestos Survey for Asbestos-Containing Materials

Prepared for:

Marshall Space Flight Center, AL

Building 4306 Marshall Space Flight Center

GSE - 013

October 31, 2008

Prepared by

Great Southern Engineering, Inc.

3795 Gordon Terry Parkway

Trinity, Alabama 35673

TABLE OF CONTENTS

1. Introduction

2. Summary

2.1. Suspect ACMs

2.2. Recommendations

3. Survey Scope

4. Limitations

5. Survey and Sample Collection Procedure

6. Previous Survey / Plans Review

7. Suspect ACM Materials Not Sampled

8. Survey Sampling Results

9. Appendices

Task Order GSE 013 Page 1 of 26

GENERAL ASBESTOS SURVEY OF

Building 4306, George C. Marshall Space Flight Center, Marshall Space Flight Center, Alabama

1. Introduction

In accordance with GSE Task Order No.GSE-013 dated April 21, 2008, Great Southern Engineering, Inc. (GSE) has performed an asbestos survey of Building 4306 located at George C.

Marshall Space Flight Center, Marshall Space Flight Center, Alabama. The 4,045 square feet building was identified to have been originally constructed in 1944. A total of 38 samples were collected from the building.

The objective of the Asbestos Survey is to determine the location and quantity of asbestos-containing materials at the Property building.

GSE’s Scope of Work included:

Visual inspection and identification of suspect asbestos-containing materials (ACMs) in the Property building and collected a representative number of samples for analysis.

As part of this asbestos survey, GSE personnel collected samples of all suspect friable and suspect damaged non-friable building materials at the Property. The remaining suspect non-friable materials were not be sampled as part of this asbestos survey

Estimated quantities and locations of ACM.

Assessed the condition of the ACM identified.

Assigned a hazard rating to each type of ACM.

This report has been prepared for the use of George C. Marshall Space Flight Center. Our investigation was performed using the degree of care and skill ordinarily exercised under similar circumstances by professional consultants practicing in this or similar localities. No other warranty or guarantee, expressed or implied, is made as to the conclusions included in this report.

Task Order GSE 013 Page 2 of 26

Building 4306, George C. Marshall Space Flight Center, Marshall Space Flight Center, Alabama

The GSE, Inc. did not perform destructive sampling procedures at the site; therefore, regardless of the thoroughness of this survey, it is possible that suspected asbestos-containing materials (ACMs) might exist in the building beneath the floors, behind walls, within pipe chases, or in other inaccessible locations. If, during renovation or demolition activities, materials not addressed in this survey are discovered, these materials should be sampled and analyzed for asbestos content prior to disturbance.

Surveyed by:

Jeff R Smith

University of Alabama Safe State Program Accredited Inspector/Management Planner

Accreditation #APL0408S7033

Written by:

Manju Ramasamudra

University of Alabama Safe State Program Accredited Inspector/Management Planner

Accreditation #APL0308R5089

Task Order GSE 013 Page 3 of 26

Building 4306, George C. Marshall Space Flight Center, Marshall Space Flight Center, Alabama

2. Summary

GSE performed an Asbestos Survey and Hazard Assessment at Building 4306 in Marshall Space Flight Center, Alabama on June 20, 2008. Sample collection was completed by licensed personnel – Jeff R Smith. The following report summarizes the independent conclusions representing GSE’ best professional judgment based on information and data available to us during the course of this survey. Factual information regarding operations, conditions, and tests data provided by the client, owner or their representative has been assumed to be correct and complete. Additionally, the conclusions presented are based on the conditions that existed on the date(s) of the assessment.

The 4,045 square feet building was identified to have been originally constructed in 1944. A total of 38 samples were collected from the building. One (1) Homogeneous material was identified as asbestos-containing material. A summary of the samples collected for this area and corresponding analytical results is presented below.

Sample Description

Sample

ID

Building Number

Sample Material

ACM

Quantity

4306 21 12" x 12" Floor Tile Beige with Gray Mottle 2,300 SF

Room Number Grid Numbers 100 F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4

101-1 F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4

101-10 F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4

101-11 F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4

101-12 F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4

101-13 F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4

101-14 F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4

101-15 F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4

101-16 F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4

101-17 F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4

101-18 F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4

101-19 F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4

101-2 F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4

101-20 F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4

101-21 F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4

101-22 F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4

101-23 F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4

101-24 F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4

101-25 F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4

101-26 F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4

101-3 F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4

101-4 F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4

Sample

ID

Building Number

Sample Material

ACM

Quantity

4306 21 12" x 12" Floor Tile Beige with Gray Mottle 2,300 SF

Room Number Grid Numbers 101-5 F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4

101-6 F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4

101-7 F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4

101-8 F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4

101-9 F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4

102 F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4

103 F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4

108 F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4

109 F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4

110 F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4

17A F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4

19A F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4

HN101-15S102 F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4

HN105S104 F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4

North Entry F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4

West Entry F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4

WL1-1

WR2-1

WR1-1

WL3-1

WL2-1

WR4-1

WR3-1

F1-1 F2-1 F3-1 F4-1

C1-1 C2-1 C3-1 C4-1

C1-2

C1-3

C1-4

C2-2

C2-3

C2-4

C3-2

C3-3

C3-4

C4-2

C4-3

C4-4

WR4-2

WR4-3

WR4-4

WR3-2

WR3-3

WR3-4

WR2-2

WR2-3

WR2-4

WR1-2

WR1-3

WR1-4

F4-2

F4-3

F4-4

F3-2

F3-4

F2-2

F2-3

F2-4

F1-2

F1-3

F1-4

WL1-2

WL1-3

WL1-4

WL2-2

WL2-3

WL2-4

WL3-2

WL3-3

WL3-4

WL4-2

WL4-3

WL4-4

F3-3

WL4-1

WF4-1 WF4-2 WF4-3 WF4-4

WF3-1

WF2-1

WF1-1

WF3-2

WF2-2

WF1-2

WF3-3

WF2-3

WF1-3

WF3-4

WF2-4

WF1-4

WE4-1WE4-2WE4-3WE4-4

WE3-1

WE2-1

WE1-1

WE3-2

WE2-2

WE1-2

WE3-3

WE2-3

WE1-3

WE3-4

WE2-4

WE1-4

Map Document: (G:\asbestos\Asbestos_Room_grid.mxd)

1. Note: Entry wall depicted is as seen from inside the room, therefore grid WE4-4 is located at the top left corner of wall. The main entry door is located within the entry wall.

2. Entry wall location shall be described as N (North) S (South) E (East) or W (West) as seen from the inside of the room. Utilizing the facilities data book, N is located at the top of page, S at bottom of page, E at right of page and W and left of page regardless of bearing shown on drawing for all buildings. (The directional bearing symbol is pointing to either NE or NW for approximately 29 buildings in the facilities data book. Consider these NE or NW bearings as being Plan N when identifying the direction of the entry wall.)

The only exception is building 4705, this drawing shall be oriented towards North as shown on drawing.

3. Type of grid system uses 4 grids by length and 4 grids by width irrespective of the room size.

Grid: C - ceiling, WF - far wall, WE - entry wall, WL - left wall, WR - right wall, F - floor

Asbestos Survey Room Grid Note: Asbestos containing material above the ceiling should be noted on the ceiling grid

Far Wall Entry Wall

Far Wall

WL1-1

WR2-1

WR1-1

WL3-1

WL2-1

WR4-1

WR3-1

WR4-2

WR4-3

WR4-4

WR3-2

WR3-3

WR3-4

WR2-2

WR2-3

WR2-4

WR1-2

WR1-3

WR1-4

WL1-2

WL1-3

WL1-4

WL2-2

WL2-3

WL2-4

WL3-2

WL3-3

WL3-4

WL4-2

WL4-3

WL4-4

WL4-1

C1-1 C2-1 C3-1 C4-1

C1-2

C1-3

C1-4

C2-2

C2-3

C2-4

C3-2

C3-3

C3-4

C4-2

C4-3

C4-4

WF4-1 WF4-2 WF4-3 WF4-4

WF3-1

WF2-1

WF1-1

WF3-2

WF2-2

WF1-2

WF3-3

WF2-3

WF1-3

WF3-4

WF2-4

WF1-4

WE4-1WE4-2WE4-3WE4-4

WE3-1

WE2-1

WE1-1

WE3-2

WE2-2

WE1-2

WE3-3

WE2-3

WE1-3

WE3-4

WE2-4

WE1-4

F1-1 F2-1 F3-1 F4-1

F4-2

F4-3

F4-4

F3-2

F3-4

F2-2

F2-3

F2-4

F1-2

F1-3

F1-4

F3-3

Map Document: (G:\asbestos\Asbestos_Hall_grid.mxd)

1. Note: Entry wall and far wall are optional; there maybe neither that are identified in the hallway. Entry wall depicted is as seen from inside the room, therefore grid WE4-1 is located at the top left corner of wall.

2. Type of grid system uses 4 grids by length and 4 grids by width irrespective of the hall size.

3. The identification of hallway segments will be determined by the end rooms. Hallways will be measured from South to North and from East to West Ex. Room most south of hallway is Room 107 and room most North of hallway is Room 200. Using H as the designation of hallway. The identification of hallway is HS107N200. Likewise from east to west would be HE107W200. The room number sequencing is arbitrary; Ex. HE200W107 would be acceptable. NS&EW are used to distinguish between vertical and horizontal run corridors on drawings.

4. Utilizing the facilities data book, N is located at the top of page, S at bottom of page, E at right of page and W and left of page regardless of bearing shown on drawing for all buildings. (The directional bearing symbol is pointing to either NE or NW for approximately 29 buildings in the facilities data book. Consider these NE or NW bearings as being Plan N when identifying the hallway number.) The only exception is building 4705, this drawing shall be oriented towards North as shown on drawing.

Grid: C - ceiling, WF - far wall, WE - entry wall, WL - left wall, WR - right wall, F - floor

Asbestos Survey Hallway Grid Note: Asbestos containing material above the ceiling should be noted on the ceiling grid

Far Wall Entry Wall

Far Wall Room XXXBeginning

Room YYY N or W

S or E

Task Order GSE 013 Page 4 of 26

Building 4306, George C. Marshall Space Flight Center, Marshall Space Flight Center, Alabama

2.1. Suspect ACMs

The following information is included for informational purposes:

A. The following suspect asbestos-containing materials were not sampled as part of this scope of work:

Suspect fibrous electrical cable covering (danger of electrocution) were not sampled.

These materials are not subject to regulation under NESHAP for demolition and renovation as long as they are in good condition and are not subject to sanding, grinding, cutting, or abrading.

Since ordinary demolition activities do not include sanding, grinding, cutting, and abrading, these materials may remain in place during building demolition, as long as they remain in good condition and are not friable.

If the material is in poor condition and is friable at the time of demolition or renovation, or if it will be subjected to sanding, grinding, cutting, or abrading, it should first be removed by a licensed asbestos removal contractor and disposed of as asbestos-containing waste.

When removing asphalt-roofing products, the material should be removed using a method that does not subject the material to sanding, cutting, grinding, or abrading (hand tools).

Asbestos-containing roofing may be disposed of as construction debris.

2.2. Recommendations

The following additional actions are recommended:

The identified asbestos-containing black mastic associated with 12” X 12” beige floortile in good condition. MSFC (Property owner/Operator) should develop and implement an Operations and Maintenance (O&M) Program. In addition suspect asbestos-containing materials in the form of floortile located below carpet, caulking on exterior walls, grout on exterior block walls, electrical cable covering, fire doors, window caulking, mirror mastic, leveling compound below ceramic tile flooring, and duct vibration joints were not sampled as a part of this assessment. These materials can be maintained as part of the asbestos O&M Program. A properly designed O&M Program is sufficient to maintain the Project in accordance with current regulatory standards and sound business practice.

ACM maintained with an O&M Program can remain in place, provided the ACM and suspect ACM remain intact and undisturbed.

Task Order GSE 013 Page 5 of 26

Building 4306, George C. Marshall Space Flight Center, Marshall Space Flight Center, Alabama

3. Survey Scope

This survey was conducted for the purpose of identifying asbestos-containing materials (ACM) throughout the building and to conduct a hazard assessment on existing ACM. The survey was non-destructive in nature and limited only to those areas that were readily accessible.

Specific areas to which access was limited by occupant request, unavailability of keys, or by site conditions included the following:

Behind the walls

Beneath the floors

Any suspect ACM not sampled as part of the assessment and if any additional suspect materials were to be identified behind walls and beneath the floors should be sampled prior to repair, renovation, or demolition activities.

Task Order GSE 013 Page 6 of 26

Building 4306, George C. Marshall Space Flight Center, Marshall Space Flight Center, Alabama

4. Limitations

GSE did not attempt to disassemble mechanical equipment, open pipe chases or assess materials within wall voids. Regardless of the thoroughness of a survey, the possibility exists that some areas containing asbestos were not identified, inaccessible or different from those at specific locations. The findings and opinions presented are relative to the dates of our site work and should not be relied upon to represent conditions at substantially later dates due to changes in the condition ACM may change over time, renovations and repairs.

This report is for the exclusive use of the client and its agents and use by any unauthorized parties in whole or in part, except as directed by legal jurisdiction, is at the sole risk of the user.

If this assessment includes reliance on work products and/or documents prepared by others, GSE has no responsibility for the accuracy of information contained therein.

Although this assessment has attempted to identify the presence or absence of ACM, potential sources of ACM may have escaped detection due to: (1) the scope of this assessment, (2) the inaccuracy of records, interviews, work products or documents made available to GSE for this report, (3) the presence of undetected or unreported renovations and repairs, (4) inaccessible areas, and/or (5) deliberate concealment of detrimental information.

Estimates presented in this report are based upon observations during the survey and owner-provided information. These reasonable estimates may be affected by unanticipated conditions potentially present in inaccessible or un-surveyed areas. GSE does not warrant or guarantee the quantity estimates. The use of such estimates shall be at the user's own risk and shall constitute a release and agreement to defend and indemnify GSE from and against any liability. If questions arise during the planning for renovation, demolition, or other construction activities, GSE should be notified to permit review of the data and present recommendations.

Interior of the following rooms were inaccessible during our Asbestos Survey on June 20, 2008: None

Task Order GSE 013 Page 7 of 26

Building 4306, George C. Marshall Space Flight Center, Marshall Space Flight Center, Alabama

5. Survey and Sample Collection Procedure

Based on United States Environmental Protection Agency (USEPA) guidance documents, GSE considered all material applications identified during the visual assessment were suspect ACM and sampled as described below.

Bulk samples were collected of any materials, which were suspected of containing asbestos with the exception of fire doors. Fire doors were not sampled because the damage caused by sampling would render these materials friable and may also void the fire rating. Since these materials were not sampled, they should be assumed to be asbestos containing, unless sampled and proven otherwise. Sampling of these assumed ACMs should be performed prior to any renovation or other activity that may cause a material disturbance.

Samples of the remaining suspect ACM were taken in accordance with USEPA recommendations.

The number and location of samples collected was based on the type of material, the manner of application, and the homogeneity of the ACM (similarity of color, texture, and type). Each sample was collected and placed into an individual sample container. The sample location was noted on the field survey form and assigned an individual identification number. This number was affixed to the sample container as the sample was collected. The survey form was also used to note the material type and general condition of the material. During the inspection, each suspect material's accessibility, location, and friability were recorded. This information was used to assess the potential hazard of the ACM and to prioritize response action recommendations.

The USEPA defines asbestos-containing materials (ACM) as those that contain greater than one percent asbestos. Friable materials are defined as those that can be crumbled or reduced to powder by hand pressure.

GSE utilized the “positive-stop” method of sample analysis. In this method, analysis is stopped on a group of samples once the first positive (e.g., greater than 1% asbestos) sample is analyzed.

According to the USEPA, if one sample of a homogenous material is identified to be asbestos containing, the entire material must be considered asbestos containing. By using the positive-stop method, GSE reduces the Client’s laboratory analysis cost by not analyzing the additional samples.

Samples collected were carried and submitted under Chain-of-Custody to Steve Moody Micro Services LLC, Farmers Branch, Texas for analysis of asbestos using USEPA Method 40 CFR, Chapter 1, Part 763, Subpart F, Appendix A, also known as Polarized Light Microscopy (PLM).

Steve Moody Micro Services LLC is certified by the National Voluntary Laboratory Accreditation Program (NVLAP) and licensed by the Department of State Health Services.

Task Order GSE 013 Page 8 of 26

Building 4306, George C. Marshall Space Flight Center, Marshall Space Flight Center, Alabama

6. Previous Survey / Plans Review

GSE was not provided with any previously conducted asbestos surveys of the Property. As-built/renovation-site plans and construction drawings were reviewed at the Facilities Department Drawing Room. Review of these documents did not identify building material specifications requiring the use of ACM. However, this does not preclude or prevent the potential use of ACM.

Task Order GSE 013 Page 9 of 26

Building 4306, George C. Marshall Space Flight Center, Marshall Space Flight Center, Alabama

7. Suspect ACM Materials Not Sampled

During the course of the property visit, GSE performed a preliminary review of interior, accessible areas of the subject building for the presence of suspect asbestos-containing materials (ACMs). This asbestos survey was conducted for overview purposes only; additional suspect materials may exist in concealed locations (behind walls and above ceilings, beneath the floors, within machinery, etc.). Also, not all suspect materials may have been sampled due to the condition or the location of the suspect materials. Destructive sampling of suspect ACMs was not performed. GSE will not be responsible for damaging materials or causing the materials to become friable. The USEPA defines asbestos-containing material as material containing greater than one percent asbestos. This review was not a pre-demolition/renovation survey or for regulatory submittal purposes.

Suspect and/or presumed ACMs were observed within the subject building during the property visit. These suspect and/or presumed ACMs that were not sampled as part of this asbestos survey are listed in the following table.

Sample Description Physical Condition

Friable Yes/No

Type of

ACM

Sample ID

9" X 9" Floor Tile, Located Below Carpet UPS2 NoM

12" X 12" Floor Tile, Located Below Carpet UPS3 NoM

Caulking, On Exterior Wall Joints UPS4 NoM

Grout, On Exterior Wall Masonary UPS5 NoM

Wiring, Fibrous Electrical Cable Covering UPS6 NoM

Fire Doors, Fire Door Insulation UPS7 NoM

Mastic, Mirror Mastic UPS8 NoM

Caulking, Window Glazing UPS10 NoM

Duct Insulation, Duct Vibration Joint UPS11 NoM

Leveling Compound, Below ceramic tile flooring UPS13 NoM

Task Order GSE 013 Page 10 of 26

Building 4306, George C. Marshall Space Flight Center, Marshall Space Flight Center, Alabama

8. Survey Sampling Results

The results of the Survey are presented in the tables on the following pages. The tables describe the entire suspect Asbestos-Containing Materials (ACMs) identified in the building and list respective sample numbers and laboratory results. Sample numbers presented in the tables correspond to the sample numbers on attached Laboratory Analysis Forms. Also presented in the tables is the estimated quantity and assessed friability for each suspect ACM. For each suspect material identified as ACM, the assessed hazard potential is presented along with GSE’ recommended response action. Hazard potential for each material application is based on the material condition and accessibility to the public and maintenance personnel.

Glossary of Items for the following Table

Type of Asbestos (1) CH = Chrysotile

AM = Amosite CR = Crocidolite AN = Anthophyllite TR = Tremolite AC = Actinolite ND = No Asbestos Detected PC = Point Count Method

Type of ACM (2) M = Miscellaneous S = Surfacing TSI = Thermal Systems Insulation

Friability (3) F = Friable NF = Non Friable

Physical Condition (4) U = Good D = Damaged SD = Significantly Damaged

Potential for Disturbance (5) NPD = No Potential for Disturbance PD = Potential for Disturbance PSD = Potential for Significant Disturbance

Assessment Category (6) 1 = Damaged or significantly damaged TSI ACBM, 2 = Damaged friable surfacing ACBM 3 = Significantly damaged friable surfacing ACBM 4 = Damaged or significantly damaged friable miscellaneous ACBM 5 = ACBM with potential for damaged 6 = ACBM potential for significant damage 7 = Any remaining friable ACBM or friable suspected

ACBM

X = not applicable

Unit of Measurement SF = Square Feet

LF = Linear Feet

Sample Location

Sample Analyzed

Yes/No

Estimated Quantity of

ACM

Assessment Category

Physical Condition

Friable Yes/No

Type of

ACM

% and Type of Asbestos Detected

Sample ID Potential For

Distrubance

Homogeneous Area 1

Pipe Insulation White Mastic on Pipe Insulation

Yes M No D XRoom: 106 Grid: C1-2

ND - Insulation ND - Paper Wrap ND - White Mastic

1 PD

Yes M No U XRoom: 106 Grid: C1-3

ND - Insulation ND - Paper/Foil Wrap ND - White Mastic

2 PD

Yes M No U XRoom: 106 Grid: C1-3

ND - Insulation ND - Paper/Foil Wrap ND - White Mastic

3 PD

Homogeneous Area 2

Wallboard Drywall System

Yes M No U XRoom: 106 Grid: WF1-4

ND - Drywall Material ND - Joint Compound

4 PD

Yes M No U XRoom: 106 Grid: WL1-1

ND - Drywall Material

5 PD

Yes M No U XRoom: 106 Grid: WR1-1

ND - Drywall Material ND - Joint Compound

6 PD

Sample Location

Sample Analyzed

Yes/No

Estimated Quantity of

ACM

Assessment Category

Physical Condition

Friable Yes/No

Type of

ACM

% and Type of Asbestos Detected

Sample ID Potential For

Distrubance

Homogeneous Area 3

Pipe Insulation Gray Mastic on Pipe Insulation

Yes M No U XRoom: 106 Grid: C3-2

ND - Insulation ND - Paper/Foil Wrap ND - White Mastic ND - Paint

7 PD

Yes M No U XRoom: 106 Grid: C3-2

ND - Insulation ND - Paper/Foil Wrap ND - White Mastic ND - Paint

8 PD

Yes M No U XRoom: 106 Grid: C3-2

ND - Insulation ND - Paper/Foil Wrap ND - White Mastic ND - Paint

9 PD

Homogeneous Area 4

Mastic Olive Duct Mastic

Yes M No U XRoom: 106 Grid: C2-3

ND - Mastic10 PD

Yes M No U XRoom: 106 Grid: C2-3

ND - Mastic11 PD

Yes M No U XRoom: 106 Grid: C2-3

ND - Mastic12 PD

Sample Location

Sample Analyzed

Yes/No

Estimated Quantity of

ACM

Assessment Category

Physical Condition

Friable Yes/No

Type of

ACM

% and Type of Asbestos Detected

Sample ID Potential For

Distrubance

Homogeneous Area 5

2' X 4' Ceiling Tile Fissured

Yes M Yes U XRoom: 107 Grid: C4-3

ND - Acoustic Tile13 PD

Yes M Yes U XRoom: 107 Grid: C3-4

ND - Acoustic Tile14 PD

Yes M Yes U XRoom: 107 Grid: C1-4

ND - Acoustic Tile15 PD

Homogeneous Area 6

2' X 2' Ceiling Tile Textured

Yes M Yes U XRoom: 103 Grid: C1-1

ND - Acoustic Tile16 PD

Yes M Yes U XRoom: HN105S104 Grid: C4-2

ND - Acoustic Tile17 PD

Yes M Yes U XRoom: 102 Grid: C4-1

ND - Acoustic Tile18 PD

Sample Location

Sample Analyzed

Yes/No

Estimated Quantity of

ACM

Assessment Category

Physical Condition

Friable Yes/No

Type of

ACM

% and Type of Asbestos Detected

Sample ID Potential For

Distrubance

Homogeneous Area 7

12" x 12" Floor Tile Beige with Gray Mottle

Yes M No U 5Room: West Entry Grid: F1-1

ND - Floor Tile ND - Yellow Mastic

19 PD

Yes M No U 5Room: South Entry Grid: F1-1

ND - Floor Tile ND - Yellow Mastic

20 PD

Yes 2,300 SF M No U 5Room: HN101-15S102 Grid: F2-3

ND - Floor Tile 5% CH - Black Mastic

21 PD

Homogeneous Area 8

Mastic 2' X 2' Green Carpet

Yes M No U XRoom: 101-18 Grid: F4-3

ND - Mastic22 PD

Yes M No U XRoom: HN101-15S102 Grid: F2-3

ND - Mastic23 PD

Yes M No U XRoom: 100 Grid: F4-2

ND - Mastic24 PD

Sample Location

Sample Analyzed

Yes/No

Estimated Quantity of

ACM

Assessment Category

Physical Condition

Friable Yes/No

Type of

ACM

% and Type of Asbestos Detected

Sample ID Potential For

Distrubance

Homogeneous Area 9

Cove Base Brown Cove Base and Mastic

Yes M No U XRoom: 101-8 Grid: WR1-1

ND - Cove Base ND - Cream Mastic

25 PD

Yes M No U XRoom: 102 Grid: WE1-1

ND - Cove Base ND - Cream Mastic

26 PD

Yes M No U XRoom: 109 Grid: WE1-1

ND - Cove Base ND - Cream Mastic

27 PD

Homogeneous Area 10

Texture Wall texture Yes S No U XRoom: 110 Grid: WL2-2

ND - Texture28 PD

Yes M No U XRoom: 101-26 Grid: WR2-1

ND - Texture29 PD

Yes M No U XRoom: 101-21 Grid: WL2-3

ND - Texture30 PD

Yes M No U XRoom: 101-3 Grid: WL2-1

ND - Texture31 PD

Yes M No U XRoom: 101 Grid: WF2-2

ND - Texture32 PD

Sample Location

Sample Analyzed

Yes/No

Estimated Quantity of

ACM

Assessment Category

Physical Condition

Friable Yes/No

Type of

ACM

% and Type of Asbestos Detected

Sample ID Potential For

Distrubance

Homogeneous Area 11

Sink Undercoating Black Yes M No U XRoom: HN105S104 Grid: C4-2

ND - Sink Undercoating

33 PD

Yes M No U XRoom: HN105S104 Grid: C4-2

ND - Sink Undercoating

34 PD

Yes M No U XRoom: HN105S104 Grid: C4-2

ND - Sink Undercoating

35 PD

Homogeneous Area 12

Blown In Attic Insulation Top of Ceiling Tile

Yes TSI Yes U XRoom: HN105S104 Grid: C4-2

ND - Insulation36 PD

Yes TSI Yes U XRoom: HN105S104 Grid: C4-2

ND - Insulation37 PD

Yes TSI Yes U XRoom: HN105S104 Grid: C4-2

ND - Insulation38 PD

1. CH = Chrysotile; AM = Amosite; CR = Crocidolite; AN = Anthophyllite; TR = Tremolite; AC = Actinolite; ND = No Asbestos Detected; or PC = Point Count Method

2. M = Miscellaneous; S = Surfacing; or TSI = Thermal Systems Insulation

3. F = Friable or NF = Non Friable

4. U = Good; D = Damaged; or SD = Significantly Damaged

5. NPD = No Potential for Disturbance; PD = Potential for Disturbance; or PSD = Potential for Significant Disturbance

6. 1 = Damaged or significantly damaged TSI ACBM, 2 = Damaged friable surfacing ACBM, 3 = Significantly damaged friable surfacing ACBM, 4 = Damaged or significantly damaged friable miscellaneous ACBM, 5 = ACBM with potential for damage, 6 = ACBM potential for significant damage, 7 = Any remaining friable ACBM or friable suspected ACBM, or X = not applicable

SF = Square Feet LF = Linear Feet

9. Appendices

Appendix A— Laboratory Results and Chain of Custody Appendix B— ACM Sample Location Drawings Appendix C— ACM Location Diagrams Appendix D— Photographs Appendix E— Certificates and Licenses

Appendix A

Laboratory Results

PLM Summary Report NVLAP Lab No. 102056

TDSHS License No. 30-0084

Client :

Project :

Project # :

Identification :

Test Method :

Great Southern Engineering

Building 4306

GSE-013

Asbestos, Bulk Sample Analysis

Polarized Light Microscopy / Dispersion Staining (PLM/DS)

EPA Method 600 / R-93 / 116

Sample Number Client Sample Description / Location Asbestos Content

Sample Date :

On 6/26/2008, thirty eight (38) bulk material samples were submitted by a representative of Great Southern Engineering for asbestos analysis by PLM/DS.

The PLM Detail Report is attached; additional information may be found therein. The results are summarized below:

Steve Moody Micro Services, LLC

Lab Job No. :

Report Date :

08B-07782

06/20/2008

06/26/2008

2051 Valley View Lane

Farmers Branch, TX 75234 (Phone 972-241-8460)

01 Mastic (White) on Pipe Insulation None Detected - Insulation

None Detected - Paper Wrap

None Detected - White Mastic

02 Mastic (White) on Pipe Insulation None Detected - Insulation

None Detected - Paper / Foil Wrap

None Detected - White Mastic

03 Mastic (White) on Pipe Insulation None Detected - Insulation

None Detected - Paper / Foil Wrap

None Detected - White Mastic

04 Wallboard and Joint Compound None Detected - Drywall Material

None Detected - Joint Compound

05 Wallboard and Joint Compound None Detected - Drywall Material

06 Wallboard and Joint Compound None Detected - Drywall Material

None Detected - Joint Compound

07 Mastic (Gray) on Pipe Insulation None Detected - Insulation

None Detected - White Mastic

None Detected - Paper / Foil Wrap

None Detected - Paint

08 Mastic (Gray) on Pipe Insulation None Detected - Insulation

None Detected - White Mastic

None Detected - Paper / Foil Wrap

None Detected - Paint

09 Mastic (Gray) on Pipe Insulation None Detected - Insulation

None Detected - White Mastic

None Detected - Paper / Foil Wrap

None Detected - Paint

10 Duct Mastic (Olive) None Detected - Mastic

11 Duct Mastic (Olive) None Detected - Mastic

12 Duct Mastic (Olive) None Detected - Mastic

TDSHS License No. 30-0084

Client :

Project :

Project # :

Identification :

Test Method :

Great Southern Engineering

Building 4306

GSE-013

Asbestos, Bulk Sample Analysis

Polarized Light Microscopy / Dispersion Staining (PLM/DS)

EPA Method 600 / R-93 / 116

Sample Number Client Sample Description / Location Asbestos Content

Sample Date :

On 6/26/2008, thirty eight (38) bulk material samples were submitted by a representative of Great Southern Engineering for asbestos analysis by PLM/DS.

The PLM Detail Report is attached; additional information may be found therein. The results are summarized below:

Steve Moody Micro Services, LLC

Lab Job No. :

Report Date :

08B-07782

06/20/2008

06/26/2008

2051 Valley View Lane

Farmers Branch, TX 75234 (Phone 972-241-8460)

13 2' x 4' Ceiling Tile (Fissured) None Detected - Acoustic Tile

14 2' x 4' Ceiling Tile (Fissured) None Detected - Acoustic Tile

15 2' x 4' Ceiling Tile (Fissured) None Detected - Acoustic Tile

16 2' x 2 Ceiling Tile (Fissured) None Detected - Acoustic Tile

17 2' x 2 Ceiling Tile (Fissured) None Detected - Acoustic Tile

18 2' x 2 Ceiling Tile (Fissured) None Detected - Acoustic Tile

19 12" x 12" Floor Tile None Detected - Floor Tile

None Detected - Yellow Mastic

20 12" x 12" Floor Tile None Detected - Floor Tile

None Detected - Yellow Mastic

21 12" x 12" Floor Tile None Detected - Floor Tile

5% Chrysotile - Black Mastic

22 Mastic, 2' x 2' Carpet Squares (Green) None Detected - Mastic

23 Mastic, 2' x 2' Carpet Squares (Green) None Detected - Mastic

24 Mastic, 2' x 2' Carpet Squares (Green) None Detected - Mastic

25 Cove Base (Brown) and Mastic None Detected - Cove Base

None Detected - Cream Mastic

26 Cove Base (Brown) and Mastic None Detected - Cove Base

None Detected - Cream Mastic

27 Cove Base (Brown) and Mastic None Detected - Cove Base

None Detected - Cream Mastic

28 Wall Texture Roll-on None Detected - Texture

29 Wall Texture Roll-on None Detected - Texture

30 Wall Texture Roll-on None Detected - Texture

TDSHS License No. 30-0084

Client :

Project :

Project # :

Identification :

Test Method :

Great Southern Engineering

Building 4306

GSE-013

Asbestos, Bulk Sample Analysis

Polarized Light Microscopy / Dispersion Staining (PLM/DS)

EPA Method 600 / R-93 / 116

Sample Number Client Sample Description / Location Asbestos Content

Sample Date :

On 6/26/2008, thirty eight (38) bulk material samples were submitted by a representative of Great Southern Engineering for asbestos analysis by PLM/DS.

The PLM Detail Report is attached; additional information may be found therein. The results are summarized below:

Steve Moody Micro Services, LLC

Lab Job No. :

Report Date :

08B-07782

06/20/2008

06/26/2008

2051 Valley View Lane

Farmers Branch, TX 75234 (Phone 972-241-8460)

31 Wall Texture Roll-on None Detected - Texture

32 Wall Texture Roll-on None Detected - Texture

33 Sink Undercoating None Detected - Sink Undercoating

34 Sink Undercoating None Detected - Sink Undercoating

35 Sink Undercoating None Detected - Sink Undercoating

36 Blown-in Insulation (White) None Detected - Insulation

37 Blown-in Insulation (White) None Detected - Insulation

38 Blown-in Insulation (White) None Detected - Insulation

Greg WerchanAnalyst(s):

Lab Director : Steve Moody Approved Signatory :

Thank you for choosing Steve Moody Micro Services

These samples were analyzed by layers. Quantification, unless otherwise noted, is performed by calibrated visual estimate. Results may not be reproduced except in full. This test report relates only to the samples tested. These test results do not imply endorsement by NVLAP or any agency of the U.S. Government. Accredited by the

National Voluntary Laboratory Accreditation Program for Bulk Asbestos Fiber Analysis under Lab Code 102056.

Lab Manager : Bruce Crabb Approved Signatory :

Steve Moody Micro Services, LLC PLM Detail Report NVLAP Lab No. 102056

TDSHS License No. 30-0084

Project # : GSE-013

Sample Number Layer Components % Of

Sample

Analysis

Date

% of

Layer Analyst

Supplement to PLM Summary Report 2051 Valley View Lane

Farmers Branch, TX 75234

Client :

Project :

Great Southern Engineering

Building 4306

Lab Job No. :

Report Date :

08B-07782

06/26/2008

Mineral Wool Fibers01 Insulation (Yellow) 10% 06/2695% GW

Resin Binders01 Insulation (Yellow) 10% 06/265% GW

Cellulose Fibers01 Paper Wrap (White) 3% 06/26100% GW

Cellulose Fibers01 White Mastic (White) 87% 06/265% GW

Pigment / Binders01 White Mastic (White) 87% 06/2695% GW

Mineral Wool Fibers02 Insulation (Yellow) 5% 06/2695% GW

Resin Binders02 Insulation (Yellow) 5% 06/265% GW

Cellulose Fibers02 Paper / Foil Wrap (Tan / Silver) 3% 06/2660% GW

Glass Wool Fibers02 Paper / Foil Wrap (Tan / Silver) 3% 06/2620% GW

Metal Foil02 Paper / Foil Wrap (Tan / Silver) 3% 06/2620% GW

Cellulose Fibers02 White Mastic (White) 92% 06/265% GW

Pigment / Binders02 White Mastic (White) 92% 06/2695% GW

Mineral Wool Fibers03 Insulation (Yellow) 75% 06/2695% GW

Resin Binders03 Insulation (Yellow) 75% 06/265% GW

Cellulose Fibers03 Paper / Foil Wrap (Tan / Silver) 10% 06/2660% GW

Glass Wool Fibers03 Paper / Foil Wrap (Tan / Silver) 10% 06/2620% GW

Metal Foil03 Paper / Foil Wrap (Tan / Silver) 10% 06/2620% GW

Cellulose Fibers03 White Mastic (White) 15% 06/265% GW

Pigment / Binders03 White Mastic (White) 15% 06/2695% GW

Glass Wool Fibers04 Drywall Material (White) 95% 06/262% GW

Gypsum / Binders04 Drywall Material (White) 95% 06/2698% GW

Cellulose Fibers04 DW Paper Facing (Tan) 2% 06/26100% GW

Calcite / Talc / Binders04 Joint Compound (White) 3% 06/26100% GW

Glass Wool Fibers05 Drywall Material (Tan) 99% 06/262% GW

Gypsum / Binders05 Drywall Material (Tan) 99% 06/2698% GW

Cellulose Fibers05 DW Paper Facing (Tan) 1% 06/26100% GW

Note: No Joint Compound

Project # : GSE-013

Sample Number Layer Components % Of

Sample

Analysis

Date

% of

Layer Analyst

Supplement to PLM Summary Report 2051 Valley View Lane

Farmers Branch, TX 75234

Client :

Project :

Great Southern Engineering

Building 4306

Lab Job No. :

Report Date :

08B-07782

06/26/2008

Cellulose Fibers06 Drywall Material (White) 90% 06/265% GW

Gypsum / Binders06 Drywall Material (White) 90% 06/2695% GW

Cellulose Fibers06 DW Paper / Tape (Tan / White) 5% 06/26100% GW

Calcite / Talc / Binders06 Joint Compound (White) 5% 06/26100% GW

Mineral Wool Fibers07 Insulation (Yellow) 70% 06/2695% GW

Resin Binders07 Insulation (Yellow) 70% 06/265% GW

Cellulose Fibers07 White Mastic (White) 15% 06/265% GW

Pigment / Binders07 White Mastic (White) 15% 06/2695% GW

Cellulose Fibers07 Paper / Foil Wrap (Tan / Silver) 10% 06/2660% GW

Glass Wool Fibers07 Paper / Foil Wrap (Tan / Silver) 10% 06/2620% GW

Metal Foil07 Paper / Foil Wrap (Tan / Silver) 10% 06/2620% GW

Pigment / Binders07 Paint (Grey) 5% 06/26100% GW

Mineral Wool Fibers08 Insulation (Yellow) 87% 06/2695% GW

Resin Binders08 Insulation (Yellow) 87% 06/265% GW

Cellulose Fibers08 White Mastic (White) 10% 06/265% GW

Pigment / Binders08 White Mastic (White) 10% 06/2695% GW

Cellulose Fibers08 Paper / Foil Wrap (Tan / Silver) 2% 06/2660% GW

Glass Wool Fibers08 Paper / Foil Wrap (Tan / Silver) 2% 06/2620% GW

Metal Foil08 Paper / Foil Wrap (Tan / Silver) 2% 06/2620% GW

Pigment / Binders08 Paint (Grey) 1% 06/26100% GW

Mineral Wool Fibers09 Insulation (Yellow) 35% 06/2695% GW

Resin Binders09 Insulation (Yellow) 35% 06/265% GW

Cellulose Fibers09 White Mastic (White) 50% 06/265% GW

Pigment / Binders09 White Mastic (White) 50% 06/2695% GW

Cellulose Fibers09 Paper / Foil Wrap (Tan / Silver) 10% 06/2660% GW

Glass Wool Fibers09 Paper / Foil Wrap (Tan / Silver) 10% 06/2620% GW

Metal Foil09 Paper / Foil Wrap (Tan / Silver) 10% 06/2620% GW

Pigment / Binders09 Paint (Grey) 5% 06/26100% GW

Calcite10 Mastic (Olive) 100% 06/2640% GW

Glue Binders10 Mastic (Olive) 100% 06/2660% GW

Project # : GSE-013

Sample Number Layer Components % Of

Sample

Analysis

Date

% of

Layer Analyst

Supplement to PLM Summary Report 2051 Valley View Lane

Farmers Branch, TX 75234

Client :

Project :

Great Southern Engineering

Building 4306

Lab Job No. :

Report Date :

08B-07782

06/26/2008

Calcite11 Mastic (Olive) 100% 06/2640% GW

Glue Binders11 Mastic (Olive) 100% 06/2660% GW

Calcite12 Mastic (Olive) 100% 06/2640% GW

Glue Binders12 Mastic (Olive) 100% 06/2660% GW

Cellulose Fibers13 Acoustic Tile (Light Grey) 100% 06/2670% GW

Mineral Wool Fibers13 Acoustic Tile (Light Grey) 100% 06/2610% GW

Perlite13 Acoustic Tile (Light Grey) 100% 06/2620% GW

Cellulose Fibers14 Acoustic Tile (Light Grey) 100% 06/2670% GW

Mineral Wool Fibers14 Acoustic Tile (Light Grey) 100% 06/2610% GW

Perlite14 Acoustic Tile (Light Grey) 100% 06/2620% GW

Cellulose Fibers15 Acoustic Tile (Light Grey) 100% 06/2670% GW

Mineral Wool Fibers15 Acoustic Tile (Light Grey) 100% 06/2610% GW

Perlite15 Acoustic Tile (Light Grey) 100% 06/2620% GW

Cellulose Fibers16 Acoustic Tile (Light Grey) 100% 06/2670% GW

Mineral Wool Fibers16 Acoustic Tile (Light Grey) 100% 06/2610% GW

Perlite16 Acoustic Tile (Light Grey) 100% 06/2620% GW

Cellulose Fibers17 Acoustic Tile (Light Grey) 100% 06/2670% GW

Mineral Wool Fibers17 Acoustic Tile (Light Grey) 100% 06/2610% GW

Perlite17 Acoustic Tile (Light Grey) 100% 06/2620% GW

Cellulose Fibers18 Acoustic Tile (Light Grey) 100% 06/2670% GW

Mineral Wool Fibers18 Acoustic Tile (Light Grey) 100% 06/2610% GW

Perlite18 Acoustic Tile (Light Grey) 100% 06/2620% GW

Calcite / Vinyl Binders19 Floor Tile (Tan) 100% 06/26100% GW

Glue Binders19 Yellow Mastic (Yellow) <1% 06/26100% GW

Calcite / Vinyl Binders20 Floor Tile (Tan) 97% 06/26100% GW

Glue Binders20 Yellow Mastic (Yellow) 3% 06/26100% GW

Calcite / Vinyl Binders21 Floor Tile (Tan) 97% 06/26100% GW

Chrysotile21 Black Mastic (Black) 3% 06/265% GW

Tar Binders21 Black Mastic (Black) 3% 06/2695% GW

Project # : GSE-013

Sample Number Layer Components % Of

Sample

Analysis

Date

% of

Layer Analyst

Supplement to PLM Summary Report 2051 Valley View Lane

Farmers Branch, TX 75234

Client :

Project :

Great Southern Engineering

Building 4306

Lab Job No. :

Report Date :

08B-07782

06/26/2008

Glue Binders22 Mastic (Green) 100% 06/26100% GW

Glue Binders23 Mastic (Yellow) 100% 06/26100% GW

Glue Binders24 Mastic (Yellow) 100% 06/26100% GW

Calcite / Vinyl Binders25 Cove Base (Brown) 97% 06/26100% GW

Calcite25 Cream Mastic (Cream) 3% 06/2650% GW

Glue Binders25 Cream Mastic (Cream) 3% 06/2650% GW

Calcite / Vinyl Binders26 Cove Base (Brown) 95% 06/26100% GW

Calcite26 Cream Mastic (Cream) 5% 06/2650% GW

Glue Binders26 Cream Mastic (Cream) 5% 06/2650% GW

Calcite / Vinyl Binders27 Cove Base (Brown) 97% 06/26100% GW

Calcite27 Cream Mastic (Cream) 3% 06/2650% GW

Glue Binders27 Cream Mastic (Cream) 3% 06/2650% GW

Calcite / Talc / Binders28 Texture (White) 100% 06/26100% GW

Calcite / Talc / Binders29 Texture (White) 100% 06/26100% GW

Calcite / Talc / Binders30 Texture (White) 100% 06/26100% GW

Calcite / Talc / Binders31 Texture (White) 100% 06/26100% GW

Calcite / Talc / Binders32 Texture (White) 100% 06/26100% GW

Cellulose Fibers33 Sink Undercoating (Off-White) 100% 06/2610% GW

Calcite / Talc33 Sink Undercoating (Off-White) 100% 06/2650% GW

Binders / Fillers33 Sink Undercoating (Off-White) 100% 06/2640% GW

Cellulose Fibers34 Sink Undercoating (Off-White) 100% 06/2610% GW

Calcite / Talc34 Sink Undercoating (Off-White) 100% 06/2650% GW

Binders / Fillers34 Sink Undercoating (Off-White) 100% 06/2640% GW

Cellulose Fibers35 Sink Undercoating (Off-White) 100% 06/2610% GW

Calcite / Talc35 Sink Undercoating (Off-White) 100% 06/2650% GW

Binders / Fillers35 Sink Undercoating (Off-White) 100% 06/2640% GW

Mineral Wool Fibers36 Insulation (White) 100% 06/26100% GW

Mineral Wool Fibers37 Insulation (White) 100% 06/26100% GW

Project # : GSE-013

Sample Number Layer Components % Of

Sample

Analysis

Date

% of

Layer Analyst

Supplement to PLM Summary Report 2051 Valley View Lane

Farmers Branch, TX 75234

Client :

Project :

Great Southern Engineering

Building 4306

Lab Job No. :

Report Date :

08B-07782

06/26/2008

Mineral Wool Fibers38 Insulation (White) 100% 06/26100% GW

Appendix B

ACM Sample Location Drawings

First Floor Building 4306

Marshall Space Flight Center Marshall Space Flight Center, AL

Task Order #GSE-013

3 24

33, 34, 17, 36, 37, 1 19

101112

Appendix C

ACM Location Diagrams

Manju Ramasamudra Text Box Black mastic associated with 12" X 12" beige floortile and carpet

Manju Ramasamudra Polygon

Manju Ramasamudra Polygon

Appendix D

Photographs

Building 4306, George C. Marshall Space Flight Center, Marshall Space Flight Center, Alabama

PHOTO 1. Pipe insulation with white mastic PHOTO 2. Wallboard system

PHOTO 3. Pipe insulation with gray mastic PHOTO 4. Olive duct mastic

PHOTO 5. 2’ X 4’ ceiling tile with fissures PHOTO 6. 12” X 12” beige floortile with mottles

Building 4306, George C. Marshall Space Flight Center, Marshall Space Flight Center, Alabama

PHOTO 7. Brown cove base PHOTO 8. Wall texture

PHOTO 9. Sink undercoating PHOTO 10. Blown in insulation

PHOTO 11. 2’ X 2’ green carpet squares PHOTO 12. 2’ X 2’ ceiling tile with fissures

Appendix E

License and Certifications

1. Introduction
2. Summary
2.1. Suspect ACMs
2.2. Recommendations
3. Survey Scope
4. Limitations
5. Survey and Sample Collection Procedure
6. Previous Survey / Plans Review
7. Suspect ACM Materials Not Sampled
8. Survey Sampling Results
9. Appendices
Appendix A Laboratory Results
Appendix B ACM Sample Location Drawings
Appendix C ACM Location Diagrams
Appendix D Photographs
Appendix E License and Certifications

File details come from the government source that posted it.