This document contains questions and answers related to a solicitation for the 47 Motor LifeBoat Service Life Extension Program. The solicitation seeks to modify 47 MLB boats to extend their service life. Key details include:

  • The Coast Guard is directing sources for fenders, doors and navigation systems and requires these suppliers to bid identical pricing to all offerors. Mockups will be constructed using an MLB provided from storage in Buffalo, New York. Transportation of this boat is to be included in CLIN 0001AA.

  • There are currently 14 MLBs not in service located per GFI #008, with 1 on the East Coast, 11 in the Great Lakes and 2 on the West Coast. An induction inspection will be completed for these boats after transportation to the production site to start the SLEP performance clock. Offerors are to assume mounting studs and coamings can be reused and replacement quantities are unknown.

  • The document provides clarification on requirements for alternator sizing, battery specifications and acceptable induction/delivery locations. Payment terms do not allow for interim or progress payments on production and stock CLINs.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

47 MLB SLEP Bidder Questions

Ques.

Section # (In RFP)

Text in Question Question Answer

1 SOW 063-6 & Spec Section 332-1.6

Specification (Spec) Section 332-1.6: Lighting for each compartment shall be provided with a single dimmer switch that is located as specified in Statement of Work (SOW) Section 063-6.

We would like to request clarification on the dimming requirements. Spec Section 332-1.6 States Lighting for each compartment shall be provided with a single dimmer switch that is located as specified in SOW Section 063-6. SOW Section 063-6 states that currently dimming is only on the bridge. Please clarify

Specification Section 332-1.6 revised. Every switch removed under section SOW 063-6.1 shall be replaced with a dimmer switch. The dimmer switch shall be in accordance with the requirements of specification section 332-1.6

2 SOW Section 087-2.1, 091-1.3, 091- 1.4, Section L Table L.9.2.

The location of the induction inspection for boats not in service will be at their USCG designated storage site. The induction inspection shall be completed prior shipment to the production facility as noted in SOW Section 091-1.3 and 091-1.4.

Referenced SOW Sections: Section C 087-2.1 [Orig] The Contractor shall select one East Coast and one West Coast location for the induction of Motor Lifeboats (MLBs) into the SLEP and the return of the MLBs to service after the modifications are complete. These locations hereafter shall be referred to as the induction/delivery location {IDL East and IDL West).

Section C 091-1.3 [Orig] The Contractor shall assume responsibility for the MLB upon completion of the induction inspection and acceptance of the completed Standardized Induction Checklist (to include attachments, if any) and DD Form 1149. The Contractor shall submit these documents to the Contracting Officer in accordance with CDRL 091-001. Section C 091-1.4 [Orig] Following the induction inspection, the Contractor is responsible for all labor, materials, and equipment required to disassemble an MLB for shipment to the production facility per SOW Section 084-4.2. The Contractor is also responsible for all labor, materials, and equipment required to reassemble an MLB at the production facility for determining the weight and centers of gravity per SOW Section 096-3.1 before and after SLEP production.

Referenced Section L: Table L.9.2 Objective -Threshold and Objective Requirements

Please provide clarification to your response to Question 21 dated 5 February 2019. Section C 087-2.1 states that, "The Contractor shall select one East Coast and one West Coast location for the induction of MLBs into the SLEP and the return of the MLBs to service after the modifications are complete." Therefore, the two IDLs are clearly defined as locations for induction of MLB into the Service Life Extension Program (SLEP). However, your response to Question 21 indicates that not-in service boats are inducted at the USCG designated storage site. This runs counter to Section C 087-2.1. Further, in your response to Question 21, you pointed to Section C 091-1.3 and 091-1.4. Neither of these sections mention induction and/or inspection location. Section C 091-1.3 states that the Contractor is liable for the MLB after induction inspection and acceptance but does not say where this takes place. Section C 091-1.4 further defines Contractor responsibility after induction inspection but does not say where this takes place. Section C 087-2.1 appears to be the only clause defining the location of induction.

As a result, for not in-service boats, would the USCG consider an inspection at their storage site, a handoff and transfer of liability to the Contractor for transportation, and a second inspection and induction at the IDL after transportation?

This approach is compliant to 087-2.1, 091-1.3, and 091-1.4. If not, would the USCG consider adjusting the requirements in Table L.9.2 to account for the difference in induction location for not in-service boats versus in service boats for FA, LRIP, and FRP?

The Coast Guard has revised the SOW to incorporate a joint transportation inspection that supports transferring the not in service boats to the Offeror without starting the production clock. For these boats an induction inspection will be completed after the boats have been transported to start the SLEP performance clock.

Sections 040-9.3.3, 087-2.1, 091-1.3, revised, Section 091-2 added, and CDRL 091-002 added.

Section B 2(a) (0003) 000lAA, Section C 039-1.4.4 [0003], Section C 098-1.2 [0003], Attachment J-2 (0003) CUN

0007AA

Section B 2(a) (0003) 0001AA Detailed Design Deliverables includes:

systems integration and engineering, general requirements for design and construction, RAM overview, human systems integration, and mockups. Included in the mockups is transportation of the designated MLB, as noted in Statement of Work in Section C Section 098-1.2, to the Contractor's Facility to be used to construct the mockups. The MLB used for the mockups shall remain available through the completion of OT&E.

Section C 039-1.4.4 [(0003) Boats not in service: There are currently 14 boats not in service in different locations: 1 on the East Coast, 11 in the Great Lakes, and 2 on the West Coast.

Section C 098-1.2 [(0003) All mockups shall be constructed on a 47B MLB provided to the Contractor for design and engineering under Detailed Design Deliverable, CUN 0001AA. The Contractor shall transport the 47B MLB for the mockup from designated USCG storage in Buffalo, New York to the Contractor's facility.

In Amendment 0003, the USCG indicated that transportation costs for the mockup should be included in CUN 0001AA (Section B 2[a]) and that the mockup boat is transported from USCG storage in Buffalo, New York (Section C 098-1.2).

The USCG further clarified that there is a total of 14 boats not in service (Section C 039-1.4.4). Attachment J-2, CLIN 0007AA calls for transport of 14 total boats between OYl and OY4. If the mock up transportation costs are captured in CUN 0001AA and the mock up boat is 1 of the 4 not in service boats stored in Buffalo as defined in GFI 08 (of 14 total not in service boats), are there only 13 remaining FA/LRIP boats left to transport in CLIN 0007AA?

Yes, Section F.6 and Attachment J-2 updated to 13. Section B updated to outline the induction of an MLB as part of production and not part of transportation.

4 Section C 039-1.4.4 [0003], GFI 08 47 MLB Locations

Section C 039-1.4.4 [0003] Boats not in service: There are currently 14 boats not in service in different locations: 1 on the East Coast, 11 in the Great Lakes, and 2 on the West Coast.

In Amendment 0003, the USCG changed the location of not in service boats from 1 on the East Coast, 10 in the Great Lakes, and 4 on the West Coast to 1 on the East Coast, 11 in the Great Lakes, and 2 on the West Coast. Based on GFI 08, the 14 boats are distributed 1 on the East Coast, 10 in the Great Lakes, and 3 on the West Coast.

What are the proper locations of all not in service 47" MLBs? If there are 1 on the East Coast, 11 in the Great Lakes, and 2 on the West Coast, what changes have been made to GFI 08? Where is the additional boat in the Great Lakes located?

Was the West Coast boat taken from Ilwaco or Seattle?

There is potential that the location of not in service boats may fluctuate over time. GFI #008 was created to establish locations that can be used to solicit, evaluate, and award a contract. GFI #008 should be used for proposal submission.

GFI #008 lists 14 boats not in service, 1 on the East Coast, 10 in the Great Lakes, and 3 on the West Coast.

Ques.

Section # (In RFP)

Text in Question Question Answer

Response to Questions, Posted on FBO February 5th, 2019, Question

The SLEP effort is being awarded to industry who will be responsible for sourcing the required components to complete the SLEP work. The USCG is not directing Offeror(s) to any particular source of supply(s).

In the government's response to Question 47 dated 5 February 2019, the USCG stated, "The SLEP effort is being awarded to industry who will be responsible for sourcing the required components to complete the SLEP work. The USCG is not directing Offeror(s) to any particular source of supply(s)."

It is our understanding based on the SOW's, Specification, and Justifications for Other than Full and Open Competition, that you are directing sources for the following items: fenders, doors and navigation systems. Please clarify this is the case and confirm that these specified direct sources must bid fair, reasonable, and identical pricing and pricing structure to all MLB SLEP offerors.

Yes, the USCG is directing the sources of fenders, doors, and navigation systems through the SOW, Specification, and Justifications for Other than Full and Open Competition (please see solicitation attachments: "47 MLB SINS-2 JOTFOC_Redacted" & "47 MLB JOTFOC_Fender_Doors_Redacted"). The USCG is not directing pricing or negotiating pricing for any directed sources for this procurement.

Question 47 and the response dated 5 February 2019 was directed at the sourcing for the shaft seal.

Ques.

Section # (In RFP)

Text in Question Question Answer

6 Section C 096-3.1, Attachment J-2

Section C 096-3.1 [Orig] The Contractor shall determine the weight and Centers-of-Gravity (CGs), (LCG, VCG, and TCG) on all boats modified under this contract. The Contractor shall use the WCMC to weigh and calculate CGs on each hull before and after SLEP production.

In order to meet Section C, 096-3, Contractors are required to have a weight and centers of gravity measurement cradle (WCMC) at both the East Coast and West Coast IDLs. CUN 0002 only allows pricing for one cradle in (OY) 1.

Additionally, the second cradle may not be necessary in (OY) 1. Please clarify under which CLIN Contractors are to include the price of the second WCMC once needed.

The USCG only requires one weight and centers of gravity measurement cradle (WCMC) to be delivered to the USCG. If the Offeror believes that a second WCMC is needed, the cost of the second WCMC should be included in the pricing for CLIN 0006.

Section C-2

CDRL 085-003

BLK16 - REMARKS:

BLK04: DID tailored per TDP Options Worksheet attached to this

CDRL.

BLK12: 90 days prior to PCA.

Allow 30 days Government review.

BLK14: Hard Copy drawings shall be two full size for the PCA.

Attachment J-2

Block 16 of CDRL 085-003 states that the first submittal for 2D drawings is 90 days prior to PCA. Section C, 041-4.3 states that, "the MLB for the PCA will be designated by the Contracting Officer that has all the changes identified during OT&E and any approved Engineering Changes incorporated in its production." PCA must therefore happen after OT&E. At the same time, CLIN 000lAB covers only Order Year (OY) 1. Please clarify under which CLIN Contractors are to bid systems engineering beyond OYl to support submittal of CDRL 085-003.

All effort to complete CDRL 085-003 shall be priced in CLIN 0001AB. The performance of this CLIN may extend beyond OY1.

Referenced Documents:

Amendment 0001 Amendment 0002

Did the USCG provide an SF-30 for Amendments 0001 and 0002? Please confirm their location. No, the USCG did not provie SF-30 for Amendments 1 & 2.

9 Section C, 061-7.1.2.1 Section C, 061-7.1.2.1 [Orig] If unserviceable, the hatch shall be removed and coaming shall be cutout. Cutting shall be as close to the existing edge of the plate opening as possible.

Can the government indicate the quantity of coamings expected to be renewed on each MLB so that contractors can prepare an accurate bid? Does the government expect coaming replacement to be priced under discovered items?

No, the USCG will not indicate the quantity of coamings that are expected to be renewed. For proposal purposes, the Offeror shall assume that all coamings can be reused. If coaming are identified for renewal, the labor to renew them will be captured in discovered item CLIN 0009AA. The material cost for these will be covered in discovered item CLIN 0009AB. CLIN 0009AB is a locked cell on the pricing worksheet and shall not be filled in by the Offeror. The USCG will fill in this cell with a NTE amount at contract award.

10 Section C, 061-9.2.2.1

Section C, 061-9.2.2.1 [Orig] The Contractor shall renew damaged mounting studs, if any, consisting of a stud and bonded disk, in accordance with USCG Drawing 47B-MLB-611-020, Rev. M, and Spec Section 074.

Can the government indicate the quantity of mounting studs expected to be renewed on each MLB so that contractors can prepare an accurate bid? Does the government expect mounting stud replacement to be priced under discovered items?

No, the USCG will not indicate the quantity of mounting studs that are expected to be renewed. For proposal purposes, the Offeror shall assume that all mounting studs can be reused. If mounting studs are identified for renewal, the labor to renew them will be captured in discovered item CLIN 0009AA. The material cost for these will be covered in discovered item CLIN 0009AB. CLIN 0009AB is a locked cell on the pricing worksheet and shall not be filled in by the Offeror. The USCG will fill in this cell with a NTE amount at contract award.

11 Section L.10 (a) 4 The Offeror shall not modify Attachment J-2 other than to insert pricing in cells highlighted for data entry; formulas on Attachment J-2 are locked.

Attachment J-2 prevents the adjustment of the cell column width resulting in the contents of some cells to be shown as:

J-2 has been revised to increase the cell column width. In the event of ###### being displayed, the USCG will review J-2 by the value inputted in the cell, and not what is being displayed.

12 Section L.10 (a) 4 Enter pricing data to the whole dollar, no cents. Except for cell C5, the cell formatting in J-2 does not allow pricing without cents. J-2 has been revised so only whole dollar amounts are displayed. All entries shall be made in whole dollar amounts.

13 Section L.10 (a) 4 Enter pricing data to the whole dollar, no cents. Is this requirement applicable to pricing of CLINS which require a composite labor rate, i.e. 0009AA and 0011AA? Yes, composite labor rates shall be in whole dollar amounts.

14 Section B.2 (a) Included in the mockups is transportation of the designated MLB, as noted in Statement of Work in Section C Section 098-1.2, to the Contractor’s Facility to be used to construct the mockups.

Is the cost for transportation of the boat required by 098-1.2 to be included in Ordering Year 1 of CLIN 0007AA or CLIN 0001AA? If CLIN 0001AA, will Attachment J-2 be revised to reflect the same? The cost for transportation of the boat required by 098-1.2 shall be included in CLIN 0001AA

15 SOW Appendix C, GFI #08

Appendix C of the SOW notes nine locations for the inactive boats. In the 5 February Q&A document (#32, 33, and 42) and SOW, the USCG noted that there were eleven inactive boats on the Great Lakes, but only six locations listed are on the Great Lakes. The industry visit to Buffalo revealed four boats there; this leaves two boats at an unknown locations on the Great Lakes. To mitigate ambiguity and support detailed transportation planning, we request the USCG provide the specific location of each inactive boat.

There is potential that the location of not in service boats may fluctuate over time. GFI #008 was created to establish locations that can be used to solicit, evaluate, and award a contract. GFI #008 should be used for proposal submission.

GFI #008 lists 14 boats not in service, 1 on the East Coast, 10 in the Great Lakes, and 3 on the West Coast.

16 Payment Terms

Reference Q&A #16, please clarify the milestone payments by each CLIN/subCLIN. Further, request the USCG allow for interim payments for production CLINs and not solely upon acceptance of MLBs. Therefore, we request monthly progress payments be permitted for all production and insurance stock CLINs, based on a milestone schedule to be mutually agreed by the USCG and the contractor or percentage physical progress, subject to reasonable hold back.

The USCG will not issue interim payments or monthly progress payments for production and system insurance stock CLINs.

Long Lead Time Material (LLTM) can be invoiced by the Offeror once the material is received and inspected at the production site(s) and witnessed by the USCG.

System Insurance Stock can be invoiced by the Offeror once material is received and inspected at the FOB destination and accepted by the

USCG.

17 SOW Section 061-8.2.1

Reference SOW 061-8.2.1 (“The Contractor shall modify, fit, install and weld the existing mounting pedestal for the motorized spotlight to eliminate the adapter plate.”) Is the Marinco Spotlight SPL-12W.OEM mounting bracket what the Coast Guard is calling “the adapter plate” and is it the Coast Guard’s intention that the contractor alter the pedestal of the OEM spotlight and design an alternate mounting solution? If so, what is the Coast Guard’s expectations for warranty on the spotlight.

The adapter plate is not the Marinco Spotlight SPL-12W OEM mounting bracket. The USCG intent is to mount the spotlight without an adaptor plate. The OEM spotlight should not be modified, and the mast should be modified to support mounting of the spotlight without an adaptor plate.

Amendment 0003 provided revised Solicitation documents with changed sections highlighted. Upon review, we have noticed that several change pages provided with this amendment did not have any actual changes. Can the Government that the intended changed pages with highlighted paragraphs were provided?

All highlighted paragraphs in Amendment 0003 had clarifications or changes. Some of the changes were very minor (clerical) and some corrected spelling.

Ques.

Section # (In RFP)

Text in Question Question Answer

19 Spec 310-1.4

Attachment C-1 Specifications Section 310-1.4 states that “310-1.4 [Orig] The combined electric power generation systems (port and starboard) shall be sized to provide sufficient power output to meet boat functional load requirements (with appropriate margins) and to maintain fully charged battery banks, as detailed below, while the boat is operating at idle speed (not low idle) and at the generation systems’ hot operating temperature (worst case).”

The above statement implies that the alternators on both engines shall be sized to meet boat functional load requirements (with operating and SLA margins) and to maintain fully charged battery banks. However, the provided “GFI_11_47B-MLB Electrical Plant Load Analysis Template (EPLA) FINAL_170828.xls” document only used two alternators (out of total of 4 alternators and two per engine) for supplying power to worst case operating condition (12VDC, 24VDC, and 120VAC loads).

We understand that the Attachment C-1 Specifications takes precedence over the provided EPLA template. We will follow the Attachment C-1 Specifications Section 310-1.4 for sizing the alternators. Please confirm.

The specification takes precedence over the EPLA template, and specification section 310 should be used to size the alternators.

The EPLA provided as GFI represents the current arrangement that has one alternator on each engine (two alternator total) dedicated to charging the starting battery circuit, and the other alternator on each engine (two alternator total) providing power to the functional load and/or the service battery bank. This arrangement does not need to be replicated and is not accurately captured in the GFI.

20 Spec 313-1.1

Attachment C-1 Specifications states the following:

“313-1.1 [Orig] The two existing 24VDC battery banks, one for hotel/service loads and one for engine starting, each comprised of two 12VDC 8D-size AGM batteries connected in series, shall be replaced in accordance with USCG Drawing 47B-MLB-313-001, Rev -.”

Please provide the existing starting and service battery capacities in amp-hrs. The batteries comprising the Starting and Service battery banks are identical. Battery capacity in Amp-hours will vary according to manufacturer, but typical values for 8D-sized AGM deep-cycle batteries are 245 to 255 Ah (at the 20-hour or C/20 rate).

21 Section 039-3

Attachment C Statement of Work states the following:

“039-3.3.2.1 [Orig] From the Great Lakes and East will be inducted and returned at IDL East.

039-3.3.2.2 [Orig] Operational boats on the West Coast will be inducted and returned at IDL West.”

Will the Government consider the boatyards/marinas located inland of east or west coast which are navigable over the water as an induction/delivery location?

The USCG will consider boatyards/marinas located inland of the east and west coast as an induction/delivery location as long as the boatyards/marinas meets the requirements of Section C, Statement of Work, Section 087-2.2. IDLs located in the Great Lakes or the Gulf of Mexico do not meet these requirements.