This document provides details of a pre-proposal site visit for the 47 Motor LifeBoat Service Life Extension Program solicitation. The site visit will take place on December 12-13, 2018 at Sector Buffalo and includes an overview of the schedule, logistics for visiting three MLBs, and safety protocols. Contractors will have allocated time slots to view the first article MLB and open viewing of the other two MLBs. The document outlines questions should be submitted by December 13th, with answers provided during an open forum discussion that day. This pre-solicitation site visit aims to provide offerors with information and access to help inform their proposals for the 47 MLB SLEP requirement issued by the United States Coast Guard.
Pre-Proposal Site Visit Brief
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pre-Proposal Site Visit, Sector Buffalo – 12-13 December 2018
47’ MLB SLEP
Unclassified |CG-9325 | Myung Park | 12 Dec 2018
47’ MLB SLEP Pre-Proposal Site Visit
• Welcome and Agenda
• Logistics
• Schedule
• Safety
• Interaction with Government Personnel
• Submitting Questions
Unclassified | Preproposal Site Visit | CG-9325| Myung Park | 12 December 2018
• Logistics
• Parking – Any open spot is available for parking (CG Command Cadre parking are labeled, do not park in these spaces), Recommend to park near Engineering
Building (see next slide)
• Conference Room in Sector Command Building
• Departing/Arriving on Base
• Heads – Command Building, Sector Engineering Building and CG Exchange
Building
• Food – Not available on Sector Buffalo
• Water/Coffee – available in Sector Engineering Building
• You may photograph, video, sketch, measure, take notes, as needed on the
MLBs, not of other USCG property or assets
• This is the only scheduled time to view MLBs prior to proposals submission
• If weather forces USCG to suspend/cancel viewing on Weds or Thurs, Fri is reserved as a make up day
• Layout/Map – See next 2 Slides
• Layout/Map
Unclassified | Preproposal Site Visit | CG-9325| Myung Park | 12 December 2018
47240
3 MLBs
Main Gate
CG Exchange
Conference Room in Sector
Command Building
Sector Engineering Building
Marina
• Layout/Map
Unclassified | Preproposal Site Visit | CG-9325| Myung Park | 12 December 2018
Sector Engineering Building
47222
47241 First Article
47283
• Schedule
Unclassified | Preproposal Site Visit | CG-9325| Myung Park | 12 December 2018
DAY 1 (Weds, Dec 12)
0800 Pre-Proposal Site Visit
Kickoff
Review of schedule, safety & security requirements, and site visit logistics
0830 47B MLB Viewing Open viewing of 2 MLBs
Allocated times for First Article (FA)
1730 End of Day 1 Contractors checkout with USCG
DAY 2 (Thurs, Dec 13)
0800 47B MLB Viewing
Check In
Open viewing of 2 MLBs, allocated times for FA
Open viewing of MLB stored in Marina 0800-1100
1230 Submit Questions Contractors submit written questions
1500 Question & Answer Open forum discussion/MLB viewing complete
1700 End of Day 2
• Schedule/Time Allocation
Day 1:
• First Article 47241
• Contract Team 1: 0830-0930
• Contract Team 2: 0930-1030
• Contract Team 3: 1030-1130
• Contract Team 4: 1130-1230
• Contract Team 5: 1230-1330
• Contract Team 6: 1330-1430
• Contract Team 7: 1430-1530
• Contract Team 8: 1530-1630
• Contract Team 9: 1630-1730
• 47222 & 47283
• Open to all: 0830-1730
Unclassified | Preproposal Site Visit | CG-9325| Myung Park | 12 December 2018
Day 2:
• First Article 47241
• Contract Team 10: 0800-0900
• Contract Team 11: 0900-1000
• Contract Team 12: 1000-1100
• Open to all: 1100-1500
• 47222 & 47283
• Open to all: 0800-1500
• 47240 (located at Marina)
• Open to all: 0800-1100
• Safety
• All MLBs are non-operational
• Only power is by temporary generators for lighting and heat
• No equipment on board is operational, nor can anything be powered/tested
• You are responsible for your own PPE and safety protocols in accordance with your company’s policy
• Access will be via step ladders
• No lifelines, foredeck is 10-12 feet off the ground
• Weather may make decks and ladders slippery
• Deck plates are susceptible to movement, please replace anything you move (i.e.
deck plates, boat outfit items, etc.) prior to leaving that space
• Interaction with Government Personnel
• Government/USCG personnel will be at each MLB for the duration of the visits/tours
• All technical requirements and specifications are per the RFP
• USCG personnel will not speak to a particular technical approach or new equipment
• USCG personnel can address what something is or where something is located
• Submitting Questions
• Please submit any questions either written on index cards or via email to the
Contracting Officer (Nakenia.S.Spruill@uscg.mil) (located in the Sector
Command Building)
• If submitting via index card, include the following
– Official name of the offeror (company name)
– SOW or SPEC reference related to the question, if applicable
• Questions are due by 1230 on Thurs, December 13
• The Government will answer as many questions as possible during the Q&A session starting at 1500 on the 13th
• If questions do not get addressed here, responses will posted on FEDBIZOPS mailto:Nakenia.S.Spruill@uscg.mil