70Z02319RAML003_-_47_MLB_SLEP.pdf
PDF 10 MB Posted
- Solicitation number
- 70Z02319AML003
About this file
This award notice provides details for a 47-foot Motor Lifeboat Service Life Extension Program requirement issued by the United States Coast Guard. Key information includes the solicitation number 70Z02319AML003 for the design, construction, and sustainment services required over a 10-year ordering period to extend the service life of 107 MLBs. Products and services include detailed design, a weight and center of gravity measurement cradle, program management support, production activities, transportation, retention of removed propulsion equipment, discovered item work, training, interim contractor logistics support, and system insurance stock spare parts. The notice specifies a firm-fixed-price IDIQ contract type and includes unit pricing tables for the base period and nine option years by CLIN. First article and low rate initial production are followed by full rate production quantities.
70Z02319RAML003
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
L-1Past Performance Questionnaire Solicitation Number: 70Z02319RAML003
Please provide your assessment of the prospective offeror’s level of past performance on a contract for which you were the reference. Please fill in the below tables and choose the appropriate rating from the drop-down list using the definitions on page two and provide justification for that rating.
Submit the questionnaire by the proposal due date to:
Nakenia.S.Spruill@uscg.mil.
Contractor Being Evaluated Company/Government Agency Completing the Questionnaire Period of Performance Being Assessed Contract Award Date Contract Number & Order Number (if applicable) Contract Completion Date Company/Government Agency Completing the Questionnaire Evaluator Name Email and Phone Total Dollar Value (includes unexercised options; ceiling amount for IDIQ) Current Dollar Value (current obligated amount) Project Title Contract Effort Description (Identify the key requirements and/or type of effort. The description should be detailed enough so that it can be used in determining the relevance of this program or project. Address the complexity of the contract/order effort and the overall technical risk associated with accomplishing the effort. Ensure acronyms are identified. Provide a complete description of the contract/order effort that identifies key technologies, components, subsystems, and requirements. For task/delivery order contracts, state the number of orders issued during the period, the number of orders completed during the period, and the number of orders that remain active.
Would you recommend this company for selection?
mailto:CG-9123BoatBuy@uscg.mil mailto:CG-9123BoatBuy@uscg.mil
Rating Definition Justification Exceptional Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective
To justify an Exceptional rating, identify multiple significant events and state how they were of benefit to the Government. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating.
Also, there should have been NO significant weaknesses identified.
Very Good Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective actions taken by the contractor was effective.
To justify a Very Good rating, identify a significant event and state how it was a benefit to the Government. There should have been no significant weaknesses identified.
Satisfactory Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
To justify a Satisfactory rating, there should have been only minor problems, or major problems the contractor recovered from without impact to the contract/order. There should have been NO significant weaknesses identified. A fundamental principle of assigning ratings is that contractors will not be evaluated with a rating lower than Satisfactory solely for not performing beyond the requirements of the contract/order.
Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
To justify Marginal performance, identify a significant event in each category that the contractor had trouble overcoming and state how it impacted the Government. A Marginal rating should be supported by referencing the management tool that notified the contractor of the contractual deficiency (e.g., management, quality, safety, or environmental deficiency report or letter).
Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
To justify an Unsatisfactory rating, identify multiple significant events in each category that the contractor had trouble overcoming and state how it impacted the Government. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating. An Unsatisfactory rating should be supported by referencing the management tools used to notify the contractor of the contractual deficiencies (e.g., management, quality, safety, or environmental deficiency reports, or letters).
Category and Description Rating (drop down) Justification Quality of Product or Service Contractor’s conformance to contract/order requirements, specifications and standards of good workmanship.
Choose a Rating
Schedule. Assess the timeliness of the contractor against the completion of the contract, task orders, milestones, delivery schedules, and administrative requirements.
Management. Assess the integration and coordination of all activity needed to execute the contract/order, specifically the timeliness, completeness and quality of problem identification, corrective action plans, proposal submittals, the contractor’s history of reasonable and cooperative behavior (to include timely identification of issues in controversy), customer satisfaction, timely award and management of subcontracts.
Regulatory Compliance Consider failure to report in accordance with contract terms and conditions, late or nonpayment to subcontractors, trafficking violations, tax delinquency, defective cost or pricing data, terminations, suspension and debarments.
Assess compliance with all terms and conditions in the contract/order relating to applicable regulations and codes, Consider aspects of performance such as compliance with financial, environmental, safety, and labor regulations as well as any other reporting requirements in the contract terms and conditions.
Given what I know today I Choose a Recommendation recommend them for similar requirements.
QualityOfProductorServiceJustification:
ScheduleJustification:
ManagementJustification:
RegulatoryComplianceJustification:
RecommendationJustification:
QualityOfProductOrServiceDropdown: [Choose A Rating]
ScheduleDropdown: [Choose A Rating]
ManagementDropdown: [Choose A Rating]
RegulatoryComplianceDropdown: [Choose A Rating]
RecommendationDropdown: [Choose a Recommendation]
Would you recommend this company for selection:
Contract Effort Description Identify the key requirements andor type of effort The description should be detailed enough so that it can be used in determining the relevance of this program or project Address the complexity of the contractorder effort and the overall technical risk associated with accomplishing the effort Ensure acronyms are identified Provide a complete description of the contractorder effort that identifies key technologies components subsystems and requirements For taskdelivery order contracts state the number of orders issued during the period the number of orders completed during the period and the number of orders that remain active:
Project Title:
Contractor Being Evaluated:
CompanyGovernment Agency Completing the Questionnaire:
Period of Performance Being Assessed:
Contract Award Date:
Contract Number Order Number if applicable:
Contract Completion Date:
CompanyGovernment Agency Completing the Questionnaire_2:
Evaluator Name Email and Phone:
Total Dollar Value includes unexercised options ceiling amount for IDIQ:
Current Dollar Value current obligated amount:
March 2014 CGAP Chapter 3033 Appendix B
APPENDIX B – CHAPTER 3033
NOTICE FOR FILING AGENCY PROTESTS
United States Coast Guard Ombudsman Program
It is the policy of the United States Coast Guard (USCG) to issue solicitations and make contract awards in a fair and timely manner. The Ombudsman Program for Agency Protests (OPAP) was established to investigate agency protest issues and resolve them without expensive and time-consuming litigation. OPAP is an independent reviewing authority that is empowered to grant a prevailing protester essentially the same relief as the Government Accountability Office (GAO).
Interested parties are encouraged to seek resolution of their concerns within the USCG as an Alternative Dispute Resolution (ADR) forum rather than filing a protest with the GAO or some external forum. Interested parties may seek resolution of their concerns informally or opt to file a formal agency protest with the Contracting Officer or Ombudsman.
Informal Forum with the Ombudsman. Interested parties who believe a specific USCG procurement is unfair or otherwise defective should first direct their concerns to the applicable Contracting Officer. If the Contracting Officer is unable to satisfy their concerns, interested parties are encouraged to contact the U.S. Coast Guard Ombudsman for Agency Protests. Under this informal process the agency is not required to suspend contract award performance. Use of an informal forum does not suspend any time requirement for filing a protest with the agency or other forum. In order to ensure a timely response, interested parties should provide the following information to the Ombudsman: solicitation/contract number, contracting office, Contracting Officer, and solicitation closing date (if applicable).
Formal Agency Protest with the Ombudsman. Prior to submitting a formal agency protest, protesters must first use their best efforts to resolve their concerns with the Contracting Officer through open and frank discussions. If the protester’s concerns are unresolved, an Independent Review is available by the Ombudsman. The protester may file a formal agency protest to either the Contracting Officer or as an alternative to that, the Ombudsman under the OPAP program.
Contract award or performance will be suspended during the protest period unless contract award or performance is justified, in writing, for urgent and compelling reasons or is determined in writing to be in the best interest of the Government. The agency’s goal is to resolve protests in less than 35 calendar days from the date of filing. Protests shall include the information set forth in FAR 33.103(d) (2). If the protester fails to submit the required information, resolution of the protest may be delayed or the protest may be dismissed. To be timely protests must be filed within the period specified in FAR 33.103(e). Formal protests filed under the OPAP program should be submitted electronically to OPAP@uscg.mil and the Contracting Officer or by hand delivery to the Contracting Officer.
Election of Forum. After an interested party protests a Coast Guard procurement to the Contracting Officer or the Ombudsman, and while the protest is pending, the protester agrees not to file a protest with the GAO or other external forum. If the protest is filed with an external forum, the agency protest will be dismissed.
The Ombudsman Hotline telephone number is 202.372.3695.
Appendix B –Notice For Filing Agency Protest
L-2
47 MLB SLEP 70Z02319RAML003
Part I – The Schedule
Section B – Supplies or Services and Prices/Costs
Section B 1 of 20
TABLE OF CONTENTS
B.1 CONTRACT TYPE
B.2 CONTRACT LINE ITEM NUMBERS (CLINs)
B.3 BASE YEAR AND OPTION YEAR PRICE TABLES
B.4 CONTRACT CEILING AMOUNT
B.1 CONTRACT TYPE
This is a Firm-Fixed Price (FFP) Indefinite Delivery, Indefinite Quantity (IDIQ) contract.
B.2 CONTRACT LINE ITEM NUMBERS (CLINs)
(a) CLIN 0001 – DETAILED DESIGN
This CLIN encompasses the work associated with the detailed design for the 47-ft. Motor
Lifeboat (47 MLB) Service-Life Extension Program (SLEP). 0001AA Detailed Design
Deliverables includes: systems integration and engineering, general requirements for design and construction, RAM overview, human systems integration, and mockups. 0001AB 2-
Dimensional Product Drawing and Calculations includes: 2D technical data package requirements, drawing number assignment report, 2D product drawings, supplemental requirements for drawings, list of required 2D drawings, and calculations. 0001AC 3-
Dimensional Technical Data package includes the 3D technical data package requirements.
0001AD technical manuals and other data includes: contractor-developed technical manuals, commercial off-the-shelf (COTS) technical manuals, and other data for the 47 MLB SLEP.
(b) CLIN 0002 – WEIGHT AND CENTERS OF GRAVITY MEASUREMENT
CRADLE (WCMC)
This CLIN encompasses the design and construction of the WCMC for the 47 MLB SLEP.
(c) CLIN 0003 – INTELLECTUAL PROPERTY
This CLIN is associated with intellectual property and data rights. This CLIN will only be priced if the contractor asserts lesser rights than those listed by the Government in
Attachment J-1. In that case, the Government may create Sub-CLINs upon award for each
CDRL where lesser rights have been identified and a price was proposed. Instructions for pricing are found in Section L.10 (a)(10), Technical Data Rights.
Section B 2 of 20
(d) CLIN 0004 – PROGRAM MANAGEMENT SUPPORT
This CLIN series (0004, 1004, 2004, 3004, 4004, 5004, 6004, 7004, 8004, and 9004) encompasses the program management and support needed in accordance with the Statement of Work in Section C. Program Management includes: project management, configuration management, warranty management, discovered items, fire, flooding and destructive weather plans, accident prevention, logistics conference, integrated logistics support program, supply support general requirement, master equipment configuration list, serial number report, list of special tools and test equipment, provisioning data requirements, transportation master plan, detailed transportation plan and notification, facilities, quality management, weight control general requirements, weight control program, loading conditions, weight estimates and reports, and weight estimate and reports requirements.
(e) CLIN 0005 – FIRST ARTICLE (FA)
This CLIN encompasses the one-time work conducted for the FA in accordance with the
Statement of Work in Section C, such as additional one-time and special tests, transportation to National Motor Lifeboat (NMLB) School from the production facility, acceptance at
NMLB School, and Contractor support during Operational Assessment.
(f) CLIN 0006 – PRODUCTION
This CLIN series (0006, 1006, 2006, 3006, 4006, 5006, 6006, 7006, 8006, and 9006) encompasses the work to be conducted for every 47 MLB undergoing SLEP in accordance with the Statement of Work in Section C. This CLIN applies to the FA, Low Rate Initial
Production (LRIP) and Full Rate Production (FRP) MLBs. Base Work Items (0006AA, 1006
AA, 2006AA, 3006AA, 4006AA, 5006AA, 6006AA, 7006AA, 8006AA, and 9006AA) includes all base work items and warranty for 107 MLBs. Long Lead Time Materials
(LLTM) (0006AB, 1006AB, 2006AB, 3006AB, 4006AB, 5006AB, 6006AB, 7006AB,
8006AB, and 9006AB) LLTM for 107 MLBs. Web Frame Modifications (0006AC, 1006AC, 2006AC, 3006AC, 4006AC, 5006AC, 6006AC, 7006AC, 8006AC, and 9006AC) includes the web frame modification for up to 83 MLBs.
Base Work Items include: general construction requirements, physical protection, protection of machinery, equipment and material, protection of the MLB during construction and trials, interferences, launching, docking and undocking, structural inspections, structural inspection-based repair plan, plate repair or renewal, forward deck plate renewal, web frame modification plan, bulkhead 5 renewal, watertight closures, mast assembly, fendering system, removal engines, install engines, cardan shafts, propellers, propeller shafts, shaft struts, stern tubes, reverse/reduction gears, electrical systems, command, control and
Section B 3 of 20 communications systems, auxiliary systems, outfit and furnishing, initial and onboard spare parts, preparing the MLBs for transportation, inspections, testing, trials, and verification, determine weight and determine parameters.
(g) CLIN 0007 – TRANSPORTATION
This CLIN series (0007, 1007, 2007, 3007, 4007, 5007, 6007, 7007, 8007, 9007) encompasses preparation and transportation of boats to and from different locations at different stages of the production process: Transportation from Storage to Production
Location (007AA, 1007AA, 2007AA, 3007AA). Transportation from IDL East to
Production Location (3007AB, 4007AB, 5007AB, 6007AB, 7007AB, 8007AB, 9007AB).
Transportation from IDL West to Production Location (3007AC, 4007AC, 5007AC, 6007AC, 7007AC, 8007AC, 9007AC). Transportation from Production Location to IDL
East (1007AD, 3007AD, 4007AD, 5007AD, 6007AD, 7007AD, 8007AD, 9007AD).
Transportation from Production Location from IDL West (1007AE, 2007AE, 3007AE, 4007AE, 5007AE, 6007AE, 7007AE, 8007AE, 9007AE).
(h) CLIN 0008 – RETENTION OF REMOVED PROPULSION EQUIPMENT
This CLIN series (3008, 4008, and 5008) encompasses the retention of removed propulsion equipment to be conducted accordance with the Statement of Work in Section C, including removal of 20 engines from the MLBs, packaging them in GFE containers and loading them onto a USGC-identified commercial shipping carrier for transportation.
(i) CLIN 0009 – DISCOVERED ITEMS
This CLIN series (0009, 1009, 2009, 3009, 4009, 5009, 6009, 7009, 8009, 9009) is established to support completion of discovered work identified through either government, contractor, or joint inspections. The discovered work will be identified and defined through the submission of a Condition Found Report (CFR). The Discovered Item CLIN will support both labor and material costs to correct the discovered work. Any work ordered under this
CLIN series will be consistent with the requirements of the specification and statement of work. This CLIN series is available in each ordering period, and will be funded at the beginning of the ordering period based on the number of MLBs estimated to be inducted during the ordering period. Labor (0009AA, 1009AA, 2009AA, 3009AA, 4009AA, 5009AA, 6009AA, 7009AA, 8009AA, 9009AA) is the labor rate that will be multiplied by the notional ordering quantity listed in J-2. Material (0009AB, 1009AB, 2009AB, 3009AB, 4009AB, 5009AB, 6009AB, 7009AB, 8009, AB, 9009AB) is a cost that will not be evaluated, and a “to be determined” amount will be added to the contract cap upon award.
Section B 4 of 20
(j) CLIN 0010 – TRAINING
This CLIN series (0010, 1010, 2010) reflects training to be conducted in accordance with the
Statement of Work in Section C, including familiarization training for the FA and ten LRIP deliveries.
(k) CLIN 0011 – INTERIM CONTRACTOR LOGISTICS SUPPORT
This CLIN series (1011, 2011, 3011, 4011, and 5011) is to provide Interim Contractor
Logistics Support (ICLS) in accordance with the Statement of Work in Section C. The support will include: technical support and labor, and other direct costs as appropriate. Labor
(1011AA, 2011AA, 3011AA, 4011AA, 5011AA) is the labor rate that will be multiplied by the notional ordering quantity listed in J-2. Other direct costs (0011AB, 1011AB, 2011AB, 3011AB, 4011AB, 5011AB) is a cost that will not be evaluated, and a “to be determined” amount will be added to the contract cap upon award.
(l) CLIN 0012 – SYSTEM INSURANCE STOCK
This CLIN series (1012, 2012, 3012, 4012, 5012, 6012, 7012, 8012, and 9012) reflects system insurance stock in accordance with the Statement of Work in Section C as follows:
Engine Set Engine Set (Port and Starboard): 1012AA, 2012AA, 3012AA, 4012AA, 5012AA, 6012AA, 7012AA, 8012AA, 9012AA
Propeller Set (Port and Starboard): 1012AB, 2012AB, 3012AB, 4012AB, 5012AB, 6012AB 7012AB, 8012AB, 9012AB
Propeller Shaft: 1012AC, 2012AC, 3012AC, 4012AC, 5012AC, 6012AC, 7012AC, 8012AC, 9012AC
Cardan Shaft: 1012AD, 2012AD, 3012AD, 4012AD, 5012AD, 6012AD, 7012AD, 8012AD, 9012AD
Propeller Strut Set (Port and Starboard): 1012AE, 2012AE, 3012AE, 4012AE, 5012AE, 6012AE, 7012AE, 8012AE, 9012AE
Reverse/Reduction Gear Set (Port and Starboard): 1012AF, 2012AF, 3012AF, 4012AF, 5012AF, 6012AF, 7012AF, 8012AF, 9012AF
Section B 5 of 20
B.3 ORDERING PERIOD PRICE TABLES
The following tables show the CLIN structure for the first ordering period (year one) and each subsequent ordering period (years two through ten). The Government will populate the unit price column from Attachment J-2 upon contract award.
ORDERING YEAR 1
New
CLIN
Type Description Unit Measure Unit Price
0001 Info DETAILED DESIGN
0001AA Priced DETAILED DESIGN DELIVERABLES JB
0001AB Priced
2-DIMENSIONAL (2D) PRODUCT
DRAWINGS & CALCULATIONS
JB
0001AC Priced
3-DIMENSIONAL TECHNICAL DATA
PACKAGE
0001AD Priced
TECHNICAL MANUALS AND OTHER
DATA
0002 Priced
WEIGHT AND CENTERS OF GRAVITY
MEASUREMENT CRADLE (WCMC)
EA
0003 Priced INTELLECTUAL PROPERTY EA
0004 Priced PROGRAM MANAGEMENT SUPPORT Per Year
0005 Priced FIRST ARTICLE EA
0006 Info PRODUCTION
0006AA Priced BASE WORK ITEMS Per MLB
0006AB Priced LONG LEAD TIME MATERIAL Per MLB
0006AC Priced WEB FRAME MODIFICATION Per MLB
0007 Info TRANSPORTATION
0007AA Priced
TRANSPORTATION FROM STORAGE TO
PRODUCTION LOCATION
Per MLB
0007AB Priced Reserved
0007AC Priced Reserved
0007AD Priced Reserved
Section B 6 of 20
ORDERING YEAR 1
0007AE Priced Reserved
0008 Priced Reserved
Composite
Hourly Rate
0009 Info DISCOVERED ITEM
0009AA Priced DISCOVERED ITEM LABOR Per Hour
Total Material
Cost
0009AB Priced DISCOVERED ITEM MATERIAL Per Delivery
Order
TBD
Unit Price
0010 Priced TRAINING EA
0011 Info Reserved
0011AA Priced Reserved
ICLS ODCs
0011AB Priced ICLS OTHER DIRECT COST
0012 Info SYSTEM INSURANCE STOCK
0012AA Priced Reserved
0012AB Priced Reserved
0012AC Priced Reserved
0012AD Priced Reserved
0012AE Priced Reserved
0012AF Priced Reserved
Section B 7 of 20
ORDERING YEAR 2
Type Description Unit Measure
1004 Priced PROGRAM MANAGEMENT SUPPORT Per Year
1006 Info PRODUCTION
1006AA Priced BASE WORK ITEMS Per MLB
1006AB Priced LONG LEAD TIME MATERIAL Per MLB
1006AC Priced WEB FRAME MODIFICATION Per MLB
1007 Info TRANSPORTATION
1007AA Priced
1007AB Priced Reserved
1007AC Priced Reserved
1007AD Priced
TRANSPORT FROM PRODUCTION
LOCATION TO IDL EAST
1007AE Priced
LOCATION TO IDL WEST
1008 Priced Reserved
1009 Info DISCOVERED ITEM
1009AA Priced DISCOVERED ITEM LABOR Per Hour
1009AB Priced DISCOVERED ITEM MATERIAL
1010 Priced TRAINING EA
Section B 8 of 20
ORDERING YEAR 2
Type Description Unit Measure
INTERIM CONTRACTOR LOGISTICS
SUPPORT (ICLS)
1011AA Priced
SUPPORT LABOR
Per Hour
1011AB Priced ICLS OTHER DIRECT COST
1012 Info SYSTEM INSURANCE STOCK
1012AA Priced ENGINE SET (PORT AND STARBOARD) Per Set
1012AB Priced
PROPELLER SET (PORT AND
STARBOARD)
Per Set
1012AC Priced SHAFT, PROPELLER Per Shaft
1012AD Priced CARDAN SHAFT Per Shaft
1012AE Priced
PROPELLER STRUT SET (PORT AND
1012AF Priced
REVERSE/REDUCTION GEAR SET (PORT
AND STARBOARD)
ORDERING YEAR 3
Description
Unit
Measure
2004 Priced PROGRAM MANAGEMENT SUPPORT Per Year
2006 Info PRODUCTION
2006AA Priced BASE WORK ITEMS Per MLB
2006AB Priced LONG LEAD TIME MATERIAL Per MLB
2006AC Priced WEB FRAME MODIFICATION Per MLB
2007 Info TRANSPORTATION
Section B 9 of 20
2007AA Priced
2007AB Priced Reserved
2007AC Priced Reserved
2007AD Priced Reserved
2007AE Priced
2008 Priced Reserved
Composite Hourly
Rate
2009 Info DISCOVERED ITEM
2009AA Priced DISCOVERED ITEM LABOR Per Hour
2009AB Priced DISCOVERED ITEM MATERIAL
2010 Priced TRAINING EA
2011 Info
2011AA Priced
2011AB Priced ICLS OTHER DIRECT COST
2012 Info SYSTEM INSURANCE STOCK
2012AA Priced ENGINE SET (PORT AND STARBOARD) Per Set
Section B 10 of 20
2012AB Priced
2012AC Priced SHAFT, PROPELLER Per Shaft
2012AD Priced CARDAN SHAFT Per Shaft
2012AE Priced
2012AF Priced
REVERSE/REDUCTION GEAR SET
(PORT AND STARBOARD)
ORDERING YEAR 4
3004 Priced PROGRAM MANAGEMENT SUPPORT Per Year
3006 Info PRODUCTION
3006AA Priced BASE WORK ITEMS Per MLB
3006AB Priced LONG LEAD TIME MATERIAL Per MLB
3006AC Priced WEB FRAME MODIFICATION Per MLB
3007 Info TRANSPORTATION
3007AA Priced
3007AB Priced
TRANSPORTATION FROM IDL EAST TO
3007AC Priced
TRANSPORTATION FROM IDL WEST TO
3007AD Priced
3007AE Priced
3008 Priced
RETENTION OF REMOVED PROPULSION
EQUIPMENT
Section B 11 of 20
ORDERING YEAR 4
3009 Info DISCOVERED ITEM
3009AA Priced DISCOVERED ITEM LABOR Per Hour
3009AB Priced DISCOVERED ITEM MATERIAL
3011 Info
3011AA Priced
3011AB Priced ICLS OTHER DIRECT COST
3012 Info SYSTEM INSURANCE STOCK
3012AA Priced ENGINE SET (PORT AND STARBOARD) Per Set
3012AB Priced
3012AC Priced SHAFT, PROPELLER Per Shaft
3012AD Priced CARDAN SHAFT Per Shaft
3012AE Priced
3012AF Priced
Section B 12 of 20
ORDERING YEAR 5
4004 Priced PROGRAM MANAGEMENT SUPPORT Per Year
4006 Info PRODUCTION
4006AA Priced BASE WORK ITEMS Per MLB
4006AB Priced LONG LEAD TIME MATERIAL Per MLB
4006AC Priced WEB FRAME MODIFICATION Per MLB
4007 Info TRANSPORTATION
4007AB Priced
4007AC Priced
4007AD Priced
4007AE Priced
4008 Priced
4009 Info DISCOVERED ITEM
4009AA Priced DISCOVERED ITEM LABOR Per Hour
4009AB Priced DISCOVERED ITEM MATERIAL
4011 Info
Section B 13 of 20
ORDERING YEAR 5
4011AA Priced
4011AB Priced ICLS OTHER DIRECT COST
4012 Info SYSTEM INSURANCE STOCK
4012AA Priced ENGINE SET (PORT AND STARBOARD) Per Set
4012AB Priced
4012AC Priced SHAFT, PROPELLER Per Shaft
4012AD Priced CARDAN SHAFT Per Shaft
4012AE Priced
4012AF Priced
ORDERING YEAR 6
5004 Priced PROGRAM MANAGEMENT SUPPORT Per Year
5006 Info PRODUCTION
5006AA Priced BASE WORK ITEMS Per MLB
5006AB Priced LONG LEAD TIME MATERIAL Per MLB
5006AC Priced WEB FRAME MODIFICATION Per MLB
5007 Info TRANSPORTATION
5007AB Priced
Section B 14 of 20
5007AC Priced
5007AD Priced
5007AE Priced
5008 Priced
5009 Info DISCOVERED ITEM
5009AA Priced DISCOVERED ITEM LABOR Per Hour
5009AB Priced DISCOVERED ITEM MATERIAL
5011 Info
5011AA Priced
5011AB Priced ICLS OTHER DIRECT COST
5012 Info SYSTEM INSURANCE STOCK
5012AA Priced ENGINE SET (PORT AND STARBOARD) Per Set
5012AB Priced
5012AC Priced SHAFT, PROPELLER Per Shaft
Section B 15 of 20
5012AD Priced CARDAN SHAFT Per Shaft
5012AE Priced
5012AF Priced
ORDERING YEAR 7
6004 Priced PROGRAM MANAGEMENT SUPPORT Per Year
6006 Info PRODUCTION
6006AA Priced BASE WORK ITEMS Per MLB
6006AB Priced LONG LEAD TIME MATERIAL Per MLB
6006AC Priced WEB FRAME MODIFICATION Per MLB
6007 Info TRANSPORTATION
6007AB Priced
6007AC Priced
6007AD Priced
6007AE Priced
6009 Info DISCOVERED ITEM
6009AA Priced DISCOVERED ITEM LABOR Per Hour
Section B 16 of 20
ORDERING YEAR 7
6009AB Priced DISCOVERED ITEM MATERIAL
6012 Info SYSTEM INSURANCE STOCK
6012AA Priced ENGINE SET (PORT AND STARBOARD) Per Set
6012AB Priced
6012AC Priced SHAFT, PROPELLER Per Shaft
6012AD Priced CARDAN SHAFT Per Shaft
6012AE Priced
6012AF Priced
ORDERING YEAR 8
7004 Priced PROGRAM MANAGEMENT SUPPORT Per Year
7006 Info PRODUCTION
7006AA Priced BASE WORK ITEMS Per MLB
7006AB Priced LONG LEAD TIME MATERIAL Per MLB
7006AC Priced WEB FRAME MODIFICATION Per MLB
7007 Info TRANSPORTATION
7007AB Priced
Section B 17 of 20
ORDERING YEAR 8
7007AC Priced
7007AD Priced
7007AE Priced
7009 Info DISCOVERED ITEM
7009AA Priced DISCOVERED ITEM LABOR Per Hour
7009AB Priced DISCOVERED ITEM MATERIAL
7012 Info SYSTEM INSURANCE STOCK
7012AA Priced ENGINE SET (PORT AND STARBOARD) Per Set
7012AB Priced
7012AC Priced SHAFT, PROPELLER Per Shaft
7012AD Priced CARDAN SHAFT Per Shaft
7012AE Priced
7012AF Priced
Section B 18 of 20
ORDERING YEAR 9
8004 Priced PROGRAM MANAGEMENT SUPPORT Per Year
8006 Info PRODUCTION
8006AA Priced BASE WORK ITEMS Per MLB
8006AB Priced LONG LEAD TIME MATERIAL Per MLB
8006AC Priced WEB FRAME MODIFICATION Per MLB
8007 Info TRANSPORTATION
8007AB Priced
8007AC Priced
8007AD Priced
8007AE Priced
8009 Info DISCOVERED ITEM
8009AA Priced DISCOVERED ITEM LABOR Per Hour
8009AB Priced DISCOVERED ITEM MATERIAL
8012 Info SYSTEM INSURANCE STOCK
8012AA Priced ENGINE SET (PORT AND STARBOARD) Per Set
8012AB Priced
8012AC Priced SHAFT, PROPELLER Per Shaft
Section B 19 of 20
ORDERING YEAR 9
8012AD Priced CARDAN SHAFT Per Shaft
8012AE Priced
8012AF Priced
ORDERING YEAR 10
9004 Priced PROGRAM MANAGEMENT SUPPORT Per Year
9006 Info PRODUCTION
9006AA Priced BASE WORK ITEMS Per MLB
9006AB Priced LONG LEAD TIME MATERIAL Per MLB
9006AC Priced WEB FRAME MODIFICATION Per MLB
9007 Info TRANSPORTATION
9007AB Priced
9007AC Priced
9007AD Priced
9007AE Priced
9009 Info DISCOVERED ITEM
9009AA Priced DISCOVERED ITEM LABOR Per Hour
Section B 20 of 20
ORDERING YEAR 10
9009AB Priced DISCOVERED ITEM MATERIAL
9012 Info SYSTEM INSURANCE STOCK
9012AA Priced ENGINE SET (PORT AND STARBOARD) Per Set
9012AB Priced
9012AC Priced SHAFT, PROPELLER Per Shaft
9012AD Priced CARDAN SHAFT Per Shaft
9012AE Priced
9012AF Priced
B.4 CONTRACT CEILING AMOUNT
(1) The CONTRACT CEILING AMOUNT for contract 70Z02319RAML003 is
$______________ (TBD). The CONTRACT CEILING AMOUNT is the total sum of all extended price CLINs from the pricing worksheet in Section J, Attachment J-2.
Department of Homeland Security (DHS)
United States Coast Guard (USCG)
47-foot Motor Lifeboat (MLB)
SERVICE - LIFE EXTENSION PROGRAM
70Z02319RAML003
STATEMENT OF WORK
SECTION C i STATEMENT OF WORK
Table of Contents
039 [Orig] SERVICE LIFE EXTENSION PROGRAM (SLEP) OVERVIEW
039-1 [Orig] Background
039-2 [Orig] Facilities Overview
039-3 [Orig] Program Approach
040 [Orig] PROJECT MANAGEMENT
040-1 [Orig] General
040-2 [Orig] Meetings
040-3 [Orig] Contract Problem Identification Reports
040-4 [Orig] Contract Data Requirements
040-5 [Orig] Information Management
040-6 [Orig] Data Exchange
040-7 [Orig] Contract Work Breakdown Structure (CWBS)
040-8 [Orig] Integrated Master Plan (IMP)
040-9 [Orig] Integrated Master Schedule (IMS)
040-10 [Orig] Integrated Baseline Review (IBR)
041 [Orig] CONFIGURATION MANAGEMENT
041-1 [Orig] General
041-2 [Orig] Contractor Configuration Management Plan (CCMP)
041-3 [Orig] Configuration Baselines
041-4 [Orig] Physical Configuration Audit (PCA)
041-5 [Orig] Configuration Control
041-6 [Orig] Post-OA and Post-OT&E Design Reviews
042 [Orig] GENERAL ADMINISTRATIVE REQUIREMENTS
042-1 [Orig] Definitions
042-2 [Orig] Warranty
042-3 [Orig] Warranty Management
042-4 [Orig] Contractor Travel
044 [Orig] MLB OPERATION
044-1 [Orig] Concept of Operation
SECTION C ii STATEMENT OF WORK
045 [Orig] CARE OF MLB DURING CONSTRUCTION
045-1 [Orig] General Requirements
045-2 [Orig] Physical Protection
045-3 [Orig] Protection of Machinery, Equipment, and Material
045-4 [Orig] Protection of the MLB During Construction and Trials
045-5 [Orig] Interferences
045-6 [Orig] Discovered Items
045-7 [Orig] Launching, Docking, and Undocking
045-8 [Orig] Fire, Flooding, and Destructive Weather Plans
061 [Orig] STRUCTURAL WORK ITEMS
061-1 [Orig] Structural Inspections
061-2 [Orig] Structural Inspection-Based Repair Plan
061-3 [Orig] Plate Repair or Renewal
061-4 [Orig] Forward Deck Plate Renewal
061-5 [Orig] Web Frame Modification
061-6 [Orig] Bulkhead 5 Renewal
061-7 [Orig] Watertight Closures
061-8 [Orig] Mast Assembly
061-9 [Orig] Fendering System
062 [Orig] PROPULSION SYSTEM WORK ITEMS
062-1 [Orig] Main Diesel Engines (MDEs)
062-2 [Orig] Cardan Shafts
062-3 [Orig] Propellers
062-4 [Orig] Propeller Shafts
062-5 [Orig] Shaft Struts
062-6 [Orig] Stern Tubes
062-7 [Orig] Reverse/Reduction Gears
063 [Orig] ELECTRICAL SYSTEMS
063-1 [Orig] Electrical Power Generation System
063-2 [Orig] Batteries
063-3 [Orig] Circuit Breakers and Receptacles
063-4 [Orig] Exterior Electrical Enclosures
063-5 [Orig] Hot Cups Removal
SECTION C iii STATEMENT OF WORK
063-6 [Orig] Lighting
064 [Orig] COMMAND, CONTROL, AND COMMUNICATION SYSTEMS
064-1 [Orig] Navigation System
064-2 [Orig] Open Bridge Console
064-3 [Orig] Enclosed Bridge Consoles
065 [Orig] AUXILIARY SYSTEMS
065-1 [Orig] Side Window Defogging Blowers
065-2 [Orig] Auxiliary Machinery Space Ventilation Blower
065-3 [Orig] Fire Suppression System
065-4 [Orig] Steering System
065-5 [Orig] Rudder
065-6 [Orig] Tow Line Reels
065-7 [Orig] Trim Tabs
066 [Orig] OUTFIT AND FURNISHING
066-1 [Orig] Recess Deck Grating Locking System
066-2 [Orig] Engine Room Deck Grating Systems
066-3 [Orig] Survivor’s Compartment Decking System
066-4 [Orig] Exterior Hull Preservation Systems
066-5 [Orig] Interior Hull Preservation Systems
066-6 [Orig] Cathodic Protection
066-7 [Orig] Hull Marking Systems
066-8 [Orig] Coating the Open and Enclosed Bridge Consoles
066-9 [Orig] Open and Enclosed Bridge Seats
066-10 [Orig] Slip-Resistant Deck Covering System
066-11 [Orig] Enclosed Bridge Deck Covering Material
066-12 [Orig] Window Washer Tank
066-13 [Orig] Thermal Insulation and Acoustic Absorptive Treatment
066-14 [Orig] Exterior Aluminum Surface Profile
066-15 [Orig] Engine Room Tool Box
066-16 [Orig] HF Radio Antenna RADHAZ Boundary Markings
068 [Orig] SYSTEMS INTEGRATION AND ENGINEERING
068-1 [Orig] General
068-2 [Orig] Detailed Design Review
SECTION C iv STATEMENT OF WORK
070 [Orig] GENERAL REQUIREMENTS FOR DESIGN AND CONSTRUCTION
070-1 [Orig] General
076 [Orig] RELIABILITY, AVAILABILITY, AND MAINTAINABILITY (RAM)
076-1 [Orig] Overview
076-2 [Orig] RAM Definitions
076-3 [Orig] Responsibilities
077 [Orig] ACCIDENT PREVENTION
077-1 [Orig] General
077-2 [Orig] Material Safety Data Sheets
080 [Orig] INTEGRATED LOGISTICS SUPPORT REQUIREMENTS
080-1 [Orig] Logistics Conference
080-2 [Orig] Integrated Logistic Support (ILS) Program
080-3 [Orig] Interim Contractor Logistics Support
080-4 [Orig] Contractor support during Operational Assessment (OA)
083 [Orig] SUPPLY SUPPORT
083-1 [Orig] General
083-2 [Orig] Master Equipment Configuration List (MECL)
083-3 [Orig] Serial Number Report (SNR)
083-4 [Orig] List of Special Tools and Test Equipment
083-5 [Orig] Spares
083-6 [Orig] Provisioning Data Requirements
083-7 [Orig] Long Lead-Time Materials (LLTM)
084 [Orig] PACKAGING, HANDLING, STORAGE, AND TRANSPORTATION
084-1 [Orig] General
084-2 [Orig] Transportation Master Plan
084-3 [Orig] Detailed Transportation Plan and Notification
084-4 [Orig] Preparing MLBs for Transportation
084-5 [Orig] Transportation of Boats Not in Service to Production Facility (For non-First
Article, complete only if CLIN x007 is ordered)
084-6 [Orig] Transportation of Boats in Service to Production Facility (Complete only if
CLIN x0007AA or x0007AB is ordered)
084-7 [Orig] Transportation of Boats from Production Facility (For non-First Article, complete only if CLIN x0007AC or x0007AD is ordered)
085 [Orig] TECHNICAL DATA PACKAGE (TDP) REQUIREMENTS
SECTION C v STATEMENT OF WORK
085-1 [Orig] General Requirements
085-2 [Orig] Drawing Number Assignment Report (DNAR)
085-3 [Orig] 2-Dimensional (2D) Product Drawings
085-4 [Orig] Supplemental Requirements for Drawings
085-5 [Orig] List of Required Two-Dimensional (2D) Drawings
085-6 [Orig] 3-Dimensional Technical Data Package (3D TDP)
085-7 [Orig] Calculations
086 [Orig] TECHNICAL MANUALS AND OTHER DATA
086-1 [Orig] General
086-2 [Orig] Commercial Off-the-Shelf (COTS) Technical Manuals
086-3 [Orig] Contractor-Developed Technical Manuals
087 [Orig] FACILITIES
087-1 [Orig] General Requirement
087-2 [Orig] Induction/Delivery Location (IDL)
087-3 [Orig] Production Facilities
087-4 [Orig] Resident Inspection Office (RIO) General Requirements
087-5 [Orig] RIO Facilities
087-6 [Orig] RIO Facilities Planning
087-7 [Orig] RIO Parking
087-8 [Orig] Access Control and Security
087-9 [Orig] Data/Telecommunication Connectivity Infrastructure
087-10 [Orig] RIO Facility (ies) Outfitting
087-11 [Orig] RIO Facilities at Each Induction/Delivery Location (IDL)
088 [Orig] HUMAN SYSTEMS INTEGRATION
088-1 [Orig] Human Systems Integration (HSI) Plan
089 [Orig] TRAINING
089-1 [Orig] Human Performance Support and Training
090 [Orig] QUALITY MANAGEMENT (QM)
090-1 [Orig] General
091 [Orig] INSPECTIONS
091-1 [Orig] Induction Inspection
092 [Orig] TESTING, TRIALS, AND VERIFICATION
092-1 [Orig] General
SECTION C vi STATEMENT OF WORK
092-2 [Orig] Administration and Conduct
092-3 [Orig] Underway Operations
092-4 [Orig] Test Documentation
092-5 [Orig] In-Plant Tests (IPTs)
092-6 [Orig] Preliminary Acceptance Inspections and Trials (PATs)
092-7 [Orig] Acceptance Trials (AT)
092-8 [Orig] Additional Tests
092-9 [Orig] Leak and Watertightness Degree 1 Testing Requirements
096 [Orig] WEIGHT CONTROL, WEIGHT REPORTS, AND SCALE WEIGHING
096-1 [Orig] General
096-2 [Orig] Weight Control Program
096-3 [Orig] Determination of Emptyship Weight Parameters
096-4 [Orig] Loading Conditions
096-5 [Orig] Weight Estimates and Reports
096-6 [Orig] Weight Estimates and Reports Requirements
097 [Orig] ADDITIONAL ONE-TIME AND SPECIAL TESTS
097-1 [Orig] General
097-2 [Orig] Self-Righting Test
097-3 [Orig] Propulsion System Inversion Test
097-4 [Orig] Electromagnetic Interference (EMI)
097-5 [Orig] Bollard Pull
097-6 [Orig] Speed, Power, and Fuel Consumption Characteristics
097-7 [Orig] Steering Characteristics
097-8 [Orig] Lighting System Survey
098 [Orig] MOCKUPS
098-1 [Orig] General
098-2 [Orig] Mockup Requirements
098-3 [Orig] Open Bridge Mockup
098-4 [Orig] Engine Room Mockup
098-5 [Orig] Enclosed Bridge Console Mockup
098-6 [Orig] Survivor’s Compartment Mockup
098-7 [Orig] Mockup Materials
APPENDIX A: WEB FRAME MODIFICATIONS
SECTION C vii STATEMENT OF WORK
APPENDIX B: LONGITUDINAL AND VERTICAL CENTERS OF GRAVITY AT EMPTYSHIP CONDITION
…………………………………………………………………………………………………...133
APPENDIX C: 47B MLB NOT IN SERVICE LOCATIONS
APPENDIX D: LIST OF CONSTRUCTION STANDARDS
RECORD OF CONTRACT CHANGES
70Z02319RAML003
Version Date Purpose
Orig. 16 Nov 2018 RFP Release
SECTION C 1 STATEMENT OF WORK
039 [Orig] SERVICE LIFE EXTENSION PROGRAM (SLEP) OVERVIEW
039-1 [Orig] Background
039-1.1 [Orig] This Statement of Work (SOW) is for a Service-Life Extension Program (SLEP) on the 47-foot Motor Lifeboats (MLBs) that are owned and operated by the United States
Coast Guard (USCG).
039-1.2 [Orig] The USCG is responsible for a wide range of missions. Where surf and heavy weather sea conditions are prevalent, the USCG uses the MLB to perform these missions.
Additional information on how the MLB is used is provided in the Concept of Operations
(SOW Section 044). At USCG Stations these missions include:
Search and Rescue (SAR)
Marine Safety
Ports Waterway and Coastal Security (PWCS)
Drug Interdiction
Migrant Interdiction
Defense Readiness
Aids to Navigation (ATON) and Waterways Management
Marine Environmental Protection
Living Marine Resources (LMR)
Other Law Enforcement
039-1.3 [Orig] The production MLBs were designed by the USCG and built from 1997 to 2003.
These boats were designated 47B MLB. The 47B MLBs are now approaching the end of their original 25-year service life and have had decreasing operational availability (Ao) due to parts-supply issues with respect to the propulsion systems and other obsolete components. The goal of the SLEP is to extend the 47B MLBs’ service life for an additional 20 years and retain their original operational capabilities and characteristics.
Post-SLEP MLBs will be designated 47C MLB.
039-1.4 [Orig] In total, 117 production boats were delivered to the USCG. Of those, there are 104 currently in service, and there is a need to maintain 107 boats in future service. The number and distribution of boats may change slightly depending on the operational needs of the USCG. The current distribution of 47B MLBs is as follows:
039-1.4.1 [Orig] East Coast: There are 54 operational boats located at stations ranging from
Oak Island, NC, to Jonesport, ME.
039-1.4.2 [Orig] Great Lakes: There are 6 operational boats at stations ranging from Portage, MI, to Rochester, NY.
039-1.4.3 [Orig] West Coast: There are 43 operational boats located at stations ranging from
Morro Bay, CA, to Neah Bay, WA. This includes boats operated by the National
Motor Lifeboat School in Ilwaco, WA.
039-1.4.4 [Orig] Boats not in service: There are 14 boats not in service in different locations: 1 on the East Coast, 10 in the Great Lakes, and 4 on the West Coast.
SECTION C 2 STATEMENT OF WORK
039-1.5 [Orig] Each 47B MLB is powered by twin Detroit Diesel 6V92TA DDEC engines rated for 435 BHP at 2050 rpm. The propulsion system is a V-drive arrangement with Cardan shafts connecting the engines to Reintjes WVS 234 UP 2:1 reverse/reduction gears located forward of the Engine Room in the Survivor's Compartment. The reverse/reduction gears connect to traditional propeller shafts driving fixed pitch propellers.
039-1.6 [Orig] There are currently four control stations: In the enclosed bridge, there are throttles on the centerline of a console extension and helm controls (jog levers) mounted on the outboard armrests of the helm seats. On the open bridge, the primary helm station is to starboard, with a steering wheel and mounted throttle controls. On the port side there are throttles and a jog lever on the console.
039-1.7 [Orig] Additional information on the design, construction and operation of the MLB in its current configuration can be found in the drawings and 47 MLB Operator's Handbook
(COMDTINST M16114.25B) that will be provided as Government Furnished Information
(GFI).
039-2 [Orig] Facilities Overview
039-2.1 [Orig] The Contractor shall provide all facilities, tools, and equipment necessary to conduct the work required, including the production facilities, East Coast and West Coast induction/delivery locations (IDLs), and facilities for the USCG Resident Inspection
Office(s) (RIOs). See SOW Section 087, Facilities.
039-3 [Orig] Program Approach
039-3.1 [Orig] The USCG intends to conduct the SLEP in four phases, which may overlap:
039-3.1.1 [Orig] Detailed Design: the completion of the design effort for the developmental work items as listed in SOW Section 068.
039-3.1.2 [Orig] First Article (FA) production, testing, and evaluation
039-3.1.3 [Orig] Low-rate initial production (LRIP), testing, and evaluation
039-3.1.4 [Orig] Full-rate production (FRP)
039-3.2 [Orig] In order to minimize the impact to the operational fleet, the USCG intends to induct boats that are not in service first before operational MLBs; there may be situations in which the USCG will induct operational boats early as part of LRIP.
039-3.2.1 [Orig] The Contractor shall transport boats not in service from their current locations to the production facility.
039-3.2.2 [Orig] The USCG will transport operational boats to the nearest IDL. The Contractor shall transport the boats from the IDL to production facility.
039-3.3 [Orig] 47C fleet distribution: Unless otherwise specified by the Contracting Officer, the following delivery locations shall be used:
039-3.3.1 [Orig] Boats not in service
039-3.3.1.1 [Orig] From the Great Lakes region will be delivered to IDL West.
039-3.3.1.2 [Orig] From the East Coast will return to service at IDL East.
039-3.3.1.3 [Orig] From the West Coast will return to service at IDL West.
039-3.3.2 [Orig] Operational boats
SECTION C 3 STATEMENT OF WORK
039-3.3.2.1 [Orig] From the Great Lakes and East will be inducted and returned at IDL East.
039-3.3.2.2 [Orig] Operational boats on the West Coast will be inducted and returned at IDL
West.
039-3.4 [Orig] Work Items: The work items to be completed on each boat have been categorized in the following manner:
039-3.4.1 [Orig] Base Work Items: These are the basic work items that are required to extend the service life of the MLB and will be required on every MLB.
039-3.4.2 [Orig] Discovered Items: These are unusual or unforeseen items that are discovered during inspections or are a result of damage or equipment malfunction and need to be corrected.
039-3.4.3 [Orig] Induction Inspection: At induction of each MLB, the USCG and the
Contractor will document the boat's material status in a joint induction inspection before the Contractor takes possession. See SOW Section 091.
039-3.5 [Orig] Upon taking possession, the Contractor shall transport the MLB to the production facility and perform the structural inspections in accordance with SOW Section 061-1.
Additional discoveries may be identified, particularly in the removal phase.
039-3.6 [Orig] First Article: The first MLB to undergo SLEP modifications described herein will be designated the FA.
039-3.6.1 [Orig] Upon induction of the FA and its delivery to the Contractor’s production facility, the Contractor shall scale weigh and determine the center-of-gravity of the emptyship weight condition boat. Removing the components identified in the SOW
Sections 061 to 066 shall start and completion of the structural inspections (see SOW
Section 061-1) with acceptance of the Structural Inspection-based Repair Plan (CDRL
061-001) will enable the Contractor to proceed with construction on those work items.
During this period, the Contractor will use the FA to assist in the detailed design of systems and their arrangements within the boat in accordance with the SOW.
039-3.6.2 [Orig] The USCG will review the design in accordance with this SOW. The most significant work items are: propulsion system, open bridge arrangements, and survivor’s compartment. The USCG will not authorize construction to begin on developmental work items (defined in SOW Section 068) until the work items specific developmental design review and weight estimate (see SOW Section 096-6.1) has been accepted by the USCG.
039-3.6.3 [Orig] The USCG will have a team stationed at a Resident Inspection Office (RIO) at the Contractor's production facilities to monitor design, production, and, testing; and assist the Contracting Officer and COR with contract administration throughout the contract performance period.
039-3.6.4 [Orig] When modifications to the FA have been completed, inspections and trials in accordance with SOW Section 092 shall be conducted at the production facility to verify contract requirements have been met. In addition to the standard testing requirements to be completed on each boat, the FA shall require completion of additional one-time tests performed per SOW Section 097.
039-3.6.5 [Orig] Upon successful completion of inspections, testing, and trials; and with approval from the Contracting Officer; the Contractor shall transport the FA to the
National Motor Lifeboat School (NMLBS) in Ilwaco, Washington, for acceptance trials (SOW Section 092) and training (SOW Section 089).
SECTION C 4 STATEMENT OF WORK
039-3.6.6 [Orig] Following USCG acceptance and training, the USCG will conduct an operational assessment (OA). The OA provides initial validation that the FA can perform the required missions under the required operating conditions before a 47C
MLB is placed at an operational unit. (Note: OA is currently planned for the surf season starting in January 2020, ending in April 2020) It is envisioned that the FA will be operated daily over a four-month period to complete this assessment. During this period, the Contractor shall be available to perform required maintenance and corrective actions on the new components on the MLB to keep the boat operational for testing (refer to SOW Section 080-4).
039-3.7 [Orig] LRIP: After the OA has commenced, the USCG may proceed with LRIP.
039-3.7.1 [Orig] Based on the emerging OA results, the USCG will address operational issues through design changes, where appropriate (see SOW Section 041-6) to correct them.
Any changes made as a result of OA are anticipated to be retrofitted on the FA through a contract modification. The FA will not be used for Operational test and evaluation (OT&E).
039-3.7.2 [Orig] The USCG anticipates ordering up to 12 LRIP boats, in addition to the FA.
039-3.7.3 [Orig] OT&E will be performed on the first and second LRIP MLBs. After these
MLBs have undergone post-production inspections (PPIs) (see SOW Section 092-6.2), the Contractor shall transport the 47C MLBs to the IDLs for acceptance. The intent is to send one to IDL East and one to IDL West. Once acceptance trials are complete, along with training as applicable, USCG crews will transit each 47C MLB from the
IDL to the operational units. The USCG intends that OT&E shall take place on these two boats, testing all aspects of the operational, maintenance, training, and supply systems. During OT&E, LRIP will continue at the Contractor's production facility.
Any changes resulting from OT&E are anticipated to be retrofitted on the FA and all
LRIP boats via a contract modification.
039-3.8 [Orig] Full-rate production: After OT&E has been successfully completed and the design changes (where appropriate) has been incorporated (see SOW Section 41-6), the USCG will proceed with full-rate production (FRP).
039-3.8.1 [Orig] The USCG estimates 20 MLB inductions/deliveries per year.
039-3.8.2 [Orig] Training requirements are detailed in SOW Section 089.
039-3.8.3 [Orig] All 47C MLBs shall have a warranty as per SOW Section 042-2. The RIO will monitor warranty claims processing and track Contractor follow-up.
040 [Orig] PROJECT MANAGEMENT
040-1 [Orig] General
040-1.1 [Orig] This Statement of Work (SOW) establishes requirements for the design, fabrication, construction, testing, delivery, logistic support, and technical documentation to extend the service life of the MLB.
040-1.2 [Orig] The Concept of Operation for the MLB is outlined in the SOW Section 044.
040-1.3 [Orig] The Contractor shall manage the entire work effort to design, fabricate, construct, test, deliver and support the MLB SLEP including the boat, logistics, and technical documentation, meeting the requirements of the SOW and the Specification. The
SECTION C 5 STATEMENT OF WORK
requirements of the SOW and Specification apply to each of the 47B MLBs included into the SLEP, unless otherwise indicated.
040-1.4 [Orig] The original USCG MLB drawings will be provided asGFI.
040-2 [Orig] Meetings
040-2.1 [Orig] General: The Contractor shall host meetings or be present at USCG meetings as required throughout the contract. For all formal meetings, the Contractor shall provide agendas and minutes unless stated otherwise in the SOW. Agendas shall be submitted by the Contractor five business days before the meeting, in accordance with CDRL 040-001.
The Contractor shall prepare and finalize the minutes for all meetings in accordance with
CDRL 040-002, with input from USCG.
040-2.2 [Orig] Routine Status Meetings: The Contractor shall conduct routine status meetings with the USCG to review and discuss contract administration and technical issues.
Meetings shall be phone conferences. Routine status meetings shall occur at the request of either the Contractor or the USCG, but not more frequently than weekly, or less frequently…