70Z02319RAML003_00003.pdf

PDF 10 MB Posted

Attached to
47 Motor LifeBoat (MLB) Service Life Extension Program (SLEP)
Solicitation number
70Z02319AML003
Issued by

About this file

This document provides a solicitation notice for a 47-foot Motor Lifeboat Service Life Extension Program.

The Coast Guard is seeking proposals to extend the service life of 107, 47-foot Motor Lifeboats. The work includes detailed design, production, transportation, discovered items, training, interim logistics support, and system insurance stock. Proposals are due on March 15, 2019. The base period consists of ordering years 1 through 5, with an option for years 6 through 10.

The solicitation uses firm-fixed-price contract line item numbers to cover the various requirements. Detailed design includes mockups and technical data deliverables. Production applies to first article, low rate initial production, and full rate production boats. Transportation involves moving boats between storage, production sites, and inventory control locations. Interim logistics support and discovered items are also line items.

The notice provides summary information on a Coast Guard opportunity to extend the service life of over 100 motor lifeboats. Proposals are due in mid-March 2019.

70Z02319RAML003_00003

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For the best experience, open this PDF portfolio in

Acrobat X or Adobe Reader X, or later.

Get Adobe Reader Now!

http://www.adobe.com/go/reader

47 MLB SLEP 70Z02319RAML003

SECTION J, ATTACHMENT 4 1 List of GFI

Department of Homeland Security (DHS)

United States Coast Guard (USCG)

47’ Motor Lifeboat (MLB)

Service Life Extension Program

70Z023219AML003

List of Government Furnished Information

(GFI)

SECTION J, ATTACHMENT 4 2 List of GFI

Attachment J-4

MLB

SLEP

Docum ent

Reference Title Rev / Ver. *

GFI

Num ber

SOW COMDTINST M16114.25 47 MLB Operator's Handbook B (Nov

2007)

SOW

Master Equipment

Configuration List (MECL)

Master Equipment

Configuration List (MECL)

Template

SOW DD FORM 1692/1

Engineering Change Proposal

(ECP)

(May 2015) 03

Engineering Change Installation

Instructions (ECII)

Engineering Change Installation

Instructions (ECII) Template

Serial Number Report (SNR)

Template SNR Template 05

SOW Integrated Support Plan (ISP) Integrated Support Plan (ISP) 06

Provisioning Parts List (PPL)

Example

Provisioning Parts List (PPL)

Example

SOW MLB Locations Spreadsheet MLB Locations Spreadsheet 08

SOW MLB Locations Graphic MLB Locations Graphic 09

SOW USCG Drawing Templates SFLC Multi-Sheet Drawing

Templates

Electrical Power Load Analysis

(EPLA) Template

Electrical Power Load Analysis

(EPLA) Template

SECTION J, ATTACHMENT 4 3 List of GFI

SLEP

Docum ent

Reference Title Rev / Ver. *

GFI

Num ber

SOW NAVSEA DDS 310-1

Design Data Sheet Electric

Power Load Analysis (EPLA)

For Surface Ships

1 (Sep

2012)

Standardized Induction

Checklist

Standardized Induction

Checklist Template

Weight Report of the Existing

Weight Report of the Existing

SOW Weight Tracking Template Weight Tracking Template 15

SPEC ACB Template ACB Template 16

CDRL

GFI_19_CDRL085-

003_Attachment

GFI_19_CDRL085-

003_Attachment

GFI_20_CDRL_085_003_Attac hment_TDP

GFI_20_CDRL_085_003_Attac

GFI_21_CDRL_085_004_Attac

GFI_21_CDRL_085_004_Attac

CDRL GFI_23_Photographs GFI_23_Photographs 23

SOW Original USCG MLB Drawings Original USCG MLB Drawings

Part IV – Representation and Instructions

Section M – Evaluation Factors for Award

SECTION M 1 of 5

TABLE OF CONTENTS

M.1 PROCEDURES FOR AWARD

M.2 BASIS FOR AWARD

M.3 SOURCE SELECTION PROCESS

M.4 EVALUATION

M.5 TECHNICAL EVALUATION

M.6 PRICE EVALUATION

M.7 PAST PERFORMANCE

M.1 PROCEDURES FOR AWARD

(a) Proposals shall be submitted in accordance with the instructions in Section L. Proposals will be reviewed for compliance with the solicitation requirements. In addition, proposals will also be evaluated for unique and innovative methods, processes, and/or solutions that are beneficial to the Government.

(b) Because the Government intends to award without discussions, the Offeror is responsible for providing its best submission in its initial proposal.

(c) A proposal may be rejected as deficient if the Contracting Officer determines that the proposal does not materially comply with the solicitation requirements.

M.2 BASIS FOR AWARD

(a) In order to be eligible for award, the Offeror's proposal must comply in all material respects with the requirements of law, regulation, and the terms and conditions set forth in the solicitation; and the Offeror must be determined responsible according to the standards set forth in FAR Subpart 9.1. Each response will be evaluated strictly in accordance with its content and the Government will not assume that performance will include areas not specified in the

Offeror’s proposal.

(b) The contract award decision will be based on the evaluation of the Offeror’s proposal as set forth in the solicitation. This assessment will determine which proposal is the best value to the

Government in terms of the established evaluation factors.

(c) The contract award decision will be based on the proposal that represents the best value to the Government through the application of the trade-off process and the established evaluation factors.

(d) The Source Selection Authority is the selection official for award.

SECTION M 2 of 5

(e) An Offeror’s proposal that takes exception to any of the terms and conditions of this solicitation shall be submitted in accordance with Section L. As noted in Section L, Offerors are cautioned that exceptions to the requirements may result in the rejection of the proposal.

M.3 SOURCE SELECTION PROCESS

(a) The Government will conduct a formal source selection in accordance with FAR Part 15 procedures.

(b) A tradeoff process will be employed in the source selection approach. The Technical factors are in descending order of importance. In this process, Technical is more important than Past

Performance and Past Performance is more important than Price. When combined, Technical and Past Performance are significantly more important than the Price.

M.4 EVALUATION

(a) Proposals shall be submitted in accordance with the instructions in Section L. A proposal may be rejected if the Contracting Officer determines that the Proposal does not comply with the solicitation requirements.

(1) For the objective and threshold values listed in Section L, the threshold values represent the minimum requirements as noted in the current solicitation.

(2) Proposed attributes that exceed threshold requirements will favorably influence rating.

(b) Each proposal that complies with the solicitation requirements will be evaluated to assess the Offeror's ability to perform the Service Life Extension Program (SLEP) in accordance with the solicitation requirements. Proposals will be evaluated on the basis of the following factors:

(1) Technical (listed in descending order of importance)

(i) Performance, Supportability, and Maintainability of the Proposed 47 MLB

(ii) Management, Production, and Logistics Capabilities

(iii) Systems Engineering and Design Approach

(iv) Configuration Management and Quality Assurance

(2) Price

(3) Past Performance

SECTION M 3 of 5

M.5 TECHNICAL EVALUATION

(a) The Technical factors will consist of an evaluation of the following, and each Technical factor will be assigned both a technical rating and a risk rating:

(b) Performance, Maintainability, and Supportability of the Proposed 47 MLB: This factor will assess the Offeror’s proposed solution in meeting the:

(1) Systems and Equipment Selection,

(2) Weight and Center of Gravity Estimates,

(3) Underway Performance Estimates,

(4) Bridge and Console Designs, and

(5) Access for Maintenance and Repair.

(c) Management, Production, and Logistics Capabilities: This factor will assess the Offeror’s ability to complete the SLEP based on their:

(1) Organization, Production Planning and Scheduling, and Transportation Planning,

(2) Production Capability and Facilities, and Labor Force, and

(3) Post-Delivery and Warranty Support.

(d) Systems Engineering and Design Approach: This factor will assess the Offeror’s ability to complete the SLEP based on their approach to completing the technical design work required for the 47 MLB SLEP including:

(1) Technical Resources and Integrated Systems Approach,

(2) Reliability and Sustainability, and

(3) Weight and Center of Gravity Control Program.

(e) Configuration Management and Quality Assurance: This factor will assess the Offeror's ability to complete the SLEP based on their approach to

(1) Configuration Management,

(2) Quality Assurance (QA), Testing and Validation, and

(3) Information Management/Technical Data Management.

(i) Data Rights: The Government will evaluate the extent to which:

(A) The Offeror proposes in Section J-1 rights in data that satisfy the

Government’s asserted and/or desired rights as described in this RFP. The degree to which the proposal provides the asserted or desired level of technical data rights (and rights in computer software) that will enable the

Government to cost effectively and adequately sustain the boats over their lifecycle to include maintainability and reparability.

(B) Where there are valid reasons why an Offeror must develop entirely at private expense or provide previously developed technical data under this contract, the Offeror may not be required, either as a condition of being responsive to this RFP or as a condition for award, to sell or otherwise relinquish to the Government any proprietary right in technical data developed at private expense except for the items identified at FAR

27.404-1(a) through (d).

SECTION M 4 of 5

(C) The Government will not assign a strength to an Offeror’s proposal that proposes to deliver rights in data greater than the minimum specified in this RFP.

M.6 PRICE EVALUATION

(a) Price will be evaluated for completeness, reasonableness, and unbalanced pricing. Proposals will not be scored, ranked, nor rated.

(b) Total Evaluated Price (TEP): TEP is defined as the sum of all proposed CLINs. The

Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).

(c) Completeness. Completeness is compliance with the price proposal instructions in Section

L.

(d) Reasonableness. Per FAR 15.404-1(a), the evaluation team will complete a proposal analysis to ensure that the final agreed to price is fair and reasonable. The Government will evaluate the proposed prices for price reasonableness.

(e) Unbalanced Pricing. The Government may reject a proposal if the prices proposed are materially unbalanced between line items or sub-line items. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more contract line items is significantly overstated or understated as indicated by the application of cost or price analysis techniques. A proposal may be rejected if the KO determines that the lack of balance poses an unacceptable risk to the Government.

(f) The estimated production schedule by ordering period and CLINs for planning and evaluation purposes is located in Section J, Attachment 2, 47 MLB SLEP IDIQ Pricing

Worksheet.

(g) The contract ceiling amount is the total sum of all extended pricing CLINs from the pricing worksheet in Section J, Attachment J-2.

M.7 PAST PERFORMANCE

Past Performance ratings will be applied to the Offeror’s stated performance record as delineated by the Offeror in response to requirements stated in Section L of the RFP and independently substantiated by the Government. The recentness, relevancy, source of the information, context of the data, and general trends in the Offeror’s performance will be considered in evaluating past performance. Offerors lacking a relevant past performance record or for whom information on past performance is not available or cannot be determined will not be evaluated favorably or unfavorably on past performance. The Government will contact references submitted by the

SECTION M 5 of 5

Offerors and may use information available to the Government (e.g., CPARS, PPIRS) to verify information provided with the Offeror’s proposal, as well as information obtained from other customers known to the Government, consumer protection organizations, and others who may have relevant and useful information. Information may also be considered regarding any significant subcontractors.

L-1Past Performance Questionnaire Solicitation Number: 70Z02319RAML003

Please provide your assessment of the prospective offeror’s level of past performance on a contract for which you were the reference. Please fill in the below tables and choose the appropriate rating from the drop-down list using the definitions on page two and provide justification for that rating.

Submit the questionnaire by the proposal due date to:

Nakenia.S.Spruill@uscg.mil.

Contractor Being Evaluated Company/Government Agency Completing the Questionnaire Period of Performance Being Assessed Contract Award Date Contract Number & Order Number (if applicable) Contract Completion Date Company/Government Agency Completing the Questionnaire Evaluator Name Email and Phone Total Dollar Value (includes unexercised options; ceiling amount for IDIQ) Current Dollar Value (current obligated amount) Project Title Contract Effort Description (Identify the key requirements and/or type of effort. The description should be detailed enough so that it can be used in determining the relevance of this program or project. Address the complexity of the contract/order effort and the overall technical risk associated with accomplishing the effort. Ensure acronyms are identified. Provide a complete description of the contract/order effort that identifies key technologies, components, subsystems, and requirements. For task/delivery order contracts, state the number of orders issued during the period, the number of orders completed during the period, and the number of orders that remain active.

Would you recommend this company for selection?

mailto:CG-9123BoatBuy@uscg.mil mailto:CG-9123BoatBuy@uscg.mil

Rating Definition Justification Exceptional Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective

To justify an Exceptional rating, identify multiple significant events and state how they were of benefit to the Government. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating.

Also, there should have been NO significant weaknesses identified.

Very Good Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective actions taken by the contractor was effective.

To justify a Very Good rating, identify a significant event and state how it was a benefit to the Government. There should have been no significant weaknesses identified.

Satisfactory Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

To justify a Satisfactory rating, there should have been only minor problems, or major problems the contractor recovered from without impact to the contract/order. There should have been NO significant weaknesses identified. A fundamental principle of assigning ratings is that contractors will not be evaluated with a rating lower than Satisfactory solely for not performing beyond the requirements of the contract/order.

Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.

To justify Marginal performance, identify a significant event in each category that the contractor had trouble overcoming and state how it impacted the Government. A Marginal rating should be supported by referencing the management tool that notified the contractor of the contractual deficiency (e.g., management, quality, safety, or environmental deficiency report or letter).

Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

To justify an Unsatisfactory rating, identify multiple significant events in each category that the contractor had trouble overcoming and state how it impacted the Government. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating. An Unsatisfactory rating should be supported by referencing the management tools used to notify the contractor of the contractual deficiencies (e.g., management, quality, safety, or environmental deficiency reports, or letters).

Category and Description Rating (drop down) Justification Quality of Product or Service Contractor’s conformance to contract/order requirements, specifications and standards of good workmanship.

Choose a Rating

Schedule. Assess the timeliness of the contractor against the completion of the contract, task orders, milestones, delivery schedules, and administrative requirements.

Management. Assess the integration and coordination of all activity needed to execute the contract/order, specifically the timeliness, completeness and quality of problem identification, corrective action plans, proposal submittals, the contractor’s history of reasonable and cooperative behavior (to include timely identification of issues in controversy), customer satisfaction, timely award and management of subcontracts.

Regulatory Compliance Consider failure to report in accordance with contract terms and conditions, late or nonpayment to subcontractors, trafficking violations, tax delinquency, defective cost or pricing data, terminations, suspension and debarments.

Assess compliance with all terms and conditions in the contract/order relating to applicable regulations and codes, Consider aspects of performance such as compliance with financial, environmental, safety, and labor regulations as well as any other reporting requirements in the contract terms and conditions.

Given what I know today I Choose a Recommendation recommend them for similar requirements.

QualityOfProductorServiceJustification:

ScheduleJustification:

ManagementJustification:

RegulatoryComplianceJustification:

RecommendationJustification:

QualityOfProductOrServiceDropdown: [Choose A Rating]

ScheduleDropdown: [Choose A Rating]

ManagementDropdown: [Choose A Rating]

RegulatoryComplianceDropdown: [Choose A Rating]

RecommendationDropdown: [Choose a Recommendation]

Would you recommend this company for selection:

Contract Effort Description Identify the key requirements andor type of effort The description should be detailed enough so that it can be used in determining the relevance of this program or project Address the complexity of the contractorder effort and the overall technical risk associated with accomplishing the effort Ensure acronyms are identified Provide a complete description of the contractorder effort that identifies key technologies components subsystems and requirements For taskdelivery order contracts state the number of orders issued during the period the number of orders completed during the period and the number of orders that remain active:

Project Title:

Contractor Being Evaluated:

CompanyGovernment Agency Completing the Questionnaire:

Period of Performance Being Assessed:

Contract Award Date:

Contract Number Order Number if applicable:

Contract Completion Date:

CompanyGovernment Agency Completing the Questionnaire_2:

Evaluator Name Email and Phone:

Total Dollar Value includes unexercised options ceiling amount for IDIQ:

Current Dollar Value current obligated amount:

March 2014 CGAP Chapter 3033 Appendix B

APPENDIX B – CHAPTER 3033

NOTICE FOR FILING AGENCY PROTESTS

United States Coast Guard Ombudsman Program

It is the policy of the United States Coast Guard (USCG) to issue solicitations and make contract awards in a fair and timely manner. The Ombudsman Program for Agency Protests (OPAP) was established to investigate agency protest issues and resolve them without expensive and time-consuming litigation. OPAP is an independent reviewing authority that is empowered to grant a prevailing protester essentially the same relief as the Government Accountability Office (GAO).

Interested parties are encouraged to seek resolution of their concerns within the USCG as an Alternative Dispute Resolution (ADR) forum rather than filing a protest with the GAO or some external forum. Interested parties may seek resolution of their concerns informally or opt to file a formal agency protest with the Contracting Officer or Ombudsman.

Informal Forum with the Ombudsman. Interested parties who believe a specific USCG procurement is unfair or otherwise defective should first direct their concerns to the applicable Contracting Officer. If the Contracting Officer is unable to satisfy their concerns, interested parties are encouraged to contact the U.S. Coast Guard Ombudsman for Agency Protests. Under this informal process the agency is not required to suspend contract award performance. Use of an informal forum does not suspend any time requirement for filing a protest with the agency or other forum. In order to ensure a timely response, interested parties should provide the following information to the Ombudsman: solicitation/contract number, contracting office, Contracting Officer, and solicitation closing date (if applicable).

Formal Agency Protest with the Ombudsman. Prior to submitting a formal agency protest, protesters must first use their best efforts to resolve their concerns with the Contracting Officer through open and frank discussions. If the protester’s concerns are unresolved, an Independent Review is available by the Ombudsman. The protester may file a formal agency protest to either the Contracting Officer or as an alternative to that, the Ombudsman under the OPAP program.

Contract award or performance will be suspended during the protest period unless contract award or performance is justified, in writing, for urgent and compelling reasons or is determined in writing to be in the best interest of the Government. The agency’s goal is to resolve protests in less than 35 calendar days from the date of filing. Protests shall include the information set forth in FAR 33.103(d) (2). If the protester fails to submit the required information, resolution of the protest may be delayed or the protest may be dismissed. To be timely protests must be filed within the period specified in FAR 33.103(e). Formal protests filed under the OPAP program should be submitted electronically to OPAP@uscg.mil and the Contracting Officer or by hand delivery to the Contracting Officer.

Election of Forum. After an interested party protests a Coast Guard procurement to the Contracting Officer or the Ombudsman, and while the protest is pending, the protester agrees not to file a protest with the GAO or other external forum. If the protest is filed with an external forum, the agency protest will be dismissed.

The Ombudsman Hotline telephone number is 202.372.3695.

Appendix B –Notice For Filing Agency Protest

L-2

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

00003

Nakenia.S.Spruil

SEE CONTINUATION PAGE

USCG HEADQUARTERS (CG-912)

2703 MARTIN LUTHER KING JR AVE SE

2118238AML003

70Z02319RAML003

1 2

02/05/2019

11/21/2018

SPRUILL.NAKENIA.S.127

9159507

Digitally signed by

SPRUILL.NAKENIA.S.1279159507

Date: 2019.02.05 12:11:18 -05'00'

2/5/2019

SECTION SF-30 BLOCK 14 CONTINUATION PAGE Page 2 of 2

The purpose of this amendment is to provide Amendment 3 to Solicitation No. 70Z02319RAM0003.

Amendment changes as follows:

1. Section B.2(a) revised to clarify transportation of the boat used for the mockup is included in the detail design deliverable sub-CLIN;

2. Section B.3 revised to outline ordering years 1 - 5 as the Base Period and ordering years 6 – 10 as Option Period One (1);

3. Section B.3, Section F.6, Section J-1 Pricing Worksheet, revised to reflect the unit of measurement of CLIN 0004, Program Management Support, from yearly to monthly;

4. Section C, Statement of Work (SOW), Sections 039-1, 040-4, 041-2, 045-4, 061-5, 061-7, 066-5, 076-3, 083-7, 084-3, 084-5, 084-6, 084-7, 085-4, 087-3, 087-4, 092-6, 092-7, 096-1, 096-4, 097- 2, 097-6 and 098-1 revised;

5. Section C, Attachment 1, Specification, Sections 233-2, 233-5, and 410-1 revised;

6. Section C, Attachment 2, Contract Data Requirement List 089-003 revised;

7. Section F.4 revised to outline Base Period and Option Period One (1);

8. Section L.5 RFP QUESTIONS AND AMENDMENTS revised to add an additional point of contact for the RFP: CDR David Obermeier, Deputy Program Manager, David J.

Obermeier@uscg.mil;

9. Section L.6 PROPOSAL DUE DATE revised, extending the proposal due date from Friday, February 15, 2019 to Friday, March 15, 2019;

10. Section L.12(a)(1)(vi)(B) revised to remove requirement to submit subcontracting plan using the DHS Subcontracting Form (Attachment J-5);

11. Provide Pre-Proposal Site Visit brief from the Sector Buffalo;

12. Provide Government Furnished Information (GFI) Drawing Reference Guide;

13. Provide all questions and clarification request(s) submitted by 16 January 2019 along with USCG answers; and

The USCG will accept additional Offerors’ question(s) and clarification request(s) in response to USCG’s posted answers NLT 5:00PM Eastern Time (ET) on Monday 11 February 2019.

mailto:Obermeier@uscg.mil

SF-30_Amendment 3

SF-30 Continuation Page

Part I – The Schedule

Section B – Supplies or Services and Prices/Costs

Section B 1 of 20

B.1 CONTRACT TYPE

B.2 CONTRACT LINE ITEM NUMBERS (CLINs)

B.3 BASE YEAR AND OPTION YEAR PRICE TABLES

B.4 CONTRACT CEILING AMOUNT

B.1 CONTRACT TYPE

This is a Firm-Fixed Price (FFP) Indefinite Delivery, Indefinite Quantity (IDIQ) contract.

B.2 CONTRACT LINE ITEM NUMBERS (CLINs)

(a) CLIN 0001 – DETAILED DESIGN

This CLIN encompasses the work associated with the detailed design for the 47-ft. Motor

Lifeboat (47 MLB) Service-Life Extension Program (SLEP).

0001AA Detailed Design Deliverables includes: systems integration and engineering, general requirements for design and construction, RAM overview, human systems integration, and mockups. Included in the mockups is transportation of the designated MLB, as noted in Statement of Work in Section C Section 098-1.2, to the Contractor’s Facility to be used to construct the mockups. The MLB used for the mockups shall remain available through the completion of OT&E.

0001AB 2-Dimensional Product Drawing and Calculations includes: 2D technical data package requirements, drawing number assignment report, 2D product drawings, supplemental requirements for drawings, list of required 2D drawings, and calculations.

0001AC 3-Dimensional Technical Data package includes the 3D technical data package requirements.

0001AD technical manuals and other data includes: contractor-developed technical manuals, commercial off-the-shelf (COTS) technical manuals, and other data for the 47 MLB SLEP.

(b) CLIN 0002 – WEIGHT AND CENTERS OF GRAVITY MEASUREMENT

CRADLE (WCMC)

This CLIN encompasses the design and construction of the WCMC for the 47 MLB SLEP.

(c) CLIN 0003 – INTELLECTUAL PROPERTY

Section B 2 of 20

This CLIN is associated with intellectual property and data rights. This CLIN will only be priced if the contractor asserts lesser rights than those listed by the Government in

Attachment J-1. In that case, the Government may create Sub-CLINs upon award for each

CDRL where lesser rights have been identified and a price was proposed. Instructions for pricing are found in Section L.10 (a)(10), Technical Data Rights.

(d) CLIN 0004 – PROGRAM MANAGEMENT SUPPORT

This CLIN series (0004, 1004, 2004, 3004, 4004, 5004, 6004, 7004, 8004, and 9004) encompasses the program management and support needed in accordance with the Statement of Work in Section C. Program Management includes: project management, configuration management, warranty management, discovered items, fire, flooding and destructive weather plans, accident prevention, logistics conference, integrated logistics support program, supply support general requirement, master equipment configuration list, serial number report, list of special tools and test equipment, provisioning data requirements, transportation master plan, detailed transportation plan and notification, facilities, quality management, weight control general requirements, weight control program, loading conditions, weight estimates and reports, and weight estimate and reports requirements.

(e) CLIN 0005 – FIRST ARTICLE (FA)

This CLIN encompasses the one-time work conducted for the FA in accordance with the

Statement of Work in Section C, such as additional one-time and special tests, transportation to National Motor Lifeboat (NMLB) School from the production facility, acceptance at

NMLB School, and Contractor support during Operational Assessment.

(f) CLIN 0006 – PRODUCTION

This CLIN series (0006, 1006, 2006, 3006, 4006, 5006, 6006, 7006, 8006, and 9006) encompasses the work to be conducted for every 47 MLB undergoing SLEP in accordance with the Statement of Work in Section C. This CLIN applies to the FA, Low Rate Initial

Production (LRIP) and Full Rate Production (FRP) MLBs. Base Work Items (0006AA, 1006

AA, 2006AA, 3006AA, 4006AA, 5006AA, 6006AA, 7006AA, 8006AA, and 9006AA) includes all base work items and warranty for 107 MLBs. Long Lead Time Materials

(LLTM) (0006AB, 1006AB, 2006AB, 3006AB, 4006AB, 5006AB, 6006AB, 7006AB,

8006AB, and 9006AB) LLTM for 107 MLBs. Web Frame Modifications (0006AC, 1006AC, 2006AC, 3006AC, 4006AC, 5006AC, 6006AC, 7006AC, 8006AC, and 9006AC) includes the web frame modification for up to 83 MLBs.

Section B 3 of 20

Base Work Items include: general construction requirements, physical protection, protection of machinery, equipment and material, protection of the MLB during construction and trials, interferences, launching, docking and undocking, structural inspections, structural inspection-based repair plan, plate repair or renewal, forward deck plate renewal, web frame modification plan, bulkhead 5 renewal, watertight closures, mast assembly, fendering system, removal engines, install engines, cardan shafts, propellers, propeller shafts, shaft struts, stern tubes, reverse/reduction gears, electrical systems, command, control and communications systems, auxiliary systems, outfit and furnishing, initial and onboard spare parts, preparing the MLBs for transportation, inspections, testing, trials, and verification, determine weight and determine parameters.

(g) CLIN 0007 – TRANSPORTATION

This CLIN series (0007, 1007, 2007, 3007, 4007, 5007, 6007, 7007, 8007, 9007) encompasses preparation and transportation of boats to and from different locations at different stages of the production process: Transportation from Storage to Production

Location (007AA, 1007AA, 2007AA, 3007AA). Transportation from IDL East to

Production Location (3007AB, 4007AB, 5007AB, 6007AB, 7007AB, 8007AB, 9007AB).

Transportation from IDL West to Production Location (3007AC, 4007AC, 5007AC, 6007AC, 7007AC, 8007AC, 9007AC). Transportation from Production Location to IDL

East (1007AD, 3007AD, 4007AD, 5007AD, 6007AD, 7007AD, 8007AD, 9007AD).

Transportation from Production Location from IDL West (1007AE, 2007AE, 3007AE, 4007AE, 5007AE, 6007AE, 7007AE, 8007AE, 9007AE).

(h) CLIN 0008 – RETENTION OF REMOVED PROPULSION EQUIPMENT

This CLIN series (3008, 4008, and 5008) encompasses the retention of removed propulsion equipment to be conducted accordance with the Statement of Work in Section C, including removal of 20 engines from the MLBs, packaging them in GFE containers and loading them onto a USGC-identified commercial shipping carrier for transportation.

(i) CLIN 0009 – DISCOVERED ITEMS

This CLIN series (0009, 1009, 2009, 3009, 4009, 5009, 6009, 7009, 8009, 9009) is established to support completion of discovered work identified through either government, contractor, or joint inspections. The discovered work will be identified and defined through the submission of a Condition Found Report (CFR). The Discovered Item CLIN will support both labor and material costs to correct the discovered work. Any work ordered under this

CLIN series will be consistent with the requirements of the specification and statement of work. This CLIN series is available in each ordering period, and will be funded at the

Section B 4 of 20 beginning of the ordering period based on the number of MLBs estimated to be inducted during the ordering period. Labor (0009AA, 1009AA, 2009AA, 3009AA, 4009AA, 5009AA, 6009AA, 7009AA, 8009AA, 9009AA) is the labor rate that will be multiplied by the notional ordering quantity listed in J-2. Material (0009AB, 1009AB, 2009AB, 3009AB, 4009AB, 5009AB, 6009AB, 7009AB, 8009, AB, 9009AB) is a cost that will not be evaluated, and a “to be determined” amount will be added to the contract cap upon award.

(j) CLIN 0010 – TRAINING

This CLIN series (0010, 1010, 2010) reflects training to be conducted in accordance with the

Statement of Work in Section C, including familiarization training for the FA and ten LRIP deliveries.

(k) CLIN 0011 – INTERIM CONTRACTOR LOGISTICS SUPPORT

This CLIN series (1011, 2011, 3011, 4011, and 5011) is to provide Interim Contractor

Logistics Support (ICLS) in accordance with the Statement of Work in Section C. The support will include: technical support and labor, and other direct costs as appropriate. Labor

(1011AA, 2011AA, 3011AA, 4011AA, 5011AA) is the labor rate that will be multiplied by the notional ordering quantity listed in J-2. Other direct costs (0011AB, 1011AB, 2011AB, 3011AB, 4011AB, 5011AB) is a cost that will not be evaluated, and a “to be determined” amount will be added to the contract cap upon award.

(l) CLIN 0012 – SYSTEM INSURANCE STOCK

This CLIN series (1012, 2012, 3012, 4012, 5012, 6012, 7012, 8012, and 9012) reflects system insurance stock in accordance with the Statement of Work in Section C as follows:

Engine Set Engine Set (Port and Starboard): 1012AA, 2012AA, 3012AA, 4012AA, 5012AA, 6012AA, 7012AA, 8012AA, 9012AA

Propeller Set (Port and Starboard): 1012AB, 2012AB, 3012AB, 4012AB, 5012AB, 6012AB 7012AB, 8012AB, 9012AB

Propeller Shaft: 1012AC, 2012AC, 3012AC, 4012AC, 5012AC, 6012AC, 7012AC, 8012AC, 9012AC

Cardan Shaft: 1012AD, 2012AD, 3012AD, 4012AD, 5012AD, 6012AD, 7012AD, 8012AD, 9012AD

Propeller Strut Set (Port and Starboard): 1012AE, 2012AE, 3012AE, 4012AE, 5012AE, 6012AE, 7012AE, 8012AE, 9012AE

Section B 5 of 20

Reverse/Reduction Gear Set (Port and Starboard): 1012AF, 2012AF, 3012AF, 4012AF, 5012AF, 6012AF, 7012AF, 8012AF, 9012AF

B.3 ORDERING PERIOD PRICE TABLES

The following tables show the CLIN structure for the first ordering period (year one) and each subsequent ordering period (years two through ten). The Government will populate the unit price column from Attachment J-2 upon contract award.

ORDERING YEAR 1 (Base) New

CLIN

Type Description Unit Measure Unit Price

0001 Info DETAILED DESIGN

0001AA Priced DETAILED DESIGN DELIVERABLES JB

0001AB Priced

2-DIMENSIONAL (2D) PRODUCT

DRAWINGS & CALCULATIONS

JB

0001AC Priced

3-DIMENSIONAL TECHNICAL DATA

PACKAGE

0001AD Priced

TECHNICAL MANUALS AND OTHER

DATA

0002 Priced

WEIGHT AND CENTERS OF GRAVITY

MEASUREMENT CRADLE (WCMC)

EA

0003 Priced INTELLECTUAL PROPERTY EA

0004 Priced PROGRAM MANAGEMENT SUPPORT Per Month

0005 Priced FIRST ARTICLE EA

0006 Info PRODUCTION

0006AA Priced BASE WORK ITEMS Per MLB

0006AB Priced LONG LEAD TIME MATERIAL Per MLB

0006AC Priced WEB FRAME MODIFICATION Per MLB

0007 Info TRANSPORTATION

0007AA Priced

TRANSPORTATION FROM STORAGE TO

PRODUCTION LOCATION

Per MLB

Section B 6 of 20

0007AB Priced Reserved

0007AC Priced Reserved

0007AD Priced Reserved

0007AE Priced Reserved

0008 Priced Reserved

Composite

Hourly Rate

0009 Info DISCOVERED ITEM

0009AA Priced DISCOVERED ITEM LABOR Per Hour

Total Material

Cost

0009AB Priced DISCOVERED ITEM MATERIAL Per Delivery

Order

TBD

Unit Price

0010 Priced TRAINING EA

0011 Info Reserved

0011AA Priced Reserved

ICLS ODCs

0011AB Priced ICLS OTHER DIRECT COST

0012 Info SYSTEM INSURANCE STOCK

0012AA Priced Reserved

0012AB Priced Reserved

0012AC Priced Reserved

0012AD Priced Reserved

0012AE Priced Reserved

Section B 7 of 20

0012AF Priced Reserved

ORDERING YEAR 2 (Base)

Type Description Unit Measure

1004 Priced PROGRAM MANAGEMENT SUPPORT Per Month

1006 Info PRODUCTION

1006AA Priced BASE WORK ITEMS Per MLB

1006AB Priced LONG LEAD TIME MATERIAL Per MLB

1006AC Priced WEB FRAME MODIFICATION Per MLB

1007 Info TRANSPORTATION

1007AA Priced

1007AB Priced Reserved

1007AC Priced Reserved

1007AD Priced

TRANSPORT FROM PRODUCTION

LOCATION TO IDL EAST

1007AE Priced

LOCATION TO IDL WEST

1008 Priced Reserved

1009 Info DISCOVERED ITEM

1009AA Priced DISCOVERED ITEM LABOR Per Hour

1009AB Priced DISCOVERED ITEM MATERIAL

Section B 8 of 20

ORDERING YEAR 2 (Base)

Type Description Unit Measure

1010 Priced TRAINING EA

INTERIM CONTRACTOR LOGISTICS

SUPPORT (ICLS)

1011AA Priced

SUPPORT LABOR

Per Hour

1011AB Priced ICLS OTHER DIRECT COST

1012 Info SYSTEM INSURANCE STOCK

1012AA Priced ENGINE SET (PORT AND STARBOARD) Per Set

1012AB Priced

PROPELLER SET (PORT AND

STARBOARD)

Per Set

1012AC Priced SHAFT, PROPELLER Per Shaft

1012AD Priced CARDAN SHAFT Per Shaft

1012AE Priced

PROPELLER STRUT SET (PORT AND

1012AF Priced

REVERSE/REDUCTION GEAR SET (PORT

AND STARBOARD)

Section B 9 of 20

ORDERING YEAR 3 (Base)

Description

Unit

Measure

2004 Priced PROGRAM MANAGEMENT SUPPORT Per Month

2006 Info PRODUCTION

2006AA Priced BASE WORK ITEMS Per MLB

2006AB Priced LONG LEAD TIME MATERIAL Per MLB

2006AC Priced WEB FRAME MODIFICATION Per MLB

2007 Info TRANSPORTATION

2007AA Priced

2007AB Priced Reserved

2007AC Priced Reserved

2007AD Priced Reserved

2007AE Priced

2008 Priced Reserved

Composite Hourly

Rate

2009 Info DISCOVERED ITEM

2009AA Priced DISCOVERED ITEM LABOR Per Hour

2009AB Priced DISCOVERED ITEM MATERIAL

2010 Priced TRAINING EA

Section B 10 of 20

ORDERING YEAR 3 (Base)

2011 Info

2011AA Priced

2011AB Priced ICLS OTHER DIRECT COST

2012 Info SYSTEM INSURANCE STOCK

2012AA Priced ENGINE SET (PORT AND STARBOARD) Per Set

2012AB Priced

2012AC Priced SHAFT, PROPELLER Per Shaft

2012AD Priced CARDAN SHAFT Per Shaft

2012AE Priced

2012AF Priced

REVERSE/REDUCTION GEAR SET

(PORT AND STARBOARD)

ORDERING YEAR 4 (Base)

3004 Priced PROGRAM MANAGEMENT SUPPORT Per Month

3006 Info PRODUCTION

3006AA Priced BASE WORK ITEMS Per MLB

3006AB Priced LONG LEAD TIME MATERIAL Per MLB

3006AC Priced WEB FRAME MODIFICATION Per MLB

3007 Info TRANSPORTATION

Section B 11 of 20

3007AA Priced

3007AB Priced

TRANSPORTATION FROM IDL EAST TO

3007AC Priced

TRANSPORTATION FROM IDL WEST TO

3007AD Priced

3007AE Priced

3008 Priced

RETENTION OF REMOVED PROPULSION

EQUIPMENT

3009 Info DISCOVERED ITEM

3009AA Priced DISCOVERED ITEM LABOR Per Hour

3009AB Priced DISCOVERED ITEM MATERIAL

3011 Info

3011AA Priced

3011AB Priced ICLS OTHER DIRECT COST

3012 Info SYSTEM INSURANCE STOCK

3012AA Priced ENGINE SET (PORT AND STARBOARD) Per Set

Section B 12 of 20

3012AB Priced

3012AC Priced SHAFT, PROPELLER Per Shaft

3012AD Priced CARDAN SHAFT Per Shaft

3012AE Priced

3012AF Priced

ORDERING YEAR 5 (Base)

4004 Priced PROGRAM MANAGEMENT SUPPORT Per Month

4006 Info PRODUCTION

4006AA Priced BASE WORK ITEMS Per MLB

4006AB Priced LONG LEAD TIME MATERIAL Per MLB

4006AC Priced WEB FRAME MODIFICATION Per MLB

4007 Info TRANSPORTATION

4007AB Priced

4007AC Priced

4007AD Priced

4007AE Priced

4008 Priced

Section B 13 of 20

ORDERING YEAR 5 (Base)

4009 Info DISCOVERED ITEM

4009AA Priced DISCOVERED ITEM LABOR Per Hour

4009AB Priced DISCOVERED ITEM MATERIAL

4011 Info

4011AA Priced

4011AB Priced ICLS OTHER DIRECT COST

4012 Info SYSTEM INSURANCE STOCK

4012AA Priced ENGINE SET (PORT AND STARBOARD) Per Set

4012AB Priced

4012AC Priced SHAFT, PROPELLER Per Shaft

4012AD Priced CARDAN SHAFT Per Shaft

4012AE Priced

4012AF Priced

Section B 14 of 20

ORDERING YEAR 6 (Option 1)

5004 Priced PROGRAM MANAGEMENT SUPPORT Per Month

5006 Info PRODUCTION

5006AA Priced BASE WORK ITEMS Per MLB

5006AB Priced LONG LEAD TIME MATERIAL Per MLB

5006AC Priced WEB FRAME MODIFICATION Per MLB

5007 Info TRANSPORTATION

5007AB Priced

5007AC Priced

5007AD Priced

5007AE Priced

5008 Priced

5009 Info DISCOVERED ITEM

5009AA Priced DISCOVERED ITEM LABOR Per Hour

5009AB Priced DISCOVERED ITEM MATERIAL

5011 Info

Section B 15 of 20

ORDERING YEAR 6 (Option 1)

5011AA Priced

5011AB Priced ICLS OTHER DIRECT COST

5012 Info SYSTEM INSURANCE STOCK

5012AA Priced ENGINE SET (PORT AND STARBOARD) Per Set

5012AB Priced

5012AC Priced SHAFT, PROPELLER Per Shaft

5012AD Priced CARDAN SHAFT Per Shaft

5012AE Priced

5012AF Priced

ORDERING YEAR 7 (Option 1)

6004 Priced PROGRAM MANAGEMENT SUPPORT Per Month

6006 Info PRODUCTION

6006AA Priced BASE WORK ITEMS Per MLB

6006AB Priced LONG LEAD TIME MATERIAL Per MLB

6006AC Priced WEB FRAME MODIFICATION Per MLB

6007 Info TRANSPORTATION

6007AB Priced

Section B 16 of 20

ORDERING YEAR 7 (Option 1)

6007AC Priced

6007AD Priced

6007AE Priced

6009 Info DISCOVERED ITEM

6009AA Priced DISCOVERED ITEM LABOR Per Hour

6009AB Priced DISCOVERED ITEM MATERIAL

6012 Info SYSTEM INSURANCE STOCK

6012AA Priced ENGINE SET (PORT AND STARBOARD) Per Set

6012AB Priced

6012AC Priced SHAFT, PROPELLER Per Shaft

6012AD Priced CARDAN SHAFT Per Shaft

6012AE Priced

6012AF Priced

Section B 17 of 20

ORDERING YEAR 8 (Option 1)

7004 Priced PROGRAM MANAGEMENT SUPPORT Per Month

7006 Info PRODUCTION

7006AA Priced BASE WORK ITEMS Per MLB

7006AB Priced LONG LEAD TIME MATERIAL Per MLB

7006AC Priced WEB FRAME MODIFICATION Per MLB

7007 Info TRANSPORTATION

7007AB Priced

7007AC Priced

7007AD Priced

7007AE Priced

7009 Info DISCOVERED ITEM

7009AA Priced DISCOVERED ITEM LABOR Per Hour

7009AB Priced DISCOVERED ITEM MATERIAL

7012 Info SYSTEM INSURANCE STOCK

7012AA Priced ENGINE SET (PORT AND STARBOARD) Per Set

7012AB Priced

7012AC Priced SHAFT, PROPELLER Per Shaft

Section B 18 of 20

ORDERING YEAR 8 (Option 1)

7012AD Priced CARDAN SHAFT Per Shaft

7012AE Priced

7012AF Priced

ORDERING YEAR 9 (Option 1)

8004 Priced PROGRAM MANAGEMENT SUPPORT Per Month

8006 Info PRODUCTION

8006AA Priced BASE WORK ITEMS Per MLB

8006AB Priced LONG LEAD TIME MATERIAL Per MLB

8006AC Priced WEB FRAME MODIFICATION Per MLB

8007 Info TRANSPORTATION

8007AB Priced

8007AC Priced

8007AD Priced

8007AE Priced

8009 Info DISCOVERED ITEM

8009AA Priced DISCOVERED ITEM LABOR Per Hour

Section B 19 of 20

ORDERING YEAR 9 (Option 1)

8009AB Priced DISCOVERED ITEM MATERIAL

8012 Info SYSTEM INSURANCE STOCK

8012AA Priced ENGINE SET (PORT AND STARBOARD) Per Set

8012AB Priced

8012AC Priced SHAFT, PROPELLER Per Shaft

8012AD Priced CARDAN SHAFT Per Shaft

8012AE Priced

8012AF Priced

ORDERING YEAR 10 (Option 1)

9004 Priced PROGRAM MANAGEMENT SUPPORT Per Month

9006 Info PRODUCTION

9006AA Priced BASE WORK ITEMS Per MLB

9006AB Priced LONG LEAD TIME MATERIAL Per MLB

9006AC Priced WEB FRAME MODIFICATION Per MLB

9007 Info TRANSPORTATION

9007AB Priced

Section B 20 of 20

ORDERING YEAR 10 (Option 1)

9007AC Priced

9007AD Priced

9007AE Priced

9009 Info DISCOVERED ITEM

9009AA Priced DISCOVERED ITEM LABOR Per Hour

9009AB Priced DISCOVERED ITEM MATERIAL

9012 Info SYSTEM INSURANCE STOCK

9012AA Priced ENGINE SET (PORT AND STARBOARD) Per Set

9012AB Priced

9012AC Priced SHAFT, PROPELLER Per Shaft

9012AD Priced CARDAN SHAFT Per Shaft

9012AE Priced

9012AF Priced

B.4 CONTRACT CEILING AMOUNT

(1) The CONTRACT CEILING AMOUNT for contract 70Z02319RAML003 is

$______________ (TBD). The CONTRACT CEILING AMOUNT is the total sum of all extended price CLINs from the pricing worksheet in Section J, Attachment J-2.

SECTION C, ATTACHMENT 1 SPECIFICATION

Department of Homeland Security (DHS)

United States Coast Guard (USCG)

47-foot Motor Lifeboat (MLB)

SERVICE-LIFE EXTENSION PROGRAM

70Z02319RAML003 Amendement 0003

Attachment C-1

Specification

04 Feb 2019

47 MLB SLEP 70Z02319RAML003 Amendement 0003

SECTION C, ATTACHMENT 1 i SPECIFICATION

SECTION 0: [ORIG] GENERAL SPECIFICATION ADMINISTRATION

042 [ORIG] GENERAL SPECIFICATION REQUIREMENTS

042-1 [Orig] General

042-2 [Orig] Definitions

042-3 [Orig] Referenced Documents

042-4 [Orig] Construction Standards

051 [ORIG] MLB DESIGN REQUIREMENTS

051-1 [Orig] General Design Requirements

051-2 [Orig] MLB Emptyship Weight and Centers of Gravity

051-3 [Orig] Operating Environment

051-4 [Orig] Speed and Range

051-5 [Orig] Design Life and Service Profile

051-6 [Orig] Maneuvering and Seakeeping

051-7 [Orig] Motion and Acceleration Limits

051-8 [Orig] Towing

051-9 [Orig] Survivability

051-10 [Orig] Tolerances

071 [ORIG] ACCESS

071-1 [Orig] General

073 [ORIG] NOISE AND VIBRATION

073-1 [Orig] General

074 [ORIG] WELDING

074-1 [Orig] General

074-2 [Orig] Code

074-3 [Orig] Non-Destructive Inspection

074-4 [Orig] Non-Destructive Testing (NDT) Reports

074-5 [Orig] Weld Repairs

074-6 [Orig] Restrictions

075 [ORIG] FASTENERS

075-1 [Orig] General

077 [ORIG] SAFETY

077-1 [Orig] Spray Shields and Protective Covers

077-2 [Orig] Protection of Equipment, Piping, and Cabling from Damage

078 [ORIG] MATERIALS

SECTION C, ATTACHMENT 1 ii SPECIFICATION

078-1 [Orig] General

078-2 [Orig] Materials

078-3 [Orig] Miscellaneous Requirements

078-4 [Orig] Electrolytically Dissimilar Metals and Corrosion Protection

078-5 [Orig] Toxic Products and Safety

078-6 [Orig] Mercury Exclusion

079 [ORIG] STABILITY AND BUOYANCY

079-1 [Orig] Trim and Heel Limits

079-2 [Orig] Ballast

100 [ORIG] STRUCTURE

100-1 [Orig] General

100-2 [Orig] Watertightness

100-3 [Orig] Fairness

110 [ORIG] SHELL PLATING AND SUPPORT STRUCTURE

110-1 [Orig] General

110-2 [Orig] Repair of Holes

110-3 [Orig] Limber Holes

110-4 [Orig] Plate Renewal

110-5 [Orig] Plate Repair

114 [ORIG] BOW FENDER SPRAY RAIL

114-1 [Orig] General

131 [ORIG] FOREDECK RENEWAL

131-1 [Orig] General

167 [ORIG] WATERTIGHT CLOSURES

167-1 [Orig] Buoyancy Box Hatches

170 [ORIG] MAST ASSEMBLY

170-1 [Orig] Mast Pivot and Mounting Points

170-2 [Orig] Mast Flagstaff Pad Eye

180 [ORIG] FOUNDATIONS

180-1 [Orig] General

SECTION 2: [ORIG] PROPULSION

200 [ORIG] PROPULSION PLANT

200-1 [Orig] General

200-2 [Orig] Propulsion System Ratings—General

200-3 [Orig] Vibration Analysis

233 [ORIG] PROPULSION DIESEL ENGINES

SECTION C, ATTACHMENT 1 iii SPECIFICATION

233-1 [Orig] General

233-2 [0003] Engine Rating

233-3 [Orig] Inversion Requirement

233-4 [Orig] Piping System

233-5 [0003] Engine Lubrication Oil System

233-6 [Orig] Engine Cooling System

233-7 [Orig] Fuel Oil System

233-8 [Orig] Emergency Shutdown

233-9 [Orig] Hot Section Shielding

233-10 [Orig] Propulsion System Foundations and Resilient Mounts

233-11 [Orig] Engine Starter

233-12 [Orig] Emissions

233-13 [Orig] Jacket Water Heating System

241 [ORIG] REVERSE/REDUCTION GEARS

241-1 [Orig] General

241-2 [Orig] Reverse/Reduction Gear Rating

241-3 [Orig] Gear Lubrication System

241-4 [Orig] Gear Cooling System

243 [ORIG] PROPELLER SHAFTING, BEARINGS, AND SEALS

243-1 [Orig] Propeller Shafts

243-2 [Orig] Shaft Struts and Stern Tube

243-3 [Orig] Engine Flywheel Couplings

243-4 [Orig] Cardan Shafts

245 [ORIG] PROPELLERS

245-1 [Orig] Selection

245-2 [Orig] Material / Manufacturing

245-3 [Orig] Surface finish, Balance and Inspection

251 [ORIG] ENGINE ROOM COMBUSTION AIR AND VENTILATION

251-1 [Orig] General Requirements and Constraints

252 [ORIG] PROPULSION CONTROL SYSTEM

252-1 [Orig] General

252-2 [Orig] Propulsion Control Response

252-3 [Orig] Monitoring and Alarm System

259 [ORIG] ENGINE EXHAUST SYSTEM

259-1 [Orig] General

259-2 [Orig] Cooling

SECTION C, ATTACHMENT 1 iv SPECIFICATION

259-3 [Orig] Hot Flex Sections

259-4 [Orig] Materials

SECTION 3: [ORIG] ELECTRICAL

300 [ORIG] ELECTRICAL POWER GENERATION AND DISTRIBUTION SYSTEM

300-1 [Orig] General Requirements

301 [ORIG] WIRING AND ELECTRIC CABLE

301-1 [Orig] General

301-2 [Orig] Cable Installation and Wiring Methods

305 [ORIG] ELECTRICAL DESIGNATION AND MARKING

305-1 [Orig] General

310 [ORIG] ELECTRIC POWER GENERATION

310-1 [Orig] General

310-2 [Orig] ALTERNATORS/GENERATORS

313 [ORIG] BATTERIES AND BATTERY CHARGING

313-1 [Orig] General

313-2 [Orig] Battery Chargers

314 [ORIG] POWER CONVERSION EQUIPMENT

314-1 [Orig] Power Converters

314-2 [Orig] Isolation Transformer

320 [ORIG] ELECTRIC POWER DISTRIBUTION SYSTEM

320-1 [Orig] General Requirements

320-2 [Orig] Electrical Distribution Panels

320-3 [Orig] Overcurrent Protection

320-4 [Orig] 120VAC Duplex Outlets

320-5 [Orig] Shore Power System

320-6 [Orig] Portable…