Pg_14_and_15_Add_Breakout_of_Cogen_Pricing.pdf

PDF 141 KB Posted

Attached to
Operation & Maintenance and Related Services
Solicitation number
47PK0218R0011
Issued by

About this file

Pg 14 and 15 add breakout of cogen pricing.

View the file

Other files

Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CLIN 0001

Startup costs: (2)

2. Startup costs may only apply to the base year of the contract and shall be a separate, lump sum cost payable during the first month of the contract.

COST BREAKDOWNS:

The following costs are to be included within the costs listed above:

ELECTRICAL SWITCH GEAR TESTING (3) (every 36 months, including Servicing Utility Fees, temporary generators, and other associated costs):

Phillip Burton FB CA0154ZZ

January 2020 Phillip Burton FB CA0154ZZ

January 2023

3. Electrical Testing is to be included within the firm fixed price of the contract. Electrical Testing is to be done per the PM Guide and NETA specifications; however the frequency of switchgear testing is to be done every three years in-cluding infrared scanning prior to testing and after testing. Building infrared scanning to be performed Annually on equipment requiring the scanning per the 2012 PM Guides. Testing should be verified during the start-up phase;

testing was last performed as follows: January 2017 at Phillip Burton FB CA0154ZZ

COGENERATION MAINTENANCE

BASE YEAR 1st OPTION 2nd OPTION 3rd OPTION 4th OPTION 2019-201 2020-2020 2021-2021 2022-2022 2023-2023 Monthly Cost Monthly Cost Monthly Cost Monthly Cost Monthly Cost

Phillip Burton

FB

If the cogeneration plant is not operating and/or decommissioned, the above maintenance costs will be deducted from the contractor’s base contract price.

C.35.10 MISCELLANEOUS WORK HOURS (Monthly, all buildings)

BASE OPTION 1 OPTION 2 OPTION 3 OPTION 4

40 40 40 40 40

ENGINEER/TECHNICIAN HOURLY RATES:

Hourly rates listed below are proposed only once. These rates may, in the event of wage determination rate increases, be escalated in accordance with FAR 52-222.44. Overtime hourly rates shall be applied for work required to be performed after the Normal Working Hours of the buildings, but which is scheduled in advance. Work performed after Normal Working Hours, solely for the convenience of the Contractor, shall be paid for at the straight time rate. Emergency callback hourly rates shall be applied when a technician must be called in outside of Normal Working Hours, without advance scheduling, unless the callback was due to negligence or poor maintenance practices on the part of the contractor.

Straight time Overtime Emergency Callback

Engineer, Stationary:

Engineer, Utility:

HVAC Technician:

General Mechanic :

H.18 ADDITIONAL SERVICES HOURLY RATES

These items are indefinite quantity (IQ) line items. These rates only apply to work which is outside the scope of work, and covered by Section H.18 (Additional Services).

Straight time Overtime Engineer, Stationary

Engineer,Utility:

HVAC Technician

General Mechanic :