18R0011_Amendment_0002_Final.pdf

PDF 69 KB Posted

Attached to
Operation & Maintenance and Related Services
Solicitation number
47PK0218R0011
Issued by

About this file

Amendment 0002.

View the file

Other files

File Type Posted
Pg.198_Update_Offer_Receipt_Date.pdf PDF
Pg.1_Update_Offer_Receipt_Date.pdf PDF
Pg.201_Add_L.6_Amendments.pdf PDF
18R0011_Amendment_0006.pdf PDF
NCMMS_Building_Inventory_-_Phillip_Burton_-_2018_(v2).xls XLS spreadsheet
Pg_14_and_15_Update_Electrical_Switch_and_Add_Window_Breakdown.pdf PDF
Q&A.pdf PDF
18R0011_Amendment_0005.pdf PDF
Pg_1_Cover_Page_Offer_Receipt_Correction.pdf PDF
SCA_WD_5637_r10.pdf PDF
Pre-Proposal_Conference_Sign-In_Sheet.pdf PDF
CBA_Supplement.pdf PDF
Pg_198_Add_Addl_Clarification_on_Who_to_Send_Questions_to.pdf PDF
Pg_14_and_15_Add_Breakout_of_Cogen_Pricing.pdf PDF
18R0011_Amendment_0004.pdf PDF
Pg_16_Correct_C.4_EDL_Report_Within_Days.pdf PDF
NCMMS_Building_Inventory_-_Phillip_Burton_-_2018.pdf PDF
18R0011_Amendment_0003.pdf PDF
Pg_1_Add_location_of_site_visit.pdf PDF
Pg_200-201_Added_site_visit_emails,_L.4_and_L.5.pdf PDF
Pg_202-203_Corrected_M.3_and_M.2.5.pdf PDF
Pg_197_Remove_language_at_top_of_page.pdf PDF
18R0011_Amendment_0001.pdf PDF
Pg_197.pdf PDF
CBA_O&M_-_Phillip_Burton_-_2018_(Final).pdf PDF
Pg_199.pdf PDF
O&M_450_Solicitation_(Final).pdf PDF
47PK0218R0011__Form_1449_(Final).pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION

NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

9PQ3R

Brian Tang, Contracting Officer

Please see attached

GSA, AMD, RECURRING CONTRACTS SEC (9PQ3R)

50 UNITED NATIONS PLAZA, 4th FL

SAN FRANCISCO, CA 94102-4912 USA

EQ9P3PMFT-18-0011

47PK0218R0011

1 3

8/8/2018

8/3/2018

INSTRUCTIONS

Instructions for items other than those that are self-explanatory, are as follows:

Item 1 (Contract ID Code). Insert the contract type identification code that appears in the title block of the contract being modified.

Item 3 (Effective date).

(1)

(2)

(3)

(4)

(5)

For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.

For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.

For a modification issued as an initial or confirming notice of termination for the convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.

For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.

For a modification confirming the contacting officer's determination of the amount due in settlement of a contract termination, the effective date shall be the same as the effective date of the initial decision.

(a)

(b)

(c)

(d)

(e)

(f)

Item 6 (Issued By). Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block.

Item 8 (Name and Address of Contractor). For modifications to a contract or order, enter the contractor's name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.

Item 9, (Amendment of Solicitation No. - Dated), and 10, (Modification of Contract/Order No. - Dated). Check the appropriate box and in the corresponding blanks insert the number and date of the original solicitation, contract, or order.

Item 12 (Accounting and Appropriation Data).

When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following entries.

(2) Accounting classification Net decrease $

Include subject matter or short title of solicitation/contract where feasible.

Item 16B. The contracting officer's signature is not required on solicitation amendments. The contracting officer's signature is normally affixed last on supplemental agreements.

(i)

NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words "See continuation sheet".

Item 13. Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)

Item 14 (Description of Amendment/Modification).

Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth in this document

Indicate the impact of the modification on the overall total contract price by inserting one of the following entries:

(i) Total contract price increased by $

(ii) Total contract price decreased by $

(iii) Total contract price unchanged.

State reason for modification.

When removing, reinstating, or adding funds, identify the contract items and accounting classifications.

(g)

(h)

When the SF 30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited to --

(i) A reference to the letter determination; and

(ii) A statement of the net amount determined to be due in settlement of the contract.

(1)

(2)

(3)

(4)

(5)

(6)

STANDARD FORM 30 (REV. 10-83) BACK

(1) Accounting classification Net increase $

Description of Amendment/Modification

Project: O&M and related services at 450 Golden Gate Ave. San Francisco, CA 94102

The purpose of this amendment is to:

1. Add location of site visit on page 1

2. Remove language at the top of page 197.

3. Add site visit RSVP emails and request response by Aug 10, 2018, add L.4 Teaming Arrangements and add L.5 Joint Ventures (JV) or Partnerships on pages 200-201.

4. Update M.3 Additional Evaluation Considerations and M.2.5 Cost/ Price Reasonableness

47PK0218R0011/0002

File details come from the government source that posted it.