PDF Posted
- Attached to
- Radiology Expansion (Construction) Prescott VAMC
- Solicitation number
- 36E77619B0012
About this file
This notice provides details for an upcoming solicitation to award a firm-fixed-price construction contract through a design-bid-build process. The scope of work involves renovating and expanding an existing radiology area at the Northern Arizona VA Medical Center, including demolishing approximately 3,000 square feet of an existing lab expansion. Key requirements include optimizing the radiology department footprint, adding a centralized waiting room and wide hallways, sufficiently sizing rooms for medical equipment, providing ground-level access, and including structure and utilities to enable a future second floor and elevator/stair access. The solicitation will be issued as a service-disabled veteran-owned small business set-aside ifb advertised on FBO. Bids are due in August 2019 with an anticipated 425-day period of performance. The construction value is estimated between $5-10 million. Questions must be submitted in writing by the specified deadline.
36E77619B0012 Attachment 7 - Mechanical Dwgs 1-22.pdf
View the file
Other files
Show 40 more
Latest 50 of 59 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MA
MV
CO
EV
VE
AI
FOV
FOR
FOS
FP
LPG
NPW
NO
O
N
G
MPG
G
MPG
CA
V
VBG
VBF
AV
AW
AW
ST
OST
GW
GW
S
W
ID
SPD
T
T
140°
S
W
ST
RS
RL
CWR
CWS
CHWR
CHWS
HWR
HWS
PD
CD
ACD
D
CD
LPC
LPS
MPC
MPS
HPC
HPS
S
SCW
WS
RD
H
T
H
T
FSD
SD
FD
FD
T
H
VD
MD
BD
RD
RDB
HPSR
HPWS
RV
CAP
LC
M
AV
FLOOR MOUNTED FLUSH VALVE
WATER
CLOSET
WALL MOUNTED FLUSH VALVE
WATER
CLOSET
26-P 3
PLUMBING PIPING SYMBOLS
ANNOTATION
XX-1
xx
X100
X100
GENERAL PLUMBING SYMBOLS
DENTAL
MEDICAL GASES
STORM
FUEL
EXISTING PIPING
WATER
WASTE
VALVE SYMBOLS
ETR
HVAC PIPING SYMBOLS
GENERAL DUCT SYMBOLS
GENERAL PLUMBING EQUIPMENT
SHOWER HEADS
JANITORS SINK
DRINKING FOUNTAIN & TYPE
SHOWER
BATHTUB
TANK TYPE WATER CLOSET
COUNTER TOP LAVATORY & TYPE
WALL MOUNTED LAVATORY & TYPE
URINAL
SINK & TYPE
JANITORS SINK - CORNER
TYPICAL UNIT NO.
BUILDING NO. WHERE EQUIPMENT
PUMP NO.3 IN BUILDING NO.26
EQUIPMENT ABBREVIATION (PUMP)
IS LOCATED.
ORAL EVACUATION
LABORATORY VACUUM
LABORATORY AIR
TEMPERED WATER RETURN
TEMPERED WATER SUPPLY
INDUSTRIAL AIR
LA
LV
OA
IA
TWR
TWS
FILTERED COLD WATERFCW
FUEL OIL DISCHARGEFOD
ANCHOR
CONNECTION - SIDE
ECCENTRIC REDUCER
CONNECTION - BOTTOM, 45° OR 90°
CONNECTION - TOP, 45° OR 90°
DIRECTION OF PIPE PITCH (DOWN)
RISE OR DROP IN PIPE
STRAINER
FLOAT & THERMOSTATIC TRAP SET W/
PIPING ACCESSORIES
PIPING ACCESSORIES
INVERTED BUCKET TRAP SET INCLUDING
FLOOR DRAIN (FD), SIZE & TYPE
ROOF DRAIN (RD), SIZE & TYPE
FLOOR SINK (FS), SIZE & TYPE
NATURAL GAS BELOW GRADE (G)
SUMP OR SEWAGE PUMP DISCHARGE (SPD)
CONDENSATE DRAIN (CD)
INDIRECT DRAIN (ID)
NATURAL GAS (G)
NITROUS OXIDE (NO)
LIQUIFIED PETROLEUM GAS (LPG)
FIRE PROTECTION (FP)
WATER SERVICE (WS)
COMPRESSED AIR (CA)
NITROGEN (N)
MEDICAL AIR (MA)
OXYGEN (O)
DOMESTIC HOT WATER RECIRC.
SOIL PIPING - ABOVE FLOOR (S)
SOIL PIPING - BELOW FLOOR (S)
STORM DRAIN - ABOVE FLOOR (ST)
STORM DRAIN - BELOW FLOOR (ST)
ACID WASTE - ABOVE FLOOR (AW)
ACID WASTE - BELOW FLOOR (AW)
DOMESTIC COLD WATER
DOMESTIC HOT WATER
140° DOMESTIC HOT WATER (140°)
WASTE PIPING - ABOVE FLOOR (W)
WASTE PIPING - BELOW FLOOR (W)
GREASE WASTE - ABOVE FLOOR (GW)
GREASE WASTE - BELOW FLOOR (GW)
SOFTENED COLD WATER (SCW)
ACID VENT (AV)
VENT PIPING (V)
HOSE BIBB (HB)
NONFREEZE WALL HYDRANT (NW)
WALL CLEANOUT (WCO)
FLOOR CLEANOUT (FCO)
EXTERIOR CLEANOUT (ECO)
THERMOSTATIC MIXING VALVE
BACKFLOW PREVENTER
OVERFLOW STORM DRAIN - ABOVE FLOOR (OST)
NON POTABLE WATER (NPW)
FUEL OIL SUPPLY (FOS)
FUEL OIL RETURN (FOR)
FUEL OIL VENT (FOV)
AUXILIARY CONDENSATE DRAIN (ACD)
VENT BELOW GRADE (VBG)
VENT BELOW FLOOR (VBF)
CARBON DIOXIDE (CO)
MEDICAL VACUUM (MV)
EVACUATION (EV)
MEDICAL VACUUM EXHAUST (VE)
MEDICAL AIR INTAKE (AI)
TRAP PRIMER LINE (T)
WATER METER
MEDIUM PRESSURE NATURAL GAS (MPG)
MEDIUM PRESSURE NATURAL GAS ON ROOF (MPG)
ELBOW DOWN WITH SHUT-OFF VALVE
TEE DOWN WITH SHUT-OFF VALVE (SOV)
TEE UP WITH SHUT-OFF VALVE (SOV)
RECIRCULATION PUMP
DIRECTION OF FLOW
EXISTING PIPING TO REMAIN
EXISTING PIPING TO BE REMOVED
FLANGE CONNECTION
CLEANOUT
ELBOW DOWN
ELBOW UP
TEE DOWN
ELBOW UP WITH SHUT-OFF VALVE (SOV)
TEE UP
UNION
THERMOMETER
PRESSURE GAUGE
PRESSURE REDUCING VALVE
REDUCER
BALL VALVE
GATE VALVE WITH 3/4 " HOSE ADAPTER
CHECK VALVE
ANGLE GLOBE VALVE
BUTTERFLY VALVE
MODULATING CONTROL VALVE
TWO POSITION CONTROL VALVE
THREE-WAY MODULATING CONTROL VALVE
AUTOMATIC FLOW CONTROL VALVE
PRESSURE RELIEF VALVE
GATE VALVE
MANUAL AIR VENT
TEST PLUG (PRESSURE/TEMPERATURE)
GLOBE VALVE
PRESSURE REGULATING VALVE
THREE-WAY TWO POSITION CONTROL VALVE
AUTOMATIC AIR VENT
MECHANICAL OR FIRE SPRINKLER PLAN NOTE CALL OUT
PLUMBING PLAN NOTE CALL OUT
ELECTRICAL OR FIRE ALARM PLAN NOTE CALL OUT
TECHNOLOGY PLAN NOTE CALL OUT
PLUMBING EQUIPMENT DESIGNATION
MECHANICAL EQUIPMENT DESIGNATION TAG
OWNER FURNISHED, CONTRACTOR INSTALLED
EQUIPMENT DESIGNATION
NEW WORK TO EXISTING WORK CONNECTION POINT
DETAIL NUMBER
SHEET NUMBER
LIMIT OF DEMOLITION
TRAP PRIMER LINE - BELOW SLAB (T)
CO
DOUBLE EXTERIOR CLEANOUT (ECO)
CLEANOUTS
DRAINS AND TRAPS
EQUIPMENT
PIPE FITTINGS AND ACCESSORIES
SHEET NUMBER
SECTION NUMBER
MEDICAL GAS OUTLET (TYPE)
EXISTING TO REMAIN
DIVISION 23 PIPE FITTINGS AND ACCESSORIES
A
A/E ARCHITECT / ENGINEER
AAHX AIR TO AIR HEAT EXCHANGER
AB AIR BLENDER
AAV AUTOMATIC AIR VENT
ACC AIR COOLED CONDENSER
ACCH AIR COOLED CHILLER
ACCU AIR-COOLED CONDENSING UNIT
ACU AIR CONDITIONING UNIT
ACD AUTOMATIC CONTROL
DAMPER,MODULATING
ACD-TP AUTOMATIC CONTROL
DAMPER,TWO POSITION
AD ACCESS DOOR
AF AFTER FILTER
AFCV AIR FLOW CONTROL VALVE
AFF ABOVE FINISHED FLOOR
AFMD AIR FLOW MEASURING DEVICE
AFW AIR FOIL WHEEL (FAN)
AHU AIR-HANDLING UNIT
AMP AMPERGE
AP ACCESS PANEL
APD AIR PRESSURE DROP
ARI AIR CONDITIONING AND
REFRIGERATION INSTITUTE
AS AIR SEPARATOR
ASME AMERICAN SOCIETY OF MECHANICAL
ENGINEERS
AW AIR WASHER
AXF AXIAL FLOW
B
B BOILER
BD BUTTERFLY DAMPER
BDD BACKDRAFT DAMPER
BDR BASE BOARD RADIATOR
BFP BACKFLOW PREVENTER
BFT BOILER PLANT FIRE TUBE
BG BOTTOM GRILLE
BHP BRAKE HORSEPOWER
BHW HOT WATER HEATING BOILER
BHX BOILER BLOWDOWN HEAT EXCHANGER
BIW BACKWARD INCLINED WHEEL (FAN)
BMT BONE MARROW TRANSPLANT
BR BOTTOM REGISTER
BSC BIOLOGICAL SAFETY CABINETS
BT BLOWOFF TANK
BTC BLOWOFF TANK CONTROL VALVE
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
BWT BOILER PLANT WATER TUBE
C
C CENTIGRADE (CELCIUS)
CC COOLING COIL
CCD COOLING COIL CONDENSATE
DRAIN
CD CEILING DIFFUSER
CD-1 CONSTRUCTION DOCUMENTS
(SUBMISSION1)
CD-2 CONSTRUCTION DOCUMENTS
(SUBMISSION2)
CENT CENTRIFICAL
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CFT CUBIC FEET
CFP CHEMICAL FEED PUMP
CG CEILING GRILLE
CH CHILLER
CHP CHILLED WATER PUMP
CHW CHILLER WATER
CHR CHILLED WATER RETURN
CHS CHILLED WATER SUPPLY
CI CAST IRON
CM CARBON MONOXIDE
CM CUBIC METER
CM/S CUBIC METER PER SECOND
CO CLEAN OUT
CO2 CARBON DIOXODE
COMP COMPRESSOR UNIT
COP COEFFICIENT OF PERFORMANCE
CP CONDENSATE PUMP
CR CEILING REGISTER
CS CONDENSATE STORAGE TANK
CSG CLEAN STEAM GENERATOR
CT COOLING TOWER
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
CV CONSTANT VOLUME
CW COLD WATER (POTABLE)
CWCC CHILLED WATER COOLING COIL
CWP CONDENSER WATER PUMP
CWR CONDENSER WATER RETURN (TO
COOLING TOWER)
CWS CONDENSER WATER SUPPLY
(FROM COOLING TOWER)
D
D DAMPER - AUTOMATIC
D-1 OUTDOOR AIR DAMPER
D-2 RETURN AIR DAMPER
D-3 RELIEF AIR DAMPER
DB DECIBELS
Db DRY-BULB TEMPERATURE
DD-1 DESIGN DEVELOPMENT
(SUBMISSION1)
DD-2 DESIGN DEVELOPMENT
(SUBMISSION2)
DDC DIRECT DIGITAL CONTROLS
DEG DEGREE
DF DIFFUSER
DIA DIAMETER
DIW DEIONIZED WATER
DP DEW POINT TEMPERATURE
DP DIFFUSER PLATE
DPA DIFFERENTIAL PRESSURE ASSEMBLY
DPS DIFFERENTIAL PRESSURE SENSOR
DX DIRECT EXPANSION
DXCC DIRECT EXPANSION COOLING COIL
E
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
EC EVAPORATIVE COOLER
ECC ENGINEERING CONTROL CENTER
ECU EVAPORATIVE CONDENSER UNIT
EDH ELECTRIC DUCT HEATER
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
EG EXHAUST GRILLE
EGS EMERGENCY GAS SHUTOFF
EGT ENTERING GLYCOL TEMPERATURE
EH EXHAUST HOOD
EJ EXPANSION JOINT
EMD END OF MAIN DRIP (STEAM)
ENT ENTERING
ER EXHAUST REGISTER
ERC ELECTRIC REHEAT COIL
ERP ELECTRIC RADIANT PANEL
ESP EXTERNAL STATIC PRESSURE
ET EXPANSION TANK
ETO ETHYLENE OXIDE
EUH ELECTRIC UNIT HEATER
EWC EVAPORATIVE WATER COOLER
EWT ENTERING WATER TEMPERATURE
EX. EXISTING
F
F FAHRENHEIT
F&T FLOAT AND THERMOSTATIC
F/SDPR COMBINATION FIRE SMOKE
DAMPER
FA FREE AREA
FC FLEXIBLE CONNECTION
FCU FAN COIL UNIT (4 PIPE)
FCUC FAN COIL UNIT COOLING ONLY
FCUH FAN COIL UNIT HEATING ONLY
FCW FORWARD CURVED WHEEL (FAN)
G
GA GAUGE
GAL GALLONS
GH GRAVITY HOOD
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GPR GAS PRESSURE REGULATOR
GS GALVANIZED STEEL
H
H HUMIDIFER
H&CW HOT & COLD WATER
HAC HOUSEKEEPING AID CLOSET
HB HOSE BIBB
HC HEATING COIL
HD HEAD
HD HOOD
HOA HAND/OFF/AUTOMATIC
HP HEAT PUMP
HP HORSEPOWER
HPDT HIGH PRESSURE DRIP TRAP
HPR HIGH PRESSURE RETURN
(STEAM CONDENSATE)
HPS HIGH PRESSURE SUPPLY
(STEAM)
HRC HEAT RECOVERY COIL
HRD HEAT RECOVERY DEVICE
HRP HYDRONIC RADIANT (CEILING)
PANEL
HRW HEAT RECOVERY WHEEL
HSTAT HUMIDISTAT
HTM HUMIDIFIER TERMINAL
HUM HUMIDIFIER UNIT MOUNTED
HVU HEATING AND VENTILATING UNIT
HW HOT WATER
HWC HOT WATER COIL
HWHC HOT WATER HEATING COIL
HWP HEATING HOT WATER PUMP
HWR HEATING HOT WATER RETURN
HWS HEATING HOT WATER SUPPLY
HWUH HOT WATER UNIT HEATER
HVD HOISTWAY VENT DAMPER
HX HEAT EXCHANGER
HZ HERTZ
M
M METER, SI UNIT
M/s METERS PER SECOND
(OR METERS/SECOND)
MA MIXED AIR
MAT MIXED AIR TEMPERATURE
MAU MAKE-UP AIR UNIT
MAV MANUAL AIR VENT
MAX MAXIMUM
MB MIXING BOX
MBH 1000 BTUH
MCA MINIMUM BRANCH CIRCUIT AMPACITY
MER MECHANICAL EQUIPMENT ROOM
MERV MINIMUM EFFICIENCY REPORTING
VALUE
MH MANHOLE
MHP MOTOR HORSEPOWER
MIN MINIMUM
MM MILLIMETER
MOV MOTOR OPERATED VALVE
MPR MEDIUM PRESSURE RETURN
(STEAM CONDENSATE)
MPS MEDIUM PRESSURE STEAM
MRI MAGNETIC RESONANCE IMAGING
MTD MEAN TEMPERATURE DIFFERENCE
MVD MANUAL VOLUME DAMPER
MZ MULTI-ZONE
I
I/O INPUT/OUTPUT
IAQ INDOOR AIR QUALITY
IBT INVERTED BUCKET TRAP
ICF IN-LINE CENTRIFUGAL FAN
ICU INTENSIVE CARE UNIT
ID INSIDE DIAMETER
IFB INTEGRAL FACE AND BYPASS
IN INCHES
IN HG INCHES OF MERCURY
IN WC INCH WATER COLUMN
IN WG INCH WATER GAUGE
IN-LB INCH-POUND
IPLV INTERGRATED PART LOAD VALUE
IRH INTRARED HEATER
IS INSECT SCREEN
IU INDUCTION UNIT
IV INLET VANES
J
J INTENTIALLY LEFT BLANK
K kg KILOGRAM kg/HR KILOGRAM PER HOUR kPa KILOPASCAL kW KILOWATT kWh KILOWATT HOUR
L
L LITER
L/h LITERS PER HOUR (OR LITERS/HOUR) L/m LITERS PER MINUTE (OR LITERS/MINUTE) L/s LITERS PER SECOND (OR LITERS/SECOND)
LAT LEAVING AIR TEMPERATURE
LBS/HR POUNDS PER HOUR
LF LINEAR FOOT (FEET)
LGT LEAVING GLYCOL TEMPERATURE
LH LATENT HEAT
LPG LIQUID PROPANE GAS
LPR LOW PRESSURE RETURN (STEAM CONDENSATE)
LPRC LOW PRESSURE STEAM RETURN (CLEAN)
LLHX LIQUID TO LIQUID HEAT EXCHANGER
LPS LOW PRESSURE STEAM
LPSC LOW PRESSURE STEAM (CLEAN)
LSD LINEAR SLOT DIFFUSER
LTCP LOCAL TEMPERATURE CONTROL PANEL
LVG LEAVING
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
N
NA NOT APPLICABLE
NC NOISE CRITERIA
NC NORMALLY CLOSED
NG NATURAL GAS
NGFM NATURAL GAS FLOWMETER
NO NORMALLY OPEN
NOAA NATIONAL OCEANIC & ATMOSPHERIC
ADMINISTRATION
O
OA OUTSIDE AIR
OAG OUTSIDE AIR GRILLE
OAI OUTSIDE AIR INTAKE
OD OUTSIDE DIAMETER
OFM OIL FLOWMETER
OR OPERATING ROOM
P
P PUMP
PA PASCAL
PC PUMPED CONDENSATE
PCF POUNDS PER CUBIC FOOT (FEET)
PD PRESSURE DROP
PEF PROPELLER (TYPE) EXHAUST FAN
PF PRE-FILTER
PG PRESSURE GAGE
PGW PROPYLENE GLYCOL-WATER (SOLUTION)
PHC PREHEAT COIL
PPM PARTS PER MILLION
PRS PRESSURE REGULATING (VALVE) STATION
PRV PRESSURE REGULATING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH – ABSOLUTE
PSIG POUNDS PER SQUARE INCH – GAGE
PSS PRIMARY SECONDARY SYSTEM
PSV PRESSURE SAFETY VALVE
PTAC PACKAGED TERMINAL AIR CONDITIONER
R
R/E RETURN OR EXHAUST
RA RETURN AIR
RAD REFRIGERANT AIR DRYER
RAF RADIO FREQUENCY
RAHX ROTARY AIR HEAT EXCHANGER
RAT RETURN AIR TEMPERATURE
RCCH REMOTE CONDENSER CHILLER
RCU RECIPROCATING CHILLER UNIT
RD REFRIGERANT DISCHARGE
RDS ROOM DATA SHEETS
REA RELIEF AIR
RF RETURN FAN
RG RETURN GRILLE
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RHG REFRIGERANT HOT GAS
RL REFRIGERANT LIQUID LINE
RLA RUN LOAD AMPERE
RO REVERSE OSMOSIS
RPM REVOLUTIONS PER MINUTE
RR RETURN REGISTER
RS REFRIGERANT SUCTION
RTU ROOF TOP UNIT
RV RELIEF VALVE
S
SA SUPPLY AIR
SAD SOUND ATTENUATING DEVICE
SAT SUPPLY AIR TEMPERATURE
SC SHADING COEFFICIENT
SCFM STANDARD CUBIC FEET PER MINUTE
SCI SPINAL CODE INJURY
SCR SILICON CONTROLLED RECTIFIER
SD SMOKE DETECTOR
SD SUPPLY AIR DIFFUSER
SD-1 SCHEMATIC DESIGN (SUBMISSION1)
SD-2 SCHEMATIC DESIGN (SUBMISSION2)
SDPR SMOKE DAMPER
SDR SMOKE DAMPER (RETURN)
SDS SMOKE DAMPER (SUPPLY)
SEN SENSIBLE HEAT
SF SUPPLY FAN
SG SUPPLY AIR GRILLE
SH STEAM HUMIDIFIER
SHC STEAM HEATING COIL
SI SQUARE INCHES
SP STATIC PRESSURE
SP GR SPECIFIC GRAVITY
SPD SUPPLY PROCESS AND DISTRIBUTION
SPRV STEAM PRESSURE REDUCING VALVE
SPS STATIC PRESSURE SENSOR
SQ FT SQUARE FOOT (FEET)
SR SUPPLY AIR REGISTER
SS STAINLESS STEEL
SSHX STEAM TO STEAM HEAT EXCHANGER
SSR SOLID SEPARATOR
ST STEAM TRAP
SUH STEAM UNIT HEATER
SV STEAM PRESSURE REDUCING VALVE
SVS STEAM VENT SILENCER
SWHX STEAM TO WATER HEAT EXCHANGER
T
T & PCV TEMPERATURE AND PRESSURE
CONTROL VALVE
TAB TESTING, ADJUSTING, BALANCE
TD TEMPERATURE DIFFERENCE
TDH TOTAL DYNAMIC HEAD
TDS TOTAL DISSOLVED SOLIDS
TG TRANSFER GRILLE
TP TRAP
TR TOP REGISTER
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
TU TERMINAL UNIT
TWU THRU-WALL UNIT
NOM NOMINAL
NPLV NON-STANDARD PART LOAD VALUE
NPSH NET POSITIVE SUCTION HEAD
NTS NOT TO SCALEFHX FLUE GAS/FEEDWATER HEAT
EXCHANGER
FM FLOW METER
FOP FUEL OIL PUMP
FOT FUEL OIL TANK
FOHX FUEL OIL HEAT EXCHANGER
FPM FEET PER MINUTE
FPS FEET PER SECOND
FPTU FAN POWERED TERMINAL UNIT
FR FLOOR REGISTER
FRP FIBER REINFORCED POLYESTER
FS FLOW SWITCH
FSTAT FREEZESTAT
FT FEET
FT-LB FOOT-POUND
FTR FIN TUBE RADIATION
FV FACE VELOCITY
FD FLOOR DRAIN
FD FIRE DAMPER
FF FINAL FILTER
DRAIN (D)
CONDENSATE DRAIN (CD)
26-TU-I-I ITEM NUMBER (TERMINAL UNIT NO. 1)
ITEM (TERMINAL UNIT SHOWN)
SERVED BY AIR HANDLER UNIT NO. 1
BUILDING NO. WHERE EQUIP. IS LOCATED
10x8AUTOMATIC BALANCING CONTROL VALVE
WYE STRAINER (WITH BALL VALVE
WATER BALANCE DEVICE
MODULATING CONTROL BUTTERFLY VALVE
CIRCUIT SETTER VALVE
GATE VALVE WITH GLOBE-VALVED BYPASS
PLUG VALVE
CONTROL VALVE (CV) - FLOAT-OPERATED
QUICK-COUPLE HOSE CONNECTOR
WYE STRAINER WITH VALVED DRAIN ANDWATER LEVEL CONTROLLER
FLOW METER
& HOSE CONNECTION)
EXISTING DUCTWORK OR EQUIPMENT TO BE REMOVED
EXISTING DUCTWORK OR EQUIPMENT TO REMAIN
BRANCH DUCT WITH 45° RECTANGLE-ROUND BRANCH
BRANCH DUCT WITH BELL-MOUTH FITTING & MANUAL
RETURN, EXHAUST, OR OUTSIDE AIR DUCT DOWN
FITTING AND MANUAL VOLUME DAMPER
SUPPLY AIR DUCT UP
RETURN, EXHAUST, OR OUTSIDE AIR DUCT UP
LINEAR SLOT DIFFUSER
ELBOW WITH TURNING VANES
INSULATED FLEXIBLE DUCT (MAX. 5'-0" LONG)
VOLUME CONTROL DAMPER
NECK SIZE, TYPE, CFM OF SUPPLY DIFFUSER/ REGISTER
MOTORIZED DAMPER
VOLUME DAMPER
THERMOSTAT
FIRE DAMPER
FIRE SMOKE DAMPER
SMOKE DAMPER
24x24 CEG-1 800 CFM
SIZE, TYPE, CFM OF EXHAUST GRILLE
MANUAL VOLUME DAMPER
SQUARE TO ROUND TRANSITION
RISER DESIGNATION
HUMIDISTAT
EQUIPMENT WITH FLEXIBLE DUCT CONNECTION
10" CSD-1 300 CFM
BACKDRAFT DAMPER
SUPPLY AIR DUCT DOWN
DUCT MOUNTED SMOKE DETECTOR
(SD=SUPPLY/RD=RETURN)
NEW DUCT (INSIDE DIMENSIONS: WIDTH x DEPTH)
LOUVER
DUCT WITH SOUND LINING
DAMPERS: (BD, FD, FSD, MD, SD, VD)
TRAP PRIMER WITH DISTRIBUTION UNIT
TRAP PRIMER
P-TRAP
GAS COCK
HEATING HOT WATER RETURN (HWR)
HEATING HOT WATER SUPPLY (HWS)
REFRIGERANT DISCHARGE BYPASS (RDB)
REFRIGERANT SUCTION (RS)
CHILLED WATER RETURN (CHWR)
CONDENSER WATER SUPPLY (CWS)
CONDENSER WATER RETURN (CWR)
REFRIGERANT DISCHARGE (HOT GAS) (RD)
HEAT PUMP WATER RETURN (HPWR)
HEAT PUMP WATER SUPPLY (HPWS)
REFRIGERANT LIQUID (RL)
CHILLED WATER SUPPLY (CHWS)
HIGH PRESSURE STEAM CONDENSATE (HPC)
HIGH PRESSURE STEAM SUPPLY (HPS)
MEDIUM PRESSURE STEAM CONDENSATE (MPC)
MEDIUM PRESSURE STEAM SUPPLY (MPS)
LOW PRESSURE STEAM CONDENSATE (LPC)
LOW PRESSURE STEAM SUPPLY (LPS)
CONDENSATE PUMP DISCHARGE (PD)
EXPANSION JOINT
F & T TRAP
TRIPLE DUTY VALVE WITH PRESSURE PORTS
BALANCING VALVE WITH PRESSURE PORTS
SOLENOID VALVE
STRAINER WITH BLOWOFF
REFRIGERANT VENT (RV)
EJ
PRESSURE AND TEMPERATURE TEST PLUG
VACUUM RELIEF VALVE
PRESSURE / VACUUM SWITCH
LIMIT OF DEMOLITION
CONNECT NEW DUCT TO EXISTING DUCT
D
INCLINED RISE, IN DIRECTION OF AIR FLOW
INCLINED DROP, IN DIRECTION OF AIR FLOW
R
BACK DRAFT DAMPER
BDD
SOLAR WATER RETURN
SOLAR WATER SUPPLY
GLYCOL-WATER HEATING RETURN
GLYCOL-WATER HEATING SUPPLY
MAKE-UP WATER
CHILLED GLYCOL-WATER RETURN
CHILLED GLYCOL-WATER SUPPLY
GHS
GHR
SWS
SWR
GCR
GCS
MW
GLYCOL-WATER RUN AROUND SUPPLY
GLYCOL-WATER RUN AROUND RETURNGRR
GRS
VACUUM CONDENSATE RETURN
FEEDWATER PUMP DISCHARGE
FEEDWATER PUMP SUCTION
VR
FWPS
FWPD
FEEDWATER SAMPLE (DEAERATOR)
BOILER WATER SAMPLE
CONTINUOUS BLOWDOWN
CF
FWS
BWS
CBD
BO
CHEMICAL FEED
BOILER BLOWOFF
TUBE CLEANER WATER SUPPLYTC
OFL OVERFLOW
REFRIGERANT SIGHT GLASS
QUICK-COUPLE HOSE CONNECTOR
TEMPERATURE SENSOR
HUMIDITY SENSOR
DUCT W/DAMPERS
DIFFUSERS,GRILLES, FLEX CONNECTIONS
FITTINGS & TRANSITIONS
SOFTENED WATERSW
BRINE & SOFT WATER
REFRIGERANT
PLANT PIPING
STEAM
EXISTING TO REMAIN
ABBREVIATIONS
U
UC UNDER CUT
UC UNIT COOLER
UH UNIT HEATER
UL UNDERWRITERS LABORATORY
URV UPBLAST UNIT VENTILATOR
V
V VALVE
VAF VANE-AXIAL FAN
VAV VARIABLE AIR VOLUME
VD VOLUME DAMPER (MANUAL OPPOSED BLADE)
VFD VARIABLE FREQUENCY DRIVE
VHA VETERANS HEALTH ADMINISTRATION
VI VIBRATION ISOLATOR
VIV VARIABLE INLET VANES
VP VACUUM PUMP
VPS VARIABLE PRIMARY SYSTEM
VR VACUUM (STEAM CONDENSATE) RETURN
VSD VARIABLE SPEED DRIVE
VUH VERTICAL UNIT HEATER
W
W WATTS
WAG WASTE ANETHESIA GAS
Wb WET-BULB (TEMPERATURE)
WC WATER COOLED
WCCH WATER COOLED CHILLER
WCCU WATER COOLED CONDENSING UNIT
WCHP WATER COOLED HEAT PUMPS
WCPU WATER COOLED PACKAGED UNIT
WEF WALL EXHAUST FAN
WF WATER FILTER
WFCV WATER FLOW CONTROL VALVE
WFM WATER FLOWMETER
WFMD WATER FLOW MEASURING DEVICE
WG WATER GAGE
WPD WATER SIDE PRESSURE DROP
Y
YR YEAR
Drawing Number
Project Number
Date
Project Title
Building NumberLocation
Checked DrawnAPPROVED: CHIEF ENGINEER
Drawing Title
VA FORM
Office of Construction and Facilities Management
Dwg
CIVIL / STRUCTURAL ENGINEER M.E.P. / T. ENGINEER
APPROVED: DIRECTOR
APPROVED: ASSOCIATE DIRECTOR
APPROVED: ASSISTANT DIRECTOR APPROVED: CHIEF ENGINEER
REVISIONS DATE
CONSULTANTS ARCHITECT
o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th s i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
1 2 3 4 5 6 7 8 9
A
1 2 3 4 5 6 7 8 9
B
C
D
E
F
A
B
C
D
E
F
H2B
1225 NORTH LOOP WEST, SUITE 900
HOUSTON, TX 77008
SPUR DESIGN
11020 KING STREET, SUITE 350
OVERLAND PARK, KS 66210
AZ ARCH REG. NO. 20013-0, EXP. 10/10/2019
AZ ENGR REG. NO. 20015-0, EXP. 10/10/2019 -OF- 148
RADIOLOGY EXPANSIONMECHANICAL LEGEND
649-413
11/01/18 JES JAD
107-M-000
100% BACKCHECK SUBMITTAL
DEPARTMENT OF VETERAN AFFAIRS
NORTHERN ARIZONA VA HEALTH CARE SYSTEM
500 HWY 89N
PRESCOTT AZ, 86313
86EXPIRES 12/31/2019EXPIRES 12/31/2019
20"x18" 1
11 22
BB
AA
"x
"ø
HATCHED AREA REPRESENTS
THE EXISTING BUILDING 107
EXTERIOR WALL
Drawing Number
Project Number
Date
Project Title
Building NumberLocation
Checked DrawnAPPROVED: CHIEF ENGINEER
Drawing Title
VA FORM
Office of Construction and Facilities Management
Dwg
CIVIL / STRUCTURAL ENGINEER M.E.P. / T. ENGINEER
APPROVED: DIRECTOR
APPROVED: ASSOCIATE DIRECTOR
APPROVED: ASSISTANT DIRECTOR APPROVED: CHIEF ENGINEER
REVISIONS DATE
CONSULTANTS ARCHITECT
o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th s i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
1 2 3 4 5 6 7 8 9
A
1 2 3 4 5 6 7 8 9
B
C
D
E
F
A
B
C
D
E
F
H2B
1225 NORTH LOOP WEST, SUITE 900
HOUSTON, TX 77008
SPUR DESIGN
11020 KING STREET, SUITE 350
OVERLAND PARK, KS 66210
AZ ARCH REG. NO. 20013-0, EXP. 10/10/2019
AZ ENGR REG. NO. 20015-0, EXP. 10/10/2019 -OF- 148
RADIOLOGY EXPANSIONMECHANICAL HVAC DEMOLITION
BASEMENT FLOOR PLAN
649-413
11/01/18 JES JAD
107-MHD100
100% BACKCHECK SUBMITTAL
DEPARTMENT OF VETERAN AFFAIRS
NORTHERN ARIZONA VA HEALTH CARE SYSTEM
500 HWY 89N
PRESCOTT AZ, 86313
1/8" = 1'-0"
MECHANICAL HVAC DEMOLITION
BASEMENT FLOOR PLAN
N
MECHANICAL DEMO PLAN NOTES:
1. REMOVE DENTAL AIR HANDLING UNIT AND ASSOCIATED PIPING & DUCTWORK. SEE SHEET
107-MPD100 FOR RELATED WORK.
2. DENTAL AHU OUTSIDE AIR INTAKE TO BE REMOVED. OUTSIDE AIR INTAKE DUCT
PENETRATION THROUGH EXISTING BUILDING 107 CRAWL SPACE TO BE REUSED. SEE SHEET
107-MP-100 FOR RELATED WORK.
GENERAL NOTES:
1. THE AREA OF WORK SHOWN IS ASSOCIATED WITH AN OPERATING FACILITY THAT MUST REMAIN
IN SERVICE 24 HOURS A DAY, 7 DAYS A WEEK.
2. COORDINATE WORK SCHEDULE WITH THE CONTRACTING OFFICER'S REPRESENTATIVE.
3. COORDINATE MECHANICAL WORK WITH ALL OTHER TRADES. VERIFY ALL EXISTING CONDITIONS
BEFORE THE START OF WORK.
4. SEE SHEET GI001 FOR ADDITIONAL INFORMATION REGARDING SCHEDULE AND PHASING
REQUIREMENTS. SHEDULE WORK IN THE EXISTING BUILDING TO MINIMIZE DISRUPTION OF
SERVICES.
5. ALL SUPPLY AND RETURN BRANCH PIPING TO INDIVIDUAL VARIABLE AIR VOLUME TERMINAL
UNITS TO BE 3/4" UNLESS NOTED OTHERWISE
EXPIRES 12/31/2019EXPIRES 12/31/2019
"x
32"x18" 32"x18"
64"x18"
8"ø
16"x16"
"x
24"x14"
24"x14"
"x
"x
14"x18" 30"x16"
24"x10"
42"x18"
"x
10"x4"
"x
24"x12"
"x
"x
14"x12"
"x
10"x6"
16"x16"
16"x16"1
"x
"x "1
"x
24"x6"
18"x6"
"x
"x
12"x4"
12"x4"
12"x4"
11 22
BB
AA
2 2 2 2
666 6 6
BID DEDUCT ALT. #2
SEE BID DEDUCT NOTES
ON SHEET 107-GI-102 AND
AND SHEET 107-MH-401B
FOR MORE INFORMATION.
BID DEDUCT ALT. #1
SEE BID DEDUCT NOTES
ON SHEET 107-GI-102 AND
AND SHEET 107-MH-401C
FOR MORE INFORMATION.
BID DEDUCT ALT. #1
SEE BID DEDUCT NOTES
ON SHEET 107-GI-102 AND
AND SHEET 107-MH-401C
FOR MORE INFORMATION.
HATCHED AREA REPRESENTS
THE EXISTING BUILDING 107
EXTERIOR WALL
Drawing Number
Project Number
Date
Project Title
Building NumberLocation
Checked DrawnAPPROVED: CHIEF ENGINEER
Drawing Title
VA FORM
Office of Construction and Facilities Management
Dwg
CIVIL / STRUCTURAL ENGINEER M.E.P. / T. ENGINEER
APPROVED: DIRECTOR
APPROVED: ASSOCIATE DIRECTOR
APPROVED: ASSISTANT DIRECTOR APPROVED: CHIEF ENGINEER
REVISIONS DATE
CONSULTANTS ARCHITECT
o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th s i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
1 2 3 4 5 6 7 8 9
A
1 2 3 4 5 6 7 8 9
B
C
D
E
F
A
B
C
D
E
F
H2B
1225 NORTH LOOP WEST, SUITE 900
HOUSTON, TX 77008
SPUR DESIGN
11020 KING STREET, SUITE 350
OVERLAND PARK, KS 66210
AZ ARCH REG. NO. 20013-0, EXP. 10/10/2019
AZ ENGR REG. NO. 20015-0, EXP. 10/10/2019 -OF- 148
RADIOLOGY EXPANSIONMECHANICAL HVAC DEMOLITION
LEVEL 1 FLOOR PLAN
649-413
11/01/18 JES JAD
107-MHD101
100% BACKCHECK SUBMITTAL
DEPARTMENT OF VETERAN AFFAIRS
NORTHERN ARIZONA VA HEALTH CARE SYSTEM
500 HWY 89N
PRESCOTT AZ, 86313
1/8" = 1'-0"
MECHANICAL HVAC DEMO LEVEL 1
FLOOR PLAN
N
MECHANICAL DEMO PLAN NOTES:
1. OUTSIDE AIR INTAKE AND ASSOCIATED DENTAL AIR HANDLING UNIT IN EXISTING BUILDING 107
CRAWL SPACE TO BE REMOVED. SEE SHEET 107-MHD100 FOR RELATED WORK.
2. REMOVE EXHAUST DUCT TO DEMARCATION POINTS SHOWN. SEE SHEET 107-MH-101 AND 107-
MP-101 FOR RELATED WORK.
3. REMOVE VERTICAL FAN COIL UNIT AND PROVIDE SHEET METAL BLANK AND SEAL OVER
ASSOCIATED OUTSIDE AIR INTAKE. OUTSIDE AIR INTAKE HOOD ON EXTERIOR WALL IS EXISTING TO
REMAIN.
4. EXISTING FIRE DEPARTMENT CONNECTION. SEE SHEETS 107-FXD101 AND 107-FX-101 FOR
RELATED INFORMATION.
5. REMOVE EXISTING DUCTWORK TO DEMARCATION POINT SHOWN. CAP EXISTING DUCT WORK
BELOW ROOF DECK. EXISTING ROOF HOOD IS EXISTING TO REMAIN (ETR).
6. REMOVE EXISTING FAN COIL UNIT AND ASSOCIATED PIPING, DUCTWORK AND ACCESSORIES AS
SHOWN. SEE SHEET 107-MPD101 FOR RELATED WORK.
GENERAL NOTES:
1. THE AREA OF WORK SHOWN IS ASSOCIATED WITH AN OPERATING FACILITY THAT MUST REMAIN
IN SERVICE 24 HOURS A DAY, 7 DAYS A WEEK.
2. COORDINATE WORK SCHEDULE WITH THE CONTRACTING OFFICER'S REPRESENTATIVE.
3. COORDINATE MECHANICAL WORK WITH ALL OTHER TRADES. VERIFY ALL EXISTING CONDITIONS
BEFORE THE START OF WORK.
4. SEE SHEET GI001 FOR ADDITIONAL INFORMATION REGARDING SCHEDULE AND PHASING
REQUIREMENTS. SHEDULE WORK IN THE EXISTING BUILDING TO MINIMIZE DISRUPTION OF
SERVICES.
5. ALL VAV TERMINAL UNIT DUCT CONNECTIONS SHALL MATCH THE ASSOCIATED UNIT
CONNECTION SIZES UNLESS NOTED OTHERWISE. ALL VAV TERMINAL UNIT REHEAT COIL
BRANCH PIPING SHALL BE 3/4" DIAMETER UNLESS NOTED OTHERWISE.
2 1/2"
2 1/2"
2" 2"
C H
W S
C H
W R
4" CHWR
4" CHWS
11 22
BB
AA
SR
SR SR
SR
SR
SR
SR
SR
SR
SR
SR
SR
SR
SR
SR
SR SR
SR
SR
SR
SR
HATCHED AREA REPRESENTS
THE EXISTING BUILDING 107
EXTERIOR WALL
Drawing Number
Project Number
Date
Project Title
Building NumberLocation
Checked DrawnAPPROVED: CHIEF ENGINEER
Drawing Title
VA FORM
Office of Construction and Facilities Management
Dwg
CIVIL / STRUCTURAL ENGINEER M.E.P. / T. ENGINEER
APPROVED: DIRECTOR
APPROVED: ASSOCIATE DIRECTOR
APPROVED: ASSISTANT DIRECTOR APPROVED: CHIEF ENGINEER
REVISIONS DATE
CONSULTANTS ARCHITECT
o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th s i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
1 2 3 4 5 6 7 8 9
A
1 2 3 4 5 6 7 8 9
B
C
D
E
F
A
B
C
D
E
F
H2B
1225 NORTH LOOP WEST, SUITE 900
HOUSTON, TX 77008
SPUR DESIGN
11020 KING STREET, SUITE 350
OVERLAND PARK, KS 66210
AZ ARCH REG. NO. 20013-0, EXP. 10/10/2019
AZ ENGR REG. NO. 20015-0, EXP. 10/10/2019 -OF- 148
RADIOLOGY EXPANSIONMECHANICAL PIPING DEMOLITION
BASEMENT FLOOR PLAN
649-413
11/01/18 JES JAD
107-MPD100
100% BACKCHECK SUBMITTAL
DEPARTMENT OF VETERAN AFFAIRS
NORTHERN ARIZONA VA HEALTH CARE SYSTEM
500 HWY 89N
PRESCOTT AZ, 86313
1/8" = 1'-0"
MECHANICAL PIPING DEMO BASEMENT
FLOOR PLAN
N
MECHANICAL DEMO PLAN NOTES:
1. REMOVE CHILLED WATER SUPPLY AND RETURN PIPING TO LOCATION INDICATED. PROVIDE
TEMPORARY CAP FOR FUTURE RECONNECT.
2. REMOVE DENTAL AIR HANDLING UNIT AND ASSOCIATED PIPING AND DUCTWORK. SEE SHEET 107-
MP-100 FOR RELATED WORK.
3. REMOVE MEDIUM PRESSURE STEAM PIPING SERVING DENTAL AHU TO SHUTOFF VALVE IN LOCATION
SHOWN. SEE SHEET 107-MP-100 FOR ADDITIONAL SCOPE.
4. DENTAL AIR HANDLING UNIT OUTSIDE AIR INTAKE DUCT PENETRATION THROUGH EXISTING
BUILDING 107 CRAWL SPACE TO BE REUSED. SEE SHEET 107-MP-100 FOR ADDITIONAL INFORMATION.
5. REMOVE STEAM RISER BACK TO DEMARCATION POINT SHOWN. EXISTING BRANCH FITTING ON MAIN
TO BE REUSED. SEE SHEET 107-MPD101 AND 107-MP-100 FOR RELATED WORK.
GENERAL NOTES:
1. THE AREA OF WORK SHOWN IS ASSOCIATED WITH AN OPERATING FACILITY THAT MUST REMAIN
IN SERVICE 24 HOURS A DAY, 7 DAYS A WEEK.
2. COORDINATE WORK SCHEDULE WITH THE CONTRACTING OFFICER'S REPRESENTATIVE.
3. COORDINATE MECHANICAL WORK WITH ALL OTHER TRADES. VERIFY ALL EXISTING CONDITIONS
BEFORE THE START OF WORK.
4. SEE SHEET GI001 FOR ADDITIONAL INFORMATION REGARDING SCHEDULE AND PHASING
REQUIREMENTS. SHEDULE WORK IN THE EXISTING BUILDING TO MINIMIZE DISRUPTION OF
SERVICES.
5. ALL SUPPLY AND RETURN BRANCH PIPING TO INDIVIDUAL VARIABLE AIR VOLUME TERMINAL
UNITS TO BE 3/4" UNLESS NOTED OTHERWISE
BID DEDUCT ALTERNATE PLAN NOTES:
1. BID DEDUCT ALT. #4: CHILLED WATER AND STEAM PIPING SERVING FAN COIL UNITS ON THE FIRST
FLOOR TO REMAIN. DISCONNECT AND RECONNECT CHILLED WATER PIPING TO NEW CHILLED
WATER MAIN AS REQUIRED. PROVIDE NEW VALVES NEAR POINT OF RECONNECTION. SEE SHEET
107-MPD101 FOR MORE BID DEDUCT INFORMATION.
1 1/4"
1 1/4"
11 22
BB
AA
SR
SR
SR
SR SR
SR
SR
SR
SR
SR
SR
SR
SR
SR
SR
SR SR
SR
SR
SR
SR
BID DEDUCT ALT. #2
SEE BID DEDUCT NOTES
ON SHEET 107-GI-102 AND
AND SHEET 107-MH-401B
FOR MORE INFORMATION.
BID DEDUCT ALT. #1
SEE BID DEDUCT NOTES
ON SHEET 107-GI-102 AND
AND SHEET 107-MH-401C
FOR MORE INFORMATION.
BID DEDUCT ALT. #1
SEE BID DEDUCT NOTES
ON SHEET 107-GI-102 AND
AND SHEET 107-MH-401C
FOR MORE INFORMATION.
HATCHED AREA REPRESENTS
THE EXISTING BUILDING 107
EXTERIOR WALL
Drawing Number
Project Number
Date
Project Title
Building NumberLocation
Checked DrawnAPPROVED: CHIEF ENGINEER
Drawing Title
VA FORM
Office of Construction and Facilities Management
Dwg
CIVIL / STRUCTURAL ENGINEER M.E.P. / T. ENGINEER
APPROVED: DIRECTOR
APPROVED: ASSOCIATE DIRECTOR
APPROVED: ASSISTANT DIRECTOR APPROVED: CHIEF ENGINEER
REVISIONS DATE
CONSULTANTS ARCHITECT
o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th s i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
1 2 3 4 5 6 7 8 9
A
1 2 3 4 5 6 7 8 9
B
C
D
E
F
A
B
C
D
E
F
H2B
1225 NORTH LOOP WEST, SUITE 900
HOUSTON, TX 77008
SPUR DESIGN
11020 KING STREET, SUITE 350
OVERLAND PARK, KS 66210
AZ ARCH REG. NO. 20013-0, EXP. 10/10/2019
AZ ENGR REG. NO. 20015-0, EXP. 10/10/2019 -OF- 148
RADIOLOGY EXPANSIONMECHANICAL PIPING DEMOLITION
LEVEL 1 FLOOR PLAN
649-413
11/01/18 JES JAD
107-MPD101
100% BACKCHECK SUBMITTAL
DEPARTMENT OF VETERAN AFFAIRS
NORTHERN ARIZONA VA HEALTH CARE SYSTEM
500 HWY 89N
PRESCOTT AZ, 86313
1/8" = 1'-0"
MECHANICAL PIPING DEMO BASEMENT
FLOOR PLAN
N
MECHANICAL DEMO PLAN NOTES:
1. REMOVE CHILLED WATER SUPPLY AND RETURN PIPING AND ASSOCIATED FAN COIL UNIT. SEE
SHEET 107-MPD-100 FOR RELATED SCOPE.
2. CHILLED WATER SUPPLY AND RETURN PIPING UP TO ROOF TOP AIR HANDLING UNIT. REMOVE
PIPING BACK TO DEMARCATION POINT IN BASEMENT. SEE 107-MPD-100 FOR RELATED
INFORMATION.
3. EXISTING FIRE DEPARTMENT CONNECTION
4. REMOVE STEAM AND CONDENSATE RISER ON 1ST FLOOR IN LOCATION SHOWN. STEAM AND
CONDENSATE RISERS ABOVE 1ST FLOOR CEILING ARE EXISTING TO BE REUSED. SEE SHEET 107-
MP-101 FOR RELATED WORK.
GENERAL NOTES:
1. THE AREA OF WORK SHOWN IS ASSOCIATED WITH AN OPERATING FACILITY THAT MUST REMAIN
IN SERVICE 24 HOURS A DAY, 7 DAYS A WEEK.
2. COORDINATE WORK SCHEDULE WITH THE CONTRACTING OFFICER'S REPRESENTATIVE.
3. COORDINATE MECHANICAL WORK WITH ALL OTHER TRADES. VERIFY ALL EXISTING CONDITIONS
BEFORE THE START OF WORK.
4. SEE SHEET GI001 FOR ADDITIONAL INFORMATION REGARDING SCHEDULE AND PHASING
REQUIREMENTS. SHEDULE WORK IN THE EXISTING BUILDING TO MINIMIZE DISRUPTION OF
SERVICES.
5. ALL SUPPLY AND RETURN BRANCH PIPING TO INDIVIDUAL VARIABLE AIR VOLUME TERMINAL
UNITS TO BE 3/4" UNLESS NOTED OTHERWISE
BB
AA
HATCHED AREA REPRESENTS
THE EXISTING BUILDING 107
EXTERIOR WALL
Drawing Number
Project Number
Date
Project Title
Building NumberLocation
Checked DrawnAPPROVED: CHIEF ENGINEER
Drawing Title
VA FORM
Office of Construction and Facilities Management
Dwg
CIVIL / STRUCTURAL ENGINEER M.E.P. / T. ENGINEER
APPROVED: DIRECTOR
APPROVED: ASSOCIATE DIRECTOR
APPROVED: ASSISTANT DIRECTOR APPROVED: CHIEF ENGINEER
REVISIONS DATE
CONSULTANTS ARCHITECT
o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th s i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
1 2 3 4 5 6 7 8 9
A
1 2 3 4 5 6 7 8 9
B
C
D
E
F
A
B
C
D
E
F
H2B
1225 NORTH LOOP WEST, SUITE 900
HOUSTON, TX 77008
SPUR DESIGN
11020 KING STREET, SUITE 350
OVERLAND PARK, KS 66210
AZ ARCH REG. NO. 20013-0, EXP. 10/10/2019
AZ ENGR REG. NO. 20015-0, EXP. 10/10/2019 -OF- 148
RADIOLOGY EXPANSIONMECHANICAL HVAC AND PIPING
DEMO ROOF PLAN
649-413
11/01/18 JES JAD
107-MD-102
100% BACKCHECK SUBMITTAL
DEPARTMENT OF VETERAN AFFAIRS
NORTHERN ARIZONA VA HEALTH CARE SYSTEM
500 HWY 89N
PRESCOTT AZ, 86313
1/8" = 1'-0"
MECHANICAL DEMO ROOF PLAN
GENERAL NOTES:
1. THE AREA OF WORK SHOWN IS ASSOCIATED WITH AN OPERATING FACILITY THAT MUST REMAIN
IN SERVICE 24 HOURS A DAY, 7 DAYS A WEEK.
2. COORDINATE WORK SCHEDULE WITH THE CONTRACTING OFFICER'S REPRESENTATIVE.
3. COORDINATE MECHANICAL WORK WITH ALL OTHER TRADES. VERIFY ALL EXISTING CONDITIONS
BEFORE THE START OF WORK.
4. SEE SHEET GI001 FOR ADDITIONAL INFORMATION REGARDING SCHEDULE AND PHASING
REQUIREMENTS. SHEDULE WORK IN THE EXISTING BUILDING TO MINIMIZE DISRUPTION OF
SERVICES.
5. ALL SUPPLY AND RETURN BRANCH PIPING TO INDIVIDUAL VARIABLE AIR VOLUME TERMINAL
UNITS TO BE 3/4" UNLESS NOTED OTHERWISE
MECHANICAL DEMO PLAN NOTES
1. REMOVE EXISTING AIR HANDLING UNIT AND ASSOCIATED PIPING, DUCTWORK, AND CONTROLS
AS SHOWN.
N
F
B
C
D
1 3 42 5
B.1
E
6 9
2.1
F.1
E.1
A.5
A.1
D.2
D.1
A
1.1 7
C.2
B.2
4.5 8
G
8.1
54"x20" R A
58"x26" EA
"x
R
A
"x
S
A
B.9
HX
HX
SD
SD
28"X10" EA UP TO
EF-1 ON ROOF
28"x10" EA 2
107-MH-400
22"x10" OA
AHU
12"x6" OA
12"x6" OA
AHU
AHU
64"x26" OA
18"x16" EA
22"x10" OA
14"x12" SA
HU
HU
HX
CT
BID DEDUCT ALT. #3
SEE BID DEDUCT NOTES
ON SHEET 107-GI-102 AND
SHEET 107-MH-400A FOR
MORE INFORMATION.
ET
14"x12" RA
AHU-1_TCP-1
AHU-3_TCP-3
AHU-2_TCP-2
107-M-301
107-M-301
107-M-301
107-M-301
107-M-301
107-M-301
107-M-301
HU
107-M-301
FCU
FCU
54"x24" SA
54"x28" SA
54"x24" SA
12"x6" OA
"x
O A
18"x12" OA
"x
R
A
28"x12" RA
"x
R
A
FD
CP
2.1
CP
2.2
Drawing Number
Project Number
Date
Project Title
Building NumberLocation
Checked DrawnAPPROVED: CHIEF ENGINEER
Drawing Title
VA FORM
Office of Construction and Facilities Management
Dwg
CIVIL / STRUCTURAL ENGINEER M.E.P. / T. ENGINEER
APPROVED: DIRECTOR
APPROVED: ASSOCIATE DIRECTOR
APPROVED: ASSISTANT DIRECTOR APPROVED: CHIEF ENGINEER
REVISIONS DATE
CONSULTANTS ARCHITECT
o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th s i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
1 2 3 4 5 6 7 8 9
A
1 2 3 4 5 6 7 8 9
B
C
D
E
F
A
B
C
D
E
F
H2B
1225 NORTH LOOP WEST, SUITE 900
HOUSTON, TX 77008
SPUR DESIGN
11020 KING STREET, SUITE 350
OVERLAND PARK, KS 66210
AZ ARCH REG. NO. 20013-0, EXP. 10/10/2019
AZ ENGR REG. NO. 20015-0, EXP. 10/10/2019 -OF- 148
RADIOLOGY EXPANSIONMECHANICAL HVAC BASEMENT
FLOOR PLAN
649-413
11/01/18 JES JAD
107-MH-100
100% BACKCHECK SUBMITTAL
DEPARTMENT OF VETERAN AFFAIRS
NORTHERN ARIZONA VA HEALTH CARE SYSTEM
500 HWY 89N
PRESCOTT AZ, 86313
1/8" = 1'-0"
MECHANICAL HVAC BASEMENT FLOOR
PLAN
GENERAL NOTES:
1. THE AREA OF WORK SHOWN IS ASSOCIATED WITH AN OPERATING FACILITY THAT MUST REMAIN
IN SERVICE 24 HOURS A DAY, 7 DAYS A WEEK.
2. COORDINATE WORK SCHEDULE WITH THE CONTRACTING OFFICER'S REPRESENTATIVE.
3. COORDINATE MECHANICAL WORK WITH ALL OTHER TRADES. VERIFY ALL EXISTING CONDITIONS
BEFORE THE START OF WORK.
4. SEE SHEET GI001 FOR ADDITIONAL INFORMATION REGARDING SCHEDULE AND PHASING
REQUIREMENTS. SHEDULE WORK IN THE EXISTING BUILDING TO MINIMIZE DISRUPTION OF
SERVICES.
5. ALL VAV TERMINAL UNIT DUCT CONNECTIONS SHALL MATCH THE ASSOCIATED UNIT
CONNECTION SIZES UNLESS NOTED OTHERWISE. ALL VAV TERMINAL UNIT REHEAT COIL
BRANCH PIPING SHALL BE 3/4" DIAMETER UNLESS NOTED OTHERWISE.
MECHANICAL PLAN NOTES
1. PROVIDE HEAT EXCHANGER AND PUMPS IN LOCATION SHOWN. SEE SHEET 107-MP-100 FOR
RELATED WORK.
2. DIVISION 23 CONTRACTOR TO ROUTE 28X10 CRAWL SPACE VENTILATION DUCT THROUGH
EXISTING PENETRATION. COORDINATE DUCT AND ELECTRICAL CONDUIT ROUTING WITH
DIVISION 26 CONTRACTOR.
N
UP
E
X-RAY
343 SF
X-RAY
345 SF
STRESS
219 SF
SOILED UTILITY
66 SF
NEW ELEC.
298 SF
ENTRY VESTIBULE
158 SF
CORRIDOR
791 SF
SCHEDULING
141 SF
CORRIDOR
791 SF
WAITING
645 SF
DRESS
48 SF
DRESS
48 SF
MEN'S RESTROOM
80 SF
WOMEN'S RESTROOM
81 SF CORRIDOR
2106 SF
CORRIDOR
2106 SF
DRESS
50 SF
DRESS
55 SF
FLUOROSCOPY X-RAY ROOM
376 SF
ALCOVE
38 SF
TOILET
135A
62 SF
CT SCAN ROOM
352 SF
CT CONTROL
211 SF
SPECT CT SCAN ROOM
404 SF
PATIENT DOSE ADMINISTRATION
138 SF
RADIO DROP-OFF
144B
102 SF
BONE DENSITOMETRY
228 SF
MRI SUB-WAITING
191 SF
MRI SCAN ROOM
146C
346 SF
MRI EQUIP. ROOM
175 SF
TOILET
111A
61 SF
HAC
58 SF
STAFF LOUNGE/TRAINING
441 SF
ULTRASOUND
184 SFULTRASOUND
179 SF
STAFF TOILET
60 SF
TOILET
109A
65 SF
WORKROOM
178 SF
WOMEN'S TOILET
62 SF
STORAGE
40 SF
INPATIENT HOLDING
120 SF
INPATIENT HOLDING
110 SF
STORAGE
117 SF
EQUIP. ALCOVE
83 SF
COMMS
100 SF
CHIEF TECHNOLOGIST
120A
102 SF
STAFF TOILET
87 SF
PHYS. VIEWING ROOM
107 SF
WORK AREA
191 SF
PHYS. VIEWING ROOM
99 SF
PHYS. VIEWING ROOM
96 SF
SUPERVISOR
120B
105 SF
MEETING ROOM
274 SF
PACS
101 SF
ON-CALL ROOM
155 SF
CORRIDOR
481 SF
MRI DRESS
146F
49 SF
MRI DRESS
146E
49 SF
RESTROOM
59 SF
NURSE
142 SF
STAIRWELL
154 SF
X-RAY TECH
62 SF
ALCOVE
146H
12 SF
ALCOVE
9 SF
ALCOVE
22 SF
MRI CONTROL ROOM
146B
119 SF
ALCOVE
31 SF
ALCOVE
29 SF
114 SF
EXISTING MEN'S RR
196 SF
EXISTING STAIRS
"x
S
A
"x
S
A
54"x20" SA
22"x16" SA
"x
S
A
"x
S
A
"x
S
A
14"x8" SA
24"x10" SA
"x
S
A
18"x14" SA
"x
S
A
"x
S
A
"x
S A
22"x10" RA
"x
R
A
22"x10" RA 16"x8" RA
16"x8" RA
54"x20" RA
MRI ACCS.
146D
14 SF
32"x16" SA
14"x8" EA
10"x6" EA
8"x6" EA
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
201 SF
RADIOPHARMACY
144A
T
16"x8" RA
"x
R A
16"x8" RA
"x
R
A
"x
R
A
"x
R
A
"x
S
A 14"x12" SA
12"x8" EA
"x
R
A
"x
R
A
16"x12" RA
14"x10" RA
"x
R
A
"x
R
A
"x
S
A
"x
R
A
"x
E
A
"x
E
A
10"x6" EA
VAV
VAV
VAV
VAV
VAV
VAV
VAV
22"x10" RA
"x
R
A
"x
S
A
VAV
VAV
VAV
"ø
E A
"ø
E A
"ø
E A
12"ø EA
VAV
"x
S
A
MRI PREP/HOLDING
146A
195 SF
FCU
ACU
ACU
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
24"x14" RA
"x
S A
"x
E
A
14"x10" EA 14"x10" EA
"x
E
A
12"x10" EA
28"x20" SA
"x
E
A
"x
E A
22"x10" SA
12"x10" SA
22"x10" RA
"x
E
A
10"x8" EA
"x
E A
"x
E A
VAV
VAV
VAV
F
B
C
D
1 3 42 5
B.1
E
6 9
2.1
F.1
E.1
A.5
A.1
D.2
D.1
A
1.1 7
C.2
B.2
4.5 8
G
8.1
B.9
ACU
FD
FD
FD
FD
FD
DUCTLESS
FUME HOOD
FD
FD
FDFD
FDFD
EXISTING 2-HR FIRE
BLANKET TO REMAIN (ETR)
SDSD
SD
SD
SD
SD
FD
FDFD
FD
FD
26"x14" RA
107-MH-401A
107-MH-401B
107-MH-401C
VAV
24"x10" SA22"x10" SA
"x
S
A
24"x12" EA
24"x12" EA
BID DEDUCT ALT. #2
SEE BID DEDUCT NOTES
ON SHEET 107-GI-102 AND
AND SHEET 107-MH-401B
FOR MORE INFORMATION.
BID DEDUCT ALT. #1
SEE BID DEDUCT NOTES
ON SHEET 107-GI-102 AND
AND SHEET 107-MH-401C
FOR MORE INFORMATION.
BID DEDUCT ALT. #1
SEE BID DEDUCT NOTES
ON SHEET 107-GI-102 AND
AND SHEET 107-MH-401C
FOR MORE INFORMATION.
BID DEDUCT ALT. #3
SEE BID DEDUCT NOTES
ON SHEET 107-GI-102 AND
SHEET 107-MH-401A FOR
MORE INFORMATION.
FD
26"x16" RA
12"x6" RA 10"x8" RA
14"x10" RA
"x
R
A
"x
S
A
22"x10" SA
"x
S
A
12"x12" SA
"x
E
A
10"x10" EA
"x
E
A
10"x10" EA
ACV
24"x12" EA
ACV
FD
FDFDFD
FD FD
Drawing Number
Project Number
Date
Project Title
Building NumberLocation
Checked DrawnAPPROVED: CHIEF ENGINEER
Drawing Title
VA FORM
Office of Construction and Facilities Management
Dwg
CIVIL / STRUCTURAL ENGINEER M.E.P. / T. ENGINEER
APPROVED: DIRECTOR
APPROVED: ASSOCIATE DIRECTOR
APPROVED: ASSISTANT DIRECTOR APPROVED: CHIEF ENGINEER
REVISIONS DATE
CONSULTANTS ARCHITECT
o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th s i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
1 2 3 4 5 6 7 8 9
A
1 2 3 4 5 6 7 8 9
B
C
D
E
F
A
B
C
D
E
F
H2B
1225 NORTH LOOP WEST, SUITE 900
HOUSTON, TX 77008
SPUR DESIGN
11020 KING STREET, SUITE 350
OVERLAND PARK, KS 66210
AZ ARCH REG. NO. 20013-0, EXP. 10/10/2019
AZ ENGR REG. NO. 20015-0, EXP. 10/10/2019 -OF- 148
RADIOLOGY EXPANSIONMECHANICAL HVAC LEVEL 1
FLOOR PLAN
649-413
11/01/18 JES JAD
107-MH-101
100% BACKCHECK SUBMITTAL
DEPARTMENT OF VETERAN AFFAIRS
NORTHERN ARIZONA VA HEALTH CARE SYSTEM
500 HWY 89N
PRESCOTT AZ, 86313
1/8" = 1'-0"
MECHANICAL HVAC LEVEL 1 FLOOR
PLAN
GENERAL NOTES:
1. THE AREA OF WORK SHOWN IS ASSOCIATED WITH AN OPERATING FACILITY THAT MUST REMAIN
IN SERVICE 24 HOURS A DAY, 7 DAYS A WEEK.
2. COORDINATE WORK SCHEDULE WITH THE CONTRACTING OFFICER'S REPRESENTATIVE.
3. COORDINATE MECHANICAL WORK WITH ALL OTHER TRADES. VERIFY ALL EXISTING CONDITIONS
BEFORE THE START OF WORK.
4. SEE SHEET GI001 FOR ADDITIONAL INFORMATION REGARDING SCHEDULE AND PHASING
REQUIREMENTS. SHEDULE WORK IN THE EXISTING BUILDING TO MINIMIZE DISRUPTION OF
SERVICES.
5. ALL VAV TERMINAL UNIT DUCT CONNECTIONS SHALL MATCH THE ASSOCIATED UNIT
CONNECTION SIZES UNLESS NOTED OTHERWISE. ALL VAV TERMINAL UNIT REHEAT COIL
BRANCH PIPING SHALL BE 3/4" UNLESS NOTED OTHERWISE.
N
C H
W S
C H
W R
C H
W S
C H
W R
4" CHWR
4" CHWS
4" CHWR
4" CHWS
C H
W S
C H
W R
CT SCANNER EQUIP. RM
112 SF
4" CHWR
4" CHWS
6" MPS6" MPS6" MPS
4" HPS
3" VR
2 1/2" DR
4" HPS
3" VR
2 1/2" DR
4" HPS
3" VR
2 1/2" DR
M
P S
H
P S
V
R
/2 D
R
M P
S H
P S
V
R
/2 D
R
SR
SR SR
SR
SR
SR
SR
SR
SR
SR
SR
SR
SR
SR
SR
SR SR
SR
SR
SR
SR
1 1/4" LPC
3" LPS
1 1/4" LPC
3" LPS
3" LPS
1 1/4" LPC
3" LPS
1 1/4" LPC
3" LPS
1 1/4" LPC
3" LPS
1 1/4" LPC
LP
S
/4 L P
C
/2 L P
S
/4 L P
C
/4 L P
C L P
S
/4 L P
C L P
S
1 1/4" LPC
3" LPS
L P
S
/4
L
P C
6" CHWR
6" CHWS
4" CHWS
4" CHWR4" CHWR
4" CHWS
4" CHWS
4" CHWR
2 1/2" HWR
2 1/2" HWS
2" HWS
2" HWR
H W
S
H
W R
H W
S
H
W R
HU
F
B
C
D
1 3 42 5
B.1
E
6 9
2.1
F.1
E.1
A.5
A.1
D.2
D.1
A
1.1 7
C.2
B.2
4.5 8
G
8.1
B.9
HX
HX
6" CHWR
6" CHWS
1" LPS
8 9
P R
V
LP
S
CT
HX
ET
BID DEDUCT ALT. #5
SEE BID DEDUCT NOTES
ON SHEET 107-GI-102 FOR
MORE INFORMATION.
AHU
AHU
AHU
2" CD
/4
C
D
3/4" CD
107-M-301
3/4" CD
3/4" CD
107-M-301
2" LPS
107-M-301
107-M-301
107-M-301
107-M-301
107-M-301
CP
2.1
CP
2.2
HU
HU
107-M-301
CP
1.1
CP
1.2
C H
W R
C H
W S
4" CHWS
4" CHWR
/4
C H
W S
/4
C H
W R
L P
S
2" HWR
2" HWS
FCU
FCU
Drawing Number
Project Number
Date
Project Title
Building NumberLocation
Checked DrawnAPPROVED: CHIEF ENGINEER
Drawing Title
VA FORM
Office of Construction and Facilities Management
Dwg
CIVIL / STRUCTURAL ENGINEER M.E.P. / T. ENGINEER
APPROVED: DIRECTOR
APPROVED: ASSOCIATE DIRECTOR
APPROVED: ASSISTANT DIRECTOR APPROVED: CHIEF ENGINEER
REVISIONS DATE
CONSULTANTS ARCHITECT
o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th s i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
1 2 3 4 5 6 7 8 9
A
1 2 3 4 5 6 7 8 9
B
C
D
E
F
A
B
C
D
E
F
H2B
1225 NORTH LOOP WEST, SUITE 900
HOUSTON, TX 77008
SPUR DESIGN
11020 KING STREET, SUITE 350
OVERLAND PARK, KS 66210
AZ ARCH REG. NO. 20013-0, EXP. 10/10/2019
AZ ENGR REG. NO. 20015-0, EXP. 10/10/2019 -OF- 148
RADIOLOGY EXPANSIONMECHANICAL PIPING BASEMENT
FLOOR PLAN
649-413
11/01/18 JES JAD
107-MP-100
100% BACKCHECK SUBMITTAL
DEPARTMENT OF VETERAN AFFAIRS
NORTHERN ARIZONA VA HEALTH CARE SYSTEM
500 HWY 89N
PRESCOTT AZ, 86313
1/8" = 1'-0"
MECHANICAL PIPING BASEMENT FLOOR
PLAN
GENERAL NOTES:
1. THE AREA OF WORK SHOWN IS ASSOCIATED WITH AN OPERATING FACILITY THAT MUST REMAIN
IN SERVICE 24 HOURS A DAY, 7 DAYS A WEEK.
2. COORDINATE WORK SCHEDULE WITH THE CONTRACTING OFFICER'S REPRESENTATIVE.
3. COORDINATE MECHANICAL WORK WITH ALL OTHER TRADES. VERIFY ALL EXISTING CONDITIONS
BEFORE THE START OF WORK.
4. SEE SHEET GI001 FOR ADDITIONAL INFORMATION REGARDING SCHEDULE AND PHASING
REQUIREMENTS. SHEDULE WORK IN THE EXISTING BUILDING TO MINIMIZE DISRUPTION OF
SERVICES.
5. ALL VAV TERMINAL UNIT DUCT CONNECTIONS SHALL MATCH THE ASSOCIATED UNIT
CONNECTION SIZES UNLESS NOTED OTHERWISE. ALL VAV TERMINAL UNIT REHEAT COIL
BRANCH PIPING SHALL BE 3/4" DIAMETER UNLESS NOTED OTHERWISE.
MECHANICAL PLAN NOTES
1. PROVIDE NEW AIR HANDLING UNIT AND ASSOCIATED PIPING, DUCTWORK, AND CONTROLS AS
SHOWN. SEE SHEET 107-M-601 FOR AIR HANDLING UNIT SCHEDULES.
2. AIR HANDLING UNIT SHALL BE PROVIDED WITH A BACKUP DX COOLING COIL CAPABLE OF
PROVIDING FULL COOLING CAPACITY IN THE EVENT OF A PRIMARY COOLING COIL FAILURE.
PROVIDE ASSOCIATED CONDENSING UNIT ON ROOF IN LOCATION SHOWN ON SHEET 107-M-102
3. VRF SPLIT SYSTEM FAN COIL UNIT AND ASSOCIATED CONDENSING UNIT ON ROOF TO SERVE AS STANDBY COOLING FOR THE CT EQUIPMENT ROOM. SEE SHEET 107-M-102 AND 107-MP-100 FOR
ADDITIONAL SCOPE.
4. ALL PIPING AND ASSOCIATED FITTINGS ON MRI CHILLED WATER LOOP SHALL CONSIST OF NON-
FERROUS MATERIAL. COORDINATE MATERIAL SELECTION WITH MRI MANUFACTURER'S
INSTALLATION REQUIREMENTS.
5. DIVISION 23 CONTRACTOR SHALL COORDINATE CHILLED WATER CONNECTIONS IN THE CT AND
MRI EQUIPMENT ROOMS WITH MANUFACTURERS INSTALLATION REQUIREMENTS. SEE FLOW
DIAGRAMS ON SHEET 107-MP-301 FOR ADDITIONAL INFORMATION.
6. CONNECT NEW 6" CHILLED WATER SUPPLY AND RETURN PIPING IN BUILDING 158 CRAWL SPACE
IN LOCATION SHOWN AND ROUTE TO NEW BUILDING 107 EXPANSION AS SHOWN.
7. 3" CHILLED WATER SUPPLY AND RETURN AND 3" HEATING HOT WATER SUPPLY AND RETURN UP
TO FLOOR ABOVE. EXTEND PIPING UPWARD AND PROVIDE VALVE AND CAP UNDER FINISHED
ROOF FOR FUTURE USE.
8. DIVISION 23 CONTRACTOR TO PROVIDE 6" CHILLED WATER SUPPLY AND RETURN BRANCH TAPS
WITH VALVE AND CAP IN LOCATION SHOWN.
9. DIVISION 23 CONTRACTOR TO PROVIDE 4" HEATING HOT WATER SUPPLY AND RETURN BRANCH
TAPS WITH VALVE AND CAP IN LOCATION SHOWN.
10. PROVIDE NEW HEAT EXCHANGER AND PUMPS FOR MRI AND CT PRIMARY CHILLED WATER
LOOPS IN LOCATION SHOWN. SEE SHEET 107-MP-101 AND 107-MP-301 FOR RELATED WORK.
11. DIVISION 23 CONTRACTOR TO PROVIDE AND INSTALL NEW STEAM TO HOT WATER HEAT
EXCHANGERS, PUMPS, AND EXPANSION TANK TO SERVE AIR HANDLERS AND VAV TERMINAL
UNIT REHEAT COILS IN LOCATION SHOWN.
12. CONNECT NEW MEDIUM PRESSURE STEAM AND DRIP RETURN PIPING TO EXISTING DENTAL AHU
STEAM PIPING AS SHOWN. ROUTE MEDIUM PRESSURE STEAM TO PRESSURE REDUCING VALV
STATION (PRV) AND CONNECT LOW PRESSURE STEAM TO STEAM TO HOT WATER HEAT
EXCHANGERS IN LOCATION SHOWN.
13. CONNECT NEW STEAM AND CONDENSATE RISERS TO EXISTING BRANCH TAPS ON MAIN.
PROVIDE NEW RISERS AND ASSOCIATED SWING ARMS IN LOCATION SHOWN. SEE SHEET 107-
MP-101 FOR CONTINUATION
N
BID DEDUCT ALTERNATE PLAN NOTES::
1. BID DEDUCT ALT. #5: PROVIDE MECHANICAL SUPPLY AND RETURN PIPING TAPS OFF OF MAIN
WITH VALVE AND CAP IN LOCATIONS SHOWN FOR FUTURE CONNECTION OF MRI EQUIPMENT IN
BASEMENT.
1 1/4" HWS
/4
H W
S
/4
H W
S
/4
H
W S
1 1/4" HWR
/4 H
W R
/4 H
W R
/4
H
W R
/4
H W
S
/4
H
W R
/4
H W
S
/4
H
W R
1 1/4" HWR
1 1/4" HWS
/4
H W
S
/4
H
W R
2" HWS
1 1/4" HWR
1 1/4" HWS
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
17 VAV
VAV
VAV
25VAV
VAV
VAV
VAV
ENTRY VESTIBULE
158 SF
SCHEDULING
141 SF
NEW ELEC.
298 SF
114 SF
EXISTING MEN'S RR
CORRIDOR
791 SF
STORAGE
40 SF
WOMEN'S TOILET
62 SF
196 SF
EXISTING STAIRS
CORRIDOR
2106 SF
WAITING
645 SF
RECEPTION
105A
99 SF
WORKROOM
178 SF
ULTRASOUND
179 SF
ULTRASOUND
184 SF
TOILET
109A
65 SF
STAFF TOILET
60 SF
CORRIDOR
2106 SF
CORRIDOR
481 SF
COMMS
100 SF
EQUIP. ALCOVE
83 SF
STORAGE
117 SF
INPATIENT HOLDING
110 SF
INPATIENT HOLDING
120 SF
STAFF LOUNGE/TRAINING
441 SF
HAC
58 SF
TOILET
111A
61 SF
MRI SCAN ROOM
146C
346 SF
MRI ACCS.
146D
14 SF
MRI EQUIP. ROOM
175 SF
MRI DRESS
146F
49 SF
MRI DRESS
146E
49 SF
MRI SUB-WAITING
191 SF
ON-CALL ROOM
155 SF
PACS
101 SF
PHYS. VIEWING ROOM
96 SF
PHYS. VIEWING ROOM
99 SF
PHYS. VIEWING ROOM
107 SF
SUPERVISOR
120B
105 SF
MEETING ROOM
274 SF
WORK AREA
191 SF
CHIEF TECHNOLOGIST
120A
102 SF
STAFF TOILET
87 SF
DRESS
48 SF
DRESS
48 SF
MEN'S RESTROOM
80 SF
WOMEN'S RESTROOM
81 SF
DRESS
55 SF
DRESS
50 SF
FLUOROSCOPY X-RAY ROOM
376 SF
ALCOVE
38 SF
TOILET
135A
62 SF
CT SCAN ROOM
352 SF
CT CONTROL
211 SF
SPECT CT SCAN ROOM
404 SF
201 SF
RADIOPHARMACY
144A
PATIENT DOSE ADMINISTRATION
138 SF
BONE DENSITOMETRY
228 SF
MRI PREP/HOLDING
146A
195 SF
RADIO DROP-OFF
144B
102 SF
MRI CONTROL ROOM
146B
119 SF
X-RAY
343 SF
X-RAY
345 SF
STRESS
219 SF
SOILED UTILITY
66 SF
NURSE
142 SF
RESTROOM
59 SF
X-RAY TECH
62 SF
ALCOVE
146H
12 SF
ALCOVE
9 SF
ALCOVE
22 SF
ALCOVE
31 SF
ALCOVE
29 SF
SR
SR
SR
SR SR
SR
SR
SR
SR
SR
SR
SR
SR
SR
SR
SR
SR
SR
SR
SR
SR
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
H
W R
H
W S
H W
S
H
W R
/4
H
W R
/4
H
W S
/2
R
E F
ACU
ACU
ACU
/2
R
E F
ACU
ACU
7 7
6 6
FCU
4 4
9 10
F
B
C
D
1 3 42 5
B.1
E
6 9
2.1
F.1
E.1
A.5
A.1
D.2
D.1
A
1.1 7
C.2
B.2
4.5 8
G
8.1
B.9
BID DEDUCT ALT. #2
SEE BID DEDUCT NOTES
ON SHEET 107-GI-102 AND
AND SHEET 107-MH-401B
FOR MORE INFORMATION.
BID DEDUCT ALT. #1
SEE BID DEDUCT NOTES
ON SHEET 107-GI-102 AND
AND SHEET 107-MPD101
FOR MORE INFORMATION.
BID DEDUCT ALT. #1
SEE BID DEDUCT NOTES
ON SHEET 107-GI-102 AND
AND SHEET 107-MH-401C
FOR MORE INFORMATION.
BID DEDUCT ALT. #3
SEE BID DEDUCT NOTES
ON SHEET 107-GI-102 FOR
MORE INFORMATION.
VAV
3/4" CD
/4
C
D
/4
C
D
3/4" CD
1/2" REF
1/2" REF
3/4" CD
SRSR
13 13
6" QV8
2" HWR
2" HWS
2" HWR
2" HWS
Drawing Number
Project Number
Date
Project Title
Building NumberLocation
Checked DrawnAPPROVED: CHIEF ENGINEER
Drawing Title
VA FORM
Office of Construction and Facilities Management
Dwg
CIVIL / STRUCTURAL ENGINEER M.E.P. / T. ENGINEER
APPROVED: DIRECTOR
APPROVED: ASSOCIATE DIRECTOR
APPROVED: ASSISTANT DIRECTOR APPROVED: CHIEF ENGINEER
REVISIONS DATE
CONSULTANTS ARCHITECT
o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th s i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
1 2 3 4 5 6 7 8 9
A
1 2 3 4 5 6 7 8 9
B
C
D
E
F
A
B
C
D
E
F
H2B
1225 NORTH LOOP WEST, SUITE 900
HOUSTON, TX 77008
SPUR DESIGN
11020 KING STREET, SUITE 350
OVERLAND PARK, KS 66210
AZ ARCH REG. NO. 20013-0, EXP. 10/10/2019
AZ ENGR REG. NO. 20015-0, EXP. 10/10/2019 -OF- 148
RADIOLOGY EXPANSIONMECHANICAL PIPING LEVEL 1
FLOOR PLAN
649-413
11/01/18 JES JAD
107-MP-101
100% BACKCHECK SUBMITTAL
DEPARTMENT OF VETERAN AFFAIRS
NORTHERN ARIZONA VA HEALTH CARE SYSTEM
500 HWY 89N
PRESCOTT AZ, 86313
1/8" = 1'-0"
MECHANICAL PIPING LEVEL 1 FLOOR
PLAN
GENERAL NOTES:
1. THE AREA OF WORK SHOWN IS ASSOCIATED WITH AN OPERATING FACILITY THAT MUST REMAIN
IN SERVICE 24 HOURS A DAY, 7 DAYS A WEEK.
2. COORDINATE WORK SCHEDULE WITH THE CONTRACTING OFFICER'S REPRESENTATIVE.
3. COORDINATE MECHANICAL WORK WITH ALL OTHER TRADES. VERIFY ALL EXISTING CONDITIONS
BEFORE THE START OF WORK.
4. SEE SHEET GI001 FOR ADDITIONAL INFORMATION REGARDING SCHEDULE AND PHASING
REQUIREMENTS. SHEDULE WORK IN THE EXISTING BUILDING TO MINIMIZE DISRUPTION OF
SERVICES.
5. ALL VAV TERMINAL UNIT DUCT CONNECTIONS SHALL MATCH THE ASSOCIATED UNIT
CONNECTION SIZES UNLESS NOTED OTHERWISE. ALL VAV TERMINAL UNIT REHEAT COIL
BRANCH PIPING SHALL BE 3/4" DIAMETER UNLESS NOTED OTHERWISE.
MECHANICAL PLAN NOTES
1. ALL PIPING AND ASSOCIATED FITTINGS ON MRI CHILLED WATER LOOP SHALL CONSIST OF NON-
FERROUS MATERIALS. COORDINATE MATERIAL SELECTION WITH MRI MANUFACTURER'S
INSTALLATION REQUIREMENTS.
2. DIVISION 23 CONTRACTOR SHALL COORDINATE CHILLED WATER CONNECTIONS IN THE CT AND
MRI EQUIPMENT ROOMS WITH MANUFACTURERS INSTALLATION REQUIREMENTS. SEE FLOW
DIAGRAMS ON SHEET 107-MP-301 FOR ADDITIONAL INFORMATION.
3. DIVISION 23 CONTRACTOR TO TERMINATE 3" CHILLED WATER SUPPLY AND RETURN AND 3"
HEATING HOT WATER SUPPLY BELOW ROOF DECK WITH VALVE AND CAP FOR FUTURE
EXTENSION TO 2ND FLOOR.
4. ROUTE 2-PIPE REFRIGERANT PIPING TO BUILDING 158 CEILING THROUGH EXISTING DUCT
PENETRATION IN LOCATION SHOWN. SEE SHEET 107-MH-101 FOR RELATED WORK.
5. PROVIDE NEW 4 PIPE VERTICAL RECESSED FAN COIL UNIT IN LOCATION SHOWN. FAN COIL UNIT
BOTTOM ELEVATION: 0'-8" ABOVE FINISHED FLOOR.
6. 2-PIPE REFRIGERANT PIPING UP TO CONDENSING UNITS ON RADIOLOGY EXPANSION ROOF. SEE
SHEET 107-M-102 FOR CONTINUATION.
7. 2-PIPE REFRIGERANT PIPING UP TO CONDENSING UNITS ON BUILDING 158 ROOF. SEE SHEET
107-M-102 FOR CONTINUATION.
8. PROVIDE 6" CRYOGEN QUENCH VENT UP THROUGH ROOF IN LOCATION SHOWN. COORDINATE
CRYOGEN QUENCH VENT TERMINATION AND SIZE WITH DETAIL X/107-M-50X AND MRI
MANUFACTURERS INSTALLATION REQUIREMENTS.
9. 2" PRIMARY CHWS/R PIPING UP FROM PLATE & FRAME HEAT EXCHANGER AND PUMPS IN
BASMENT. SEE SHEET 107-MP-100 FOR MORE INFORMATION.
10. 2" BACKUP CHWS/R PIPING DOWN FROM MANUFACTURER PROVIDED CHILLER ON ROOF. SEE
SHEET 107-M-102 FOR MORE INFORMATION.
11. REMOVE HEATING HOT WATER SUPPLY AND RETURN PIPING TO DEMARCATION POINT SHOWN
ON SHEET 107-MPD101. PROVIDE NEW PIPE EXTENSIONS WITH VALVE AND CAP AS SHOWN.
12. THE DEFINED AREA DENOTES THE CRYOGEN EXCLUSION ZONE. THE AREA SHALL BE CLEARLY
MARKED AND ACCESSIBLE TO AUTHORIZED PERSONELL ONLY. ALL WINDOWS WITHIN THE AREA
SHALL BE FIXED OR RENDERED INOPERABLE. SEE ARCHITECTURAL DRAWINGS FOR RELATED
WORK.
13. ROUTE NEW STEAM AND CONDENSATE RISERS UP TO FIRST FLOOR CEILING SPACE IN
LOCATION SHOWN. CONNECT NEW RISERS TO EXISTING AS SHOWN AND PROVIDE VALVE
ABOVE FIRST FLOOR CEILING.
N
BID DEDUCT ALTERNATE PLAN NOTES:
1. BID DEDUCT ALT. #2: MECHANICAL EQUIPMENT AND ASSOCIATED DUCTWORK AND PIPING ARE
NOT INCLUDED IN BID DEDUCT ALT. #2 AND SHALL NOT BE REMOVED FROM THE SCOPE OF
WORK.
2. BID DEDUCT ALT. #4: PROVIDE VALVE AND CAP ON MECHANICAL SUPPLY AND RETURN PIPING
FOR FUTURE RECONNECT IN LOCATION SHOWN.
3. BID DEDUCT ALT. #4: SPLIT SYSTEM FAN COIL UNIT AND ASSOCIATED CONDENSING UNIT ON
BUILDING 158 ROOF SERVING ROOM 124 PACS IS TO REMAIN AND SHALL NOT BE REMOVED
FROM THE SCOPE OF WORK. COORDINATE NEW LOCATION WITH THE CONTRACTING OFFICER'S
REPRESENTATIVE AND THE ENGINEER ON RECORD PRIOR TO INSTALLATION.
4. BID DEDUCT ALT. #4: SPLIT SYSTEM FAN COIL UNIT AND ASSOCIATED CONDENSING UNIT ON
BUILDING 158 ROOF SERVING ROOM 116 COMMS TO REMAIN AS SHOWN AND SHALL NOT BE
REMOVED FROM THE SCOPE OF WORK.
5. BID DEDUCT ALT. #5: MECHANICAL EQUIPMENT AND ASSOCIATED DUCTWORK AND PIPING ARE
NOT INCLUDED IN BID DEDUCT ALT. #5 AND SHALL NOT BE REMOVED FROM THE SCOPE OF
WORK.
6. BID DEDUCT ALT.