This notice provides details for an upcoming solicitation to award a firm-fixed-price construction contract through a design-bid-build process. The scope of work involves renovating and expanding an existing radiology area at the Northern Arizona VA Medical Center, including demolishing approximately 3,000 square feet of an existing lab expansion. Key requirements include optimizing the radiology department footprint, adding a centralized waiting room and wide hallways, sufficiently sizing rooms for medical equipment, providing ground-level access, and including structure and utilities to enable a future second floor and elevator/stair access. The solicitation will be issued as a service-disabled veteran-owned small business set-aside ifb advertised on FBO. Bids are due in August 2019 with an anticipated 425-day period of performance. The construction value is estimated between $5-10 million. Questions must be submitted in writing by the specified deadline.

36E77619B0012 Attachment 7 - Mechanical Dwgs 1-22.pdf

View the file

Other files

File Type Posted
36E77619B0012-0005000.docx DOCX document
36E77619B0012-0005001.pdf PDF
36E77619B0012-0005001.pdf PDF
36E77619B0012-0005000.docx DOCX document
36E77619B0012-0004000.docx DOCX document
36E77619B0012-0004002.pdf PDF
36E77619B0012-0004001.pdf PDF
36E77619B0012-0004005.pdf PDF
36E77619B0012-0004003.pdf PDF
36E77619B0012-0004004.pdf PDF
36E77619B0012-0004005.pdf PDF
36E77619B0012-0004001.pdf PDF
36E77619B0012-0004003.pdf PDF
36E77619B0012-0004004.pdf PDF
36E77619B0012-0004000.docx DOCX document
36E77619B0012-0004002.pdf PDF
36E77619B0012-0003000.docx DOCX document
36E77619B0012-0003001.pdf PDF
36E77619B0012-0003001.pdf PDF
36E77619B0012-0003000.docx DOCX document
36E77619B0012-0002001.pdf PDF
36E77619B0012-0002000.docx DOCX document
36E77619B0012-0002000.docx DOCX document
36E77619B0012-0002001.pdf PDF
36E77619B0012-0001000.docx DOCX document
36E77619B0012-0001000.docx DOCX document
36E77619B0012-005.pdf PDF
36E77619B0012-010.pdf PDF
36E77619B0012-012.pdf PDF
36E77619B0012-003.pdf PDF
36E77619B0012-001.docx DOCX document
36E77619B0012-013.pdf PDF
36E77619B0012-007.pdf PDF
36E77619B0012-011.pdf PDF
36E77619B0012-006.pdf PDF
36E77619B0012-002.pdf PDF
36E77619B0012-004.pdf PDF
36E77619B0012-015.docx DOCX document
36E77619B0012-009.pdf PDF
36E77619B0012-016.pdf PDF
36E77619B0012-014.pdf PDF
36E77619B0012-001.docx DOCX document
36E77619B0012-004.pdf PDF
36E77619B0012-006.pdf PDF
36E77619B0012-002.pdf PDF
36E77619B0012-014.pdf PDF
36E77619B0012-008.pdf PDF
36E77619B0012-012.pdf PDF
36E77619B0012-011.pdf PDF
36E77619B0012-009.pdf PDF
Show 40 more

Latest 50 of 59 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MA

MV

CO

EV

VE

AI

FOV

FOR

FOS

FP

LPG

NPW

NO

O

N

G

MPG

G

MPG

CA

V

VBG

VBF

AV

AW

AW

ST

OST

GW

GW

S

W

ID

SPD

T

T

140°

S

W

ST

RS

RL

CWR

CWS

CHWR

CHWS

HWR

HWS

PD

CD

ACD

D

CD

LPC

LPS

MPC

MPS

HPC

HPS

S

SCW

WS

RD

H

T

H

T

FSD

SD

FD

FD

T

H

VD

MD

BD

RD

RDB

HPSR

HPWS

RV

CAP

LC

M

AV

FLOOR MOUNTED FLUSH VALVE

WATER

CLOSET

WALL MOUNTED FLUSH VALVE

WATER

CLOSET

26-P 3

PLUMBING PIPING SYMBOLS

ANNOTATION

XX-1

xx

X100

X100

GENERAL PLUMBING SYMBOLS

DENTAL

MEDICAL GASES

STORM

FUEL

EXISTING PIPING

WATER

WASTE

VALVE SYMBOLS

ETR

HVAC PIPING SYMBOLS

GENERAL DUCT SYMBOLS

GENERAL PLUMBING EQUIPMENT

SHOWER HEADS

JANITORS SINK

DRINKING FOUNTAIN & TYPE

SHOWER

BATHTUB

TANK TYPE WATER CLOSET

COUNTER TOP LAVATORY & TYPE

WALL MOUNTED LAVATORY & TYPE

URINAL

SINK & TYPE

JANITORS SINK - CORNER

TYPICAL UNIT NO.

BUILDING NO. WHERE EQUIPMENT

PUMP NO.3 IN BUILDING NO.26

EQUIPMENT ABBREVIATION (PUMP)

IS LOCATED.

ORAL EVACUATION

LABORATORY VACUUM

LABORATORY AIR

TEMPERED WATER RETURN

TEMPERED WATER SUPPLY

INDUSTRIAL AIR

LA

LV

OA

IA

TWR

TWS

FILTERED COLD WATERFCW

FUEL OIL DISCHARGEFOD

ANCHOR

CONNECTION - SIDE

ECCENTRIC REDUCER

CONNECTION - BOTTOM, 45° OR 90°

CONNECTION - TOP, 45° OR 90°

DIRECTION OF PIPE PITCH (DOWN)

RISE OR DROP IN PIPE

STRAINER

FLOAT & THERMOSTATIC TRAP SET W/

PIPING ACCESSORIES

PIPING ACCESSORIES

INVERTED BUCKET TRAP SET INCLUDING

FLOOR DRAIN (FD), SIZE & TYPE

ROOF DRAIN (RD), SIZE & TYPE

FLOOR SINK (FS), SIZE & TYPE

NATURAL GAS BELOW GRADE (G)

SUMP OR SEWAGE PUMP DISCHARGE (SPD)

CONDENSATE DRAIN (CD)

INDIRECT DRAIN (ID)

NATURAL GAS (G)

NITROUS OXIDE (NO)

LIQUIFIED PETROLEUM GAS (LPG)

FIRE PROTECTION (FP)

WATER SERVICE (WS)

COMPRESSED AIR (CA)

NITROGEN (N)

MEDICAL AIR (MA)

OXYGEN (O)

DOMESTIC HOT WATER RECIRC.

SOIL PIPING - ABOVE FLOOR (S)

SOIL PIPING - BELOW FLOOR (S)

STORM DRAIN - ABOVE FLOOR (ST)

STORM DRAIN - BELOW FLOOR (ST)

ACID WASTE - ABOVE FLOOR (AW)

ACID WASTE - BELOW FLOOR (AW)

DOMESTIC COLD WATER

DOMESTIC HOT WATER

140° DOMESTIC HOT WATER (140°)

WASTE PIPING - ABOVE FLOOR (W)

WASTE PIPING - BELOW FLOOR (W)

GREASE WASTE - ABOVE FLOOR (GW)

GREASE WASTE - BELOW FLOOR (GW)

SOFTENED COLD WATER (SCW)

ACID VENT (AV)

VENT PIPING (V)

HOSE BIBB (HB)

NONFREEZE WALL HYDRANT (NW)

WALL CLEANOUT (WCO)

FLOOR CLEANOUT (FCO)

EXTERIOR CLEANOUT (ECO)

THERMOSTATIC MIXING VALVE

BACKFLOW PREVENTER

OVERFLOW STORM DRAIN - ABOVE FLOOR (OST)

NON POTABLE WATER (NPW)

FUEL OIL SUPPLY (FOS)

FUEL OIL RETURN (FOR)

FUEL OIL VENT (FOV)

AUXILIARY CONDENSATE DRAIN (ACD)

VENT BELOW GRADE (VBG)

VENT BELOW FLOOR (VBF)

CARBON DIOXIDE (CO)

MEDICAL VACUUM (MV)

EVACUATION (EV)

MEDICAL VACUUM EXHAUST (VE)

MEDICAL AIR INTAKE (AI)

TRAP PRIMER LINE (T)

WATER METER

MEDIUM PRESSURE NATURAL GAS (MPG)

MEDIUM PRESSURE NATURAL GAS ON ROOF (MPG)

ELBOW DOWN WITH SHUT-OFF VALVE

TEE DOWN WITH SHUT-OFF VALVE (SOV)

TEE UP WITH SHUT-OFF VALVE (SOV)

RECIRCULATION PUMP

DIRECTION OF FLOW

EXISTING PIPING TO REMAIN

EXISTING PIPING TO BE REMOVED

FLANGE CONNECTION

CLEANOUT

ELBOW DOWN

ELBOW UP

TEE DOWN

ELBOW UP WITH SHUT-OFF VALVE (SOV)

TEE UP

UNION

THERMOMETER

PRESSURE GAUGE

PRESSURE REDUCING VALVE

REDUCER

BALL VALVE

GATE VALVE WITH 3/4 " HOSE ADAPTER

CHECK VALVE

ANGLE GLOBE VALVE

BUTTERFLY VALVE

MODULATING CONTROL VALVE

TWO POSITION CONTROL VALVE

THREE-WAY MODULATING CONTROL VALVE

AUTOMATIC FLOW CONTROL VALVE

PRESSURE RELIEF VALVE

GATE VALVE

MANUAL AIR VENT

TEST PLUG (PRESSURE/TEMPERATURE)

GLOBE VALVE

PRESSURE REGULATING VALVE

THREE-WAY TWO POSITION CONTROL VALVE

AUTOMATIC AIR VENT

MECHANICAL OR FIRE SPRINKLER PLAN NOTE CALL OUT

PLUMBING PLAN NOTE CALL OUT

ELECTRICAL OR FIRE ALARM PLAN NOTE CALL OUT

TECHNOLOGY PLAN NOTE CALL OUT

PLUMBING EQUIPMENT DESIGNATION

MECHANICAL EQUIPMENT DESIGNATION TAG

OWNER FURNISHED, CONTRACTOR INSTALLED

EQUIPMENT DESIGNATION

NEW WORK TO EXISTING WORK CONNECTION POINT

DETAIL NUMBER

SHEET NUMBER

LIMIT OF DEMOLITION

TRAP PRIMER LINE - BELOW SLAB (T)

CO

DOUBLE EXTERIOR CLEANOUT (ECO)

CLEANOUTS

DRAINS AND TRAPS

EQUIPMENT

PIPE FITTINGS AND ACCESSORIES

SHEET NUMBER

SECTION NUMBER

MEDICAL GAS OUTLET (TYPE)

EXISTING TO REMAIN

DIVISION 23 PIPE FITTINGS AND ACCESSORIES

A

A/E ARCHITECT / ENGINEER

AAHX AIR TO AIR HEAT EXCHANGER

AB AIR BLENDER

AAV AUTOMATIC AIR VENT

ACC AIR COOLED CONDENSER

ACCH AIR COOLED CHILLER

ACCU AIR-COOLED CONDENSING UNIT

ACU AIR CONDITIONING UNIT

ACD AUTOMATIC CONTROL

DAMPER,MODULATING

ACD-TP AUTOMATIC CONTROL

DAMPER,TWO POSITION

AD ACCESS DOOR

AF AFTER FILTER

AFCV AIR FLOW CONTROL VALVE

AFF ABOVE FINISHED FLOOR

AFMD AIR FLOW MEASURING DEVICE

AFW AIR FOIL WHEEL (FAN)

AHU AIR-HANDLING UNIT

AMP AMPERGE

AP ACCESS PANEL

APD AIR PRESSURE DROP

ARI AIR CONDITIONING AND

REFRIGERATION INSTITUTE

AS AIR SEPARATOR

ASME AMERICAN SOCIETY OF MECHANICAL

ENGINEERS

AW AIR WASHER

AXF AXIAL FLOW

B

B BOILER

BD BUTTERFLY DAMPER

BDD BACKDRAFT DAMPER

BDR BASE BOARD RADIATOR

BFP BACKFLOW PREVENTER

BFT BOILER PLANT FIRE TUBE

BG BOTTOM GRILLE

BHP BRAKE HORSEPOWER

BHW HOT WATER HEATING BOILER

BHX BOILER BLOWDOWN HEAT EXCHANGER

BIW BACKWARD INCLINED WHEEL (FAN)

BMT BONE MARROW TRANSPLANT

BR BOTTOM REGISTER

BSC BIOLOGICAL SAFETY CABINETS

BT BLOWOFF TANK

BTC BLOWOFF TANK CONTROL VALVE

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNIT PER HOUR

BWT BOILER PLANT WATER TUBE

C

C CENTIGRADE (CELCIUS)

CC COOLING COIL

CCD COOLING COIL CONDENSATE

DRAIN

CD CEILING DIFFUSER

CD-1 CONSTRUCTION DOCUMENTS

(SUBMISSION1)

CD-2 CONSTRUCTION DOCUMENTS

(SUBMISSION2)

CENT CENTRIFICAL

CFH CUBIC FEET PER HOUR

CFM CUBIC FEET PER MINUTE

CFT CUBIC FEET

CFP CHEMICAL FEED PUMP

CG CEILING GRILLE

CH CHILLER

CHP CHILLED WATER PUMP

CHW CHILLER WATER

CHR CHILLED WATER RETURN

CHS CHILLED WATER SUPPLY

CI CAST IRON

CM CARBON MONOXIDE

CM CUBIC METER

CM/S CUBIC METER PER SECOND

CO CLEAN OUT

CO2 CARBON DIOXODE

COMP COMPRESSOR UNIT

COP COEFFICIENT OF PERFORMANCE

CP CONDENSATE PUMP

CR CEILING REGISTER

CS CONDENSATE STORAGE TANK

CSG CLEAN STEAM GENERATOR

CT COOLING TOWER

CU CONDENSING UNIT

CUH CABINET UNIT HEATER

CV CONSTANT VOLUME

CW COLD WATER (POTABLE)

CWCC CHILLED WATER COOLING COIL

CWP CONDENSER WATER PUMP

CWR CONDENSER WATER RETURN (TO

COOLING TOWER)

CWS CONDENSER WATER SUPPLY

(FROM COOLING TOWER)

D

D DAMPER - AUTOMATIC

D-1 OUTDOOR AIR DAMPER

D-2 RETURN AIR DAMPER

D-3 RELIEF AIR DAMPER

DB DECIBELS

Db DRY-BULB TEMPERATURE

DD-1 DESIGN DEVELOPMENT

(SUBMISSION1)

DD-2 DESIGN DEVELOPMENT

(SUBMISSION2)

DDC DIRECT DIGITAL CONTROLS

DEG DEGREE

DF DIFFUSER

DIA DIAMETER

DIW DEIONIZED WATER

DP DEW POINT TEMPERATURE

DP DIFFUSER PLATE

DPA DIFFERENTIAL PRESSURE ASSEMBLY

DPS DIFFERENTIAL PRESSURE SENSOR

DX DIRECT EXPANSION

DXCC DIRECT EXPANSION COOLING COIL

E

EA EXHAUST AIR

EAT ENTERING AIR TEMPERATURE

EC EVAPORATIVE COOLER

ECC ENGINEERING CONTROL CENTER

ECU EVAPORATIVE CONDENSER UNIT

EDH ELECTRIC DUCT HEATER

EER ENERGY EFFICIENCY RATIO

EF EXHAUST FAN

EG EXHAUST GRILLE

EGS EMERGENCY GAS SHUTOFF

EGT ENTERING GLYCOL TEMPERATURE

EH EXHAUST HOOD

EJ EXPANSION JOINT

EMD END OF MAIN DRIP (STEAM)

ENT ENTERING

ER EXHAUST REGISTER

ERC ELECTRIC REHEAT COIL

ERP ELECTRIC RADIANT PANEL

ESP EXTERNAL STATIC PRESSURE

ET EXPANSION TANK

ETO ETHYLENE OXIDE

EUH ELECTRIC UNIT HEATER

EWC EVAPORATIVE WATER COOLER

EWT ENTERING WATER TEMPERATURE

EX. EXISTING

F

F FAHRENHEIT

F&T FLOAT AND THERMOSTATIC

F/SDPR COMBINATION FIRE SMOKE

DAMPER

FA FREE AREA

FC FLEXIBLE CONNECTION

FCU FAN COIL UNIT (4 PIPE)

FCUC FAN COIL UNIT COOLING ONLY

FCUH FAN COIL UNIT HEATING ONLY

FCW FORWARD CURVED WHEEL (FAN)

G

GA GAUGE

GAL GALLONS

GH GRAVITY HOOD

GPD GALLONS PER DAY

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GPR GAS PRESSURE REGULATOR

GS GALVANIZED STEEL

H

H HUMIDIFER

H&CW HOT & COLD WATER

HAC HOUSEKEEPING AID CLOSET

HB HOSE BIBB

HC HEATING COIL

HD HEAD

HD HOOD

HOA HAND/OFF/AUTOMATIC

HP HEAT PUMP

HP HORSEPOWER

HPDT HIGH PRESSURE DRIP TRAP

HPR HIGH PRESSURE RETURN

(STEAM CONDENSATE)

HPS HIGH PRESSURE SUPPLY

(STEAM)

HRC HEAT RECOVERY COIL

HRD HEAT RECOVERY DEVICE

HRP HYDRONIC RADIANT (CEILING)

PANEL

HRW HEAT RECOVERY WHEEL

HSTAT HUMIDISTAT

HTM HUMIDIFIER TERMINAL

HUM HUMIDIFIER UNIT MOUNTED

HVU HEATING AND VENTILATING UNIT

HW HOT WATER

HWC HOT WATER COIL

HWHC HOT WATER HEATING COIL

HWP HEATING HOT WATER PUMP

HWR HEATING HOT WATER RETURN

HWS HEATING HOT WATER SUPPLY

HWUH HOT WATER UNIT HEATER

HVD HOISTWAY VENT DAMPER

HX HEAT EXCHANGER

HZ HERTZ

M

M METER, SI UNIT

M/s METERS PER SECOND

(OR METERS/SECOND)

MA MIXED AIR

MAT MIXED AIR TEMPERATURE

MAU MAKE-UP AIR UNIT

MAV MANUAL AIR VENT

MAX MAXIMUM

MB MIXING BOX

MBH 1000 BTUH

MCA MINIMUM BRANCH CIRCUIT AMPACITY

MER MECHANICAL EQUIPMENT ROOM

MERV MINIMUM EFFICIENCY REPORTING

VALUE

MH MANHOLE

MHP MOTOR HORSEPOWER

MIN MINIMUM

MM MILLIMETER

MOV MOTOR OPERATED VALVE

MPR MEDIUM PRESSURE RETURN

(STEAM CONDENSATE)

MPS MEDIUM PRESSURE STEAM

MRI MAGNETIC RESONANCE IMAGING

MTD MEAN TEMPERATURE DIFFERENCE

MVD MANUAL VOLUME DAMPER

MZ MULTI-ZONE

I

I/O INPUT/OUTPUT

IAQ INDOOR AIR QUALITY

IBT INVERTED BUCKET TRAP

ICF IN-LINE CENTRIFUGAL FAN

ICU INTENSIVE CARE UNIT

ID INSIDE DIAMETER

IFB INTEGRAL FACE AND BYPASS

IN INCHES

IN HG INCHES OF MERCURY

IN WC INCH WATER COLUMN

IN WG INCH WATER GAUGE

IN-LB INCH-POUND

IPLV INTERGRATED PART LOAD VALUE

IRH INTRARED HEATER

IS INSECT SCREEN

IU INDUCTION UNIT

IV INLET VANES

J

J INTENTIALLY LEFT BLANK

K kg KILOGRAM kg/HR KILOGRAM PER HOUR kPa KILOPASCAL kW KILOWATT kWh KILOWATT HOUR

L

L LITER

L/h LITERS PER HOUR (OR LITERS/HOUR) L/m LITERS PER MINUTE (OR LITERS/MINUTE) L/s LITERS PER SECOND (OR LITERS/SECOND)

LAT LEAVING AIR TEMPERATURE

LBS/HR POUNDS PER HOUR

LF LINEAR FOOT (FEET)

LGT LEAVING GLYCOL TEMPERATURE

LH LATENT HEAT

LPG LIQUID PROPANE GAS

LPR LOW PRESSURE RETURN (STEAM CONDENSATE)

LPRC LOW PRESSURE STEAM RETURN (CLEAN)

LLHX LIQUID TO LIQUID HEAT EXCHANGER

LPS LOW PRESSURE STEAM

LPSC LOW PRESSURE STEAM (CLEAN)

LSD LINEAR SLOT DIFFUSER

LTCP LOCAL TEMPERATURE CONTROL PANEL

LVG LEAVING

LVR LOUVER

LWT LEAVING WATER TEMPERATURE

N

NA NOT APPLICABLE

NC NOISE CRITERIA

NC NORMALLY CLOSED

NG NATURAL GAS

NGFM NATURAL GAS FLOWMETER

NO NORMALLY OPEN

NOAA NATIONAL OCEANIC & ATMOSPHERIC

ADMINISTRATION

O

OA OUTSIDE AIR

OAG OUTSIDE AIR GRILLE

OAI OUTSIDE AIR INTAKE

OD OUTSIDE DIAMETER

OFM OIL FLOWMETER

OR OPERATING ROOM

P

P PUMP

PA PASCAL

PC PUMPED CONDENSATE

PCF POUNDS PER CUBIC FOOT (FEET)

PD PRESSURE DROP

PEF PROPELLER (TYPE) EXHAUST FAN

PF PRE-FILTER

PG PRESSURE GAGE

PGW PROPYLENE GLYCOL-WATER (SOLUTION)

PHC PREHEAT COIL

PPM PARTS PER MILLION

PRS PRESSURE REGULATING (VALVE) STATION

PRV PRESSURE REGULATING VALVE

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH – ABSOLUTE

PSIG POUNDS PER SQUARE INCH – GAGE

PSS PRIMARY SECONDARY SYSTEM

PSV PRESSURE SAFETY VALVE

PTAC PACKAGED TERMINAL AIR CONDITIONER

R

R/E RETURN OR EXHAUST

RA RETURN AIR

RAD REFRIGERANT AIR DRYER

RAF RADIO FREQUENCY

RAHX ROTARY AIR HEAT EXCHANGER

RAT RETURN AIR TEMPERATURE

RCCH REMOTE CONDENSER CHILLER

RCU RECIPROCATING CHILLER UNIT

RD REFRIGERANT DISCHARGE

RDS ROOM DATA SHEETS

REA RELIEF AIR

RF RETURN FAN

RG RETURN GRILLE

RH RELATIVE HUMIDITY

RHC REHEAT COIL

RHG REFRIGERANT HOT GAS

RL REFRIGERANT LIQUID LINE

RLA RUN LOAD AMPERE

RO REVERSE OSMOSIS

RPM REVOLUTIONS PER MINUTE

RR RETURN REGISTER

RS REFRIGERANT SUCTION

RTU ROOF TOP UNIT

RV RELIEF VALVE

S

SA SUPPLY AIR

SAD SOUND ATTENUATING DEVICE

SAT SUPPLY AIR TEMPERATURE

SC SHADING COEFFICIENT

SCFM STANDARD CUBIC FEET PER MINUTE

SCI SPINAL CODE INJURY

SCR SILICON CONTROLLED RECTIFIER

SD SMOKE DETECTOR

SD SUPPLY AIR DIFFUSER

SD-1 SCHEMATIC DESIGN (SUBMISSION1)

SD-2 SCHEMATIC DESIGN (SUBMISSION2)

SDPR SMOKE DAMPER

SDR SMOKE DAMPER (RETURN)

SDS SMOKE DAMPER (SUPPLY)

SEN SENSIBLE HEAT

SF SUPPLY FAN

SG SUPPLY AIR GRILLE

SH STEAM HUMIDIFIER

SHC STEAM HEATING COIL

SI SQUARE INCHES

SP STATIC PRESSURE

SP GR SPECIFIC GRAVITY

SPD SUPPLY PROCESS AND DISTRIBUTION

SPRV STEAM PRESSURE REDUCING VALVE

SPS STATIC PRESSURE SENSOR

SQ FT SQUARE FOOT (FEET)

SR SUPPLY AIR REGISTER

SS STAINLESS STEEL

SSHX STEAM TO STEAM HEAT EXCHANGER

SSR SOLID SEPARATOR

ST STEAM TRAP

SUH STEAM UNIT HEATER

SV STEAM PRESSURE REDUCING VALVE

SVS STEAM VENT SILENCER

SWHX STEAM TO WATER HEAT EXCHANGER

T

T & PCV TEMPERATURE AND PRESSURE

CONTROL VALVE

TAB TESTING, ADJUSTING, BALANCE

TD TEMPERATURE DIFFERENCE

TDH TOTAL DYNAMIC HEAD

TDS TOTAL DISSOLVED SOLIDS

TG TRANSFER GRILLE

TP TRAP

TR TOP REGISTER

TSP TOTAL STATIC PRESSURE

TSTAT THERMOSTAT

TU TERMINAL UNIT

TWU THRU-WALL UNIT

NOM NOMINAL

NPLV NON-STANDARD PART LOAD VALUE

NPSH NET POSITIVE SUCTION HEAD

NTS NOT TO SCALEFHX FLUE GAS/FEEDWATER HEAT

EXCHANGER

FM FLOW METER

FOP FUEL OIL PUMP

FOT FUEL OIL TANK

FOHX FUEL OIL HEAT EXCHANGER

FPM FEET PER MINUTE

FPS FEET PER SECOND

FPTU FAN POWERED TERMINAL UNIT

FR FLOOR REGISTER

FRP FIBER REINFORCED POLYESTER

FS FLOW SWITCH

FSTAT FREEZESTAT

FT FEET

FT-LB FOOT-POUND

FTR FIN TUBE RADIATION

FV FACE VELOCITY

FD FLOOR DRAIN

FD FIRE DAMPER

FF FINAL FILTER

DRAIN (D)

CONDENSATE DRAIN (CD)

26-TU-I-I ITEM NUMBER (TERMINAL UNIT NO. 1)

ITEM (TERMINAL UNIT SHOWN)

SERVED BY AIR HANDLER UNIT NO. 1

BUILDING NO. WHERE EQUIP. IS LOCATED

10x8AUTOMATIC BALANCING CONTROL VALVE

WYE STRAINER (WITH BALL VALVE

WATER BALANCE DEVICE

MODULATING CONTROL BUTTERFLY VALVE

CIRCUIT SETTER VALVE

GATE VALVE WITH GLOBE-VALVED BYPASS

PLUG VALVE

CONTROL VALVE (CV) - FLOAT-OPERATED

QUICK-COUPLE HOSE CONNECTOR

WYE STRAINER WITH VALVED DRAIN ANDWATER LEVEL CONTROLLER

FLOW METER

& HOSE CONNECTION)

EXISTING DUCTWORK OR EQUIPMENT TO BE REMOVED

EXISTING DUCTWORK OR EQUIPMENT TO REMAIN

BRANCH DUCT WITH 45° RECTANGLE-ROUND BRANCH

BRANCH DUCT WITH BELL-MOUTH FITTING & MANUAL

RETURN, EXHAUST, OR OUTSIDE AIR DUCT DOWN

FITTING AND MANUAL VOLUME DAMPER

SUPPLY AIR DUCT UP

RETURN, EXHAUST, OR OUTSIDE AIR DUCT UP

LINEAR SLOT DIFFUSER

ELBOW WITH TURNING VANES

INSULATED FLEXIBLE DUCT (MAX. 5'-0" LONG)

VOLUME CONTROL DAMPER

NECK SIZE, TYPE, CFM OF SUPPLY DIFFUSER/ REGISTER

MOTORIZED DAMPER

VOLUME DAMPER

THERMOSTAT

FIRE DAMPER

FIRE SMOKE DAMPER

SMOKE DAMPER

24x24 CEG-1 800 CFM

SIZE, TYPE, CFM OF EXHAUST GRILLE

MANUAL VOLUME DAMPER

SQUARE TO ROUND TRANSITION

RISER DESIGNATION

HUMIDISTAT

EQUIPMENT WITH FLEXIBLE DUCT CONNECTION

10" CSD-1 300 CFM

BACKDRAFT DAMPER

SUPPLY AIR DUCT DOWN

DUCT MOUNTED SMOKE DETECTOR

(SD=SUPPLY/RD=RETURN)

NEW DUCT (INSIDE DIMENSIONS: WIDTH x DEPTH)

LOUVER

DUCT WITH SOUND LINING

DAMPERS: (BD, FD, FSD, MD, SD, VD)

TRAP PRIMER WITH DISTRIBUTION UNIT

TRAP PRIMER

P-TRAP

GAS COCK

HEATING HOT WATER RETURN (HWR)

HEATING HOT WATER SUPPLY (HWS)

REFRIGERANT DISCHARGE BYPASS (RDB)

REFRIGERANT SUCTION (RS)

CHILLED WATER RETURN (CHWR)

CONDENSER WATER SUPPLY (CWS)

CONDENSER WATER RETURN (CWR)

REFRIGERANT DISCHARGE (HOT GAS) (RD)

HEAT PUMP WATER RETURN (HPWR)

HEAT PUMP WATER SUPPLY (HPWS)

REFRIGERANT LIQUID (RL)

CHILLED WATER SUPPLY (CHWS)

HIGH PRESSURE STEAM CONDENSATE (HPC)

HIGH PRESSURE STEAM SUPPLY (HPS)

MEDIUM PRESSURE STEAM CONDENSATE (MPC)

MEDIUM PRESSURE STEAM SUPPLY (MPS)

LOW PRESSURE STEAM CONDENSATE (LPC)

LOW PRESSURE STEAM SUPPLY (LPS)

CONDENSATE PUMP DISCHARGE (PD)

EXPANSION JOINT

F & T TRAP

TRIPLE DUTY VALVE WITH PRESSURE PORTS

BALANCING VALVE WITH PRESSURE PORTS

SOLENOID VALVE

STRAINER WITH BLOWOFF

REFRIGERANT VENT (RV)

EJ

PRESSURE AND TEMPERATURE TEST PLUG

VACUUM RELIEF VALVE

PRESSURE / VACUUM SWITCH

LIMIT OF DEMOLITION

CONNECT NEW DUCT TO EXISTING DUCT

D

INCLINED RISE, IN DIRECTION OF AIR FLOW

INCLINED DROP, IN DIRECTION OF AIR FLOW

R

BACK DRAFT DAMPER

BDD

SOLAR WATER RETURN

SOLAR WATER SUPPLY

GLYCOL-WATER HEATING RETURN

GLYCOL-WATER HEATING SUPPLY

MAKE-UP WATER

CHILLED GLYCOL-WATER RETURN

CHILLED GLYCOL-WATER SUPPLY

GHS

GHR

SWS

SWR

GCR

GCS

MW

GLYCOL-WATER RUN AROUND SUPPLY

GLYCOL-WATER RUN AROUND RETURNGRR

GRS

VACUUM CONDENSATE RETURN

FEEDWATER PUMP DISCHARGE

FEEDWATER PUMP SUCTION

VR

FWPS

FWPD

FEEDWATER SAMPLE (DEAERATOR)

BOILER WATER SAMPLE

CONTINUOUS BLOWDOWN

CF

FWS

BWS

CBD

BO

CHEMICAL FEED

BOILER BLOWOFF

TUBE CLEANER WATER SUPPLYTC

OFL OVERFLOW

REFRIGERANT SIGHT GLASS

QUICK-COUPLE HOSE CONNECTOR

TEMPERATURE SENSOR

HUMIDITY SENSOR

DUCT W/DAMPERS

DIFFUSERS,GRILLES, FLEX CONNECTIONS

FITTINGS & TRANSITIONS

SOFTENED WATERSW

BRINE & SOFT WATER

REFRIGERANT

PLANT PIPING

STEAM

EXISTING TO REMAIN

ABBREVIATIONS

U

UC UNDER CUT

UC UNIT COOLER

UH UNIT HEATER

UL UNDERWRITERS LABORATORY

URV UPBLAST UNIT VENTILATOR

V

V VALVE

VAF VANE-AXIAL FAN

VAV VARIABLE AIR VOLUME

VD VOLUME DAMPER (MANUAL OPPOSED BLADE)

VFD VARIABLE FREQUENCY DRIVE

VHA VETERANS HEALTH ADMINISTRATION

VI VIBRATION ISOLATOR

VIV VARIABLE INLET VANES

VP VACUUM PUMP

VPS VARIABLE PRIMARY SYSTEM

VR VACUUM (STEAM CONDENSATE) RETURN

VSD VARIABLE SPEED DRIVE

VUH VERTICAL UNIT HEATER

W

W WATTS

WAG WASTE ANETHESIA GAS

Wb WET-BULB (TEMPERATURE)

WC WATER COOLED

WCCH WATER COOLED CHILLER

WCCU WATER COOLED CONDENSING UNIT

WCHP WATER COOLED HEAT PUMPS

WCPU WATER COOLED PACKAGED UNIT

WEF WALL EXHAUST FAN

WF WATER FILTER

WFCV WATER FLOW CONTROL VALVE

WFM WATER FLOWMETER

WFMD WATER FLOW MEASURING DEVICE

WG WATER GAGE

WPD WATER SIDE PRESSURE DROP

Y

YR YEAR

Drawing Number

Project Number

Date

Project Title

Building NumberLocation

Checked DrawnAPPROVED: CHIEF ENGINEER

Drawing Title

VA FORM

Office of Construction and Facilities Management

Dwg

CIVIL / STRUCTURAL ENGINEER M.E.P. / T. ENGINEER

APPROVED: DIRECTOR

APPROVED: ASSOCIATE DIRECTOR

APPROVED: ASSISTANT DIRECTOR APPROVED: CHIEF ENGINEER

REVISIONS DATE

CONSULTANTS ARCHITECT

o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th s i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

1 2 3 4 5 6 7 8 9

A

1 2 3 4 5 6 7 8 9

B

C

D

E

F

A

B

C

D

E

F

H2B

1225 NORTH LOOP WEST, SUITE 900

HOUSTON, TX 77008

SPUR DESIGN

11020 KING STREET, SUITE 350

OVERLAND PARK, KS 66210

AZ ARCH REG. NO. 20013-0, EXP. 10/10/2019

AZ ENGR REG. NO. 20015-0, EXP. 10/10/2019 -OF- 148

RADIOLOGY EXPANSIONMECHANICAL LEGEND

649-413

11/01/18 JES JAD

107-M-000

100% BACKCHECK SUBMITTAL

DEPARTMENT OF VETERAN AFFAIRS

NORTHERN ARIZONA VA HEALTH CARE SYSTEM

500 HWY 89N

PRESCOTT AZ, 86313

86EXPIRES 12/31/2019EXPIRES 12/31/2019

20"x18" 1

11 22

BB

AA

"x

"ø

HATCHED AREA REPRESENTS

THE EXISTING BUILDING 107

EXTERIOR WALL

Drawing Number

Project Number

Date

Project Title

Building NumberLocation

Checked DrawnAPPROVED: CHIEF ENGINEER

Drawing Title

VA FORM

Office of Construction and Facilities Management

Dwg

CIVIL / STRUCTURAL ENGINEER M.E.P. / T. ENGINEER

APPROVED: DIRECTOR

APPROVED: ASSOCIATE DIRECTOR

APPROVED: ASSISTANT DIRECTOR APPROVED: CHIEF ENGINEER

REVISIONS DATE

CONSULTANTS ARCHITECT

o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th s i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

1 2 3 4 5 6 7 8 9

A

1 2 3 4 5 6 7 8 9

B

C

D

E

F

A

B

C

D

E

F

H2B

1225 NORTH LOOP WEST, SUITE 900

HOUSTON, TX 77008

SPUR DESIGN

11020 KING STREET, SUITE 350

OVERLAND PARK, KS 66210

AZ ARCH REG. NO. 20013-0, EXP. 10/10/2019

AZ ENGR REG. NO. 20015-0, EXP. 10/10/2019 -OF- 148

RADIOLOGY EXPANSIONMECHANICAL HVAC DEMOLITION

BASEMENT FLOOR PLAN

649-413

11/01/18 JES JAD

107-MHD100

100% BACKCHECK SUBMITTAL

DEPARTMENT OF VETERAN AFFAIRS

NORTHERN ARIZONA VA HEALTH CARE SYSTEM

500 HWY 89N

PRESCOTT AZ, 86313

1/8" = 1'-0"

MECHANICAL HVAC DEMOLITION

BASEMENT FLOOR PLAN

N

MECHANICAL DEMO PLAN NOTES:

1. REMOVE DENTAL AIR HANDLING UNIT AND ASSOCIATED PIPING & DUCTWORK. SEE SHEET

107-MPD100 FOR RELATED WORK.

2. DENTAL AHU OUTSIDE AIR INTAKE TO BE REMOVED. OUTSIDE AIR INTAKE DUCT

PENETRATION THROUGH EXISTING BUILDING 107 CRAWL SPACE TO BE REUSED. SEE SHEET

107-MP-100 FOR RELATED WORK.

GENERAL NOTES:

1. THE AREA OF WORK SHOWN IS ASSOCIATED WITH AN OPERATING FACILITY THAT MUST REMAIN

IN SERVICE 24 HOURS A DAY, 7 DAYS A WEEK.

2. COORDINATE WORK SCHEDULE WITH THE CONTRACTING OFFICER'S REPRESENTATIVE.

3. COORDINATE MECHANICAL WORK WITH ALL OTHER TRADES. VERIFY ALL EXISTING CONDITIONS

BEFORE THE START OF WORK.

4. SEE SHEET GI001 FOR ADDITIONAL INFORMATION REGARDING SCHEDULE AND PHASING

REQUIREMENTS. SHEDULE WORK IN THE EXISTING BUILDING TO MINIMIZE DISRUPTION OF

SERVICES.

5. ALL SUPPLY AND RETURN BRANCH PIPING TO INDIVIDUAL VARIABLE AIR VOLUME TERMINAL

UNITS TO BE 3/4" UNLESS NOTED OTHERWISE

EXPIRES 12/31/2019EXPIRES 12/31/2019

"x

32"x18" 32"x18"

64"x18"

8"ø

16"x16"

"x

24"x14"

24"x14"

"x

"x

14"x18" 30"x16"

24"x10"

42"x18"

"x

10"x4"

"x

24"x12"

"x

"x

14"x12"

"x

10"x6"

16"x16"

16"x16"1

"x

"x "1

"x

24"x6"

18"x6"

"x

"x

12"x4"

12"x4"

12"x4"

11 22

BB

AA

2 2 2 2

666 6 6

BID DEDUCT ALT. #2

SEE BID DEDUCT NOTES

ON SHEET 107-GI-102 AND

AND SHEET 107-MH-401B

FOR MORE INFORMATION.

BID DEDUCT ALT. #1

SEE BID DEDUCT NOTES

ON SHEET 107-GI-102 AND

AND SHEET 107-MH-401C

FOR MORE INFORMATION.

BID DEDUCT ALT. #1

SEE BID DEDUCT NOTES

ON SHEET 107-GI-102 AND

AND SHEET 107-MH-401C

FOR MORE INFORMATION.

HATCHED AREA REPRESENTS

THE EXISTING BUILDING 107

EXTERIOR WALL

Drawing Number

Project Number

Date

Project Title

Building NumberLocation

Checked DrawnAPPROVED: CHIEF ENGINEER

Drawing Title

VA FORM

Office of Construction and Facilities Management

Dwg

CIVIL / STRUCTURAL ENGINEER M.E.P. / T. ENGINEER

APPROVED: DIRECTOR

APPROVED: ASSOCIATE DIRECTOR

APPROVED: ASSISTANT DIRECTOR APPROVED: CHIEF ENGINEER

REVISIONS DATE

CONSULTANTS ARCHITECT

o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th s i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

1 2 3 4 5 6 7 8 9

A

1 2 3 4 5 6 7 8 9

B

C

D

E

F

A

B

C

D

E

F

H2B

1225 NORTH LOOP WEST, SUITE 900

HOUSTON, TX 77008

SPUR DESIGN

11020 KING STREET, SUITE 350

OVERLAND PARK, KS 66210

AZ ARCH REG. NO. 20013-0, EXP. 10/10/2019

AZ ENGR REG. NO. 20015-0, EXP. 10/10/2019 -OF- 148

RADIOLOGY EXPANSIONMECHANICAL HVAC DEMOLITION

LEVEL 1 FLOOR PLAN

649-413

11/01/18 JES JAD

107-MHD101

100% BACKCHECK SUBMITTAL

DEPARTMENT OF VETERAN AFFAIRS

NORTHERN ARIZONA VA HEALTH CARE SYSTEM

500 HWY 89N

PRESCOTT AZ, 86313

1/8" = 1'-0"

MECHANICAL HVAC DEMO LEVEL 1

FLOOR PLAN

N

MECHANICAL DEMO PLAN NOTES:

1. OUTSIDE AIR INTAKE AND ASSOCIATED DENTAL AIR HANDLING UNIT IN EXISTING BUILDING 107

CRAWL SPACE TO BE REMOVED. SEE SHEET 107-MHD100 FOR RELATED WORK.

2. REMOVE EXHAUST DUCT TO DEMARCATION POINTS SHOWN. SEE SHEET 107-MH-101 AND 107-

MP-101 FOR RELATED WORK.

3. REMOVE VERTICAL FAN COIL UNIT AND PROVIDE SHEET METAL BLANK AND SEAL OVER

ASSOCIATED OUTSIDE AIR INTAKE. OUTSIDE AIR INTAKE HOOD ON EXTERIOR WALL IS EXISTING TO

REMAIN.

4. EXISTING FIRE DEPARTMENT CONNECTION. SEE SHEETS 107-FXD101 AND 107-FX-101 FOR

RELATED INFORMATION.

5. REMOVE EXISTING DUCTWORK TO DEMARCATION POINT SHOWN. CAP EXISTING DUCT WORK

BELOW ROOF DECK. EXISTING ROOF HOOD IS EXISTING TO REMAIN (ETR).

6. REMOVE EXISTING FAN COIL UNIT AND ASSOCIATED PIPING, DUCTWORK AND ACCESSORIES AS

SHOWN. SEE SHEET 107-MPD101 FOR RELATED WORK.

GENERAL NOTES:

1. THE AREA OF WORK SHOWN IS ASSOCIATED WITH AN OPERATING FACILITY THAT MUST REMAIN

IN SERVICE 24 HOURS A DAY, 7 DAYS A WEEK.

2. COORDINATE WORK SCHEDULE WITH THE CONTRACTING OFFICER'S REPRESENTATIVE.

3. COORDINATE MECHANICAL WORK WITH ALL OTHER TRADES. VERIFY ALL EXISTING CONDITIONS

BEFORE THE START OF WORK.

4. SEE SHEET GI001 FOR ADDITIONAL INFORMATION REGARDING SCHEDULE AND PHASING

REQUIREMENTS. SHEDULE WORK IN THE EXISTING BUILDING TO MINIMIZE DISRUPTION OF

SERVICES.

5. ALL VAV TERMINAL UNIT DUCT CONNECTIONS SHALL MATCH THE ASSOCIATED UNIT

CONNECTION SIZES UNLESS NOTED OTHERWISE. ALL VAV TERMINAL UNIT REHEAT COIL

BRANCH PIPING SHALL BE 3/4" DIAMETER UNLESS NOTED OTHERWISE.

2 1/2"

2 1/2"

2" 2"

C H

W S

C H

W R

4" CHWR

4" CHWS

11 22

BB

AA

SR

SR SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR SR

SR

SR

SR

SR

HATCHED AREA REPRESENTS

THE EXISTING BUILDING 107

EXTERIOR WALL

Drawing Number

Project Number

Date

Project Title

Building NumberLocation

Checked DrawnAPPROVED: CHIEF ENGINEER

Drawing Title

VA FORM

Office of Construction and Facilities Management

Dwg

CIVIL / STRUCTURAL ENGINEER M.E.P. / T. ENGINEER

APPROVED: DIRECTOR

APPROVED: ASSOCIATE DIRECTOR

APPROVED: ASSISTANT DIRECTOR APPROVED: CHIEF ENGINEER

REVISIONS DATE

CONSULTANTS ARCHITECT

o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th s i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

1 2 3 4 5 6 7 8 9

A

1 2 3 4 5 6 7 8 9

B

C

D

E

F

A

B

C

D

E

F

H2B

1225 NORTH LOOP WEST, SUITE 900

HOUSTON, TX 77008

SPUR DESIGN

11020 KING STREET, SUITE 350

OVERLAND PARK, KS 66210

AZ ARCH REG. NO. 20013-0, EXP. 10/10/2019

AZ ENGR REG. NO. 20015-0, EXP. 10/10/2019 -OF- 148

RADIOLOGY EXPANSIONMECHANICAL PIPING DEMOLITION

BASEMENT FLOOR PLAN

649-413

11/01/18 JES JAD

107-MPD100

100% BACKCHECK SUBMITTAL

DEPARTMENT OF VETERAN AFFAIRS

NORTHERN ARIZONA VA HEALTH CARE SYSTEM

500 HWY 89N

PRESCOTT AZ, 86313

1/8" = 1'-0"

MECHANICAL PIPING DEMO BASEMENT

FLOOR PLAN

N

MECHANICAL DEMO PLAN NOTES:

1. REMOVE CHILLED WATER SUPPLY AND RETURN PIPING TO LOCATION INDICATED. PROVIDE

TEMPORARY CAP FOR FUTURE RECONNECT.

2. REMOVE DENTAL AIR HANDLING UNIT AND ASSOCIATED PIPING AND DUCTWORK. SEE SHEET 107-

MP-100 FOR RELATED WORK.

3. REMOVE MEDIUM PRESSURE STEAM PIPING SERVING DENTAL AHU TO SHUTOFF VALVE IN LOCATION

SHOWN. SEE SHEET 107-MP-100 FOR ADDITIONAL SCOPE.

4. DENTAL AIR HANDLING UNIT OUTSIDE AIR INTAKE DUCT PENETRATION THROUGH EXISTING

BUILDING 107 CRAWL SPACE TO BE REUSED. SEE SHEET 107-MP-100 FOR ADDITIONAL INFORMATION.

5. REMOVE STEAM RISER BACK TO DEMARCATION POINT SHOWN. EXISTING BRANCH FITTING ON MAIN

TO BE REUSED. SEE SHEET 107-MPD101 AND 107-MP-100 FOR RELATED WORK.

GENERAL NOTES:

1. THE AREA OF WORK SHOWN IS ASSOCIATED WITH AN OPERATING FACILITY THAT MUST REMAIN

IN SERVICE 24 HOURS A DAY, 7 DAYS A WEEK.

2. COORDINATE WORK SCHEDULE WITH THE CONTRACTING OFFICER'S REPRESENTATIVE.

3. COORDINATE MECHANICAL WORK WITH ALL OTHER TRADES. VERIFY ALL EXISTING CONDITIONS

BEFORE THE START OF WORK.

4. SEE SHEET GI001 FOR ADDITIONAL INFORMATION REGARDING SCHEDULE AND PHASING

REQUIREMENTS. SHEDULE WORK IN THE EXISTING BUILDING TO MINIMIZE DISRUPTION OF

SERVICES.

5. ALL SUPPLY AND RETURN BRANCH PIPING TO INDIVIDUAL VARIABLE AIR VOLUME TERMINAL

UNITS TO BE 3/4" UNLESS NOTED OTHERWISE

BID DEDUCT ALTERNATE PLAN NOTES:

1. BID DEDUCT ALT. #4: CHILLED WATER AND STEAM PIPING SERVING FAN COIL UNITS ON THE FIRST

FLOOR TO REMAIN. DISCONNECT AND RECONNECT CHILLED WATER PIPING TO NEW CHILLED

WATER MAIN AS REQUIRED. PROVIDE NEW VALVES NEAR POINT OF RECONNECTION. SEE SHEET

107-MPD101 FOR MORE BID DEDUCT INFORMATION.

1 1/4"

1 1/4"

11 22

BB

AA

SR

SR

SR

SR SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR SR

SR

SR

SR

SR

BID DEDUCT ALT. #2

SEE BID DEDUCT NOTES

ON SHEET 107-GI-102 AND

AND SHEET 107-MH-401B

FOR MORE INFORMATION.

BID DEDUCT ALT. #1

SEE BID DEDUCT NOTES

ON SHEET 107-GI-102 AND

AND SHEET 107-MH-401C

FOR MORE INFORMATION.

BID DEDUCT ALT. #1

SEE BID DEDUCT NOTES

ON SHEET 107-GI-102 AND

AND SHEET 107-MH-401C

FOR MORE INFORMATION.

HATCHED AREA REPRESENTS

THE EXISTING BUILDING 107

EXTERIOR WALL

Drawing Number

Project Number

Date

Project Title

Building NumberLocation

Checked DrawnAPPROVED: CHIEF ENGINEER

Drawing Title

VA FORM

Office of Construction and Facilities Management

Dwg

CIVIL / STRUCTURAL ENGINEER M.E.P. / T. ENGINEER

APPROVED: DIRECTOR

APPROVED: ASSOCIATE DIRECTOR

APPROVED: ASSISTANT DIRECTOR APPROVED: CHIEF ENGINEER

REVISIONS DATE

CONSULTANTS ARCHITECT

o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th s i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

1 2 3 4 5 6 7 8 9

A

1 2 3 4 5 6 7 8 9

B

C

D

E

F

A

B

C

D

E

F

H2B

1225 NORTH LOOP WEST, SUITE 900

HOUSTON, TX 77008

SPUR DESIGN

11020 KING STREET, SUITE 350

OVERLAND PARK, KS 66210

AZ ARCH REG. NO. 20013-0, EXP. 10/10/2019

AZ ENGR REG. NO. 20015-0, EXP. 10/10/2019 -OF- 148

RADIOLOGY EXPANSIONMECHANICAL PIPING DEMOLITION

LEVEL 1 FLOOR PLAN

649-413

11/01/18 JES JAD

107-MPD101

100% BACKCHECK SUBMITTAL

DEPARTMENT OF VETERAN AFFAIRS

NORTHERN ARIZONA VA HEALTH CARE SYSTEM

500 HWY 89N

PRESCOTT AZ, 86313

1/8" = 1'-0"

MECHANICAL PIPING DEMO BASEMENT

FLOOR PLAN

N

MECHANICAL DEMO PLAN NOTES:

1. REMOVE CHILLED WATER SUPPLY AND RETURN PIPING AND ASSOCIATED FAN COIL UNIT. SEE

SHEET 107-MPD-100 FOR RELATED SCOPE.

2. CHILLED WATER SUPPLY AND RETURN PIPING UP TO ROOF TOP AIR HANDLING UNIT. REMOVE

PIPING BACK TO DEMARCATION POINT IN BASEMENT. SEE 107-MPD-100 FOR RELATED

INFORMATION.

3. EXISTING FIRE DEPARTMENT CONNECTION

4. REMOVE STEAM AND CONDENSATE RISER ON 1ST FLOOR IN LOCATION SHOWN. STEAM AND

CONDENSATE RISERS ABOVE 1ST FLOOR CEILING ARE EXISTING TO BE REUSED. SEE SHEET 107-

MP-101 FOR RELATED WORK.

GENERAL NOTES:

1. THE AREA OF WORK SHOWN IS ASSOCIATED WITH AN OPERATING FACILITY THAT MUST REMAIN

IN SERVICE 24 HOURS A DAY, 7 DAYS A WEEK.

2. COORDINATE WORK SCHEDULE WITH THE CONTRACTING OFFICER'S REPRESENTATIVE.

3. COORDINATE MECHANICAL WORK WITH ALL OTHER TRADES. VERIFY ALL EXISTING CONDITIONS

BEFORE THE START OF WORK.

4. SEE SHEET GI001 FOR ADDITIONAL INFORMATION REGARDING SCHEDULE AND PHASING

REQUIREMENTS. SHEDULE WORK IN THE EXISTING BUILDING TO MINIMIZE DISRUPTION OF

SERVICES.

5. ALL SUPPLY AND RETURN BRANCH PIPING TO INDIVIDUAL VARIABLE AIR VOLUME TERMINAL

UNITS TO BE 3/4" UNLESS NOTED OTHERWISE

BB

AA

HATCHED AREA REPRESENTS

THE EXISTING BUILDING 107

EXTERIOR WALL

Drawing Number

Project Number

Date

Project Title

Building NumberLocation

Checked DrawnAPPROVED: CHIEF ENGINEER

Drawing Title

VA FORM

Office of Construction and Facilities Management

Dwg

CIVIL / STRUCTURAL ENGINEER M.E.P. / T. ENGINEER

APPROVED: DIRECTOR

APPROVED: ASSOCIATE DIRECTOR

APPROVED: ASSISTANT DIRECTOR APPROVED: CHIEF ENGINEER

REVISIONS DATE

CONSULTANTS ARCHITECT

o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th s i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

1 2 3 4 5 6 7 8 9

A

1 2 3 4 5 6 7 8 9

B

C

D

E

F

A

B

C

D

E

F

H2B

1225 NORTH LOOP WEST, SUITE 900

HOUSTON, TX 77008

SPUR DESIGN

11020 KING STREET, SUITE 350

OVERLAND PARK, KS 66210

AZ ARCH REG. NO. 20013-0, EXP. 10/10/2019

AZ ENGR REG. NO. 20015-0, EXP. 10/10/2019 -OF- 148

RADIOLOGY EXPANSIONMECHANICAL HVAC AND PIPING

DEMO ROOF PLAN

649-413

11/01/18 JES JAD

107-MD-102

100% BACKCHECK SUBMITTAL

DEPARTMENT OF VETERAN AFFAIRS

NORTHERN ARIZONA VA HEALTH CARE SYSTEM

500 HWY 89N

PRESCOTT AZ, 86313

1/8" = 1'-0"

MECHANICAL DEMO ROOF PLAN

GENERAL NOTES:

1. THE AREA OF WORK SHOWN IS ASSOCIATED WITH AN OPERATING FACILITY THAT MUST REMAIN

IN SERVICE 24 HOURS A DAY, 7 DAYS A WEEK.

2. COORDINATE WORK SCHEDULE WITH THE CONTRACTING OFFICER'S REPRESENTATIVE.

3. COORDINATE MECHANICAL WORK WITH ALL OTHER TRADES. VERIFY ALL EXISTING CONDITIONS

BEFORE THE START OF WORK.

4. SEE SHEET GI001 FOR ADDITIONAL INFORMATION REGARDING SCHEDULE AND PHASING

REQUIREMENTS. SHEDULE WORK IN THE EXISTING BUILDING TO MINIMIZE DISRUPTION OF

SERVICES.

5. ALL SUPPLY AND RETURN BRANCH PIPING TO INDIVIDUAL VARIABLE AIR VOLUME TERMINAL

UNITS TO BE 3/4" UNLESS NOTED OTHERWISE

MECHANICAL DEMO PLAN NOTES

1. REMOVE EXISTING AIR HANDLING UNIT AND ASSOCIATED PIPING, DUCTWORK, AND CONTROLS

AS SHOWN.

N

F

B

C

D

1 3 42 5

B.1

E

6 9

2.1

F.1

E.1

A.5

A.1

D.2

D.1

A

1.1 7

C.2

B.2

4.5 8

G

8.1

54"x20" R A

58"x26" EA

"x

R

A

"x

S

A

B.9

HX

HX

SD

SD

28"X10" EA UP TO

EF-1 ON ROOF

28"x10" EA 2

107-MH-400

22"x10" OA

AHU

12"x6" OA

12"x6" OA

AHU

AHU

64"x26" OA

18"x16" EA

22"x10" OA

14"x12" SA

HU

HU

HX

CT

BID DEDUCT ALT. #3

SEE BID DEDUCT NOTES

ON SHEET 107-GI-102 AND

SHEET 107-MH-400A FOR

MORE INFORMATION.

ET

14"x12" RA

AHU-1_TCP-1

AHU-3_TCP-3

AHU-2_TCP-2

107-M-301

107-M-301

107-M-301

107-M-301

107-M-301

107-M-301

107-M-301

HU

107-M-301

FCU

FCU

54"x24" SA

54"x28" SA

54"x24" SA

12"x6" OA

"x

O A

18"x12" OA

"x

R

A

28"x12" RA

"x

R

A

FD

CP

2.1

CP

2.2

Drawing Number

Project Number

Date

Project Title

Building NumberLocation

Checked DrawnAPPROVED: CHIEF ENGINEER

Drawing Title

VA FORM

Office of Construction and Facilities Management

Dwg

CIVIL / STRUCTURAL ENGINEER M.E.P. / T. ENGINEER

APPROVED: DIRECTOR

APPROVED: ASSOCIATE DIRECTOR

APPROVED: ASSISTANT DIRECTOR APPROVED: CHIEF ENGINEER

REVISIONS DATE

CONSULTANTS ARCHITECT

o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th s i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

1 2 3 4 5 6 7 8 9

A

1 2 3 4 5 6 7 8 9

B

C

D

E

F

A

B

C

D

E

F

H2B

1225 NORTH LOOP WEST, SUITE 900

HOUSTON, TX 77008

SPUR DESIGN

11020 KING STREET, SUITE 350

OVERLAND PARK, KS 66210

AZ ARCH REG. NO. 20013-0, EXP. 10/10/2019

AZ ENGR REG. NO. 20015-0, EXP. 10/10/2019 -OF- 148

RADIOLOGY EXPANSIONMECHANICAL HVAC BASEMENT

FLOOR PLAN

649-413

11/01/18 JES JAD

107-MH-100

100% BACKCHECK SUBMITTAL

DEPARTMENT OF VETERAN AFFAIRS

NORTHERN ARIZONA VA HEALTH CARE SYSTEM

500 HWY 89N

PRESCOTT AZ, 86313

1/8" = 1'-0"

MECHANICAL HVAC BASEMENT FLOOR

PLAN

GENERAL NOTES:

1. THE AREA OF WORK SHOWN IS ASSOCIATED WITH AN OPERATING FACILITY THAT MUST REMAIN

IN SERVICE 24 HOURS A DAY, 7 DAYS A WEEK.

2. COORDINATE WORK SCHEDULE WITH THE CONTRACTING OFFICER'S REPRESENTATIVE.

3. COORDINATE MECHANICAL WORK WITH ALL OTHER TRADES. VERIFY ALL EXISTING CONDITIONS

BEFORE THE START OF WORK.

4. SEE SHEET GI001 FOR ADDITIONAL INFORMATION REGARDING SCHEDULE AND PHASING

REQUIREMENTS. SHEDULE WORK IN THE EXISTING BUILDING TO MINIMIZE DISRUPTION OF

SERVICES.

5. ALL VAV TERMINAL UNIT DUCT CONNECTIONS SHALL MATCH THE ASSOCIATED UNIT

CONNECTION SIZES UNLESS NOTED OTHERWISE. ALL VAV TERMINAL UNIT REHEAT COIL

BRANCH PIPING SHALL BE 3/4" DIAMETER UNLESS NOTED OTHERWISE.

MECHANICAL PLAN NOTES

1. PROVIDE HEAT EXCHANGER AND PUMPS IN LOCATION SHOWN. SEE SHEET 107-MP-100 FOR

RELATED WORK.

2. DIVISION 23 CONTRACTOR TO ROUTE 28X10 CRAWL SPACE VENTILATION DUCT THROUGH

EXISTING PENETRATION. COORDINATE DUCT AND ELECTRICAL CONDUIT ROUTING WITH

DIVISION 26 CONTRACTOR.

N

UP

E

X-RAY

343 SF

X-RAY

345 SF

STRESS

219 SF

SOILED UTILITY

66 SF

NEW ELEC.

298 SF

ENTRY VESTIBULE

158 SF

CORRIDOR

791 SF

SCHEDULING

141 SF

CORRIDOR

791 SF

WAITING

645 SF

DRESS

48 SF

DRESS

48 SF

MEN'S RESTROOM

80 SF

WOMEN'S RESTROOM

81 SF CORRIDOR

2106 SF

CORRIDOR

2106 SF

DRESS

50 SF

DRESS

55 SF

FLUOROSCOPY X-RAY ROOM

376 SF

ALCOVE

38 SF

TOILET

135A

62 SF

CT SCAN ROOM

352 SF

CT CONTROL

211 SF

SPECT CT SCAN ROOM

404 SF

PATIENT DOSE ADMINISTRATION

138 SF

RADIO DROP-OFF

144B

102 SF

BONE DENSITOMETRY

228 SF

MRI SUB-WAITING

191 SF

MRI SCAN ROOM

146C

346 SF

MRI EQUIP. ROOM

175 SF

TOILET

111A

61 SF

HAC

58 SF

STAFF LOUNGE/TRAINING

441 SF

ULTRASOUND

184 SFULTRASOUND

179 SF

STAFF TOILET

60 SF

TOILET

109A

65 SF

WORKROOM

178 SF

WOMEN'S TOILET

62 SF

STORAGE

40 SF

INPATIENT HOLDING

120 SF

INPATIENT HOLDING

110 SF

STORAGE

117 SF

EQUIP. ALCOVE

83 SF

COMMS

100 SF

CHIEF TECHNOLOGIST

120A

102 SF

STAFF TOILET

87 SF

PHYS. VIEWING ROOM

107 SF

WORK AREA

191 SF

PHYS. VIEWING ROOM

99 SF

PHYS. VIEWING ROOM

96 SF

SUPERVISOR

120B

105 SF

MEETING ROOM

274 SF

PACS

101 SF

ON-CALL ROOM

155 SF

CORRIDOR

481 SF

MRI DRESS

146F

49 SF

MRI DRESS

146E

49 SF

RESTROOM

59 SF

NURSE

142 SF

STAIRWELL

154 SF

X-RAY TECH

62 SF

ALCOVE

146H

12 SF

ALCOVE

9 SF

ALCOVE

22 SF

MRI CONTROL ROOM

146B

119 SF

ALCOVE

31 SF

ALCOVE

29 SF

114 SF

EXISTING MEN'S RR

196 SF

EXISTING STAIRS

"x

S

A

"x

S

A

54"x20" SA

22"x16" SA

"x

S

A

"x

S

A

"x

S

A

14"x8" SA

24"x10" SA

"x

S

A

18"x14" SA

"x

S

A

"x

S

A

"x

S A

22"x10" RA

"x

R

A

22"x10" RA 16"x8" RA

16"x8" RA

54"x20" RA

MRI ACCS.

146D

14 SF

32"x16" SA

14"x8" EA

10"x6" EA

8"x6" EA

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

201 SF

RADIOPHARMACY

144A

T

16"x8" RA

"x

R A

16"x8" RA

"x

R

A

"x

R

A

"x

R

A

"x

S

A 14"x12" SA

12"x8" EA

"x

R

A

"x

R

A

16"x12" RA

14"x10" RA

"x

R

A

"x

R

A

"x

S

A

"x

R

A

"x

E

A

"x

E

A

10"x6" EA

VAV

VAV

VAV

VAV

VAV

VAV

VAV

22"x10" RA

"x

R

A

"x

S

A

VAV

VAV

VAV

"ø

E A

"ø

E A

"ø

E A

12"ø EA

VAV

"x

S

A

MRI PREP/HOLDING

146A

195 SF

FCU

ACU

ACU

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

24"x14" RA

"x

S A

"x

E

A

14"x10" EA 14"x10" EA

"x

E

A

12"x10" EA

28"x20" SA

"x

E

A

"x

E A

22"x10" SA

12"x10" SA

22"x10" RA

"x

E

A

10"x8" EA

"x

E A

"x

E A

VAV

VAV

VAV

F

B

C

D

1 3 42 5

B.1

E

6 9

2.1

F.1

E.1

A.5

A.1

D.2

D.1

A

1.1 7

C.2

B.2

4.5 8

G

8.1

B.9

ACU

FD

FD

FD

FD

FD

DUCTLESS

FUME HOOD

FD

FD

FDFD

FDFD

EXISTING 2-HR FIRE

BLANKET TO REMAIN (ETR)

SDSD

SD

SD

SD

SD

FD

FDFD

FD

FD

26"x14" RA

107-MH-401A

107-MH-401B

107-MH-401C

VAV

24"x10" SA22"x10" SA

"x

S

A

24"x12" EA

24"x12" EA

BID DEDUCT ALT. #2

SEE BID DEDUCT NOTES

ON SHEET 107-GI-102 AND

AND SHEET 107-MH-401B

FOR MORE INFORMATION.

BID DEDUCT ALT. #1

SEE BID DEDUCT NOTES

ON SHEET 107-GI-102 AND

AND SHEET 107-MH-401C

FOR MORE INFORMATION.

BID DEDUCT ALT. #1

SEE BID DEDUCT NOTES

ON SHEET 107-GI-102 AND

AND SHEET 107-MH-401C

FOR MORE INFORMATION.

BID DEDUCT ALT. #3

SEE BID DEDUCT NOTES

ON SHEET 107-GI-102 AND

SHEET 107-MH-401A FOR

MORE INFORMATION.

FD

26"x16" RA

12"x6" RA 10"x8" RA

14"x10" RA

"x

R

A

"x

S

A

22"x10" SA

"x

S

A

12"x12" SA

"x

E

A

10"x10" EA

"x

E

A

10"x10" EA

ACV

24"x12" EA

ACV

FD

FDFDFD

FD FD

Drawing Number

Project Number

Date

Project Title

Building NumberLocation

Checked DrawnAPPROVED: CHIEF ENGINEER

Drawing Title

VA FORM

Office of Construction and Facilities Management

Dwg

CIVIL / STRUCTURAL ENGINEER M.E.P. / T. ENGINEER

APPROVED: DIRECTOR

APPROVED: ASSOCIATE DIRECTOR

APPROVED: ASSISTANT DIRECTOR APPROVED: CHIEF ENGINEER

REVISIONS DATE

CONSULTANTS ARCHITECT

o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th s i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

1 2 3 4 5 6 7 8 9

A

1 2 3 4 5 6 7 8 9

B

C

D

E

F

A

B

C

D

E

F

H2B

1225 NORTH LOOP WEST, SUITE 900

HOUSTON, TX 77008

SPUR DESIGN

11020 KING STREET, SUITE 350

OVERLAND PARK, KS 66210

AZ ARCH REG. NO. 20013-0, EXP. 10/10/2019

AZ ENGR REG. NO. 20015-0, EXP. 10/10/2019 -OF- 148

RADIOLOGY EXPANSIONMECHANICAL HVAC LEVEL 1

FLOOR PLAN

649-413

11/01/18 JES JAD

107-MH-101

100% BACKCHECK SUBMITTAL

DEPARTMENT OF VETERAN AFFAIRS

NORTHERN ARIZONA VA HEALTH CARE SYSTEM

500 HWY 89N

PRESCOTT AZ, 86313

1/8" = 1'-0"

MECHANICAL HVAC LEVEL 1 FLOOR

PLAN

GENERAL NOTES:

1. THE AREA OF WORK SHOWN IS ASSOCIATED WITH AN OPERATING FACILITY THAT MUST REMAIN

IN SERVICE 24 HOURS A DAY, 7 DAYS A WEEK.

2. COORDINATE WORK SCHEDULE WITH THE CONTRACTING OFFICER'S REPRESENTATIVE.

3. COORDINATE MECHANICAL WORK WITH ALL OTHER TRADES. VERIFY ALL EXISTING CONDITIONS

BEFORE THE START OF WORK.

4. SEE SHEET GI001 FOR ADDITIONAL INFORMATION REGARDING SCHEDULE AND PHASING

REQUIREMENTS. SHEDULE WORK IN THE EXISTING BUILDING TO MINIMIZE DISRUPTION OF

SERVICES.

5. ALL VAV TERMINAL UNIT DUCT CONNECTIONS SHALL MATCH THE ASSOCIATED UNIT

CONNECTION SIZES UNLESS NOTED OTHERWISE. ALL VAV TERMINAL UNIT REHEAT COIL

BRANCH PIPING SHALL BE 3/4" UNLESS NOTED OTHERWISE.

N

C H

W S

C H

W R

C H

W S

C H

W R

4" CHWR

4" CHWS

4" CHWR

4" CHWS

C H

W S

C H

W R

CT SCANNER EQUIP. RM

112 SF

4" CHWR

4" CHWS

6" MPS6" MPS6" MPS

4" HPS

3" VR

2 1/2" DR

4" HPS

3" VR

2 1/2" DR

4" HPS

3" VR

2 1/2" DR

M

P S

H

P S

V

R

/2 D

R

M P

S H

P S

V

R

/2 D

R

SR

SR SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR SR

SR

SR

SR

SR

1 1/4" LPC

3" LPS

1 1/4" LPC

3" LPS

3" LPS

1 1/4" LPC

3" LPS

1 1/4" LPC

3" LPS

1 1/4" LPC

3" LPS

1 1/4" LPC

LP

S

/4 L P

C

/2 L P

S

/4 L P

C

/4 L P

C L P

S

/4 L P

C L P

S

1 1/4" LPC

3" LPS

L P

S

/4

L

P C

6" CHWR

6" CHWS

4" CHWS

4" CHWR4" CHWR

4" CHWS

4" CHWS

4" CHWR

2 1/2" HWR

2 1/2" HWS

2" HWS

2" HWR

H W

S

H

W R

H W

S

H

W R

HU

F

B

C

D

1 3 42 5

B.1

E

6 9

2.1

F.1

E.1

A.5

A.1

D.2

D.1

A

1.1 7

C.2

B.2

4.5 8

G

8.1

B.9

HX

HX

6" CHWR

6" CHWS

1" LPS

8 9

P R

V

LP

S

CT

HX

ET

BID DEDUCT ALT. #5

SEE BID DEDUCT NOTES

ON SHEET 107-GI-102 FOR

MORE INFORMATION.

AHU

AHU

AHU

2" CD

/4

C

D

3/4" CD

107-M-301

3/4" CD

3/4" CD

107-M-301

2" LPS

107-M-301

107-M-301

107-M-301

107-M-301

107-M-301

CP

2.1

CP

2.2

HU

HU

107-M-301

CP

1.1

CP

1.2

C H

W R

C H

W S

4" CHWS

4" CHWR

/4

C H

W S

/4

C H

W R

L P

S

2" HWR

2" HWS

FCU

FCU

Drawing Number

Project Number

Date

Project Title

Building NumberLocation

Checked DrawnAPPROVED: CHIEF ENGINEER

Drawing Title

VA FORM

Office of Construction and Facilities Management

Dwg

CIVIL / STRUCTURAL ENGINEER M.E.P. / T. ENGINEER

APPROVED: DIRECTOR

APPROVED: ASSOCIATE DIRECTOR

APPROVED: ASSISTANT DIRECTOR APPROVED: CHIEF ENGINEER

REVISIONS DATE

CONSULTANTS ARCHITECT

o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th s i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

1 2 3 4 5 6 7 8 9

A

1 2 3 4 5 6 7 8 9

B

C

D

E

F

A

B

C

D

E

F

H2B

1225 NORTH LOOP WEST, SUITE 900

HOUSTON, TX 77008

SPUR DESIGN

11020 KING STREET, SUITE 350

OVERLAND PARK, KS 66210

AZ ARCH REG. NO. 20013-0, EXP. 10/10/2019

AZ ENGR REG. NO. 20015-0, EXP. 10/10/2019 -OF- 148

RADIOLOGY EXPANSIONMECHANICAL PIPING BASEMENT

FLOOR PLAN

649-413

11/01/18 JES JAD

107-MP-100

100% BACKCHECK SUBMITTAL

DEPARTMENT OF VETERAN AFFAIRS

NORTHERN ARIZONA VA HEALTH CARE SYSTEM

500 HWY 89N

PRESCOTT AZ, 86313

1/8" = 1'-0"

MECHANICAL PIPING BASEMENT FLOOR

PLAN

GENERAL NOTES:

1. THE AREA OF WORK SHOWN IS ASSOCIATED WITH AN OPERATING FACILITY THAT MUST REMAIN

IN SERVICE 24 HOURS A DAY, 7 DAYS A WEEK.

2. COORDINATE WORK SCHEDULE WITH THE CONTRACTING OFFICER'S REPRESENTATIVE.

3. COORDINATE MECHANICAL WORK WITH ALL OTHER TRADES. VERIFY ALL EXISTING CONDITIONS

BEFORE THE START OF WORK.

4. SEE SHEET GI001 FOR ADDITIONAL INFORMATION REGARDING SCHEDULE AND PHASING

REQUIREMENTS. SHEDULE WORK IN THE EXISTING BUILDING TO MINIMIZE DISRUPTION OF

SERVICES.

5. ALL VAV TERMINAL UNIT DUCT CONNECTIONS SHALL MATCH THE ASSOCIATED UNIT

CONNECTION SIZES UNLESS NOTED OTHERWISE. ALL VAV TERMINAL UNIT REHEAT COIL

BRANCH PIPING SHALL BE 3/4" DIAMETER UNLESS NOTED OTHERWISE.

MECHANICAL PLAN NOTES

1. PROVIDE NEW AIR HANDLING UNIT AND ASSOCIATED PIPING, DUCTWORK, AND CONTROLS AS

SHOWN. SEE SHEET 107-M-601 FOR AIR HANDLING UNIT SCHEDULES.

2. AIR HANDLING UNIT SHALL BE PROVIDED WITH A BACKUP DX COOLING COIL CAPABLE OF

PROVIDING FULL COOLING CAPACITY IN THE EVENT OF A PRIMARY COOLING COIL FAILURE.

PROVIDE ASSOCIATED CONDENSING UNIT ON ROOF IN LOCATION SHOWN ON SHEET 107-M-102

3. VRF SPLIT SYSTEM FAN COIL UNIT AND ASSOCIATED CONDENSING UNIT ON ROOF TO SERVE AS STANDBY COOLING FOR THE CT EQUIPMENT ROOM. SEE SHEET 107-M-102 AND 107-MP-100 FOR

ADDITIONAL SCOPE.

4. ALL PIPING AND ASSOCIATED FITTINGS ON MRI CHILLED WATER LOOP SHALL CONSIST OF NON-

FERROUS MATERIAL. COORDINATE MATERIAL SELECTION WITH MRI MANUFACTURER'S

INSTALLATION REQUIREMENTS.

5. DIVISION 23 CONTRACTOR SHALL COORDINATE CHILLED WATER CONNECTIONS IN THE CT AND

MRI EQUIPMENT ROOMS WITH MANUFACTURERS INSTALLATION REQUIREMENTS. SEE FLOW

DIAGRAMS ON SHEET 107-MP-301 FOR ADDITIONAL INFORMATION.

6. CONNECT NEW 6" CHILLED WATER SUPPLY AND RETURN PIPING IN BUILDING 158 CRAWL SPACE

IN LOCATION SHOWN AND ROUTE TO NEW BUILDING 107 EXPANSION AS SHOWN.

7. 3" CHILLED WATER SUPPLY AND RETURN AND 3" HEATING HOT WATER SUPPLY AND RETURN UP

TO FLOOR ABOVE. EXTEND PIPING UPWARD AND PROVIDE VALVE AND CAP UNDER FINISHED

ROOF FOR FUTURE USE.

8. DIVISION 23 CONTRACTOR TO PROVIDE 6" CHILLED WATER SUPPLY AND RETURN BRANCH TAPS

WITH VALVE AND CAP IN LOCATION SHOWN.

9. DIVISION 23 CONTRACTOR TO PROVIDE 4" HEATING HOT WATER SUPPLY AND RETURN BRANCH

TAPS WITH VALVE AND CAP IN LOCATION SHOWN.

10. PROVIDE NEW HEAT EXCHANGER AND PUMPS FOR MRI AND CT PRIMARY CHILLED WATER

LOOPS IN LOCATION SHOWN. SEE SHEET 107-MP-101 AND 107-MP-301 FOR RELATED WORK.

11. DIVISION 23 CONTRACTOR TO PROVIDE AND INSTALL NEW STEAM TO HOT WATER HEAT

EXCHANGERS, PUMPS, AND EXPANSION TANK TO SERVE AIR HANDLERS AND VAV TERMINAL

UNIT REHEAT COILS IN LOCATION SHOWN.

12. CONNECT NEW MEDIUM PRESSURE STEAM AND DRIP RETURN PIPING TO EXISTING DENTAL AHU

STEAM PIPING AS SHOWN. ROUTE MEDIUM PRESSURE STEAM TO PRESSURE REDUCING VALV

STATION (PRV) AND CONNECT LOW PRESSURE STEAM TO STEAM TO HOT WATER HEAT

EXCHANGERS IN LOCATION SHOWN.

13. CONNECT NEW STEAM AND CONDENSATE RISERS TO EXISTING BRANCH TAPS ON MAIN.

PROVIDE NEW RISERS AND ASSOCIATED SWING ARMS IN LOCATION SHOWN. SEE SHEET 107-

MP-101 FOR CONTINUATION

N

BID DEDUCT ALTERNATE PLAN NOTES::

1. BID DEDUCT ALT. #5: PROVIDE MECHANICAL SUPPLY AND RETURN PIPING TAPS OFF OF MAIN

WITH VALVE AND CAP IN LOCATIONS SHOWN FOR FUTURE CONNECTION OF MRI EQUIPMENT IN

BASEMENT.

1 1/4" HWS

/4

H W

S

/4

H W

S

/4

H

W S

1 1/4" HWR

/4 H

W R

/4 H

W R

/4

H

W R

/4

H W

S

/4

H

W R

/4

H W

S

/4

H

W R

1 1/4" HWR

1 1/4" HWS

/4

H W

S

/4

H

W R

2" HWS

1 1/4" HWR

1 1/4" HWS

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

17 VAV

VAV

VAV

25VAV

VAV

VAV

VAV

ENTRY VESTIBULE

158 SF

SCHEDULING

141 SF

NEW ELEC.

298 SF

114 SF

EXISTING MEN'S RR

CORRIDOR

791 SF

STORAGE

40 SF

WOMEN'S TOILET

62 SF

196 SF

EXISTING STAIRS

CORRIDOR

2106 SF

WAITING

645 SF

RECEPTION

105A

99 SF

WORKROOM

178 SF

ULTRASOUND

179 SF

ULTRASOUND

184 SF

TOILET

109A

65 SF

STAFF TOILET

60 SF

CORRIDOR

2106 SF

CORRIDOR

481 SF

COMMS

100 SF

EQUIP. ALCOVE

83 SF

STORAGE

117 SF

INPATIENT HOLDING

110 SF

INPATIENT HOLDING

120 SF

STAFF LOUNGE/TRAINING

441 SF

HAC

58 SF

TOILET

111A

61 SF

MRI SCAN ROOM

146C

346 SF

MRI ACCS.

146D

14 SF

MRI EQUIP. ROOM

175 SF

MRI DRESS

146F

49 SF

MRI DRESS

146E

49 SF

MRI SUB-WAITING

191 SF

ON-CALL ROOM

155 SF

PACS

101 SF

PHYS. VIEWING ROOM

96 SF

PHYS. VIEWING ROOM

99 SF

PHYS. VIEWING ROOM

107 SF

SUPERVISOR

120B

105 SF

MEETING ROOM

274 SF

WORK AREA

191 SF

CHIEF TECHNOLOGIST

120A

102 SF

STAFF TOILET

87 SF

DRESS

48 SF

DRESS

48 SF

MEN'S RESTROOM

80 SF

WOMEN'S RESTROOM

81 SF

DRESS

55 SF

DRESS

50 SF

FLUOROSCOPY X-RAY ROOM

376 SF

ALCOVE

38 SF

TOILET

135A

62 SF

CT SCAN ROOM

352 SF

CT CONTROL

211 SF

SPECT CT SCAN ROOM

404 SF

201 SF

RADIOPHARMACY

144A

PATIENT DOSE ADMINISTRATION

138 SF

BONE DENSITOMETRY

228 SF

MRI PREP/HOLDING

146A

195 SF

RADIO DROP-OFF

144B

102 SF

MRI CONTROL ROOM

146B

119 SF

X-RAY

343 SF

X-RAY

345 SF

STRESS

219 SF

SOILED UTILITY

66 SF

NURSE

142 SF

RESTROOM

59 SF

X-RAY TECH

62 SF

ALCOVE

146H

12 SF

ALCOVE

9 SF

ALCOVE

22 SF

ALCOVE

31 SF

ALCOVE

29 SF

SR

SR

SR

SR SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

H

W R

H

W S

H W

S

H

W R

/4

H

W R

/4

H

W S

/2

R

E F

ACU

ACU

ACU

/2

R

E F

ACU

ACU

7 7

6 6

FCU

4 4

9 10

F

B

C

D

1 3 42 5

B.1

E

6 9

2.1

F.1

E.1

A.5

A.1

D.2

D.1

A

1.1 7

C.2

B.2

4.5 8

G

8.1

B.9

BID DEDUCT ALT. #2

SEE BID DEDUCT NOTES

ON SHEET 107-GI-102 AND

AND SHEET 107-MH-401B

FOR MORE INFORMATION.

BID DEDUCT ALT. #1

SEE BID DEDUCT NOTES

ON SHEET 107-GI-102 AND

AND SHEET 107-MPD101

FOR MORE INFORMATION.

BID DEDUCT ALT. #1

SEE BID DEDUCT NOTES

ON SHEET 107-GI-102 AND

AND SHEET 107-MH-401C

FOR MORE INFORMATION.

BID DEDUCT ALT. #3

SEE BID DEDUCT NOTES

ON SHEET 107-GI-102 FOR

MORE INFORMATION.

VAV

3/4" CD

/4

C

D

/4

C

D

3/4" CD

1/2" REF

1/2" REF

3/4" CD

SRSR

13 13

6" QV8

2" HWR

2" HWS

2" HWR

2" HWS

Drawing Number

Project Number

Date

Project Title

Building NumberLocation

Checked DrawnAPPROVED: CHIEF ENGINEER

Drawing Title

VA FORM

Office of Construction and Facilities Management

Dwg

CIVIL / STRUCTURAL ENGINEER M.E.P. / T. ENGINEER

APPROVED: DIRECTOR

APPROVED: ASSOCIATE DIRECTOR

APPROVED: ASSISTANT DIRECTOR APPROVED: CHIEF ENGINEER

REVISIONS DATE

CONSULTANTS ARCHITECT

o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th s i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

1 2 3 4 5 6 7 8 9

A

1 2 3 4 5 6 7 8 9

B

C

D

E

F

A

B

C

D

E

F

H2B

1225 NORTH LOOP WEST, SUITE 900

HOUSTON, TX 77008

SPUR DESIGN

11020 KING STREET, SUITE 350

OVERLAND PARK, KS 66210

AZ ARCH REG. NO. 20013-0, EXP. 10/10/2019

AZ ENGR REG. NO. 20015-0, EXP. 10/10/2019 -OF- 148

RADIOLOGY EXPANSIONMECHANICAL PIPING LEVEL 1

FLOOR PLAN

649-413

11/01/18 JES JAD

107-MP-101

100% BACKCHECK SUBMITTAL

DEPARTMENT OF VETERAN AFFAIRS

NORTHERN ARIZONA VA HEALTH CARE SYSTEM

500 HWY 89N

PRESCOTT AZ, 86313

1/8" = 1'-0"

MECHANICAL PIPING LEVEL 1 FLOOR

PLAN

GENERAL NOTES:

1. THE AREA OF WORK SHOWN IS ASSOCIATED WITH AN OPERATING FACILITY THAT MUST REMAIN

IN SERVICE 24 HOURS A DAY, 7 DAYS A WEEK.

2. COORDINATE WORK SCHEDULE WITH THE CONTRACTING OFFICER'S REPRESENTATIVE.

3. COORDINATE MECHANICAL WORK WITH ALL OTHER TRADES. VERIFY ALL EXISTING CONDITIONS

BEFORE THE START OF WORK.

4. SEE SHEET GI001 FOR ADDITIONAL INFORMATION REGARDING SCHEDULE AND PHASING

REQUIREMENTS. SHEDULE WORK IN THE EXISTING BUILDING TO MINIMIZE DISRUPTION OF

SERVICES.

5. ALL VAV TERMINAL UNIT DUCT CONNECTIONS SHALL MATCH THE ASSOCIATED UNIT

CONNECTION SIZES UNLESS NOTED OTHERWISE. ALL VAV TERMINAL UNIT REHEAT COIL

BRANCH PIPING SHALL BE 3/4" DIAMETER UNLESS NOTED OTHERWISE.

MECHANICAL PLAN NOTES

1. ALL PIPING AND ASSOCIATED FITTINGS ON MRI CHILLED WATER LOOP SHALL CONSIST OF NON-

FERROUS MATERIALS. COORDINATE MATERIAL SELECTION WITH MRI MANUFACTURER'S

INSTALLATION REQUIREMENTS.

2. DIVISION 23 CONTRACTOR SHALL COORDINATE CHILLED WATER CONNECTIONS IN THE CT AND

MRI EQUIPMENT ROOMS WITH MANUFACTURERS INSTALLATION REQUIREMENTS. SEE FLOW

DIAGRAMS ON SHEET 107-MP-301 FOR ADDITIONAL INFORMATION.

3. DIVISION 23 CONTRACTOR TO TERMINATE 3" CHILLED WATER SUPPLY AND RETURN AND 3"

HEATING HOT WATER SUPPLY BELOW ROOF DECK WITH VALVE AND CAP FOR FUTURE

EXTENSION TO 2ND FLOOR.

4. ROUTE 2-PIPE REFRIGERANT PIPING TO BUILDING 158 CEILING THROUGH EXISTING DUCT

PENETRATION IN LOCATION SHOWN. SEE SHEET 107-MH-101 FOR RELATED WORK.

5. PROVIDE NEW 4 PIPE VERTICAL RECESSED FAN COIL UNIT IN LOCATION SHOWN. FAN COIL UNIT

BOTTOM ELEVATION: 0'-8" ABOVE FINISHED FLOOR.

6. 2-PIPE REFRIGERANT PIPING UP TO CONDENSING UNITS ON RADIOLOGY EXPANSION ROOF. SEE

SHEET 107-M-102 FOR CONTINUATION.

7. 2-PIPE REFRIGERANT PIPING UP TO CONDENSING UNITS ON BUILDING 158 ROOF. SEE SHEET

107-M-102 FOR CONTINUATION.

8. PROVIDE 6" CRYOGEN QUENCH VENT UP THROUGH ROOF IN LOCATION SHOWN. COORDINATE

CRYOGEN QUENCH VENT TERMINATION AND SIZE WITH DETAIL X/107-M-50X AND MRI

MANUFACTURERS INSTALLATION REQUIREMENTS.

9. 2" PRIMARY CHWS/R PIPING UP FROM PLATE & FRAME HEAT EXCHANGER AND PUMPS IN

BASMENT. SEE SHEET 107-MP-100 FOR MORE INFORMATION.

10. 2" BACKUP CHWS/R PIPING DOWN FROM MANUFACTURER PROVIDED CHILLER ON ROOF. SEE

SHEET 107-M-102 FOR MORE INFORMATION.

11. REMOVE HEATING HOT WATER SUPPLY AND RETURN PIPING TO DEMARCATION POINT SHOWN

ON SHEET 107-MPD101. PROVIDE NEW PIPE EXTENSIONS WITH VALVE AND CAP AS SHOWN.

12. THE DEFINED AREA DENOTES THE CRYOGEN EXCLUSION ZONE. THE AREA SHALL BE CLEARLY

MARKED AND ACCESSIBLE TO AUTHORIZED PERSONELL ONLY. ALL WINDOWS WITHIN THE AREA

SHALL BE FIXED OR RENDERED INOPERABLE. SEE ARCHITECTURAL DRAWINGS FOR RELATED

WORK.

13. ROUTE NEW STEAM AND CONDENSATE RISERS UP TO FIRST FLOOR CEILING SPACE IN

LOCATION SHOWN. CONNECT NEW RISERS TO EXISTING AS SHOWN AND PROVIDE VALVE

ABOVE FIRST FLOOR CEILING.

N

BID DEDUCT ALTERNATE PLAN NOTES:

1. BID DEDUCT ALT. #2: MECHANICAL EQUIPMENT AND ASSOCIATED DUCTWORK AND PIPING ARE

NOT INCLUDED IN BID DEDUCT ALT. #2 AND SHALL NOT BE REMOVED FROM THE SCOPE OF

WORK.

2. BID DEDUCT ALT. #4: PROVIDE VALVE AND CAP ON MECHANICAL SUPPLY AND RETURN PIPING

FOR FUTURE RECONNECT IN LOCATION SHOWN.

3. BID DEDUCT ALT. #4: SPLIT SYSTEM FAN COIL UNIT AND ASSOCIATED CONDENSING UNIT ON

BUILDING 158 ROOF SERVING ROOM 124 PACS IS TO REMAIN AND SHALL NOT BE REMOVED

FROM THE SCOPE OF WORK. COORDINATE NEW LOCATION WITH THE CONTRACTING OFFICER'S

REPRESENTATIVE AND THE ENGINEER ON RECORD PRIOR TO INSTALLATION.

4. BID DEDUCT ALT. #4: SPLIT SYSTEM FAN COIL UNIT AND ASSOCIATED CONDENSING UNIT ON

BUILDING 158 ROOF SERVING ROOM 116 COMMS TO REMAIN AS SHOWN AND SHALL NOT BE

REMOVED FROM THE SCOPE OF WORK.

5. BID DEDUCT ALT. #5: MECHANICAL EQUIPMENT AND ASSOCIATED DUCTWORK AND PIPING ARE

NOT INCLUDED IN BID DEDUCT ALT. #5 AND SHALL NOT BE REMOVED FROM THE SCOPE OF

WORK.

6. BID DEDUCT ALT.