36E77619B0012-0004005.pdf

PDF Posted

Attached to
Radiology Expansion (Construction) Prescott VAMC
Solicitation number
36E77619B0012
Issued by

About this file

This document provides details for a federal construction solicitation. The Department of Veterans Affairs intends to solicit proposals and award a single firm-fixed-price contract for renovations and an expansion to the radiology area at the Northern Arizona VA Medical Center. The scope of work includes demolishing an existing lab expansion of approximately 3,000 square feet and constructing a new optimized footprint for the radiology department with centralized waiting, wide hallways, and sufficiently sized rooms. The structure must also accommodate a future second floor addition accessible from an adjacent building as well as an elevator and access stairs. The solicitation will be advertised as a Service-Disabled Veteran-Owned Small Business set-aside with proposals due on or around August 8, 2019. The period of performance is approximately 425 calendar days and the magnitude of construction is estimated between $5 million to $10 million.

36E77619B0012 0004 Bldg 107 - LBP Survey Report (Final).pdf

View the file

Other files

File Type Posted
36E77619B0012-0005000.docx DOCX document
36E77619B0012-0005001.pdf PDF
36E77619B0012-0005001.pdf PDF
36E77619B0012-0005000.docx DOCX document
36E77619B0012-0004000.docx DOCX document
36E77619B0012-0004002.pdf PDF
36E77619B0012-0004001.pdf PDF
36E77619B0012-0004003.pdf PDF
36E77619B0012-0004004.pdf PDF
36E77619B0012-0004005.pdf PDF
36E77619B0012-0004001.pdf PDF
36E77619B0012-0004003.pdf PDF
36E77619B0012-0004004.pdf PDF
36E77619B0012-0004000.docx DOCX document
36E77619B0012-0004002.pdf PDF
36E77619B0012-0003000.docx DOCX document
36E77619B0012-0003001.pdf PDF
36E77619B0012-0003001.pdf PDF
36E77619B0012-0003000.docx DOCX document
36E77619B0012-0002001.pdf PDF
36E77619B0012-0002000.docx DOCX document
36E77619B0012-0002000.docx DOCX document
36E77619B0012-0002001.pdf PDF
36E77619B0012-0001000.docx DOCX document
36E77619B0012-0001000.docx DOCX document
36E77619B0012-005.pdf PDF
36E77619B0012-010.pdf PDF
36E77619B0012-012.pdf PDF
36E77619B0012-003.pdf PDF
36E77619B0012-001.docx DOCX document
36E77619B0012-013.pdf PDF
36E77619B0012-007.pdf PDF
36E77619B0012-011.pdf PDF
36E77619B0012-006.pdf PDF
36E77619B0012-002.pdf PDF
36E77619B0012-004.pdf PDF
36E77619B0012-015.docx DOCX document
36E77619B0012-009.pdf PDF
36E77619B0012-016.pdf PDF
36E77619B0012-014.pdf PDF
36E77619B0012-008.pdf PDF
36E77619B0012-001.docx DOCX document
36E77619B0012-004.pdf PDF
36E77619B0012-006.pdf PDF
36E77619B0012-002.pdf PDF
36E77619B0012-014.pdf PDF
36E77619B0012-008.pdf PDF
36E77619B0012-012.pdf PDF
36E77619B0012-011.pdf PDF
36E77619B0012-009.pdf PDF
Show 40 more

Latest 50 of 59 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IIHHII

E N V I R O N M E N T A L

LEAD BASED PAINT INSPECTION

Bob Stump Veterans Affairs Medical Center Building 107 – Hospital

500 North Highway 89

Prescott, Arizona

Order Number VA649-C10326

April 19, 2012

Prepared for:

Richard Trevino Northern Arizona Veterans Affairs Health Care System

500 North Highway 89 Prescott, Arizona 86313

Prepared by: Reviewed by:

Mr. Oulono Folau

EPA Lead Inspector Joseph K. Palermo, REA, LEED® AP

Regional Manager

Project #11P-A3138

4527 NORTH 16TH STREET, #105 PHOENIX AZ 85016 TELEPHONE: 602.776.0300 FAX: 602.776.0301 E-MAIL: PHOENIX@IHI-ENV.COM

SALT LAKE CITY SAN FRANCISCO PHOENIX DENVER SEATTLE

NAVAHCS Bob Stump VAMC Bldg. 107 Executive Summary IHI Environmental LBP Inspection Project #11P-A3138

IIHHII

E N V I R O N M E N T A L

Executive Summary As requested by the Northern Arizona Veterans Affairs Health Care System (NAVAHCS), IHI Environmental (IHI) conducted a Lead-based Paint (LBP) Inspection at the Building 107

– Hospital facility located at the Bob Stump Veterans Affairs Medical Center, 500 North Highway 89, Prescott, Arizona.

The Lead-based Paint Inspection was performed to identify and locate lead-based paint at the facility. This inspection included a Paint Condition Inspection to identify Lead Hazards.

The following table summarizes the results.

XRF Samples 3,928 Positive for Lead (>1 mg/cm2) 492

Components in Poor Condition 4

Based on the results of the survey, lead-based paint was identified on several exterior and interior building components. The paint on all of the components was considered to be in either intact or fair condition, with some exceptions. Four (4) components containing lead-based paint were considered to be in poor condition. Based on HUD guidelines, all painted components that are considered LBP (>1.0 mg/cm2) and identified as being in poor condition, represent potential lead hazards.

Estimated costs for the abatement of lead-based painted components in poor condition range from $120 to $481. Details of the estimated costs are provided in Section 6 and Appendix D.

TABLE OF CONTENTS

EXECUTIVE SUMMARY

1.0 INTRODUCTION

1.1 Scope of Work

2.0 METHODOLOGY

2.1 Lead-paint Inspection

2.2 Paint Condition Inspection

3.0 RESULTS

3.1 Summary of LBP Inspection and Condition Results

4.0 LEAD HAZARD CONTROLS DISCUSSION

4.1 Lead Hazard Controls for LBP Hazards

5.0 CONCLUSIONS AND RECOMMENDATIONS

5.1 Lead-paint Hazards

6.0 COST ESTIMATES FOR ABATEMENT

7.0 REFERENCES

8.0 PROJECT LIMITATIONS

APPENDICES

Appendix A Floor Plans Appendix B LBP Summary Sheet Appendix C XRF Data Appendix D Cost Estimates for Abatement Appendix E IHI Certification

NAVAHCS Bob Stump VAMC Bldg. 107 TOC-1 IHI Environmental

NAVAHCS Bob Stump VAMC Bldg. 107 TOC-2 IHI Environmental

Abbreviations and Definitions

ADEQ Arizona Department of Environmental Quality

DEUR ADEQ’s Waste Programs – Remediation and Declaration of Environmental Use Restriction

AWP ADEQ’s Waste Programs

EPA U.S. Environmental Protection Agency

EPCRA Emergency Planning and Community Right-to-Know Act

Hazardous substance

A substance defined as a hazardous substance (Section 101(14) of CERCLA). In accordance with ASTM Standard E 1527, this definition includes petroleum products.

HUD U.S. Department of Housing and Urban Development

HUD

guidelines

HUD Guidelines for the Evaluation and Control of Lead-Based Paint Hazards in Housing, June 1995, US Department of Housing and Urban Development, (http://www.hud.gov/offices/lead/lbp/hudguidelines)

LBP Lead-based Paint. HUD considers paint to be lead-based paint (LBP) if the concentration is 1.0 milligram of lead per square centimeter (1.0 mg/cm2) or greater, or if the lead concentration is greater than 5,000 parts per million (ppm) or 0.5% by weight.

LBP Hazard A lead-based paint “hazard” is any condition that causes exposure to lead from lead-contaminated dust, lead-contaminated soil, or lead-contaminated paint that is deteriorated or is present in accessible surfaces, friction surfaces, or impact surfaces that would result in adverse human health effects.

OSHA Occupational Safety and Health Administration

RCRA Resource Conservation and Recovery Act. The regulations which govern the identification, management, transportation, and disposal of hazardous wastes from “cradle to grave.”

VRP ADEQ’s Voluntary Remediation Program.

1.0 INTRODUCTION

The Northern Arizona Veterans Affairs Health Care System NAVAHCS retained IHI

Environmental (IHI) to conduct a Lead-based Paint Inspection of the Bob Stump Veterans

Affairs Medical Center facility, located at 500 North Highway 89, Prescott, Arizona.

1.1 Scope of Work

IHI was retained by NAVAHCS to conduct a Lead-based Paint Inspection (LBP) Inspection using methodology outlined in the HUD guidelines (HUD, 1995). Each painted space was analyzed using an X-ray fluorescence (XRF) spectrometer to determine the presence of lead-based paint. A sufficient number of samples were collected to meet HUD guidelines. This inspection included a Paint Condition Inspection to identify Lead Hazards.

The results, conclusions, and recommendations in this report are based on information identified during the performance of this inspection. If greater certainty or detail is needed to understand the risks associated with the presence of lead at the site, additional evaluation may be required. Floor plans of the building are presented in Appendix A.

2.0 METHODOLOGY

2.1 Lead-paint Inspection

The LBP Inspection was conducted by Mr. Oulono Folau, a Environmental Protection Agency

(EPA)-accredited Lead Risk Assessor (PB-1056) from January 19 to 26, 2012.

Measurements for lead in paint were made using a RMD LPA-1 Lead Paint Analyzer (Serial

Number 1195). The RMD non-destructively measures lead concentrations in painted surfaces, regardless of the number of paint layers present. Results are reported in mg/cm2.

Quality control procedures included checking the internal calibration of the XRF before and after the testing was completed by taking three consecutive measurements on a National

Institute for Standards and Technology (NIST) standard with a known concentration of lead.

2.2 Paint Condition Inspection

IHI inspected the condition of each painted material at the site. The condition of painted surfaces was determined based on the criteria found in Table 1.

NAVAHCS Bob Stump VAMC Bldg. 107 1 IHI Environmental

Table 1 Paint Conditions (as defined by HUD)

Total Area of Deteriorated Paint on Each Component Type of Building

Component1 Intact Fair2 Poor3 Exterior components with large surface areas

Entire surface is intact

Less than or equal to 10 square feet

More than 10 square feet

Interior components with large surface areas (walls, ceilings, floors, doors)

Entire surface is intact

Less than or equal to 2 square feet

More than 2 square feet

Interior and exterior components with small surface areas (window sills, baseboards, soffits, trim)

Entire surface is intact

Less than or equal to 10 percent of the total surface area of the component

More than 10 percent of the total surface area of the component

Notes

1. Building component in this table refers to each individual component or side of building, not the combined surface area of all similar components in a room (e.g., a wall with 1 square foot of deteriorated paint is in “fair” condition, even if the other three walls in a room are intact).

2. Surfaces in “fair” condition should be repaired and/or monitored, but are not considered to be “lead-based paint hazards” as defined in by HUD guidelines.

3. Surfaces in “poor” condition are considered to be “lead-based paint hazards” as defined in HUD guidelines and should be addressed through abatement or interim controls.

3.0 RESULTS

In accordance with federal law, this Lead-Paint Inspection was conducted by Mr. Oulono

Folau. A copy of his current EPA certificate for conducting lead based paint activities is presented in Appendix E.

3.1 Summary of LBP Inspection and Condition Results

A summary of the samples which tested positive as LBP (Appendix B, Summary Report) show 492 components tested positive for LBP, and 4 components were identified as both

LBP and in poor condition. Based on the HUD guidelines, the components in poor condition represent a lead hazard at the site. A complete set of the XRF data is presented in Appendix

C.

NAVAHCS Bob Stump VAMC Bldg. 107 2 IHI Environmental

4.0 LEAD HAZARD CONTROLS DISCUSSION

As outlined in the HUD guidelines there are two different types of control options for lead hazards. These are interim (temporary) controls or permanent abatement. Interim controls are less expensive initially, but may be more expensive than abatement in the long run since they need to be re-evaluated and maintained more frequently. If all lead-based paint surfaces are abated or replaced, no re-evaluation is needed.

4.1 Lead Hazard Controls for LBP Hazards

As a measure of controlling LBP hazards at this site, there are several interim controls that can be utilized; however, these methods will require ongoing monitoring to assure that the existing hazard has not returned or new hazards developed. A listing of these controls is as follows:

• Paint film stabilization: This interim control involves repair or restoration of existing substrate, removal of the loose or deteriorated paint, and applying a new protective coating, such as a sealant or a new coat of non lead-based paint.

• Lead dust reduction: This interim control involves the ongoing cleaning of potential lead dust-impacted surfaces through the use of a HEPA vacuum in addition to wet washing the impacted components.

• Impact surface elimination or reduction: This interim control involves the reconfiguration of the building components to eliminate impact surfaces. This can include lining window tracks with vinyl guides or the narrowing of doors or windows to eliminate impact surfaces.

As a measure of permanent elimination of the LBP hazard at the site, there are several abatement options that can be selected. These options will eliminate the source of the lead hazard and do not require ongoing monitoring. A listing of permanent abatement measures are as follows:

• Lead-based paint removal: This method involves the removal of the lead-based paint from the building components, using approved methods, such as approved low temperature heat guns, wet sanding or scraping, in addition to a HEPA vacuuming, and/or the use of approved chemical strippers. These methods should only be performed by trained lead abatement contractors.

• Component replacement: This method involves the removal and complete replacement of impacted building components with non lead-based painted materials.

NAVAHCS Bob Stump VAMC Bldg. 107 3 IHI Environmental

5.0 CONCLUSIONS AND RECOMMENDATIONS

5.1 Lead-paint Hazards

Based on HUD guidelines, all painted components that are considered LBP (>1.0 mg/cm2) and were identified as being in poor condition, represent lead hazards. IHI identified 4 components that represent a lead hazard at the facility. Recommended Controls for the abatement of components include either lead-based paint removal or component replacement.

6.0 COST ESTIMATES FOR ABATEMENT

Cost Estimates for the abatement of lead-based painted components in poor condition are presented in Appendix D. The cost estimates for the abatement of LBP hazards were derived by use of the RS Means Cost Guide and through IHI’s experience in the local and regional markets. The cost estimate provided is for use in long-term budgeting and planning only and does not have a level of accuracy sufficient to be used as construction design cost estimates.

The actual cost of LBP abatement is highly dependent on a number of factors such as the size of the job (single room or window, or an entire floor or building); the required time frame for removal; the time of year the job is conducted; and travel time and distance to the job for the contractor. Therefore, actual removal costs could vary significantly from these estimates.

Materials replacement and consultant abatement management costs are not included in these estimates and can add 15 - 50% to the project costs.

7.0 REFERENCES

HUD, 1995. Guidelines for the Evaluation and Control of Lead-Based Paint Hazards in Housing, June 1995, US Department of Housing and Urban Development, (http://www.hud.gov/offices/lead/lbp/hudguidelines).

8.0 PROJECT LIMITATIONS

This project was performed using, as a minimum, practices consistent with standards acceptable within the industry at this time, and a level of diligence typically exercised by

EH&S consultants performing similar services.

NAVAHCS Bob Stump VAMC Bldg. 107 4 IHI Environmental

NAVAHCS Bob Stump VAMC Bldg. 107 5 IHI Environmental

The procedures used attempt to establish a balance between the competing goals of limiting investigative and reporting costs and time, and reducing the uncertainty about unknown conditions. Therefore, because the findings of this report were derived from the scope, costs, time and other limitations, the conclusions should not be construed as a guarantee that all universal, toxic and/or hazardous wastes have been identified and fully evaluated.

Furthermore, IHI assumes no responsibility for omissions or errors resulting from inaccurate information, or data, provided by sources outside of IHI or from omissions or errors in public records.

It is emphasized that the final decision on how much risk to accept always remains with the client since IHI is not in a position to fully understand all of the client's needs. Clients with a greater aversion to risk may want to take additional actions while others, with less aversion to risk, may want to take no further action.

Appendix A

Floor Plans

V

Pr oj ec ts

\V A

M C

\1 1P

-A

V

A M

C P re sc ot t A sb -L

B P

In sp ii\ D ra w in gs

\S R

_V A

As be st os

S ur ve y

C A

D \2

4\

P-

A

-B ld g

7.

dw g, B 1-

Pb , 2

/2 4/

:2

4:

P M

, m ik eb

BUILDING 108

PROJECT No:

SHEET:

DRAWN BY:

REVIEWED BY:

Le ad

S am pl in g W al l R ef er en ce

K ey

Ba se m en t

DATE:

DATE:

DATE:

REVISED BY:

0 15' 30'

11P-A3138 B1_Pb

MBradley 2-24-12

D ep ar tm en t o f V et er an s Af fa irs

N or th er n Ar iz on a Ve te ra ns A ffa irs

H ea lth C ar e

S ys te m

(N

AV

AH

C

S) H os pi ta l B ui ld in g

P re sc ot t, A riz on a

Side C

Side A

S id e

DS

ide B

Lead Sampling Wall Reference Key for

Typical Room

Si de

C

Si de

A

Side D

Side B

Le ad

S am pl in g W al l

Re fe re nc e Ke y fo r

Ty pi ca l R oo m

Side C

Side A

Side D

Side B

Lead Sam pling W all

Reference Key for

Typical Room

Pr oj ec ts

\V A

M C

\1 1P

-A

V

A M

C P re sc ot t A sb -L

B P

In sp ii\ D ra w in gs

\S R

_V A

As be st os

S ur ve y

C A

D \2

4\

P-

A

-B ld g

7.

dw g, F 1-

Pb , 2

/2 4/

:2

4:

P M

, m ik eb

BUILDING 108

BUILDING 148 CORRIDOR

BUILD

IN

G

BUILD

IN

G

PROJECT No:

SHEET:

DRAWN BY:

REVIEWED BY:

Le ad

S am pl in g W al l R ef er en ce

K ey

Fi rs t F lo or

DATE:

DATE:

DATE:

REVISED BY:

0 15' 30'

11P-A3138 F1_Pb ar tm en t o f V et er an s Af fa irs

N or th er n Ar iz on a Ve te ra ns A ffa irs

H ea lth C ar e

S ys te m

(N

AV

AH

C

S) H os pi ta l B ui ld in g

P re sc ot t, A riz on a

Side C

Side A

S id e

DS

ide B

Lead Sampling Wall Reference Key for

Typical Room

Si de

C

Si de

A

Side D

Side B

Le ad

S am pl in g W al l

Re fe re nc e Ke y fo r

Ty pi ca l R oo m

Side C

Side A

Side D

Side B

Lead Sam pling W all

Pr oj ec ts

\V A

M C

\1 1P

-A

V

A M

C P re sc ot t A sb -L

B P

In sp ii\ D ra w in gs

\S R

_V A

As be st os

S ur ve y

C A

D \2

4\

P-

A

-B ld g

7.

dw g, F 2-

Pb , 2

/2 4/

:2

4:

P M

, m ik eb BUILDING 108

BUILDING 148 CORRIDOR

BUILDING 117

PROJECT No:

SHEET:

DRAWN BY:

REVIEWED BY:

Le ad

S am pl in g W al l R ef er en ce

K ey

Se co nd

F lo or

DATE:

DATE:

DATE:

REVISED BY:

0 15' 30'

11P-A3138 F2_Pb ar tm en t o f V et er an s Af fa irs

N or th er n Ar iz on a Ve te ra ns A ffa irs

H ea lth C ar e

S ys te m

(N

AV

AH

C

S) H os pi ta l B ui ld in g

P re sc ot t, A riz on a

Side C

Side A

S id e

DS

ide B Lead Sampling Wall Reference Key for

Typical Room

Si de

C

Si de

A

Side D

Side B

Le ad

S am pl in g W al l

Re fe re nc e Ke y fo r

Ty pi ca l R oo m

Side C

Side A

Side D

Side B

Lead Sam pling W all

Pr oj ec ts

\V A

M C

\1 1P

-A

V

A M

C P re sc ot t A sb -L

B P

In sp ii\ D ra w in gs

\S R

_V A

As be st os

S ur ve y

C A

D \2

4\

P-

A

-B ld g

7.

dw g, F 3-

Pb , 2

/2 4/

:2

4:

P M

, m ik eb BUILDING 108

ROOF

BUILDING 117

PROJECT No:

SHEET:

DRAWN BY:

REVIEWED BY:

Le ad

S am pl in g W al l R ef er en ce

K ey

Th ird F lo or

DATE:

DATE:

DATE:

REVISED BY:

0 15' 30'

11P-A3138 F3_Pb ar tm en t o f V et er an s Af fa irs

N or th er n Ar iz on a Ve te ra ns A ffa irs

H ea lth C ar e

S ys te m

(N

AV

AH

C

S) H os pi ta l B ui ld in g

P re sc ot t, A riz on a

Side C

Side A

S id e

DS

ide B Lead Sampling Wall Reference Key for

Typical Room

Si de

C

Si de

A

Side D

Side B

Le ad

S am pl in g W al l

Re fe re nc e Ke y fo r

Ty pi ca l R oo m

Side C

Side A

Side D

Side B

Lead Sam pling W all

Pr oj ec ts

\V A

M C

\1 1P

-A

V

A M

C P re sc ot t A sb -L

B P

In sp ii\ D ra w in gs

\S R

_V A

As be st os

S ur ve y

C A

D \2

4\

P-

A

-B ld g

7.

dw g, F 4-

Pb , 2

/2 4/

:2

4:

P M

, m ik eb

BUILDING 108

ROOF

PROJECT No:

SHEET:

DRAWN BY:

REVIEWED BY:

Le ad

S am pl in g W al l R ef er en ce

K ey

Fo ur th

F lo or

DATE:

DATE:

DATE:

REVISED BY:

0 15' 30'

11P-A3138 F4_Pb ar tm en t o f V et er an s Af fa irs

N or th er n Ar iz on a Ve te ra ns A ffa irs

H ea lth C ar e

S ys te m

(N

AV

AH

C

S) H os pi ta l B ui ld in g

P re sc ot t, A riz on a

Side C

Side A

S id e

DS

ide B Lead Sampling Wall Reference Key for

Typical Room

Si de

C

Si de

A

Side D

Side B

Le ad

S am pl in g W al l

Re fe re nc e Ke y fo r

Ty pi ca l R oo m

Side C

Side A

Side D

Side B

Lead Sam pling W all

Pr oj ec ts

\V A

M C

\1 1P

-A

V

A M

C P re sc ot t A sb -L

B P

In sp ii\ D ra w in gs

\S R

_V A

As be st os

S ur ve y

C A

D \2

4\

P-

A

-B ld g

7.

dw g, F 4-

Pb , 2

/2 4/

:2

4:

P M

, m ik eb

BUILDING 108

ROOF

PROJECT No:

SHEET:

DRAWN BY:

REVIEWED BY:

Le ad

S am pl in g W al l R ef er en ce

K ey

Fo ur th

F lo or

DATE:

DATE:

DATE:

REVISED BY:

0 15' 30'

11P-A3138 F4_Pb ar tm en t o f V et er an s Af fa irs

N or th er n Ar iz on a Ve te ra ns A ffa irs

H ea lth C ar e

S ys te m

(N

AV

AH

C

S) H os pi ta l B ui ld in g

P re sc ot t, A riz on a

Side C

Side A

S id e

DS

ide B Lead Sampling Wall Reference Key for

Typical Room

Si de

C

Si de

A

Side D

Side B

Le ad

S am pl in g W al l

Re fe re nc e Ke y fo r

Ty pi ca l R oo m

Side C

Side A

Side D

Side B

Lead Sam pling W all

Appendix B

LBP Summary Sheet

B107 1st Floor Summary.TXT SUMMARY REPORT OF LEAD PAINT INSPECTION FOR: Building 107 - Hospital First Floor

Inspection Date: 01/20/12 IHI Environmental #11P-A3138 Report Date: 4/12/2012 NAVAHCS - Prescott, Arizona Abatement Level: 1.0 Report No. 01/20/12 09:51 Total Readings: 680 (Partial) Actionable: 61 Job Started: 01/20/12 09:51 Job Finished: 01/21/12 16:26

Read Paint Paint Lead No. Wall Structure Location Member Cond Substrate Color (mg/cm²) Mode Interior Room 003 102 030 C Wall L Lft I Plaster White 1.0 QM 034 C Door Ctr Rgt jamb I Metal Gray >9.9 QM Interior Room 004 103 050 C Door Rgt Frame I Metal Gray >9.9 QM Interior Room 006 103b 062 C Door Lft Frame I Metal White 8.1 QM Interior Room 016 110D 137 B Door Ctr Rgt jamb I Metal White 5.0 QM Interior Room 022 112 174 B Radiator Rgt I Metal silver 1.0 QM 175 D Door Rgt Frame I Metal Gray 9.3 QM Interior Room 024 114 186 C Wall Rgt I Plaster White 1.6 QM Interior Room 027 116 208 D Door Rgt Header I Metal Gray >9.9 QM Interior Room 028 117 214 A Ceiling Rgt I Drywall White >9.9 QM Interior Room 029 118 219 B Wall Rgt I Drywall White 1.3 QM 222 C Pipe Rgt I Metal Red 4.1 QM 223 C Stairs Rgt Post I Metal White 5.2 QM 224 C Stairs Rgt Risers I Metal Gray 3.7 QM Interior Room 030 119 230 B Door Rgt Frame I Metal White 7.6 QM Interior Room 031 120 239 B Door Rgt Frame I Metal White >9.9 QM Interior Room 032 121 250 C Door Rgt Frame I Metal Gray >9.9 QM Interior Room 033 122 257 B Door Rgt Frame I Metal Tan >9.9 QM Interior Room 034 123 259 A Wall Rgt I Plaster White 3.6 QM 265 A Wall Rgt Chase I Drywall White 2.1 QM

260 B Wall Rgt I Plaster White 2.0 QM 261 C Wall Rgt I Plaster White 3.1 QM 267 C Door Rgt Frame I Metal White >9.9 QM 262 D Wall Rgt I Plaster White 2.8 QM 263 D Wall Rgt Electrical I Plaster White 2.1 QM 264 D Ceiling Rgt I Plaster White 1.9 QM Interior Room 036 127 storage 280 D Door Rgt Frame I Metal White >9.9 QM Interior Room 039 127a 297 A Wall Chase Rgt I Drywall White 7.4 QM Interior Room 040 100 closet 305 A Door Rgt Frame I Metal Lt. Tan >9.9 QM Interior Room 041 130 315 B Door Rgt Frame I Metal Gray >9.9 QM 313 C Chair Rail Rgt I Wood White 3.4 QM 317 D Wall L Rgt I Plaster White 1.0 QM Interior Room 042 100c 325 D Door Rgt Frame I Metal Gray >9.9 QM Interior Room 043 100cb 339 A Window Rgt ballaster I Wood Varnish >9.9 QM Interior Room 044 A corridor 349 A Wall Rgt sill I Wood White 3.7 QM 350 A Wall Rgt apron I Wood White 2.5 QM Interior Room 045 100b 361 A Wall Rgt I Drywall White 1.0 QM Interior Room 051 140 410 A Window Rgt Frame I Metal White 6.0 QM 415 A Door Rgt L Ctr I Wood Varnish >9.9 QM Interior Room 052 141 422 A Door Rgt Frame I Metal White >9.9 QM 421 B Window Rgt Frame I Metal White >9.9 QM Interior Room 056 143 456 B Window Rgt Frame I Metal White 8.1 QM Interior Room 057 143a 466 A Door Rgt L Rgt I Wood Varnish >9.9 QM Interior Room 059 154 479 1.0 Std 480 1.0 Std 481 1.0 Std Interior Room 060 100ca 485 1.0 Std 493 C Window Rgt trim I Wood White >9.9 QM 495 C Window Rgt arch I Wood White >9.9 QM 494 C Window Rgt Sill I Wood White >9.9 QM 492 C Door Rgt Header I Wood White >9.9 QM Interior Room 063 stair 4 519 A Door Ctr Frame I Metal White >9.9 QM 517 D Stairs Ctr Post I Metal White 5.0 QM

518 D Stairs Ctr Stringers I N/A Gray 8.1 QM Interior Room 065 148 533 B Window Ctr Frame I Metal White 6.9 QM 534 C Door Ctr Frame I Metal White >9.9 QM Interior Room 069 135 563 C Wall Ctr I Plaster White 2.0 QM 564 C Wall Ctr Chase I Drywall White 2.5 QM Interior Room 075 132a 615 D Door Ctr Frame I Metal White 7.4 QM Interior Room 077 150 625 C Wall Ctr I Plaster White 2.0 QM 631 C Door Ctr Frame I Metal White 7.0 QM Calibration Readings ---- End of Readings ----

B107 2nd Floor Summary.TXT SUMMARY REPORT OF LEAD PAINT INSPECTION FOR: Building 107 - Hospital Second Floor

Inspection Date: 01/21/12 IHI Environmental #11P-A3138 Report Date: 4/12/2012 NAVAHCS - Prescott, Arizona Abatement Level: 1.0 Report No. 01/21/12 16:28 Total Readings: 718 Actionable: 121 Job Started: 01/21/12 16:28 Job Finished: 01/23/12 11:41

Read Paint Paint Lead No. Wall Structure Location Member Cond Substrate Color (mg/cm²) Mode Interior Room 011 213 087 B Wall Ctr I Drywall white 2.7 QM Interior Room 012 221 098 D Wall Ctr I Plaster Orange 4.9 QM 102 D Door Ctr Frame I Metal Gray 9.4 QM Interior Room 200 200A 671 A Wall L Ctr I Plaster white 2.4 QM 678 A Ceiling Ctr Beam I Plaster white 1.8 QM 670 A Window Lft Apron I Wood Red 1.6 QM 669 A Window Lft Sill I Wood Red 2.3 QM 328 B Window Lft Apron I Wood Brown 2.4 QM 327 B Window Lft Sill I Plaster Brown 1.9 QM 665 C Wall L Ctr VENT I Metal Cream >9.9 QM 672 C Wall L Ctr I Plaster white 1.9 QM Comment: CORRIDOR NO B WALL Interior Room 201 201 289 A Wall L Ctr I Plaster Yellow 5.6 QM 298 A Wall U Lft I Plaster Yellow 5.7 QM 293 A Soffit Ctr I Plaster white 9.7 QM 290 B Wall L Ctr I Plaster white 6.6 QM 291 C Wall L Ctr I Plaster white 3.0 QM 296 C Door Ctr Rgt jamb I Metal Brown >9.9 QM 292 D Wall U Ctr I Plaster white 7.2 QM Interior Room 202 202 300 A Wall L Rgt I Plaster Green 5.7 QM 302 C Wall L Rgt I Plaster white 5.9 QM 308 C Door Lft Rgt jamb I Metal Brown 7.8 QM Interior Room 203 203 310 A Door Rgt L Rgt I Plaster Green 5.8 QM 312 C Door Rgt L Rgt I Plaster white 4.7 QM Interior Room 204 204 244 A Wall L Lft I Plaster Tan 3.0 QM Interior Room 205 205A 704 A Wall L Lft I Plaster white 1.7 QM 702 A Ceiling Ctr panel I Metal white 1.0 QM Interior Room 206 206 207 B Wall L Lft I Plaster Tan 5.3 QM Interior Room 207 207

200 B Wall L Ctr I Drywall Tan 4.3 QM Interior Room 208 Number Only 163 B Wall Rgt I Plaster Tan 6.5 QM Interior Room 209 Number Only 154 B Wall Rgt I Plaster Tan 6.3 QM Interior Room 223 Number Only 172 D Wall Ctr I Plaster Tan 6.9 QM Interior Room 225 Number Only 185 D Wall Rgt I Plaster Tan 6.7 QM Interior Room 226 226 221 B Door Ctr Rgt jamb I Metal Brown >9.9 QM 218 C Wall Chase Ctr I Drywall white 3.6 QM 216 C Wall U Ctr I Plaster white 3.2 QM Interior Room 228 228 233 C Door Lft Rgt jamb I Metal Brown 2.8 QM Interior Room 229 229 235 A Wall U Ctr I Drywall white 4.9 QM 242 A Door Rgt Rgt jamb I Metal Brown 3.0 QM 238 C Wall L Ctr I Plaster Green 5.5 QM Interior Room 230 230 259 A Column Lft I Plaster white 2.9 QM 255 C Wall U Ctr I Plaster Yellow 2.7 QM Interior Room 231 231 268 A Door Ctr Lft jamb I Metal Brown 6.8 QM Interior Room 232 232 270 A Wall U Ctr I Drywall white 4.6 QM 272 C Wall U Ctr I Plaster white 3.2 QM 274 D Wall Chase Lft I Drywall Brown 2.5 QM Interior Room 236 236 357 B Door Ctr Lft jamb I Metal Brown 9.1 QM Interior Room 237 237 368 A Door Ctr Rgt jamb I Metal Lt. Pink 8.4 QM Interior Room 238 238 370 A Wall U Lft I Plaster white 2.0 QM 378 A Door Lft Lft jamb I Metal Brown >9.9 QM 376 B Panel Rgt I Metal white 1.0 QM 371 B Wall U Lft I Plaster white 3.3 QM 375 C Wall Chase Lft I Plaster white 2.9 QM 373 D Wall U Lft I Plaster white 2.6 QM Interior Room 239 239 380 A Wall L Rgt I Plaster white 3.6 QM 387 A Door Lft Rgt jamb I Metal Brown 7.8 QM 381 B Wall L Lft I Plaster white 2.4 QM Interior Room 240 240 389 A Wall U Ctr I Plaster white 3.7 QM 397 A Door Rgt L Lft I Metal Brown 7.8 QM 392 D Wall L Lft I Plaster purple 3.5 QM

Interior Room 241 241 399 A Wall L Lft I Plaster white 3.3 QM 406 A Door Lft Rgt jamb I Metal Brown 9.4 QM 400 B Wall L Lft I Drywall white 3.7 QM Interior Room 242 242 408 A Wall U Rgt I Plaster Brown 2.5 QM 415 A Door Lft Rgt jamb I Metal Brown 6.3 QM 409 B Wall U Rgt I Plaster Brown 1.7 QM 410 C Wall U Rgt I Plaster Brown 1.0 QM 411 D Wall U Rgt I Plaster Brown 1.0 QM Interior Room 243 243 424 A Door Ctr Rgt jamb I Metal Lt. Pink >9.9 QM Interior Room 244 244 439 A Door Ctr Rgt jamb I Metal white 7.2 QM 436 B Chair Rail Rgt I Wood white 2.8 QM 433 D Chair Rail Ctr I Wood white 3.0 QM Interior Room 245 245 443 B Wall L Lft I Plaster white 2.5 QM Comment: no A wall Interior Room 246 246 454 D Wall Chase Rgt I Drywall white 3.9 QM 452 D Wall L Ctr I Plaster white 4.3 QM Interior Room 247 247 457 A Wall U Lft I Plaster white 5.4 QM 464 A Door Rgt Lft jamb I Metal Lt. Pink 8.5 QM 458 B Wall U Rgt I Plaster white 5.1 QM 459 C Wall U Rgt I Plaster white 6.7 QM 463 C Ceiling Lft I Drywall white 7.4 QM 460 D Wall L Ctr I Plaster white 6.6 QM Interior Room 248 248 467 B Wall U Lft I Plaster white 4.6 QM 469 C Wall U Rgt I Plaster white 6.2 QM 471 C Ceiling Ctr I Plaster white 7.2 QM 473 C Window Rgt Sill I Drywall white 5.8 QM Interior Room 249 249 484 D Ceiling Ctr I Plaster white 6.6 QM Interior Room 250 250 491 B Ceiling Ctr I Plaster white 6.9 QM 490 C Wall Chase Rgt I Drywall white 7.0 QM 487 C Wall U Lft I Drywall white 6.0 QM Interior Room 252 252 509 D Window Rgt Sill I Plaster white 1.0 QM Interior Room 253 253 514 A Wall L Lft I Plaster white 5.9 QM 510 A Wall U Lft I Plaster white 1.0 QM Interior Room 254 254 518 A Wall L Lft I Plaster white 5.7 QM Interior Room 255 255 525 A Wall L Rgt I Plaster white 5.5 QM 526 B Wall L Rgt I Plaster white 3.5 QM

Interior Room 257 257 548 C Door Lft Lft jamb I Metal Lt. Pink 6.3 QM Interior Room 259 259 556 A Wall U Lft I Plaster white 6.5 QM 559 D Wall L Lft I Plaster white 7.6 QM Interior Room 260 260 568 C Wall Chase Ctr I Plaster Yellow 7.5 QM Interior Room 261 261 571 A Wall U Lft I Plaster white 6.8 QM 572 B Wall U Ctr I Drywall white 6.7 QM Interior Room 262 262A 623 A Wall U Lft I Plaster white 3.2 QM 587 A Wall U Ctr I Plaster white 2.5 QM 627 A Ceiling Ctr I Plaster white 3.2 QM 626 D Wall U Lft I Plaster white 4.2 QM Interior Room 263 263 621 C Door Rgt Rgt jamb I Metal Lt. Pink >9.9 QM Interior Room 264 264 632 B Wall U Ctr I Plaster white 3.3 QM 635 C Wall Chase Rgt I Drywall white 4.5 QM 633 C Wall U Rgt I Plaster white 2.7 QM 638 C Door Ctr Lft jamb I Metal white 9.7 QM 634 D Wall U Lft I Plaster white 4.5 QM Interior Room 265 265 642 C Wall L Lft I Drywall white 3.6 QM 647 C Door Rgt Rgt jamb I Metal Brown 7.5 QM 643 D Wall L Ctr I Plaster Green 2.5 QM Interior Room 266 266 681 C Wall L Lft I Plaster white 4.5 QM 684 C Ceiling Ctr I Plaster white 7.3 QM 685 C Door Ctr Lft jamb I Metal white >9.9 QM Interior Room 267 267 649 A Wall U Lft I Plaster white 5.4 QM 653 C Wall Chase Ctr I Plaster white 3.5 QM 651 C Wall U Lft I Drywall white 5.4 QM 655 C Ceiling Ctr I Plaster white 6.2 QM 657 C Door Ctr Lft jamb I Metal Brown 9.5 QM Calibration Readings

B107 3rd Floor Summary.TXT SUMMARY REPORT OF LEAD PAINT INSPECTION FOR: Building 107- Hospital Third Floor

Inspection Date: 01/24/12 IHI Environmental #11P-A3138 Report Date: 4/12/2012 NAVAHCS - Prescott, Arizona Abatement Level: 1.0 Report No. 01/24/12 10:00 Total Readings: 780 Actionable: 53 Job Started: 01/24/12 10:00 Job Finished: 01/25/12 11:38

Read Paint Paint Lead No. Wall Structure Location Member Cond Substrate Color (mg/cm²) Mode Interior Room 004 334 040 B Door Rgt Lft jamb I Metal white >9.9 QM Interior Room 006 331 050 A Wall U Lft I Drywall white 3.6 QM 055 C Wall Chase Rgt I Drywall white 4.8 QM 052 C Wall U Lft I Plaster white 2.9 QM Interior Room 007 302 059 A Wall L Lft I Plaster Green 4.7 QM 061 B Wall L Ctr I Plaster Cream 6.7 QM 062 C Wall L Lft I Plaster Cream 7.1 QM 066 C Ceiling Ctr I Plaster white 7.6 QM 067 C Door Ctr Rgt jamb I Metal Brown >9.9 QM 063 D Wall L Lft I Plaster Cream 6.3 QM Interior Room 008 330 077 A Door Ctr Lft jamb I Metal white >9.9 QM Interior Room 010 329 089 A Wall Chase Rgt I Drywall white 6.6 QM 088 A Wall L Ctr I Plaster white 1.4 QM 096 A Door Lft Rgt jamb I Metal Brown 7.1 QM 091 C Wall U Lft I Plaster Green 2.4 QM 095 C Ceiling Rgt I Plaster white 8.3 QM Interior Room 011 328 099 A Wall Chase Lft I Plaster Cream 5.7 QM 098 A Wall U Ctr I Plaster Cream 4.9 QM 106 A Ceiling Rgt I Plaster white >9.9 QM 104 A Door Rgt Lft jamb I Metal Brown >9.9 QM Interior Room 013 325 111 A Wall L Rgt I Plaster white 5.4 QM 123 B Door Ctr Lft jamb I Metal Brown 6.0 QM 115 C Chair Rail Rgt I Wood white 4.6 QM 116 C Wall Chase Rgt I Drywall white 4.2 QM 113 C Wall L Ctr I Plaster white 4.0 QM 114 C Wall U Ctr I Plaster white 4.7 QM 119 D Wall U Ctr I Plaster white 3.2 QM 120 D Ceiling Ctr I Drywall white 5.1 QM Interior Room 016 320 145 C Wall U Lft I Plaster white 4.4 QM Interior Room 037 3A Clin Hal 318 C Wall U Lft I Plaster Yellow 2.8 QM

Interior Room 038 335 323 A Wall U Rgt I Plaster white 4.3 QM 330 A Door Ctr Rgt jamb I Metal Brown 9.2 QM 324 B Wall U Lft I Plaster white 5.3 QM 325 C Wall Chase Lft I Plaster white 4.0 QM 327 D Wall Chase Rgt I Plaster white 7.1 QM 326 D Wall U Rgt I Plaster white 4.1 QM Interior Room 044 338A 374 A Wall Chase Ctr I Drywall Cream 3.2 QM Interior Room 047 340 401 C Wall Chase Rgt I Drywall Orange 2.8 QM Interior Room 048 340A 408 A Wall Chase Lft I Plaster Cream 3.0 QM Interior Room 049 341 418 C Wall Chase Rgt I Plaster Yellow 2.8 QM Interior Room 051 343 429 B Wall L Rgt I Plaster Yellow 1.5 QM Interior Room 053 342 450 A Door Rgt Rgt jamb I Metal Brown 6.2 QM 445 B Wall L Rgt I Drywall white 2.8 QM Interior Room 060 349 511 A Wall Chase Lft I Plaster Yellow 1.5 QM Interior Room 064 351 538 B Wall Chase Lft I Plaster Yellow 3.6 QM 537 B Wall L Ctr I Plaster Yellow 2.9 QM Interior Room 076 327 641 A Door Rgt Lft jamb I Metal Brown >9.9 QM Interior Room 082 359 688 C Wall U Lft I Drywall Cream 1.4 QM 693 C Door Rgt Rgt jamb I Metal Brown 5.5 QM Interior Room 083 360 698 C Wall L Rgt I Drywall Cream 1.5 QM Interior Room 084 360A 707 B Wall Trim Lft I Plaster white 4.0 QM Interior Room 087 363 731 C Door Rgt Lft jamb I Metal Brown 1.0 QM Interior Room 092 300B West 773 C Door Ctr Str 4 jamb I Metal Brown >9.9 QM Comment: no b wall Calibration Readings

SUMMARY REPORT OF LEAD PAINT INSPECTION FOR: Building 107- Hospital Third Floor

Inspection Date: 01/24/12 IHI Environmental #11P-A3138 Report Date: 4/12/2012 NAVAHCS - Prescott, Arizona Abatement Level: 1.0 Report No. 01/24/12 10:00 Total Readings: 780 Actionable: 53 Job Started: 01/24/12 10:00 Job Finished: 01/25/12 11:38

Read Paint Paint Lead No. Wall Structure Location Member Cond Substrate Color (mg/cm²) Mode Interior Room 004 334 040 B Door Rgt Lft jamb I Metal white >9.9 QM Interior Room 006 331 050 A Wall U Lft I Drywall white 3.6 QM 055 C Wall Chase Rgt I Drywall white 4.8 QM 052 C Wall U Lft I Plaster white 2.9 QM Interior Room 007 302 059 A Wall L Lft I Plaster Green 4.7 QM 061 B Wall L Ctr I Plaster Cream 6.7 QM 062 C Wall L Lft I Plaster Cream 7.1 QM 066 C Ceiling Ctr I Plaster white 7.6 QM 067 C Door Ctr Rgt jamb I Metal Brown >9.9 QM 063 D Wall L Lft I Plaster Cream 6.3 QM Interior Room 008 330 077 A Door Ctr Lft jamb I Metal white >9.9 QM Interior Room 010 329 089 A Wall Chase Rgt I Drywall white 6.6 QM 088 A Wall L Ctr I Plaster white 1.4 QM 096 A Door Lft Rgt jamb I Metal Brown 7.1 QM 091 C Wall U Lft I Plaster Green 2.4 QM 095 C Ceiling Rgt I Plaster white 8.3 QM Interior Room 011 328 099 A Wall Chase Lft I Plaster Cream 5.7 QM 098 A Wall U Ctr I Plaster Cream 4.9 QM 106 A Ceiling Rgt I Plaster white >9.9 QM 104 A Door Rgt Lft jamb I Metal Brown >9.9 QM Interior Room 013 325 111 A Wall L Rgt I Plaster white 5.4 QM 123 B Door Ctr Lft jamb I Metal Brown 6.0 QM 115 C Chair Rail Rgt I Wood white 4.6 QM 116 C Wall Chase Rgt I Drywall white 4.2 QM 113 C Wall L Ctr I Plaster white 4.0 QM 114 C Wall U Ctr I Plaster white 4.7 QM 119 D Wall U Ctr I Plaster white 3.2 QM 120 D Ceiling Ctr I Drywall white 5.1 QM Interior Room 016 320 145 C Wall U Lft I Plaster white 4.4 QM Interior Room 037 3A Clin Hal 318 C Wall U Lft I Plaster Yellow 2.8 QM

Interior Room 038 335 323 A Wall U Rgt I Plaster white 4.3 QM 330 A Door Ctr Rgt jamb I Metal Brown 9.2 QM 324 B Wall U Lft I Plaster white 5.3 QM 325 C Wall Chase Lft I Plaster white 4.0 QM 327 D Wall Chase Rgt I Plaster white 7.1 QM 326 D Wall U Rgt I Plaster white 4.1 QM Interior Room 044 338A 374 A Wall Chase Ctr I Drywall Cream 3.2 QM Interior Room 047 340 401 C Wall Chase Rgt I Drywall Orange 2.8 QM Interior Room 048 340A 408 A Wall Chase Lft I Plaster Cream 3.0 QM Interior Room 049 341 418 C Wall Chase Rgt I Plaster Yellow 2.8 QM Interior Room 051 343 429 B Wall L Rgt I Plaster Yellow 1.5 QM Interior Room 053 342 450 A Door Rgt Rgt jamb I Metal Brown 6.2 QM 445 B Wall L Rgt I Drywall white 2.8 QM Interior Room 060 349 511 A Wall Chase Lft I Plaster Yellow 1.5 QM Interior Room 064 351 538 B Wall Chase Lft I Plaster Yellow 3.6 QM 537 B Wall L Ctr I Plaster Yellow 2.9 QM Interior Room 076 327 641 A Door Rgt Lft jamb I Metal Brown >9.9 QM Interior Room 082 359 688 C Wall U Lft I Drywall Cream 1.4 QM 693 C Door Rgt Rgt jamb I Metal Brown 5.5 QM Interior Room 083 360 698 C Wall L Rgt I Drywall Cream 1.5 QM Interior Room 084 360A 707 B Wall Trim Lft I Plaster white 4.0 QM Interior Room 087 363 731 C Door Rgt Lft jamb I Metal Brown 1.0 QM Interior Room 092 300B West 773 C Door Ctr Str 4 jamb I Metal Brown >9.9 QM Comment: no b wall Calibration Readings

B107 4th Floor Summary.TXT SUMMARY REPORT OF LEAD PAINT INSPECTION FOR: Building 107 - Hospital Fourth Floor

Inspection Date: 01/25/12 IHI Environmental #11P-A3138 Report Date: 4/12/2012 NAVAHCS Prescott, Arizona Abatement Level: 1.0 Report No. 01/25/12 11:48 Total Readings: 753 Actionable: 141 Job Started: 01/25/12 11:48 Job Finished: 01/26/12 12:25

Read Paint Paint Lead No. Wall Structure Location Member Cond Substrate Color (mg/cm²) Mode Interior Room 003 430 024 D Door Rgt Rgt jamb I Metal Lt. Blue 1.0 QM Interior Room 004 432 033 A Ceiling Ctr I Drywall white 1.5 QM 036 B Door Ctr Lft jamb I Metal Orange >9.9 QM Interior Room 006 429A 054 A Door Lft Rgt jamb I Metal white 5.4 QM Interior Room 007 429B 058 B Wall Chase Rgt I Drywall white 6.1 QM 057 B Wall U Lft I Plaster white 4.5 QM 059 C Wall L Ctr I Plaster white 4.6 QM 060 D Wall L Ctr I Drywall white 5.4 QM Interior Room 008 402 065 A Wall U Lft I Plaster white 6.8 QM 066 B Wall U Lft I Drywall white 8.2 QM 067 C Wall U Lft I Drywall white 6.9 QM 071 C Door Rgt Lft jamb I Metal Lt.Green 1.5 QM 068 D Wall U Rgt I Plaster white 4.9 QM Interior Room 009 403 074 B Wall U Ctr I Drywall white 4.8 QM 076 C Wall U Ctr I Plaster white 6.0 QM 079 C Door Rgt Lft jamb I Metal Lt. Blue 8.3 QM 077 D Wall U Ctr I Plaster white 5.8 QM Interior Room 010 404 081 A Wall U Lft I Plaster white 6.7 QM 082 B Wall U Lft I Plaster white 5.2 QM 087 C Door Lft Rgt jamb I Metal Lt. Blue 4.1 QM 086 D Wall Chase Lft I Drywall white 5.3 QM 085 D Wall U Lft I Plaster white 6.0 QM Interior Room 011 405 089 A Wall U Lft I Plaster white 8.8 QM 090 B Wall U Lft I Drywall white 6.1 QM 092 C Wall L Rgt I Plaster white 6.4 QM 094 D Wall U Ctr I Drywall white 7.4 QM Interior Room 012 406 097 A Wall U Lft I Plaster white 8.3 QM 098 B Wall U Lft I Drywall white 4.7 QM Interior Room 013 425

104 A Wall U Rgt I Plaster white 9.0 QM 110 A Door Rgt Rgt jamb I Metal Lt. Blue 2.6 QM 105 B Wall U Ctr I Drywall white 7.5 QM 106 C Wall U Lft I Plaster white 9.0 QM 107 D Wall U Lft I Plaster white 7.8 QM Interior Room 014 421 114 C Wall U Lft I Plaster white 4.3 QM Interior Room 015 409 120 A Wall U Lft I Plaster white 8.1 QM Interior Room 016 420 130 C Wall U Rgt I Plaster white 5.8 QM Interior Room 017 413 137 A Wall U Rgt I Plaster white 4.7 QM Interior Room 020 418 161 C Wall U Rgt I Plaster white 4.7 QM 164 D Wall U Lft I Plaster white 6.2 QM Interior Room 021 417 170 B Wall U Lft I Plaster white 6.1 QM 174 C Wall Chase Rgt I Drywall white 3.4 QM 171 C Wall U Rgt I Plaster white 6.4 QM Interior Room 022 414 177 A Wall U Rgt I Plaster white 7.6 QM 180 B Wall Chase Lft I Drywall white 6.5 QM 179 B Wall U Lft I Plaster white 6.8 QM Interior Room 024 416 198 C Wall U Ctr I Plaster white 1.4 QM Interior Room 025 419 206 A Wall U Rgt I Plaster white 7.7 QM 214 A Ceiling Ctr I Plaster white >9.9 QM 212 A Door Lft Rgt jamb I Metal Lt.Green 8.3 QM 207 B Wall U Rgt I Drywall white 9.2 QM 208 C Wall U Rgt I Plaster white 7.9 QM 209 D Wall U Lft I Plaster white 7.2 QM Interior Room 026 411 221 C Door Rgt Lft jamb I Metal Lt.Green 2.7 QM Interior Room 028 421A 237 A Ceiling Ctr I Plaster white 6.5 QM 236 D Wall U Ctr I Drywall white 6.3 QM Interior Room 029 422 250 A Door Rgt Rgt jamb I Metal Lt. Blue 1.0 QM 247 B Chair Rail Ctr I Wood white 3.4 QM 246 B Closet Shelf Rgt I Wood white 8.5 QM 245 D Wall U Lft I Drywall white 3.3 QM Interior Room 031 423 265 A Door Lft Header I Metal Lt.Green 3.3 QM Interior Room 033 400A East 275 A Wall U Ctr I Drywall white 1.7 QM 284 C Door Ctr str 2 jamb I Metal Lt. Blue 7.8 QM

Interior Room 034 424 288 A Wall U Lft I Drywall white 9.3 QM 294 A Door Ctr Rgt jamb I Metal Lt. Blue >9.9 QM 289 B Wall U Ctr I Drywall white 6.6 QM 290 C Wall U Lft I Plaster white 6.6 QM 291 D Wall U Lft I Drywall white 7.2 QM Interior Room 035 426 298 B Wall U Ctr I Plaster white 6.2 QM 299 C Wall U Rgt I Plaster white 2.7 QM 301 D Wall U Ctr I Drywall white 5.2 QM Interior Room 038 401 322 A Wall U Rgt I Plaster white 6.7 QM 323 B Wall U Rgt I Plaster Brown 5.9 QM 325 C Wall U Rgt I Plaster white 7.7 QM 326 D Wall L Ctr I Plaster white 6.2 QM Interior Room 039 401A 332 A Wall U Lft I Plaster white 7.5 QM Interior Room 041 433 357 A Door Ctr Rgt jamb I Metal Tan >9.9 QM Interior Room 042 434 365 A Door Lft Rgt jamb I Metal Lt. Blue 9.8 QM Interior Room 044 436 382 A Door Lft Lft jamb I Metal white 6.8 QM 377 B Wall U Rgt I Drywall Green 1.0 QM 378 C Wall U Rgt I Plaster Green 2.7 QM 381 D Wall Chase Rgt I Plaster white 3.6 QM Interior Room 045 437 385 A Wall Chase Rgt I Drywall white 5.9 QM 390 A Door Lft Rgt jamb I Metal Beige 6.0 QM 389 D Wall U Lft I Plaster white 4.7 QM Interior Room 046 438 399 A Door Lft Rgt jamb I Metal white 8.1 QM Interior Room 047 456 402 A Wall U Lft I Plaster Brown 5.9 QM 404 B Wall U Ctr I Drywall white 3.8 QM 409 C Door Rgt Lft jamb I Metal white 9.8 QM 406 D Wall U Rgt I Drywall white 5.6 QM Interior Room 048 457 419 C Door Lft Rgt jamb I Metal white 4.7 QM Interior Room 049 458 422 A Wall U Lft I Plaster white 3.3 QM 424 B Wall U Lft I Plaster white 7.9 QM 432 C Ceiling Rgt Upper I Plaster white >9.9 QM 430 C Door Rgt Rgt jamb I Metal white 5.1 QM 428 D Wall U Lft I Plaster Green 5.3 QM Interior Room 050 459 433 A Wall U Lft I Plaster white 3.8 QM 434 B Wall U Lft I Drywall white 3.3 QM 445 B Ceiling Ctr I Plaster Yellow >9.9 QM 438 C Wall U Lft I Plaster Yellow 4.7 QM 442 C Door Lft Lft jamb I Metal white 8.9 QM

439 D Wall U Lft I Plaster Brown 4.3 QM Interior Room 051 460 446 A Wall U Rgt I Plaster Green 2.9 QM 448 B Wall U Lft I Plaster white 7.1 QM 450 C Wall U Rgt I Plaster white 6.6 QM 452 C Door Lft Rgt jamb I Metal white 3.9 QM 451 D Wall U Lft I Plaster white 5.6 QM Interior Room 052 400B Cent 464 A Window Lft Apron I Wood Lt. Blue 2.0 QM 463 A Window Lft Sill I Wood Cream 1.6 QM 467 C Wall L Rgt grill I Metal white >9.9 QM Interior Room 053 461 468 A Wall U Lft I Plaster white 7.8 QM 470 A Wall U Rgt I Plaster Green 2.5 QM 471 B Wall L Lft I Plaster white 6.5 QM 473 C Wall Chase Ctr I Plaster white 8.8 QM 472 C Wall L Lft I Plaster white 6.2 QM 475 C Door Ctr Rgt jamb I Metal white 8.2 QM 474 D Wall U Ctr I Plaster Blue 4.6 QM Interior Room 054 461A 478 A Wall U Lft I Plaster Orange 7.3 QM 484 B Ceiling Lft I Plaster white 4.9 QM 483 D Wall Chase Rgt I Plaster white 8.9 QM 482 D Wall L Ctr I Plaster white 8.5 QM Interior Room 055 455 499 A Wall L Lft I Plaster white 2.3 QM 502 B Wall U Lft I Plaster Gray 4.9 QM 503 C Wall L Lft I Plaster Gray 4.5 QM 506 D partition Lft I Drywall Gray 3.7 QM 504 D Wall L Rgt I Plaster Gray 2.9 QM Interior Room 056 455A 509 A Wall L Lft I Plaster white 3.0 QM 512 B Wall U Rgt I Plaster white 7.5 QM 513 C Wall L Lft I Plaster white 2.8 QM 517 C Door Lft Rgt jamb I Metal white 6.8 QM 514 D Wall U Ctr I Plaster white 3.3 QM Interior Room 057 454 519 A Wall U Ctr I Plaster Beige 2.0 QM 522 C Wall U Lft show wall I Plaster Beige 3.9 QM 523 D Wall L Lft I Plaster Brown 4.1 QM Interior Room 058 454A 528 A Wall U Ctr I Plaster white 5.5 QM 529 B Wall U Ctr I Plaster white 3.2 QM Interior Room 076 ICU Hall 688 D Ceiling Rgt beam I Plaster white 8.2 QM Interior Room 077 453 692 A Wall L Rgt I Plaster white 8.2 QM 696 D Wall U Lft I Plaster Brown 4.7 QM Interior Room 080 440 726 C Chair Rail Ctr I Wood white 2.9 QM 731 D Door Lft Lft jamb I Metal Tan 7.1 QM Comment: b wall not accessible

Interior Room 081 439 739 D Door Rgt Lft jamb I Metal Tan 9.6 QM Calibration Readings

B107 5th Floor Summary.TXT SUMMARY REPORT OF LEAD PAINT INSPECTION FOR: Building 107 - Hospital Fifth Floor

Inspection Date: 01/23/12 IHI Environmental #11P-A3138 Report Date: 4/12/2012 NAVAHCS Prescott, Arizona Abatement Level: 1.0 Report No. 01/23/12 12:08 Total Readings: 344 Actionable: 38 Job Started: 01/23/12 12:08 Job Finished: 01/23/12 17:44

Read Paint Paint Lead No. Wall Structure Location Member Cond Substrate Color (mg/cm²) Mode Interior Room 002 526 019 D Door Ctr Rgt jamb P Metal Brown >9.9 QM Interior Room 021 523 143 C Door Rgt Lft jamb I Metal Tan 9.4 QM Comment: all walls ceramic tile Interior Room 022 521 147 D Wall U Lft I Plaster Green 1.3 QM Comment: a wall ceramic Interior Room 023 522 152 A Wall U Rgt I Plaster white 1.7 QM 154 C Wall U Ctr I Plaster white 1.3 QM 155 D Wall U Ctr I Plaster white 1.3 QM Interior Room 024 521 156 B Door Rgt Rgt jamb I Metal Tan >9.9 QM Comment: all walls ceramic Interior Room 033 501 216 D Wall U Lft I Drywall white 2.2 QM Interior Room 035 601 mech 232 A Window Lft Casing I Wood Gray 7.0 QM 233 A Window Lft Rgt jamb I Wood Gray 6.0 QM 231 A Window Lft Sash I Wood Gray 5.3 QM 236 A Window Rgt Rgt casing I Wood Gray 6.3 QM 235 A Window Rgt Sash I Wood Gray 4.7 QM 229 B Pipe Ctr I Metal Gray 2.8 QM 238 B Window Lft Rgt jamb I Wood Gray 3.9 QM 237 B Window Lft Rgt casing I Wood Gray 8.6 QM 234 C Wall L Rgt Electrical I Metal Gray >9.9 QM 243 D Door Lft Lft casing I Metal Orange 6.7 QM 240 D Stairs Lft Stringers I Concrete Gray >9.9 QM 241 D Stairs Lft Risers I Concrete Gray >9.9 QM 242 D Stairs Rgt Railing I Metal Gray 1.9 QM Interior Room 036 elevator ro 250 C Stairs Lft Stringers I Metal Black 1.0 QM 249 D elevator mot Lft I Metal Green 1.5 QM Interior Room 038 stair 3 266 A Wall L Lft I Concrete white 2.1 QM 277 C Baseboard Ctr I Wood Gray >9.9 QM 275 C Stairs Ctr Stringers I Metal Gray >9.9 QM 276 C Stairs Ctr Risers I Metal purple >9.9 QM

B107 5th Floor Summary.TXT 278 D Stairs Rgt Newel post I Wood white >9.9 QM Interior Room 039 PH B Mech 293 A Floor Ctr Lower I Concrete Gray 1.5 QM 288 C Stairs Lft Railing I Metal Black 2.6 QM 289 C Stairs Lft Railing I Metal Black 4.5 QM 295 D Pipe Ctr I Metal Gray 1.0 QM Interior Room 041 PH A 308 B mech Lft hvac I Metal Gray 1.0 QM 318 C Floor Ctr I Concrete Gray 2.3 QM Interior Room 043 PH A Foyer 325 C Door Ctr Rgt jamb I Metal Orange 9.4 QM 329 D Floor Ctr I Concrete Gray 3.1 QM Interior Room 044 stairs 2 336 C Baseboard Ctr I Metal Gray >9.9 QM 335 D Wall L Rgt I Plaster white 1.0 QM Calibration Readings

B107-Basement Summary.TXT SUMMARY REPORT OF LEAD PAINT INSPECTION FOR: Building 107 - Hospital BASEMENT

Inspection Date: 01/19/12 IHI Environmental #11P-A3138 Report Date: 4/12/2012 NAVAHCS Prescott, Arizona Abatement Level: 1.0 Report No. 01/19/12 10:03 Total Readings: 306 Actionable: 50 Job Started: 01/19/12 10:03 Job Finished: 01/19/12 18:04

Read Paint Paint Lead No. Wall Structure Location Member Cond Substrate Color (mg/cm²) Mode Interior Room 001 017a 014 B Pipe Lft Sprinkler I Metal White 1.0 QM 011 D Wall L Ctr I Concrete White 4.0 QM Interior Room 002 017 018 A Wall U Rgt I Wood White 3.5 QM 019 B Wall L Lft I Concrete White 1.6 QM 028 D Pipe Ctr I Metal Yellow 3.4 QM Interior Room 003 001 043 C Door Rgt Rgt casing I Metal White >9.9 QM Interior Room 004 001A 056 B Door Lft Rgt casing I Metal White >9.9 QM Comment: n0 paint surf in chse Interior Room 005 002A 061 D Door Ctr Rgt casing I Metal White >9.9 QM 062 D Door Ctr U Rgt I Metal Yellow 3.0 QM Comment: All ceramic walls Interior Room 006 013 068 A Ceiling Ctr I Plaster White 1.0 QM 064 B Wall L Ctr I Plaster White 1.0 QM 065 C Wall L Ctr I Plaster White 1.0 QM Interior Room 008 003 094 B Wall L Ctr I Plaster White 2.7 QM 095 C Wall L Ctr I Plaster White 3.9 QM 096 D Wall L Ctr I Plaster White 1.5 QM Interior Room 009 004 106 A Pipe Rgt I Metal Red 4.8 QM 107 A Door Rgt Rgt jamb I N/A White >9.9 QM 110 A Railing Rgt Balusters I Metal White >9.9 QM 101 B Wall U Ctr I Plaster White 8.6 QM 102 C Wall U Ctr I Plaster White 6.0 QM 104 D Wall U Rgt I Drywall White 4.6 QM 105 D Ceiling Rgt I Plaster White 7.1 QM Interior Room 011 006 114 B Wall L Ctr I Plaster Lt. Blue 1.0 QM 123 D Door Rgt Lft jamb I Metal Lt. Blue >9.9 QM Interior Room 014 007 144 D Radiator Lft I Metal White >9.9 QM 146 D Window Lft Sill I Wood White 6.5 QM

B107-Basement Summary.TXT 148 D Window Ctr Rgt casing I Wood White 4.9 QM 147 D Window Ctr Sash I Wood White >9.9 QM 149 D Window Rgt Apron I Wood Tan 5.5 QM Interior Room 015 007b 157 D Door Rgt L Ctr I Metal White >9.9 QM Interior Room 016 008 158 A Wall L Lft I Plaster White 2.0 QM 162 D Ceiling Lft I Plaster White 2.4 QM Interior Room 017 009 174 B Ceiling Ctr I Plaster White 2.7 QM Interior Room 018 010 182 B Door Ctr Rgt casing I Metal White 7.7 QM Interior Room 019 011 190 B Door Ctr Rgt casing I Metal White 8.8 QM Interior Room 020 012 198 B Door Lft Rgt casing I Metal White >9.9 QM Interior Room 021 000b 200 A Wall L Ctr I Plaster White 1.5 QM 205 D Wall L Lft wall insert I Plaster Tan 2.3 QM 206 D Wall L Lft wall insert I Wood Tan 3.2 QM Interior Room 024 014 238 A Panel Lft Electrical I Metal White 1.9 QM 233 A Window Rgt Sash I Wood White 6.1 QM 235 A Window Rgt Apron I Wood White 6.0 QM 234 A Window Rgt Lft casing I Wood White 3.2 QM 230 B Door Rgt Rgt casing I Metal Gray 9.0 QM Interior Room 025 015 249 B Door Rgt Header I Metal Gray >9.9 QM Interior Room 027 stair 3 263 B Pipe Ctr Sprinkler I Metal Red 3.4 QM 265 B Door Lft Header I Metal White 3.1 QM Interior Room 028 018 266 B Pipe Ctr F Metal White 4.2 QM Comment: no painted walls Interior Room 029 stairs 8 268 B Pipe Ctr I Metal Yellow 1.5 QM Interior Room 030 00C 276 C Door Ctr Lft casing F Metal White 5.0 QM Calibration Readings

B107 Exterior Summary.TXT SUMMARY REPORT OF LEAD PAINT INSPECTION FOR: Building 107 - Hospital Exterior

Inspection Date: 01/26/12 IHI Environmental #11P-A3138 Report Date: 4/12/2012 NAVAHCS Prescott, Arizona Abatement Level: 1.0 Report No. 01/26/12 12:57 Total Readings: 347 (Partial) Actionable: 28 Job Started: 01/26/12 12:57 Job Finished: 01/27/12 14:03

Read Paint Paint Lead No. Wall Structure Location Member Cond Substrate Color (mg/cm²) Mode Exterior Room 001 C-SE 038 A Lamp Lft I Metal Black 6.4 QM 044 A Grating Lft Basement I Steel white 7.5 QM Basement Window 096 A Foundation Lft Grating I Metal white 4.6 QM 021 A Lamp Rgt I Metal Black 5.3 QM 084 A Foundation Rgt Wind Sash I Wood white >9.9 QM Basement WA10 SW 085 A Foundation Rgt Win Jamb I Wood white >9.9 QM Basement WA10 SW 086 A Foundation Rgt Win Sill P Wood white >9.9 QM Basement WA10 - SW 087 A Foundation Rgt Win Casing P Wood white >9.9 QM Basement WA10 - SW 091 A Foundation Rgt Grating I Metal white >9.9 QM 025 A Window Lft Upp Sill I Wood white >9.9 QM 026 A Window Lft Upp Casing I Wood white >9.9 QM 027 A Window Lft Balluster I Wood white >9.9 QM 030 A Window Lft Low Casing I Wood white 1.3 QM 028 A Window Lft Header I Wood white >9.9 QM 046 A Window Lft Lft casing I Wood white 9.0 QM Basement Window 008 A Window Rgt Upp Sill I Wood white >9.9 QM 009 A Window Rgt Upp casing I Wood white >9.9 QM 010 A Window Rgt ballasters I Wood white >9.9 QM 013 A Window Rgt Lft casing I Wood white 2.0 QM 148 C fascia Ctr Awning I Metal white >9.9 QM 149 C Crown Mldg Ctr Awning I Metal white 4.3 QM 341 C Foundation Ctr Wall I Concrete white 2.7 QM Ext Wall Shot taken inside mech rm 018 by crawl door.

158 C Door Lft Frame I Metal white 3.9 QM Door A 145 C Door Ctr Lft casing I Metal white 4.0 QM Morgue door - ext 146 C Door Ctr L Rgt I Metal white 2.9 QM morgue door - ext 123 C Door Rgt U Rgt I Metal white 4.0 QM Mech Rm 017 Door Exterior Room 002 PH B Ext 241 D Wall L Lft Louv Frame P Metal…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .