36E77619B0012-003.pdf
PDF Posted
- Attached to
- Radiology Expansion (Construction) Prescott VAMC
- Solicitation number
- 36E77619B0012
About this file
This document provides details for a federal construction contract opportunity for a Radiology Expansion project at the Northern Arizona VA Medical Center. The project scope involves renovating and expanding an existing radiology area through new construction and demolition of approximately 3,000 square feet. Key requirements include optimizing the department footprint with centralized waiting, wide hallways, and sufficiently sized rooms. The contract will be awarded as a firm-fixed-price design-bid-build project. The solicitation will be issued as a Service-Disabled Veteran-Owned Small Business set-aside with a NAICS code of 236220 and $5-10 million magnitude. All questions must be submitted in writing to the issuing office by the specified due date in the solicitation. The performance period is approximately 425 days from notice to proceed.
36E77619B0012 Attachment 2 - 100 Specification - Volume 2.pdf
View the file
Other files
Show 40 more
Latest 50 of 59 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A 312 NW SW 25th Street, Oklahoma City, OK 73109 P 405.842.6100 E design@spur-design.com W spur-design.com
NORTHERN ARIZONA VA HEALTH CARE SYSTEM
PROJECT #: 649-413
Radiology Expansion at NAVAHCS Prescott, AZ November 1, 2018
100% CONSTRUCTION DOCUMENTS
Construction Specifications
Volume Two – Divisions 7-14
649-413 Radiology Expansion at NAVAHCS
11/1/18
00 01 10-1
TABLE OF CONTENTS
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
Section 00 01 10
DIVISION 00
000107.01 Civil Seal Page
000107.02 Architectural Seal Page
000107.03 Structural Seal Page
000107.04 Mechanical Seal Page
000107.05 Electrical Seal Page
000115 List of Drawing Sheets
DIVISION 01 – GENERAL REQUIREMENTS
01 00 00 General Requirements
01 33 23 Shop Drawings, Product Data, and Samples
01 35 26 Safety Requirements
01 42 19 Reference Standards
01 45 29 Testing Laboratory Services
01 57 19 Temporary Environmental Controls
01 58 16 Temporary Interior Signage
01 74 19 Construction Waste Management
01 91 00 General Commissioning Requirements
APPENDIX A GEOTECHNICAL REPORT
DIVISION 02 – EXISTING CONDITIONS
02 41 00 Demolition
02 82 11 Traditional Asbestos Abatement
DIVISION 03 – CONCRETE
03 30 00 Cast-in-Place Concrete
DIVISION 04 – MASONRY-NOT USED
DIVISION 05 – METALS
05 12 00 Structural Steel Framing
05 31 00 Steel Decking
05 36 00 Composite Metal Decking
05 40 00 Cold-Formed Metal Framing
05 50 00 Metal Fabrications
05 51 00 Metal Stairs
DIVISION 06 – WOOD,PLASTICS AND COMPOSITES
06 10 00 Rough Carpentry
00 01 10-2
06 20 00 Finish Carpentry
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 13 25 Self-Adhering Sheet Waterproofing
07 21 13 Thermal Insulation
07 24 00 Exterior Insulation and Finish Systems
07 54 23 Thermoplastic Polyolefin (TPO) Roofing
07 60 00 Flashing and Sheet Metal
07 71 00 Roof Specialties
07 72 00 Roof Accessories
07 81 00 Applied Fireproofing
07 84 00 Firestopping
07 92 00 Joint Sealants
07 95 13 Expansion Joint Cover Assemblies
DIVISION 08 - OPENINGS
08 11 13 Hollow Metal Doors and Frames
08 14 00 Interior Wood Doors
08 17 10 Integrated Door Assemblies
08 31 13 Access Doors and Frames
08 33 00 Coiling Doors and Grilles
08 41 13 Aluminum-Framed Entrances and Storefronts
08 51 13 Aluminum Windows
08 56 19 Pass Windows
08 56 53 Security Windows
08 71 00 Door Hardware
08 71 13 Automatic Door Operators
08 80 00 Glazing
DIVISION 09 – FINISHES
09 06 00 Schedule for Finishes
09 22 16 Non-Structural Metal Framing
09 29 00 Gypsum Board
09 30 13 Ceramic/Porcelain Tiling
09 51 00 Acoustical Ceilings
09 65 13 Resilient Base and Accessories
09 65 16 Resilient Sheet Flooring
09 65 19 Resilient Tile Flooring
09 67 23 Resinous Flooring
09 68 00 Carpeting
09 80 00 Acoustical Treatment
09 91 00 Painting
DIVISION 10 – SPECIALTIES
10 14 00 Signage
10 21 23 Cubicle Curtain Tracks
10 26 00 Wall and Door Protection
10 28 00 Toilet, Bath, and Laundry Accessories
00 01 10-3
10 44 13 Fire Extinguisher Cabinets
10 51 26 Lockers
DIVISION 11 – EQUIPMENT
11 05 12 General Motor Requirements for Equipment
11 17 36 Package Transfer Units
11 73 00 Ceiling Mounted Patient Lift System
APPENDIX B IMAGING EQUIPMENT INFORMATION
DIVISION 12 – FURNISHINGS
12 24 00 Window Shades
12 36 00 Countertops
DIVISION 13 - SPECIAL CONSTRUCTION
13 05 41 Seismic Restraint Requirements for Non-Structural Components
13 49 00 Radiation Protection
13 49 16 RF Shielding for MRI
DIVISION 14– CONVEYING EQUIPMENT – NOT USED
DIVISION 21- FIRE SUPPRESSION
21 08 00 Commissioning of Fire Suppression System
21 13 13 Wet-Pipe Sprinkler Systems
DIVISION 22 – PLUMBING
22 05 11 Common Work Results for Plumbing
22 05 12 General Motor Requirements for Plumbing Equipment
22 05 19 Meters and Gages for Plumbing Piping
22 05 23 General-Duty Valves for Plumbing Piping
22 07 11 Plumbing Insulation
22 08 00 Commissioning of Plumbing Systems
22 11 00 Facility Water Distribution
22 13 00 Facility Sanitary and Vent Piping
22 13 29 Sanitary Sewerage Pumps
22 13 33 Packaged, Submersible Sewerage Pump Units
22 14 00 Facility Storm Drainage
22 14 36 Packaged, Submersible, Drainage Pump Units
22 40 00 Plumbing Fixtures
22 62 00 Vacuum Systems for Laboratory and Healthcare Facilities
22 63 00 Gas Systems for Laboratory and Healthcare Facilities
22 66 00 Chemical-Waste Systems for Laboratory and Healthcare Facilities
DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 05 11 Common Work Results for HVAC
23 05 12 General Motor Requirements for HVAC and Steam Generation
Equipment
23 05 41 Noise and Vibration Control for HVAC Piping and Equipment
00 01 10-4
23 05 93 Testing, Adjusting, and Balancing for HVAC
23 07 11 HVAC and Boiler Plant Insulation
23 08 00 Commissioning of HVAC Systems
23 09 23 Direct-Digital Control System for HVAC
23 11 23 Facility Natural-Gas Piping
23 21 13 Hydronic Piping
23 21 23 Hydronic Pumps
23 22 13 Steam and Condensate Heating Piping
23 23 00 Refrigerant Piping
23 25 00 HVAC Water Treatment
23 31 00 HVAC Ducts and Casings
23 34 00 HVAC Fans
23 36 00 Air Terminal Units
23 37 00 Air Outlets and Inlets
23 40 00 HVAC Air Cleaning Devices
23 73 00 Indoor Central-Station Air-Handling Units
23 81 00 Decentralized Unitary HVAC Equipment
23 81 23 Computer-Room Air-Conditioners
23 82 00 Convection Heating and Cooling Units
23 82 16 Air Coils
DIVISION 25 – INTEGRATED AUTOMATION
25 10 10 Advanced Utility Metering System
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations
26 05 13 Medium-Voltage Cables
26 05 19 Low-Voltage Electrical Power Conductors and Cables
26 05 26 Grounding and Bonding for Electrical Systems
26 05 33 Raceway and Boxes for Electrical Systems
26 05 36 Wireways for Radiology Equipment
26 05 39 Underfloor Raceways for Electrical Systems
26 05 41 Underground Electrical Construction
26 05 73 Overcurrent Protective Device Coordination Study
26 08 00 Commissioning of Electrical Systems
26 09 23 Lighting Controls
26 12 19 Pad-Mounted, Liquid-Filled, Medium-Voltage Transformers
26 22 00 Low-Voltage Transformers
26 24 13 Distribution Switchboards
26 24 16 Panelboards
26 27 26 Wiring Devices
26 29 11 Motor Controllers
26 29 21 Enclosed Switches and Circuit Breakers
26 41 00 Facility Lightning Protection
26 43 13 Surge Protective Devices
26 51 00 Interior Lighting
26 56 00 Exterior Lighting
DIVISION 27 – COMMUNICATIONS
00 01 10-5
27 05 11 Requirements for Communications Installations
27 05 26 Grounding and Bonding for Communications Systems
27 05 33 Raceways and Boxes for Communications Systems
27 08 00 Commissioning of Communications Systems
27 10 00 Control, Communication and Signal Wiring
27 11 00 Communications Equipment Room Fittings
27 15 00 Communications Structured Cabling
27 41 31 Master Antenna Television Equipment and Systems
27 51 16 Public Address and Mass Notification Systems
27 51 23 Intercommunications and Program Systems
27 52 23 Nurse Call and Code Blue Systems
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 05 00 Common Work Results for Electronic Safety and Security
28 05 13 Conductors and Cables for Electronic Safety and Security
28 05 26 Grounding and Bonding for Electronic Safety and Security
28 05 28.33 Conduits and Backboxes for Electronic Safety and Security
28 08 00 Commissioning of Electronic Safety and Security Systems
28 13 00 Physical Access Control System
28 13 53 Security Access Detection
28 16 00 Intrusion Detection System
28 23 00 Video Surveillance
28 26 00 Electronic Personal Protection System
28 31 00 Fire Detection and Alarm
DIVISION 31 – EARTHWORK
31 20 11 Earthwork (Short Form)
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 05 23 Cement and Concrete for Exterior Improvements
32 12 16 Asphalt Paving
32 17 23 Pavement Markings
DIVISION 33 – UTILITIES
33 10 00 Water Utilities
33 30 00 Sanitary Sewer Utilities
33 40 00 Storm Sewer Utilities
DIVISION 34 – TRANSPORTATION
34 71 13 Vehicle Barriers
DIVISION 48 – Electrical Power Generation – NOT USED
07 13 25 -1
Self-Adhering Sheet Waterproofing
SECTION 07 13 25
SELF-ADHERING SHEET WATERROOFING
PART 1 — GENERAL
1.1 SUMMARY
A. The work of this section includes, but is not limited to, the following:
1. Rubberized asphalt sheet membrane waterproofing
2. Prefabricated drainage composite
3. Protection board
B. Related Sections: Other specification sections which directly relate to the work of this section include, but are not limited to, the following:
1. Section 033000 – Cast-In-Place Concrete
2. Section 079200 – Joint Sealants
1.2 REFERENCE STANDARDS
A. The following standards and publications are applicable to the extent referenced in the text.
B. American Society for Testing and Materials (ASTM)
C 836 Standard Specification for High Solids, Cold Liquid-Applied
Elastomeric Waterproofing Membrane for Use with Separate Wearing
Course
D 412 Standard Test Methods for Rubber Properties in Tension
D 570 Standard Test Method for Water Absorption of Plastics
D 882 Standard Test Methods for Tensile Properties of Thin Plastic
Sheeting
D 903 Standard Test Method for Peel or Stripping Strength of Adhesive
Bonds
D 1876 Standard Test Method for Peel Release of Adhesives (T-Peel)
D 1970 Standard Specification for Self-Adhering Polymer Modified
Bituminous Sheet Materials Used as Steep Roofing Underlayment for
Ice Dam Protection
D 3767 Standard Practice for Rubber - Measurements of Dimensions
D 5385 Standard Test Method for Hydrostatic Pressure Resistance of
Waterproofing Membranes
E 96 Standard Test Methods for Water Vapor Transmission of Materials
E 154 Standard Test Methods for Water Vapor Retarders Used in Contact with Earth Under Concrete Slabs, on Walls, or as Ground Cover
1.3 SUBMITTALS
A. Product Data: Submit manufacturer’s product data, installation instructions, use limitations and recommendations. Include certification of data indicating VOC (Volatile Organic Compound) content of all components of waterproofing system.
B. Samples: Submit representative samples of the following for approval:
1. Sheet membrane
2. Protection board
3. Prefabricated drainage composite
1.4 QUALITY ASSURANCE
A. Manufacturer: Sheet membrane waterproofing shall be manufactured and marketed by a firm with a minimum of 20 years experience in the production and sales of self-adhesive sheet membrane waterproofing. Manufacturers proposed for use but not named in these specifications shall submit evidence of ability to meet all requirements specified, and include a list of projects of similar design and complexity completed within the past 5 years.
07 13 25 -2
B. Installer: A firm which has at least 3 years experience in work of the type required by this section.
C. Materials: For each type of material required for the work of this section, provide primary materials which are the products of one manufacturer.
D. Pre-Installation Conference: A pre-installation conference shall be held prior to commencement of field operations to establish procedures to maintain optimum working conditions and to coordinate this work with related and adjacent work. Agenda for meeting shall include review of special details and flashing.
1.5 DELIVERY, STORAGE AND HANDLING
A. Deliver materials and products in labeled packages. Store and handle in strict compliance with manufacturer’s instructions, recommendations and material safety data sheets. Protect from damage from sunlight, weather, excessive temperatures and construction operations. Remove damaged material from the site and dispose of in accordance with applicable regulations.
1. Do not double-stack pallets of membrane on the job site. Provide cover on top and all sides, allowing for adequate ventilation.
2. Protect mastic and adhesive from moisture and potential sources of ignition.
3. Store drainage composite or protection board flat and off the ground. Provide cover on top and all sides.
B. Sequence deliveries to avoid delays, but minimize on-site storage.
1.6 PROJECT CONDITIONS
A. Perform work only when existing and forecasted weather conditions are within the limits established by the manufacturer of the materials and products used.
B. Proceed with installation only when substrate construction and preparation work is complete and in condition to receive sheet membrane waterproofing.
1.7 WARRANTY
A. Sheet Membrane Waterproofing: Provide written 5 year material warranty issued by the membrane manufacturer upon completion of the work.
PART 2 — PRODUCTS
2.1 MATERIALS
A. Sheet Membrane Waterproofing: Basis of Design: Bituthene® 3000/Low
Temperature Membrane by GCP Advanced Technologies Construction Products; a self-adhesive, cold-applied composite sheet consisting of a thickness of
1.4 mm (0.056 in.) of rubberized asphalt and 0.1 mm (0.004 in.) of cross-laminated, high density polyethylene film. Provide rubberized asphalt membrane covered with a release sheet, which is removed during installation. No special adhesive or heat shall be required to form laps.
B. Sheet Membrane Waterproofing
PHYSICAL PROPERTIES FOR BITUTHENE 3000/LOW TEMPERATURE MEMBRANE:
Property Test Method Typical Value
Color Dark gray-black
Thickness ASTM D 3767 Method A 1.5 mm (0.060 in.)
nominal
Flexibility, 180° bend over
ASTM D 1970 Unaffected
07 13 25 -3
25 mm (1 in.) mandrel at
-43°C (-45°F)
Tensile Strength, Membrane
Die C
ASTM D 412 Modified1 2240 kPa (325 lbs/in.2) minimum
Tensile Strength, Film ASTM D 882 Modified1 34.5 MPa (5,000 lbs/in.2) minimum
Elongation, Ultimate
Failure of Rubberized
Asphalt
ASTM D 412 Modified1 300% minimum
Crack Cycling at -32°C
(-25°F), 100 Cycles
ASTM C 836 Unaffected
Lap Adhesion at Minimum
Application Temperature
ASTM D 1876 Modified2 700 N/m (4 lbs/in.) –
Bituthene 3000
880 N/m (5 lbs/in.) –
Low Temp
Peel Strength ASTM D 903 Modified3 1576 N/m (9 lbs/in.)
Puncture Resistance, Membrane
ASTM E 154 222 N (50 lbs) minimum
Resistance to
Hydrostatic Head
ASTM D 5385 60 m (200 ft) of water
Permeance ASTM E 96, Section 12 – Water
Method
2.9 ng/m2sPa
(0.05 perms) maximum
Water Absorption ASTM D 570 0.1% maximum
Footnotes:
1. The test is run at a rate of 50 mm (2 in.) per minute.
2. The test is conducted 15 minutes after the lap is formed and run at a rate of
50 mm (2 in.) per minute at -4°C (25°F).
3. The 180° peel strength is run at a rate of 300 mm (12 in.) per minute.
C. Prefabricated Drainage Composite: Basis of Design: Hydroduct® 220 Drainage
Composite by GCP Advanced Technologies Construction Products. Drainage
Composite shall be designed to promote positive drainage while serving as a protection course.
D. Protection Board:
1. Expanded Polystyrene Protection Board: 25 mm (1 in.) thick for vertical applications with the following characteristics. Adhere to waterproofing membrane with Bituthene Protection Board Adhesive.
Normal Density: 16 kg/m3 (1.0 lb/ft3)
Thermal Conductivity, K factor: 0.24 at 5°C (40°F), 0.26 at 24°C
(75°F)
Thermal Resistance, R-Value: 4 per 25 mm (1 in.) of thickness.
2. Asphalt Hardboard: A premolded semi-rigid protection board consisting of bitumen, mineral core and reinforcement. Provide 3 mm
(0.125 in.) thick hardboard on horizontal surfaces not receiving steel reinforced slab. Where steel reinforcing bars are to be used, apply two layers of 3 mm (0.125 in.) thick hardboard or one layer of
6 mm (0.25 in.) thick hardboard.
E. Waterstop: Basis of Design: AdcorTM ES hydrophilic non-bentonite waterstop by GCP Advanced Technologies Construction Products for non-moving concrete construction joints.
F. Miscellaneous Materials: Surface conditioner, mastic, liquid membrane, tape and accessories specified or acceptable to manufacturer of sheet membrane waterproofing.
07 13 25 -4
PART 3 — EXECUTION
3.1 EXAMINATION
A. The installer shall examine conditions of substrates and other conditions under which this work is to be performed and notify the contractor, in writing, of circumstances detrimental to the proper completion of the work. Do not proceed with work until unsatisfactory conditions are corrected.
3.2 PREPARATION OF SUBSTRATES
A. Refer to manufacturer’s literature for requirements for preparation of substrates. Surfaces shall be structurally sound and free of voids, spalled areas, loose aggregate and sharp protrusions. Remove contaminants such as grease, oil and wax from exposed surfaces. Remove dust, dirt, loose stone and debris. Use repair materials and methods which are acceptable to manufacturer of sheet membrane waterproofing.
B. Cast-In-Place Concrete Substrates:
1. Do not proceed with installation until concrete has properly cured and dried
(minimum 7 days for normal structural concrete and minimum 14 days for lightweight structural concrete).
2. Fill form tie rod holes with concrete and finish flush with surrounding surface.
3. Repair bugholes over 13 mm (0.5 in.) in length and 6 mm (0.25 in.)
deep and finish flush with surrounding surface.
4. Remove scaling to sound, unaffected concrete and repair exposed area.
5. Grind irregular construction joints to suitable flush surface.
C. Masonry Substrates: Apply waterproofing over concrete block and brick with smooth trowel-cut mortar joints or parge coat.
D. Wood Substrates: Apply waterproofing membrane over securely fastened sound surface. All joints and fasteners shall be flush to create a smooth surface.
E. Related Materials: Treat joints and install flashing as recommended by waterproofing manufacturer.
3.3 INSTALLATION
A. Refer to manufacturer’s literature for recommendations on installation, including but not limited to, the following:
1. Apply primer at rate recommended by manufacturer. Recoat areas not waterproofed if contaminated by dust. Mask and protect adjoining exposed finish surfaces to protect those surfaces from excessive application of primer.
2. Delay application of membrane until primer is completely dry. Dry time will vary with weather conditions.
3. Seal daily terminations with troweled bead of mastic.
4. Apply protection board and related materials in accordance with manufacturer’s recommendations.
3.4 CLEANING AND PROTECTION
A. Remove any masking materials after installation. Clean any stains on materials which would be exposed in the completed work.
B. Protect completed membrane waterproofing from subsequent construction activities as recommended by manufacturer.
- - - END - - -
07 21 13 - 1
THERMAL INSULATION
SECTION 07 21 13
THERMAL INSULATION
PART 1 - GENERAL
1.1 DESCRIPTION:
A. This section specifies thermal and acoustical insulation for buildings.
B. Acoustical insulation is identified by thickness and words "Acoustical
Insulation".
1.2 RELATED REQUIREMENTS
A. Insulation for Insulated Wall Panels: Section 07 40 00, ROOFING AND
SIDING PANELS.
B. Safing Insulation: Section 07 84 00, FIRESTOPPING.
1.2 APPLICABLE PUBLICATIONS
A. Comply with references to extent specified in this section.
B. ASTM International (ASTM):
1. C516-08(2013) e1 - Vermiculite Loose Fill Thermal Insulation.
2. C549-06(2012) - Perlite Loose Fill Insulation.
3. C552-15 - Cellular Glass Thermal Insulation.
4. C553-13 - Mineral Fiber Blanket Thermal Insulation for Commercial and Industrial Applications.
5. C578-15 - Rigid, Cellular Polystyrene Thermal Insulation.
6. C591-15 - Unfaced Preformed Rigid Cellular Polyisocyanurate Thermal
Insulation.
7. C612-14 - Mineral Fiber Block and Board Thermal Insulation.
8. C665-12 - Mineral-Fiber Blanket Thermal Insulation for Light Frame
Construction and Manufactured Housing.
9. C728-15 - Perlite Thermal Insulation Board.
10. C954-15 - Steel Drill Screws for the Application of Gypsum Panel
Products or Metal Plaster Base to Steel Studs from 0.033 (0.84 mm) inch to 0.112 inch (2.84 mm) in thickness.
11. C1002-14 - Steel Self-Piercing Tapping Screws for Application of
Gypsum Panel Products or Metal Plaster Bases to Wood Studs or Steel
Studs.
12. D312/D312M-15 - Asphalt Used in Roofing.
13. E84-15a - Surface Burning Characteristics of Building Materials.
14. F1667-15 - Driven Fasteners: Nails, Spikes, and Staples.
07 21 13 - 2
1.3 SUBMITTALS
A. Submittal Procedures: Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
B. Submittal Drawings:
1. Show insulation type, thickness, and R-value for each location.
C. Manufacturer's Literature and Data:
1. Description of each product.
2. Adhesive indicating manufacturer recommendation for each application.
D. Sustainable Construction Submittals:
1. Recycled Content: Identify post-consumer and pre-consumer recycled content percentage by weight.
2. Low Pollutant-Emitting Materials:
a. Show volatile organic compound types and quantities.
1.4 DELIVERY
A. Deliver products in manufacturer's original sealed packaging.
B. Mark packaging, legibly. Indicate manufacturer's name or brand, type, production run number, and manufacture date.
C. Before installation, return or dispose of products within distorted, damaged, or opened packaging.
1.5 STORAGE AND HANDLING
A. Store products indoors in dry, weathertight facility.
B. Protect products from damage during handling and construction operations.
C. Protect foam plastic insulation from UV exposure.
1.6 WARRANTY
A. Construction Warranty: FAR clause 52.246-21, "Warranty of
Construction."
PART 2 - PRODUCTS
2.1 INSULATION – GENERAL:
A. Where thermal resistance ("R" value) is specified or shown for insulation, the thickness shown on the drawings is nominal. Use only insulation with actual thickness that is not less than that required to provide the thermal resistance specified.
B. Where "R" value is not specified for insulation, use the thickness shown on the drawings.
07 21 13 - 3
C. Where more than one type of insulation is specified, the type of insulation for each use is optional, except use only one type of insulation in any particular area.
D. Insulation Products shall comply with following minimum content standards for recovered materials:
Material Type Percent by Weight
Perlite composite board 23 percent post consumer recovered paper
Polyisocyanurate/polyurethane
Rigid foam 9 percent recovered material
Foam-in-place 5 percent recovered material
Glass fiber reinforced 6 percent recovered material
Phenolic rigid foam 5 percent recovered material
Rock wool material 75 percent recovered material
The minimum-content standards are based on the weight (not the volume) of the material in the insulating core only.
2.3 PERIMETER INSULATION IN CONTACT WITH SOIL:
A. Polystyrene Board: ASTM C578, Type IV, V, VI, VII, or IX where covered by soil or concrete.
B. Cellular Glass Block: ASTM C552, Type I or IV.
2.4 EXTERIOR FRAMING OR FURRING INSULATION:
A. Batt or Blanket: Optional.
B. Mineral Fiber: ASTM C665, Type II, Class C, Category I where framing is faced with gypsum board.
C. Mineral Fiber: ASTM C665, Type III, Class A where framing is not faced with gypsum board.
2.5 ACOUSTICAL INSULATION:
A. Mineral Fiber boards: ASTM C553, Type II, flexible, or Type III, semirigid (4.5-pound nominal density).
B. Mineral Fiber Batt or Blankets: ASTM C665. Maximum flame spread of 25 and smoke development of 450 when tested in accordance with ASTM E84.
C. Thickness as shown; of widths and lengths to fit tight against framing.
2.6 SOUND DEADENING BOARD:
A. Mineral Fiber Board: ASTM C612, Type IB, 13 mm (1/2 inch thick).
B. Perlite Board: ASTM C728, 13 mm (1/2 inch thick).
07 21 13 - 4
2.7 RIGID INSULATION:
A. On the inside face of exterior walls, spandrel beams, floors, bottom of slabs, and where shown.
B. Mineral Fiber Board: ASTM C612, Type IB or 2.
C. Perlite Board: ASTM C728.
D. Cellular Glass Block: ASTM C552, Type I.
2.9 FASTENERS:
A. Staples or Nails: ASTM F1667, zinc-coated, size and type best suited for purpose.
B. Screws: ASTM C954 or C1002, size and length best suited for purpose with washer not less than 50 mm (two inches) in diameter.
C. Impaling Pins: Steel pins with head not less than 50 mm (two inches) in diameter with adhesive for anchorage to substrate. Provide impaling pins of length to extend beyond insulation and retain cap washer when washer is placed on the pin.
2.10 ADHESIVE:
A. As recommended by the manufacturer of the insulation.
B. Asphalt: ASTM D312, Type III or IV.
C. Mortar: ASTM C270, Type 0.
2.11 TAPE:
A. Pressure sensitive adhesive on one face.
B. Perm rating of not more than 0.50.
PART 3 - EXECUTION
3.1 INSTALLATION - GENERAL
A. Install insulation with the vapor barrier facing the heated side, unless specified otherwise.
B. Install rigid insulating units with joints close and flush, in regular courses and with cross joints broken.
C. Install batt or blanket insulation with tight joints and filling framing void completely. Seal cuts, tears, and unlapped joints with tape.
D. Fit insulation tight against adjoining construction and penetrations, unless specified otherwise.
3.2 MASONRY CAVITY WALLS:
A. Mount insulation on exterior faces of inner wythes of masonry cavity walls and brick faced concrete walls. Fill joints with same material used for bonding.
07 21 13 - 5
B. Bond polystyrene board to surfaces with adhesive or Portland cement mortar mixed and applied in accordance with recommendations of insulation manufacturer.
C. Bond mineral fiberboard, polyurethane or polyisocyanurate board, and perlite board to surfaces with adhesive as recommended by insulation manufacturer.
D. Bond cellular glass insulation to surfaces with hot asphalt or adhesive cement.
3.3 PERIMETER INSULATION:
A. Vertical insulation:
1. Fill joints of insulation with same material used for bonding.
2. Bond polystyrene board to surfaces with adhesive or Portland cement mortar mixed and applied in accordance with recommendations of insulation manufacturer.
3. Bond cellular glass insulation to surfaces with hot asphalt or adhesive cement.
B. Horizontal insulation under concrete floor slab:
1. Lay insulation boards and blocks horizontally on level, compacted and drained fill.
2. Extend insulation from foundation walls towards center of building not less than 600 mm (24 inches) or as shown.
3.4 EXTERIOR FRAMING OR FURRING BLANKET INSULATION:
A. Pack insulation around door frames and windows and in building expansion joints, door soffits and other voids. Pack behind outlets around pipes, ducts, and services encased in walls. Open voids are not permitted. Hold insulation in place with pressure sensitive tape.
B. Lap vapor retarder flanges together over face of framing for continuous surface. Seal all penetrations through the insulation.
C. Fasten blanket insulation between metal studs or framing and exterior wall furring by continuous pressure sensitive tape along flanged edges.
D. Fasten blanket insulation between wood studs or framing with nails or staples through flanged edges on face of stud. Space fastenings not more than 150 mm (six inches) apart.
E. Roof Rafter Insulation or Floor Joist Insulation: Place mineral fiber blankets between framing to provide not less than a 50 mm (two inch) air space between insulation and roof sheathing or subfloor.
F. Ceiling Insulation and Soffit Insulation:
07 21 13 - 6
1. Fasten blanket insulation between wood framing or joist with nails or staples through flanged edges of insulation.
2. At metal framing or ceilings suspension systems, install blanket insulation above suspended ceilings or metal framing at right angles to the main runners or framing. Tape insulation tightly together so no gaps occur and metal framing members are covered by insulation.
3. In areas where suspended ceilings adjoin areas without suspended ceilings, install either blanket, batt, or mineral fiberboard extending from the suspended ceiling to underside of deck or slab above. Secure in place to prevent collapse or separation of hung blanket, batt, or board insulation and maintain in vertical position. Secure blanket or batt with continuous cleats to structure above.
3.5 RIGID INSULATION ON SURFACE OF EXTERIOR WALLS, FLOORS, AND UNDERSIDE OF
FLOORS:
A. On the interior face of solid masonry and concrete walls, beams, beam soffits, underside of floors, and to the face of studs for interior wall finish where shown.
B. Bond to solid vertical surfaces with adhesive as recommended by insulation manufacturer. Fill joints with adhesive cement.
C. Use impaling pins for attachment to underside of horizontal surfaces.
Space fastenings as required to hold insulation in place and prevent sagging.
D. Fasten board insulation to face of studs with screws, nails or staples.
Space fastenings not more than 300 mm (12 inches) apart. Stagger fasteners at joints of boards. Install at each corner.
E. Floor insulation:
1. Bond insulation to concrete floors in attic by coating surfaces with hot steep asphalt applied at rate of not less than 11.5 Kg per m²
(25 lbs/100 sq. ft.), and firmly bed insulation therein.
2. When applied in more than one layer, bed succeeding layers in hot steep asphalt applied at the rate of not less than 11.5 Kg per m² per m² lbs/100 sq. ft.).
3. Contractors option: Insulation may be installed with nonflammable adhesive in accordance with the manufacturer's printed instructions when a separate vapor retarder is used.
07 21 13 - 7
3.7 ACOUSTICAL INSULATION:
A. Fasten blanket insulation between metal studs and wall furring with continuous pressure sensitive tape along edges or adhesive.
B. Pack insulation around door frames and windows and in cracks, expansion joints, control joints, door soffits and other voids. Pack behind outlets, around pipes, ducts, and services encased in wall or partition. Hold insulation in place with pressure sensitive tape or adhesive.
C. Do not compress insulation below required thickness except where embedded items prevent required thickness.
D. Where acoustical insulation is installed above suspended ceilings install blanket at right angles to the main runners or framing. Extend insulation over wall insulation systems not extending to structure above.
E. Where semi-rigid insulation is used which is not full thickness of cavity, adhere to one side of cavity maintaining continuity of insulation and covering penetrations or embedments in insulation.
F. Where sound deadening board is shown, secure with adhesive to masonry or concrete walls. Secure sufficiently in place until subsequent cover is installed. Seal all cracks with caulking.
- - - E N D - - -
07 24 00 - 1
EXTERIOR INSULATION AND FINISH SYSTEM
SECTION 07 24 00
EXTERIOR INSULATION AND FINISH SYSTEMS
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Exterior insulation and finish systems (EIFS).
1.2 APPLICABLE PUBLICATIONS
A. Comply with references to extent specified in this section.
B. ASTM International (ASTM):
1. B117-11 - Operating Salt Spray (Fog) Apparatus.
2. C67-14 - Sampling and Testing Brick and Structural Clay Tile.
3. C177-13 - Steady-State Heat Flux Measurements and Thermal
Transmission Properties by Means of the Guarded-Hot-Plate Apparatus.
4. C578-15 - Rigid, Cellular Polystyrene Thermal Insulation.
5. C920-14a - Elastomeric Joint Sealants.
6. E84-15a - Surface Burning Characteristics of Building Materials.
7. E96/E96M-15 - Water Vapor Transmission of Materials.
8. E119-15 - Fire Tests of Building Construction and Materials.
9. E330/E330M-14 - Structural Performance of Exterior Windows, Doors, Skylights and Curtain Walls by Uniform Static Air Pressure
Difference.
10. E331-00(2009) - Water Penetration of Exterior Windows, Skylights, Doors, and Curtain Wall by Uniform Static Air Pressure Differences.
11. E2486/E2486M-13 - Impact Resistance of Class PB and PI Exterior
Insulation and Finish Systems (EIFS).
12. G90-10 - Performing Accelerated Outdoor Weathering of Nonmetallic
Materials Using Concentrated Natural Sunlight.
1.3 PREINSTALLATION MEETINGS
A. Conduct preinstallation meeting minimum 30 days before beginning Work of this section.
1. Required Participants:
a. Contracting Officer's Representative.
b. Contractor.
c. Installer.
d. Manufacturer's field representative.
07 24 00 - 2
e. Other installers responsible for adjacent and intersecting work, including air barriers and sealants.
2. Meeting Agenda: Distribute agenda to participants minimum 3 days before meeting.
a. Installation schedule.
b. Installation sequence.
c. Preparatory work.
d. Protection before, during, and after installation.
e. Installation.
f. Terminations.
g. Transitions and connections to other work.
h. Inspecting and testing.
i. Other items affecting successful completion.
3. Document and distribute meeting minutes to participants to record decisions affecting installation.
1.4 SUBMITTALS
A. Submittal Procedures: Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
B. Submittal Drawings:
1. Show size, configuration, and fabrication and installation details.
2. Show details for corner treatment, sills, soffits, dentils, quoins, lintels, openings, penetrations, flashing, and other special applications.
C. Manufacturer's Literature and Data:
1. Description of each product.
2. Installation instructions.
3. Warranty.
D. Samples:
1. Two 300 mm (1 foot) square samples of EIFS finishes over cement board identical to proposed installation in thickness, color, texture, insulation, and workmanship.
E. Test reports: Certify each product and complete system complies with specifications.
F. Qualifications: Substantiate qualifications comply with specifications.
1. Installer with project experience list.
1.5 QUALITY ASSURANCE
A. Installer Qualifications:
07 24 00 - 3
1. Regularly installs specified products.
2. Installed specified products with satisfactory service on five similar installations for minimum five years.
a. Project Experience List: Provide contact names and addresses for completed projects.
1.6 DELIVERY
A. Deliver products in manufacturer's original sealed packaging.
B. Mark packaging, legibly. Indicate manufacturer's name or brand, type, production run number, and manufacture date.
C. Before installation, return or dispose of products within distorted, damaged, or opened packaging.
1.7 STORAGE AND HANDLING
A. Store products indoors in dry, weathertight facility.
B. Protect products from damage during handling and construction operations.
1.8 FIELD CONDITIONS
A. Environment:
1. Unless greater temperature is required by system manufacturer, install products only when ambient air temperature is minimum
7 degrees C (45 degrees F) and rising and predicted to persist for
24 hours after installation.
1.9 WARRANTY
A. Construction Warranty: FAR clause 52.246-21, "Warranty of
Construction."
B. Manufacturer's Warranty: Warrant EIFS system materials against material and manufacturing defects.
1. Warranty Period: 10 years.
PART 2 - PRODUCTS
2.1 PRODUCTS - GENERAL
A. Provide system components from one manufacturer and from one production run.
2.2 EXTERIOR INSULATION AND FINISH SYSTEM (EIFS)
A. Description: Polymer-Based (PB) system consists of Type I molded rigid polystyrene insulation adhered to sheathing and finished with glass-fiber-mesh reinforced based-coat and textured finish coat.
07 24 00 - 4
B. Performance Requirements:
1. Surface Burning Characteristics: When tested according to ASTM E84.
a. Flame Spread Rating: 25 maximum.
b. Smoke Developed Rating: 450 maximum.
2. Full Scale Wall Fire Test: No significant surface flaming or propagation of vertical or lateral flames when tested according to
ASTM E119.
3. Impact Resistance (Sample to be cured. Finish, base coat and fabric over 25 mm (1 inch) insulation typical of project application), ASTM E2486/E2486M:
a. Standard Impact Resistance - 2.83 to 5.54 J (25-49 inch-lbs.).
4. Structural Performance: (Test panels 1200 mm x 1200 mm (4 feet by
4 feet) typical of project application): ASTM E330/E330M, no permanent deformation, delamination or deterioration for positive and negative pressures as required.
a. Wind Loads: Uniform pressure as indicated on Drawings.
5. Water Penetration: ASTM E331, no water penetration minimum 720Pa
(15psf) for windows and 300 Pa (6.24 psf) for curtain wall assembly.
6. Abrasion Resistance: ASTM D968, 500 liters of sand with slight smoothing and no loss of film integrity.
7. Accelerated Weathering: ASTM G90; 2000 hours with no deterioration.
8. Salt Spray Resistance: ASTM B117; Withstand 300 hours with no deleterious effects.
9. Water Vapor: ASTM E96/E96M; Maximum 12 g/h/sq. m (18 grains/hour/sf.).
10. Absorption-Freeze-Thaw (Pre-weighed 100 mm x 200 mm (4 inch by
8 inch) specimens; 25 mm (1 inch) insulation, faced with finish coat cured and stored in air; tested with edges and back open), ASTM C67.
a. 50 Cycles: 20 hours at 9 degrees C (4 degrees F); 4-hour thaw in water.
b. After 50 cycles; total weight gain of maximum 6.2 grams. No checking splitting, or cracking.
C. Adhesive: Manufacturers standard product including primer compatible with sheathing.
D. Insulation:
1. Thermal Resistance: Thermal resistance (R-value), as indicated, measured by ASTM C177.
07 24 00 - 5
2. Insulating Material: ASTM C578, as recommended by EIFS manufacturer and treated to be compatible with EIFS components. Age insulation minimum of 6 weeks before installation.
3. Provide Type I Molded Expanded Polystyrene (MEPS) insulation board for Type PB systems, in sizes as required except maximum 600 mm X
1200 mm (24 X 48 inches) boards, and maximum 100 mm (4 inches) thick.
E. Mechanical Anchors: As recommended by EIFS manufacturer.
F. Accessories:
1. Trim, control joints, weep screed, edging, anchors, expansion joints, and other items required for proper installation as recommended by EIFS manufacturer.
2. Metal Items and Fasteners: Corrosion resistant.
G. Reinforcing Fabric: Balanced, open weave, glass fiber fabric made from twisted multi-end strands specifically treated for compatibility with the other materials of system.
1. Minimum weight 100 g/sq. m (4.3 oz./sq. yd.).
H. Base Coat: Manufacturer's standard.
I. Finish Coat: Manufacturer's standard. Minimum thickness 1.5 mm
(1/16 inch), complying with performance requirements.
J. Sealant: ASTM C920; Class 50 with 100 percent recovery. Type, grade and use as recommended by sealant manufacturer.
1. When required, provide non-staining primer, bond breaker, and backer rods as recommended by sealant manufacturer.
2. Do not use absorptive materials as backer rods.
PART 3 - EXECUTION
3.1 PREPARATION
A. Examine and verify substrate suitability for product installation.
B. Protect existing construction and completed work from damage.
C. Notify Contracting Officer's Representative in writing of conditions detrimental to proper completion of work.
D. Do not proceed with work until unsatisfactory conditions are corrected.
3.2 INSTALLATION - GENERAL
A. Install products according to manufacturer's instructions and approved submittal drawings.
07 24 00 - 6
1. When manufacturer's instructions deviate from specifications, submit proposed resolution for Contracting Officer's Representative consideration.
3.3 CONTROL JOINT INSTALLATION
A. See drawings for location of building control joints and surface control joints.
B. Install surface control joints as follows:
1. Exterior Insulation and Finish System. Install at 15 meters
(50 feet) maximum in both directions and at building expansion joints, floor lines and where EIFS intersects other materials per manufacturer's recommendations.
3.4 SEALANT INSTALLATION
A. Exterior Insulation and Finish System: Apply sealant according to EIFS manufacturer's recommendation.
B. Do not apply sealant in locations intended for water drainage.
3.5 EXTERIOR INSULATION AND FINISH SYSTEM INSTALLATION
A. Insulation Board Layout: Place horizontally from level base line.
Stagger vertical joints and interlock at corners. Butt joints tightly.
Provide flush surfaces at joints. Offset insulation board joints from joints in sheathing minimum 200 mm (8 inches). Do not align joints with corners of doors, windows and other openings. Do not leave insulation board exposed longer than recommended by insulation manufacturer.
B. Adhesive: Apply directly to entire back surface of the insulation board as recommended by the system manufacturer and immediately apply to gypsum board substrate. Apply firm pressure over entire board to ensure uniform contact and level surface. Allow adhesive to cure for 24 hours minimum before sanding.
C. Create means of drainage between insulation board and gypsum board sheathing.
D. Flash penetrations and terminations to discharge water to exterior.
E. Mechanical Fasteners: Fasten with manufacturer's standard anchors, spaced as recommended by manufacturer, maximum 600 mm (24 inches) on center horizontally and vertically.
F. Sanding: Sand entire surface of insulation before applying base coat, level high joints and remove dirt and weathering damage. Do not pre-fill low areas with basecoat.
07 24 00 - 7
G. Base Coat: Trowel apply uniform thickness of base coat to insulation with minimum thickness of 1-1/2 times reinforcing fabric thickness and minimum 2.4 mm (3/32 inches) wet thickness.
H. Install reinforcing fabric embedded in base coat. Provide diagonal reinforcement at opening corners, back wrapping, and other reinforcement recommended by EIFS manufacturer. Ensure fabric pattern is not visible beneath the surface of the basecoat after installation.
Cure basecoat 24 hours minimum before applying finish coat.
I. Finish Coat:
1. Inspect basecoat for damage or defects and repair before applying finish coat.
2. Trowel apply finish coat minimum 1.6 mm (1/16 inch) thick.
3. Texture finish as required.
4. Surface Tolerance: Maximum 1/500 (1/4 inch in 10 feet) deviation from plumb and plane.
- - E N D - -
07 54 23 - 1
THERMOPLASTIC POLYOLEFIN (TPO) ROOFING
SECTION 07 54 23
PART 1 GENERAL
1.1 DESCRIPTION
A. Thermoplastic Polyolefin (TPO) sheet roofing adhered to roof deck.
1.2 RELATED WORK
A. Treated wood framing, blocking, and nailers: Section 06 10 00, ROUGH CARPENTRY
B. Roof Insulation: Section 07 22 00, ROOF AND DECK INSULATION.
C. Sheet metal components and wind uplift requirements for roof-edge design:
Section 07 60 00, FLASHING AND SHEET METAL.
D. Roof hatches, equipment supports, dome type skylights, and gravity ventilators: Section 07 72 00, ROOF ACCESSORIES
E. Miscellaneous items: Section 07 71 00, ROOF SPECIALTIES/ Section 07 72 00, ROOF ACCESSORIES.
1.3 APPLICABLE PUBLICATIONS
A. Publications listed below form a part of this specification to the extent referenced. Publications are referenced in the text by the basic designation only. Editions of applicable publications current on date of issue of bidding documents apply unless otherwise indicated.
B. American National Standards Institute/Single-Ply Roofing Institute
(ANSI/SPRI):
ANSI/SPRI ES-1-03.......Wind Design Standard for Edge Systems Used with Low
Slope Roofing Systems.
C. American Society of Civil Engineers/Structural Engineering Institute
(ASCE/SEI):
ASCE/SEI-7-10...........Minimum Design Loads for Buildings and Other
Structures
D. ASTM International (ASTM):
C67-09..................Standard Test Methods for Sampling and Testing Brick and Structural Clay Tile
C140-09.................Standard Test Methods for Sampling and Testing
Concrete Masonry Units and Related Units
C1371-04................Standard Test Method for Determination of Emittance of
Materials Near Room Temperature Using Portable
Emissometers
07 54 23 - 2
C1549-04................Standard Test Method for Determination of Solar
Reflectance Near Ambient Temperature Using a Portable
Solar Reflectometer
D4263...................Standard Test Method for Indicating Moisture in
Concrete by the Plastic Sheet Method
D4434-06................Standard Specification for Poly (Vinyl Chloride) Sheet
Roofing
D6878-08................Standard Specification for Thermoplastic Polyolefin
Based Sheet Roofing
E108-10.................Standard Test Methods for Fire Tests of Roof Coverings
E408-71(R2008)..........Standard Test Methods for Total Normal Emittance of
Surfaces Using Inspection-Meter Techniques
E1918-06................Standard Test Method for Measuring Solar Reflectance of Horizontal and Low-Sloped Surfaces in the Field
E1980-01................Standard Test Method for Measuring Solar Reflectance of Horizontal and Low-Sloped Surfaces in the Field
E. American Society of Heating, Refrigeration, and Air Conditioning Engineers
(ASHRAE)
ASHRAE 90.1-2007........Energy Standard for Buildings Except Low-Rise
Residential Buildings, Appendix f.
F. Cool Roof Rating Council:
CRRC-1..................Product Rating Program, www.coolroofs.org
G. FM Approvals: RoofNav Approved Roofing Assemblies and Products.
4450-89.................Approved Standard for Class 1 Insulated Steel Deck
Roofs
4470-10.................Approved Standard for Class 1 Roof Coverings
1-28-09.................Loss Prevention Data Sheet: Design Wind Loads.
1-29-09.................Loss Prevention Data Sheet: Above-Deck Roof Components
1-49-09.................Loss Prevention Data Sheet: Perimeter Flashing
H. National Roofing Contractors Association: Roofing and Waterproofing Manual
I. U.S. Department of Agriculture (USDA): USDA BioPreferred Catalog, www.biopreferred.gov
J. U.S. Department of Energy (DoE): Roof Products Qualified Product List, www.energystar.gov
1.4 PERFORMANCE REQUIREMENTS
A. Material Compatibility: Provide roofing materials that are compatible with one another under conditions of service and application required, as demonstrated by membrane roofing manufacturer based on testing and field experience.
07 54 23 - 3
B. Roofing System Energy Performance Requirements: Provide a roofing system identical to components that that have been successfully tested by a qualified independent testing and inspecting agency to meet the following requirements:
1. Energy Performance, Energy Star: Provide roofing system that is listed on
DOE's ENERGY STAR "Roof Products Qualified Product List" for low-slope roof products.
2. Energy Performance, aged: Provide roofing system with minimum three-year aged solar reflectance not less than 0.55 when tested in accordance with
ASTM C1549 or ASTM E1918, and in addition, a minimum three-year-aged thermal emittance of 0.75 when tested in accordance with ASTM C1371 or ASTM
E408.
a. Where tested aged values are not available for proposed product, submit calculations to adjust initial solar reflectance to demonstrate compliance as indicated in ASHRAE 90.1-2007 Addendum f.
b. Alternatively, provide roofing system with minimum three-year aged Solar
Reflectance Index of not less than 64 when determined in accordance with the Solar Reflectance Index method in ASTM E1980 using a convection coefficient of 2.1 BTU/h-ft2 (12 W/m2K).
1.5 QUALITY CONTROL
A. Installer Qualifications:
1. Licensed or approved in writing by manufacturer to perform work under warranty requirements of this Section.
2. Employ full-time supervisors knowledgeable and experienced in roofing of similar types and scopes, and able to communicate with owner and workers.
B. Inspector Qualifications: Inspection of work by third-party technical inspector or technical representative of manufacturer experienced in the installation and maintenance of the specified roofing system, qualified to perform roofing observation and inspection specified in Field Quality Control
Article, to determine Installer’s compliance with the requirements of this
Project, and approved by the manufacturer to issue warranty certification. The
Roofing Inspector shall be one of the following:
1. An authorized full-time technical employee of the manufacturer, not engaged in the sale of products.
2. An independent party certified as a Registered Roof Observer by the Roof
Consultants Institute (RCI), retained by the Contractor or the Manufacturer and approved by the Manufacturer.
C. Product/Material Requirements:
1. Obtain products from single manufacturer or from sources recommended by manufacturer for use with roofing system and incorporated in manufacturer's warranty.
07 54 23 - 4
2. Bio-Based Materials: For Products designated by the USDA’s Bio Preferred program, provide products that meet or exceed USDA recommendations for bio-based content, so long as products meet all performance requirements in this specifications section. For more information regarding the product categories covered by the Bio-Preferred program, visit http://www.biopreferred.gov
D. Roofing system design standard requirements:
1. Recommendations of the NRCA "Roofing and Waterproofing Manual" applicable to modified bituminous sheet roofing for storage, handling and application.
2. Recommendations of FM Approvals 1-49 Loss Prevention Data Sheet for
Perimeter Flashings.
3. Recommendations of ANSI/SPRI ES-1 for roof edge design.
4. Roofing System Design: Provide roofing system that is identical to systems that have been successfully tested by a qualified testing and inspecting agency to resist uplift pressure calculated according to ASCE/SEI 7.
a. Corner Uplift Pressure: 00 kPa/sq. m (00 lbf/sq. ft.).
b. Perimeter Uplift Pressure: 00 kPa/sq. m (00 lbf/sq. ft.).
c. Field-of-Roof Uplift Pressure: 00 kPa/sq. m (00 lbf/sq. ft.).
5. FM Approvals Listing: Provide roofing membrane, base flashing, and component materials that comply with requirements in FM Approvals 4450 and
FM Approvals 4470 as part of a roofing system and that are listed in FM
Approvals "RoofNav" for Class 1 or noncombustible construction, as applicable. Identify materials with FM Approvals markings.
a. Fire/Windstorm Classification: Class 1A-75.
b. Hail Resistance: MH.
E. Pre-Roofing Meeting:
1. Upon completion of roof deck installation and prior to any roofing application, hold a pre-roofing meeting arranged by the Contractor and attended by the Roofing Inspector, Material Manufacturers Technical
Representative, Roofing Applicator, Contractor, andCOR.
2. Discuss specific expectations and responsibilities, construction procedures, specification requirements, application, environmental conditions, job and surface readiness, material storage, and protection.
3. Inspect roof deck at this time to:
a. Verify that work of other trades which penetrates roof deck is completed.
b. Determine adequacy of deck anchorage, presence of foreign material, moisture and unlevel surfaces, or other conditions that would prevent application of roofing system from commencing or cause a roof failure.
c. Examine samples and installation instructions of manufacturer.
07 54 23 - 5
1.6 SUBMITTALS
A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, SAMPLES.
B. Product Data:
1. Adhesive materials.
2. Membrane sheet roofing and flashing membrane.
3. Roofing cement.
4. Fastening requirements.
5. Application instructions.
C. Samples:
1. Nails and fasteners, each type.
D. Shop Drawings: Include plans, sections, details, and attachments.
1. Base flashings and terminations.
E. Certificates:
1. Indicating materials and method of application of roofing system meets requirements of FM Approvals "RoofNav" for specified fire/windstorm classification.
2. Indicating compliance with energy performance requirement.
F. Warranty: As specified.