This document is a technical specification for fluid-applied membrane air barriers for the Marion National Cemetery Land Expansion project (NCA Project No. 817CM3025), scheduled for 10/30/2024. The specification covers a vapor-permeable air barrier system for exterior above-grade wall assemblies, requiring a continuous, durable barrier that accommodates substrate movement and seals various transitions.

Key technical requirements include an air barrier with maximum air leakage of 0.2 L/s/square meter at 75 Pa, minimum 1.0 mm dry film thickness, and specific performance characteristics such as air permeance of 0.02 L/s/square meter, vapor permeance of minimum 580 ng/Pa/s/square meter, and 200% minimum elongation. The specification mandates using components from a single manufacturer, complying with sustainable construction requirements, and meeting strict installation, inspection, and testing protocols. Field quality control includes multiple inspections based on surface area, with requirements for compatibility testing, substrate suitability assessment, and potential retesting of defective work.

View the file

Other files

File Type Posted
36C78625B0035 0003.docx DOCX document
Responses to Prebid RFIs 2 for 36C78625B0035 for 817CM3025 New Land Expansion at Marion NC.pdf PDF
075323 EPDM Roofing Specification.pdf PDF
329000Planting - Revised.pdf PDF
312011EarthMovingSF - Revised.pdf PDF
283100 - Fire Detection and Alarm - Revised.pdf PDF
000110TOC - Revised.pdf PDF
Addendum 01_Cover Information_20250820 Marion NC.pdf PDF
Revised Davis-Bacon Wage Determination - Building - IN20250002 08-08-2025.pdf PDF
Responses to Prebid RFIs 36C78625B0035 for 817CM3025 New Land Expansion at Marion NC.pdf PDF
36C78625B0035 0002.docx DOCX document
Addendum 01_Plans_20250820 Marion NC.pdf PDF
Revised Davis-Bacon Wage Determination - Heavy - IN20250006 08-08-2025.pdf PDF
034821PrecastConcBurialCrypts - Revised.pdf PDF
263213EngGen - Revised.pdf PDF
Prebid Site Visit Attendance Sheet 817CM3025 New Land Expansion at Marion NC_ 07-17-2025.pdf PDF
36C78625B0035 0001.docx DOCX document
Drawings_Vol-2_817CM3025_Marion NC.pdf PDF
Drawings_Vol-9_817CM3025_Marion NC.pdf PDF
Drawings_Vol-5_817CM3025_Marion NC.pdf PDF
Bid Specification_Vol-2 817CM3025_Marion NC.pdf PDF
Solicitation 36C78625B0035 for 817CM3025 New Land Expansion at Marion NC.docx DOCX document
IFB Cost Estimate Worksheet.xlsx XLSX spreadsheet
Drawings_Vol-7_817CM3025_Marion NC.pdf PDF
Davis-Bacon Wage Determination - Building - IN20250006 05-23-2025.pdf PDF
VAAR 852.219-75 VA Notice of Limitations On Subcontracting Certificate.docx DOCX document
Drawings_Vol-3_817CM3025_Marion NC.pdf PDF
Drawings_Vol-10_817CM3025_Marion NC.pdf PDF
Drawings_Vol-4_817CM3025_Marion NC.pdf PDF
Drawings_Vol-6_817CM3025_Marion NC.pdf PDF
Drawings_Vol-8_817CM3025_Marion NC.pdf PDF
Bid Specification_Vol-1 817CM3025_Marion NC.pdf PDF
Davis-Bacon Wage Determination - Heavy - IN20250006 05-23-2025.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MARION NATIONAL CEMETERY BID DOCUMENTS (ADDENDUM 1)

NEW LAND EXPANSION 10/30/2024

NCA PROJECT NO. 817CM3025

07 27 26 - 1

SECTION 07 27 26

FLUID-APPLIED MEMBRANE AIR BARRIERS, VAPOR PERMEABLE

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Fluid-applied vapor-permeable air barrier at exterior above grade wall assemblies.

2. Connection to adjacent air barrier components providing a durable, continuous, full building air barrier.

1.2 RELATED WORK

A. Section 01 45 29 TESTING LABORATORY SERVICES: General Quality Assurance and Quality Control Requirements.

B. Section 01 81 13 SUSTAINABLE CONSTRUCTION REQUIREMENTS: General

Sustainable Construction Requirements.

C. Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS: Commissioning of building envelope components.

D. Section 04 20 00 UNIT MASONRY: Masonry Unit Air Barrier Substrates.

E. Section 07 40 00 ROOFING AND SIDING PANELS: Flashing Components of

Factory Finished Roofing and Wall Systems Requiring Air Barrier

Transitions.

F. Section 07 60 00 FLASHING AND SHEET METAL: Metal Flashing Requiring Air

Barrier Transitions.

G. Section 07 92 00, JOINT SEALANTS: Joint Sealants.

H. Division 08 sections for aluminum-framed entrances and storefronts, aluminum windows, glazed aluminum curtain walls, louvers and vents :

Exterior Wall Openings Requiring Air Barrier Transitions.

I. Section 09 29 00 GYPSUM BOARD: Wall Sheathings Air Barrier Substrates.

1.3 APPLICABLE PUBLICATIONS

A. Comply with references to extent specified in this section.

B. Air Barrier Association of America (ABAA):

Quality Assurance Program.

C. ASTM International (ASTM):

C920-18.................Elastomeric Joint Sealants.

C1193-16................Use of Joint Sealants.

D412-16.................Vulcanized Rubber and Thermoplastic

Elastomers-Tension.

E96/E96M-16.............Water Vapor Transmission of Materials.

NCA PROJECT NO. 817CM3025

07 27 26 - 2

E162-16.................Surface Flammability of Materials Using a

Radiant Heat Energy Source.

E783-02(2018)...........Field Measurement of Air Leakage Through

Installed Exterior Windows and Doors.

E1186-17................Air Leakage Site Detection in Building

Envelopes and Air Barrier Systems.

E2178-13................Air Permanence of Building Materials.

E2357-18................Determining Air Leakage of Air Barrier

Assemblies.

1.4 SUBMITTALS

A. Submittal Procedures: Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.

1. Show size, configuration, and fabrication and installation details.

B. Manufacturer's Literature and Data:

1. Description of each product.

2. Installation instructions.

C. Sustainable Construction Submittals:

1. Low Pollutant-Emitting Materials:

a. Identify volatile organic compound types and quantities.

D. Test reports:

1. Submit field inspection and test reports.

E. Certificates: Certify each product complies with specifications.

1. Compatibility: Certify products are compatible with adjacent materials.

F. Qualifications: Substantiate qualifications comply with specifications.

1. Manufacturer with project experience list .

2. Installer with project experience list .

a. Include personnel qualifications.

b. Field supervisor qualifications.

c. Certify installer approval by air barrier manufacturer.

1.5 QUALITY ASSURANCE

A. Coordinate work with adjacent and related work to provide continuous, unbroken, durable air barrier system.

B. Manufacturer Qualifications:

1. Regularly and presently manufactures specified products.

2. Manufactured specified products with satisfactory service on five similar installations for minimum five years.

C. Installer Qualifications:

NCA PROJECT NO. 817CM3025

07 27 26 - 3

1. Regularly and presently installs specified products.

2. Approved by manufacturer.

3. Applicators trained and certified by manufacturer of air barrier system.

4. Full time on-site field supervisor has completed three projects of similar scope within last year.

5. Field Supervisor: Holds Sealant, Waterproofing, and Restoration

Institute (SWRI) Wall Coating Validation Program Certificate, or similar qualification acceptable to Contracting Officer’s

Representative.

D. Testing Agency Qualifications:

1. Accredited by International Accreditation Service, Inc. or American

Association for Laboratory Accreditation.

2. Staff experienced in installation of specified system and qualified to perform observation and inspection specified and determine compliance with project requirements.

1.6 DELIVERY

A. Deliver products in manufacturer's original sealed packaging.

B. Mark packaging, legibly. Indicate manufacturer's name or brand, type, production run number, and manufacture date.

C. Before installation, return or dispose of products within distorted, damaged, or opened packaging.

1.7 STORAGE AND HANDLING

A. Store products indoors in dry, weathertight, conditioned facility.

B. Protect products from damage during handling and construction operations.

1.8 FIELD CONDITIONS

A. Environment:

1. Work Area Ambient Temperature Range: 4 to 32 degrees C (40 to

90 degrees F) continuously, beginning 48 hours before installation.

2. Surface Requirements: visibly dry, and complying with manufacturer's instructions.

1.9 WARRANTY

A. Construction Warranty: FAR clause 52.246-21, "Warranty of

Construction."

NCA PROJECT NO. 817CM3025

07 27 26 - 4

PART 2 - PRODUCTS

2.1 SYSTEM PERFORMANCE

A. Air-Barrier Assembly Air Leakage: Maximum 0.2 L/s/square meter

(0.04 cfm/square feet) of surface area at 75 Pa (1.57 psf) differential pressure when tested according to ASTM E2357.

B. Provide full system of compatible materials under conditions of service and application required. Compatibility based on testing by material manufacturer.

C. Perform as continuous vapor permeable air barrier and moisture drainage plane.

D. Transition to adjacent flashings and discharge water to building exterior.

E. Accommodate substrate movement and seal expansion and control joints, construction material transitions, opening transitions, penetrations, and perimeter conditions without moisture deterioration and air leakage exceeding performance requirements.

2.2 PRODUCTS - GENERAL

A. Provide air barrier system components from one manufacturer.

B. Sustainable Construction Requirements:

1. Low Pollutant-Emitting Materials: Comply with VOC limits specified in Section 01 81 13 , SUSTAINABLE CONSTRUCTION REQUIREMENTS for the following products:

a. Non-Flooring Adhesives and Sealants.

2.3 AIR BARRIER

A. Fluid-Applied, Vapor-Permeable Membrane Air Barrier:

1. Elastomeric, modified bituminous or synthetic polymer membrane.

2. Air Permeance: ASTM E2178: 0.02 L/s/square meter

(0.004 cfm/square feet) of surface area at 75 Pa (1.57 psf) differential pressure.

3. Vapor Permeance: ASTM E96/E96M: Minimum 580 ng/Pa/s/square meter

(10 perms).

4. Elongation: Ultimate, ASTM D412, Die C: 200 percent, minimum.

5. Thickness: Minimum 1.0 mm (40 mils) dry film thickness, applied in single continuous coat.

6. Surface Burning Characteristics: When tested according to ASTM E84.

a. Flame Spread Rating: 25 maximum.

b. Smoke Developed Rating: 450 maximum.

NCA PROJECT NO. 817CM3025

07 27 26 - 5

2.4 ACCESSORIES

A. Primer: Waterborne primer complying with VOC requirements, recommended air barrier manufacturer to suit application.

B. Counterflashing Sheet: Modified bituminous, minimum 1.0 mm (40 mils) thick, self-adhering composite sheet consisting of minimum 0.8 mm

(33 mils) of rubberized asphalt laminated to polyethylene film.

C. Substrate Patching Material: Manufacturer's standard trowel-grade filler material.

D. Sprayed Polyurethane Foam Sealant: Foamed-in-place, 24 to 32 kg/cu. m

(1.5 to 2.0 pcf) density, with maximum flame-spread index of 25 when tested according to ASTM E84.

E. Flexible Opening Transition: Cured low-modulus silicone extrusion with reinforcing ribs, sized to fit opening widths, designed for adhesion to or insertion into aluminum framing extrusions, and compatible with air barrier system materials and accessories.

F. Joint Sealant: ASTM C920, single-component, neutral-curing silicone;

Class 100/50 (low modulus), Grade NS, Use NT related to exposure, approved by membrane air barrier manufacturer for adhesion and compatibility with membrane air barrier and accessories.

PART 3 - EXECUTION

3.1 PREPARATION

A. Examine and verify substrate suitability for product installation.

B. Protect existing construction and completed work from damage.

C. Correct substrate deficiencies:

1. Remove projections and excess materials and fill voids with substrate patching material.

2. Remove contaminants capable of affecting subsequently installed product's performance.

D. Prepare and treat substrate joints and cracks according to ASTM C1193 and membrane air barrier manufacturer's instructions.

3.2 INSTALLATION - AIR BARRIER

A. Install products according to manufacturer's instructions.

1. When manufacturer's instructions deviate from specifications, submit proposed resolution for Contracting Officer's Representative consideration.

B. Apply primer.

C. Install transition strips and accessory materials.

D. Seal air barrier to adjacent components of building air barrier system.

NCA PROJECT NO. 817CM3025

07 27 26 - 6

E. Install flexible opening transition at each opening perimeter. Extend transition onto each substrate minimum 75 mm (3 inches).

1. Fill gaps at perimeter of openings with foam sealant.

F. At penetrations, seal transition strips around penetrating objects with termination mastic.

1. Fill gaps at perimeter of penetrations with sprayed polyurethane foam sealant.

G. At top of through-wall flashings, seal with continuous transition strip of manufacturer's recommended material to suit application.

H. Apply air barrier in full contact with substrate to produce continuous seal with transitions.

I. Apply fluid membrane in thickness recommended by manufacturer, and minimum specified thickness.

J. Leave air barrier exposed until tested and inspected and approved by

Contracting Officer’s Representative.

3.3 FIELD QUALITY CONTROL

A. Field Inspections and Tests: Performed by testing laboratory specified in Section 01 45 29, TESTING LABORATORY SERVICES.

1. Perform inspections and tests before concealing air barrier with subsequent work.

B. Inspections:

1. Compatibility of materials within air barrier system and adjacent materials.

2. Suitability of substrate and support for air barrier.

3. Suitability of conditions under which air barrier is applied.

4. Adequacy of substrate priming.

5. Application and treatment of joints and edges of transition strips, flexible opening transitions, and accessory materials.

6. Continuity and gap-free installation of air barrier, transition strips, and accessory materials.

C. Tests:

1. Qualitative air-leakage testing according to ASTM E1186.

2. Quantitative air-leakage testing according to ASTM E783.

D. Inspection and Test Frequency: Determined by installed air barrier surface area.

1. Up to 900 square meter (10,000 square feet): One inspection.

2. 901 - 3,300 square meter (10,001 - 35,000 square feet): Two inspections.

NCA PROJECT NO. 817CM3025

07 27 26 - 7

3. 3,300 - 7,000 square meter (35,001 - 75,000 square feet): Three inspections.

4. 7,001 - 11,600 square meter (75,001 - 125,000 square feet): Four inspections.

5. 11,601 - 19,000 square meter (125,001 - 200,000 square feet): Five inspections.

6. Over 19,000 square meter (200,000 square feet): Six inspections.

E. Submit inspection and test reports to the Contracting Officer’s

Representative within seven calendar days of completing the inspection and test.

F. Defective Work:

1. Correct deficiencies, make necessary repairs, and retest as required to demonstrate compliance with specified requirements.

3.4 CLEANING

A. Remove masking materials.

B. Clean spills and overspray using cleaning agents recommended by manufacturers of affected construction.

3.5 PROTECTION

A. Protect air barrier from construction operations.

B. Protect air barrier from exposure to UV light exposure exceeding manufacturer's recommendation.

C. Replace overexposed materials and retest.

- - E N D - -