000110TOC - Revised.pdf

PDF 32 KB Posted

Attached to
Y1PZ--817CM3025 New Land Expansion at Marion National Cemetery
Solicitation number
36C78625B0035_1
Issued by

About this file

This document is a Table of Contents for the Marion National Cemetery New Land Expansion project (NCA Project No. 817CM3025), dated 10/30/2024. The comprehensive bid documents span multiple construction and engineering divisions, including earthwork, utilities, electrical, HVAC, communications, plumbing, and site improvements. Key technical areas of focus include precast concrete burial crypts, columbarium units, memorial wall units, site surveys, demolition, environmental controls, electrical systems, access control, video surveillance, water and sewage utilities, and landscaping.

The project includes specialized specifications for cemetery infrastructure development, with detailed technical requirements across 33 divisions and three appendices (Geotechnical Report, Asbestos Inspection Report, and Limited Lead Paint Testing Results). Notable technical elements include provisions for earth moving, dewatering, asphalt paving, decorative metal fences and gates, planting irrigation, structured cabling, electronic safety systems, and advanced utility metering. The documents provide a comprehensive technical framework for expanding the Marion National Cemetery's land and infrastructure.

View the file

Other files

File Type Posted
36C78625B0035 0003.docx DOCX document
075323 EPDM Roofing Specification.pdf PDF
Responses to Prebid RFIs 2 for 36C78625B0035 for 817CM3025 New Land Expansion at Marion NC.pdf PDF
283100 - Fire Detection and Alarm - Revised.pdf PDF
Addendum 01_Cover Information_20250820 Marion NC.pdf PDF
Revised Davis-Bacon Wage Determination - Building - IN20250002 08-08-2025.pdf PDF
Responses to Prebid RFIs 36C78625B0035 for 817CM3025 New Land Expansion at Marion NC.pdf PDF
36C78625B0035 0002.docx DOCX document
034821PrecastConcBurialCrypts - Revised.pdf PDF
263213EngGen - Revised.pdf PDF
329000Planting - Revised.pdf PDF
312011EarthMovingSF - Revised.pdf PDF
Addendum 01_Plans_20250820 Marion NC.pdf PDF
072726Fluid-Applied Membrane - Revised.pdf PDF
Revised Davis-Bacon Wage Determination - Heavy - IN20250006 08-08-2025.pdf PDF
Prebid Site Visit Attendance Sheet 817CM3025 New Land Expansion at Marion NC_ 07-17-2025.pdf PDF
36C78625B0035 0001.docx DOCX document
Solicitation 36C78625B0035 for 817CM3025 New Land Expansion at Marion NC.docx DOCX document
IFB Cost Estimate Worksheet.xlsx XLSX spreadsheet
Drawings_Vol-7_817CM3025_Marion NC.pdf PDF
Davis-Bacon Wage Determination - Building - IN20250006 05-23-2025.pdf PDF
Drawings_Vol-6_817CM3025_Marion NC.pdf PDF
Drawings_Vol-8_817CM3025_Marion NC.pdf PDF
Bid Specification_Vol-1 817CM3025_Marion NC.pdf PDF
Davis-Bacon Wage Determination - Heavy - IN20250006 05-23-2025.pdf PDF
Drawings_Vol-2_817CM3025_Marion NC.pdf PDF
Drawings_Vol-9_817CM3025_Marion NC.pdf PDF
Drawings_Vol-5_817CM3025_Marion NC.pdf PDF
Bid Specification_Vol-2 817CM3025_Marion NC.pdf PDF
VAAR 852.219-75 VA Notice of Limitations On Subcontracting Certificate.docx DOCX document
Drawings_Vol-3_817CM3025_Marion NC.pdf PDF
Drawings_Vol-10_817CM3025_Marion NC.pdf PDF
Drawings_Vol-4_817CM3025_Marion NC.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MARION NATIONAL CEMETERY BID DOCUMENTS (ADDENDUM 1)

NEW LAND EXPANSION 10/30/2024

NCA PROJECT NO. 817CM3025

TABLE OF CONTENTS

00 01 10-1

DEPARTMENT OF VETERANS AFFAIRS

NCA MASTER SPECIFICATIONS

Section 00 01 10

DIVISION 00 - SPECIAL SECTIONS

00 01 15 List of Drawing Sheets

DIVISION 01 - GENERAL REQUIREMENTS

01 00 02 General Requirements (Minor NCA Projects)

01 32 17 Network Analysis Schedules (Microsoft Project Gantt Chart)

01 33 23 Shop Drawings, Product Data, and Samples

01 42 19 Reference Standards

01 43 39 Mockup Requirements

01 45 29 Testing Laboratory Services

01 57 19 Temporary Environmental Controls

01 74 19 Construction Waste Management

01 81 13 Sustainable Construction Requirements

01 91 00 General Commissioning Requirements

DIVISION 02 – EXISTING CONDITIONS

02 21 00 Site Surveys

02 41 10 Demolition and Site Clearing

02 82 13.41 Asbestos Abatement For Total Demolition Projects

02 83 33.13 Lead-Based Paint Removal and Disposal

DIVISION 03 – CONCRETE

03 30 53 (Short-Form) Cast-in-Place Concrete

03 48 21 Precast Concrete Burial Crypts (Double Depth Lawn Crypt)

03 48 24 Precast Concrete Columbarium Units

03 48 26 Precast Concrete Memorial Wall Units

DIVISION 04 – MASONRY

04 05 13 Masonry Mortaring

04 05 16 Masonry Grouting

04 05 31 Masonry Tuck Pointing

04 20 00 Unit Masonry

04 43 00 Natural Stone Veneer

04 73 00 Columbarium Niche Covers

04 73 10 Memorial Wall Markers

DIVISION 05 – METALS

05 40 00 Cold-Formed Metal Framing

05 50 00 Metal Fabrications

00 01 10-2

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES

06 10 00 Rough Carpentry

06 18 13 Structural Glued Laminated Timber

06 20 00 Finish Carpentry

06 43 00 Wood Stairs and Railings

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 01 50.19 Preparation for Re-Roofing

07 08 00 Facility Exterior Closure Commissioning

07 13 52 Modified Bituminous Sheet Waterproofing

07 21 13 Thermal Insulation

07 21 23 Loose-Fill Insulation

07 22 00 Roof and Deck Insulation

07 27 26 Fluid-Applied Membrane Air Barriers, Vapor Permeable

07 31 29.13 Wood Shingles Repair

07 41 13 Standing Seam Metal Roofing

07 60 00 Flashing and Sheet Metal

07 84 00 Firestopping

07 92 00 Joint Sealants

DIVISION 08 - OPENINGS

08 01 52 Wood Window Repairs

08 11 13 Hollow Metal Doors and Frames

08 14 00 Interior Wood Doors

08 31 13 Access Doors and Frames

08 41 13 Aluminum-Framed Entrances and Storefronts

08 51 13 Aluminum Windows

08 52 00 Wood Windows

08 56 19 Pass Windows

08 71 00 Door Hardware

08 80 00 Glazing

08 90 00 Louvers and Vents

DIVISION 09 – FINISHES

09 05 16 Subsurface Preparation for Floor Finishes

09 22 16 Non-Structural Metal Framing

09 29 00 Gypsum Board

09 30 00 Specialty Moldings and Trims

09 30 13 Tiling

09 51 00 Acoustical Ceilings

09 65 13 Resilient Base and Accessories

09 65 19 Resilient Tile Flooring

09 65 36.13 Static-Dissipative Resilient Flooring

09 67 23 Resinous Flooring

09 68 00 Carpeting

09 72 16 Vinyl-Coated Fabric Wallcoverings

09 77 00 Fiberglass Reinforced Wall Panels

00 01 10-3

09 91 00 Painting

DIVISION 10 – SPECIALTIES

10 14 00 Exterior Signage

10 14 05 Interior Signage

10 21 13 Toilet Compartments

10 28 00 Toilet and Bath Accessories

10 44 13 Fire Extinguisher Cabinets

10 51 13 Metal Lockers

10 56 13 Steel Shelving

10 75 00 Flagpoles

DIVISION 11 - EQUIPMENT

11 30 13 Small Commercial Appliances

11 83 00 Global Investigation Satellite System (GNSS) Reference System

11 83 02 GNSS & GIS Mapping and Geodata

DIVISION 12 – FURNISHINGS

12 24 00 Window Shades

12 32 00 Manufactured Wood Casework

12 36 00 Countertops

DIVISION 22 – PLUMBING

22 05 11 Common Work Results for Plumbing

22 05 12 General Motor Requirements for Plumbing Equipment

22 05 19 Meters and Gauges for Plumbing

22 05 23 General-Duty Valves for Plumbing Piping

22 07 11 Plumbing Insulation

22 08 00 Commissioning of Plumbing Systems

22 11 00 Facility Water Distribution

22 11 23 Domestic Water Pumps

22 13 00 Facility Sanitary and Vent Piping

22 33 00 Electric Water Heaters

22 40 00 Plumbing Fixtures

DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING

(HVAC)

23 05 11 Common Work Results for HVAC

23 05 12 General Motor Requirements for HVAC Equipment

23 05 41 Noise and Vibration Control for HVAC Piping and Equipment

23 05 93 Testing, Adjusting, and Balancing for HVAC

23 07 11 HVAC Insulation

23 08 00 Commissioning of HVAC Systems

23 09 23 DDC Controls For HVAC

23 23 00 Refrigerant Piping

23 31 00 HVAC Ducts and Casings

23 34 00 HVAC Fans

00 01 10-4

23 36 00 Air Terminal Units

23 37 00 Air Outlets and Inlets

23 40 00 HVAC Air Cleaning Devices

23 81 00 Unitary HVAC Equipment

23 81 43 Air-Source Unitary Heat Pumps

23 82 16 Air Coils

23 82 39 Unit Heaters

DIVISION 25 – INTEGRATED AUTOMATION

25 10 10 Advanced Utility Metering System

DIVISION 26 – ELECTRICAL

26 05 11 Requirements for Electrical Installations

26 05 19 Low-Voltage Electrical Power Conductors and Cables

26 05 26 Grounding and Bonding for Electrical Systems

26 05 33 Raceway and Boxes for Electrical Systems

26 05 41 Underground Electrical Construction

26 05 73 Overcurrent Protective Device Coordination Study

26 08 00 Commissioning of Electrical Systems

26 09 23 Lighting Controls

26 24 13 Distribution Switchboards

26 24 16 Panelboards

26 27 26 Wiring Devices

26 29 11 Motor Controllers

26 29 21 Enclosed Switches and Circuit Breakers

26 32 13 Engine Generators

26 36 23 Automatic Transfer Switches

26 41 00 Facility Lightning Protection

26 51 00 Interior Lighting

26 56 00 Exterior Lighting

DIVISION 27 – COMMUNICATIONS

27 05 00 Common Work Results for Communications

27 05 26 Grounding and Bonding for Communications Systems

27 05 33 Conduits and Backboxes for Communications Systems

27 08 00 Commissioning of Communication Systems

27 10 00 Structured Cabling

27 11 00 Communications Equipment Room Fittings

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 08 00 Commissioning of Electronic Safety and Security Systems

28 10 00 Access Control

28 20 00 Video Surveillance

28 31 00 Intrusion Detection

DIVISION 31 – EARTHWORK

31 20 11 Earth Moving (Short Form)

00 01 10-5

31 23 19 Dewatering

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 05 23 Cement and Concrete for Exterior Improvements

32 08 00 Commissioning of Planting Irrigation Systems

32 12 16 Asphalt Paving

32 17 23 Pavement Markings

32 31 19 Decorative Metal Fences and Gates

32 33 00 Site Furnishings

32 84 00 Planting Irrigation

32 90 00 Planting

DIVISION 33 – UTILITIES

33 10 00 Water Utilities

33 30 00 Sanitary Sewerage Utilities

33 40 00 Storm Sewer Utilities

33 41 13 Foundation Drainage

APPENDIX

A Geotechnical Report

B Asbestos Inspection Report

C Limited Lead Paint Testing Results

File details come from the government source that posted it. Updated .