This solicitation is for construction services to renovate existing space and relocate IT offices at the Cincinnati VA Medical Center. The contractor will demolish existing elements in the space, perform plumbing, HVAC, electrical, security and fire protection work as specified in the drawings and specifications. Work will include infection control and noise/vibration reduction measures, and will be phased to accommodate ongoing medical center operations. Multiple outages must be coordinated with the center. The estimated value is between $500,000 to $1,000,000. The IFB is expected to post on August 30, 2021 with bids due 30-45 days after. The awarded contractor will have 180 days from notice to proceed to complete all work. The solicitation will be set aside for Service-Disabled Veteran Owned Small Businesses.

View the file

Other files

File Type Posted
36C25021B0065 0012.pdf PDF
36C25021B0065 0011.pdf PDF
VA Cincinnati IT Amendment 211119.docx DOCX document
General Requirements 010000 update.pdf PDF
36C25021B0065 0010.pdf PDF
RELOCATE IT UPDATED DRAWINGS 211102.pdf PDF
23 05 41.pdf PDF
23 37 00.pdf PDF
26 05 33.pdf PDF
23 36 00.pdf PDF
26 51 00.pdf PDF
36C25021B0065 0009.pdf PDF
010000.pdf PDF
23 21 13.pdf PDF
23 31 00.pdf PDF
270533.pdf PDF
230923 DDC Controls Amendment 1 211019.pdf PDF
130541 Non-Structural.pdf PDF
000100.pdf PDF
23 05 11.pdf PDF
36C25021B0065 0008.docx DOCX document
Honeywell Siemens JCI Sole Source Justification_Relocate IT (002) - Redacted.pdf PDF
Tridium Niagara Sole Source Justification_Relocate IT - Redacted (002).pdf PDF
36C25021B0065 0007.docx DOCX document
VAAR 852.219-77 SEPT 2021 Deviation.pdf PDF
36C25021B0065 0006.docx DOCX document
230511.pdf PDF
539 21 208 RELOCATE IT UPDATED DRAWINGS 211015.pdf PDF
36C25021B0065 0005.docx DOCX document
233700.pdf PDF
233100.pdf PDF
233600.pdf PDF
265100.pdf PDF
539 21 208 VA Cincinnati IT Amendment 01 211019.docx DOCX document
260533.pdf PDF
230541.pdf PDF
010000 General Requirements update.pdf PDF
230923 DDC Controls Amendment 211019.pdf PDF
36C25021B0065 0004.docx DOCX document
36C25021B0065 0003.docx DOCX document
36C25021B0065 0002.docx DOCX document
Site Visit -Sign-In.pdf PDF
36C25021B0065 0001.docx DOCX document
Attachment 4- RFI Form.pdf PDF
36C25021B0065_1.docx DOCX document
Attachment 5 - EMR Attachment.pdf PDF
Attahcment 1 -Specifications Updated.pdf PDF
Attachment 3- DBA OH20210082.pdf PDF
Attachment 2 Drawings Updated.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VA CINCINNATI PROJECT NO. 539-21-208

RELOCATE I.T. OFFICES

02-01-20 (Amendment No. 11/2/21 Revision)

23 21 13-1

SECTION 23 21 13

HYDRONIC PIPING

PART 1 - GENERAL

1.1 DESCRIPTION

A. Water piping to connect HVAC equipment, including the following:

1. Heating hot water piping.

B. A complete listing of common acronyms and abbreviations are included in Section 23 05 11, COMMON WORK RESULTS FOR HVAC.

1.2 RELATED WORK

A. Section 01 00 00, GENERAL REQUIREMENTS.

B. Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.

C. Section 01 81 13, SUSTAINABLE CONSTRUCTION REQUIREMENTS.

D. Section 23 05 11, COMMON WORK RESULTS FOR HVAC: General mechanical requirements and items, which are common to more than one section of Division 23.

E. Section 23 05 41, NOISE AND VIBRATION CONTROL FOR HVAC PIPING AND EQUIPMENT.

F. Section 23 07 11, HVAC AND BOILER PLANT INSULATION: Piping insulation.

G. Section 23 09 23, DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC: Temperature and pressure sensors and valve operators.

H. Section 23 25 00, HVAC WATER TREATMENT: Water treatment for open and closed systems.

H.I. Section 13 05 41, SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL

COMPONENTS: Seismic restraints for piping.

1.3 APPLICABLE PUBLICATIONS

A. The publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only. Where conflicts occur these specifications and the VHA standard will govern.

B. American Society of Mechanical Engineers (ASME):

B1.20.1-2013 .............................. Pipe Threads, General Purpose (Inch)

B16.3-2016 ................................. Malleable Iron Threaded Fittings: Classes 150 and 300

B16.4-2016 ................................. Gray Iron Threaded Fittings: (Classes 125 and 250)

B16.5-2017 ................................. Pipe Flanges and Flanged Fittings: NPS 1/2 through NPS 24

Metric/Inch Standard

B16.9-2018 ................................. Factory Made Wrought Buttwelding Fittings

B16.11-2016 ............................... Forged Fittings, Socket-Welding and Threaded

B16.18-2018 ............................... Cast Copper Alloy Solder Joint Pressure Fittings

B16.22-2018 ............................... Wrought Copper and Copper Alloy Solder-Joint Pressure Fittings

02-01-20 (Amendment 11/2/21 Revision)

23 21 13-2

B16.24-2016 ............................... Cast Copper Alloy Pipe Flanges and Flanged Fittings: Classes

150, 300, 600, 900, 1500, and 2500

B16.39-2014 ............................... Malleable Iron Threaded Pipe Unions: Classes 150, 250, and

B16.42-2016 ............................... Ductile Iron Pipe Flanges and Flanged Fittings

B31.9-2014 ................................. Building Services Piping

B40.100-2013 ............................. Pressure Gauges and Gauge Attachments

ASME Boiler and Pressure Vessel Code:

BPVC Section VIII-2015 ............. Rules for Construction of Pressure Vessels

C. American Society for Testing and Materials (ASTM):

A47/A47M-2018 ......................... Standard Specification for Ferritic Malleable Iron Castings

A53/A53M-2018 ......................... Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless

A106/A106M-2019 ..................... Standard Specification for Seamless Carbon Steel Pipe for High-

Temperature Service

A126-2004(R2019) ..................... Standard Specification for Gray Iron Castings for Valves, Flanges, and Pipe Fittings

A183-2014 .................................. Standard Specification for Carbon Steel Track Bolts and Nuts

A216/A216M-2018 ..................... Standard Specification for Steel Castings, Carbon, Suitable for

Fusion Welding, for High-Temperature Service

A307-2016 .................................. Standard Specification for Carbon Steel Bolts, Studs, and

Threaded Rod 60,000 PSI Tensile Strength

A536-1984(R2019) ..................... Standard Specification for Ductile Iron Castings

B62-2017 .................................... Standard Specification for Composition Bronze or Ounce Metal

Castings

B88-2016 .................................... Standard Specification for Seamless Copper Water Tube

F439-2019 .................................. Standard Specification for Chlorinated Poly (Vinyl Chloride)

(CPVC) Plastic Pipe Fittings, Schedule 80

F441/F441M-2015 ...................... Standard Specification for Chlorinated Poly (Vinyl Chloride)

(CPVC) Plastic Pipe, Schedules 40 and 80

D. American Welding Society (AWS):

B2.1/B2.1M-2014 ....................... Standard for Welding Procedure and Performance Specification

E. Expansion Joint Manufacturer’s Association, Inc. (EJMA):

EJMA 2017 ................................. Expansion Joint Manufacturer’s Association Standards, Tenth

Edition

F. Manufacturers Standardization Society (MSS) of the Valve and Fitting Industry, Inc.:

23 21 13-3

SP-67-2017 ................................ Butterfly Valves

SP-70-2014 ................................ Gray Iron Gate Valves, Flanged and Threaded Ends

SP-71-2014 ................................ Gray Iron Swing Check Valves, Flanged and Threaded Ends

SP-80-2014 ................................ Bronze Gate, Globe, Angle, and Check Valves

SP-85-2014 ................................ Gray Iron Globe and Angle Valves, Flanged and Threaded Ends

SP-110-2014 .............................. Ball Valves Threaded, Socket-Welding, Solder Joint, Grooved and Flared Ends

SP-125-2018 .............................. Gray Iron and Ductile Iron In-line, Spring-Loaded, Center-Guided

Check Valves

G. Tubular Exchanger Manufacturers Association (TEMA):

TEMA Standards 2015 ............... 9th Edition

1.4 SUBMITTALS

A. Submittals, including number of required copies, shall be submitted in accordance with Section

01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.

B. Information and material submitted under this section shall be marked “SUBMITTED UNDER

SECTION 23 21 13, HYDRONIC PIPING”, with applicable paragraph identification.

C. Manufacturer's Literature and Data including: Full item description and optional features and accessories. Include dimensions, weights, materials, applications, standard compliance, model numbers, size, and capacity.

1. Pipe and equipment supports.

2. Pipe and tubing, with specification, class or type, and schedule.

3. Pipe fittings, including miscellaneous adapters and special fittings.

4. Flanges, gaskets and bolting.

5. Couplings and fittings.

6. Valves of all types.

7. Strainers.

8. All specified hydronic system components.

9. Gauges.

10. Thermometers and test wells.

10.11. Seismic bracing details for piping.

D. Submit the welder’s qualifications in the form of a current (less than one-year old) and formal certificate.

E. As-Built Piping Diagrams: Provide drawing as follows for heating hot water system and other piping systems and equipment.

1. One wall-mounted stick file with complete set of prints. Mount stick file in the 5th floor penthouse along with control diagram stick file.

23 21 13-4

2. One complete set of reproducible drawings.

3. One complete set of drawings in electronic AutoCAD and pdf format.

F. Complete operating and maintenance manuals including wiring diagrams, technical data sheets, information for ordering replacement parts, and troubleshooting guide:

1. Include complete list indicating all components of the systems.

2. Include complete diagrams of the internal wiring for each item of equipment.

3. Diagrams shall have their terminals identified to facilitate installation, operation and maintenance.

1.5 QUALITY ASSURANCE

A. Section 23 05 11, COMMON WORK RESULTS FOR HVAC, which includes welding qualifications.

B. Submit prior to welding of steel piping a certificate of Welder’s certification. The certificate shall be current and not more than one-year old.

C. All couplings, fittings, valves, and specialties shall be the products of a single manufacturer.

1. All castings used for coupling housings, fittings, valve bodies, etc., shall be date stamped for quality assurance and traceability.

1.6 AS-BUILT DOCUMENTATION

A. Submit manufacturer’s literature and data updated to include submittal review comments and any equipment substitutions.

B. Submit operation and maintenance data updated to include submittal review comments, VA approved substitutions and construction revisions in electronic version on CD or flash drive. All aspects of system operation and maintenance procedures, including applicable piping isometrics, wiring diagrams of all circuits, a written description of system design, control logic, and sequence of operation shall be included in the operation and maintenance manual. The operations and maintenance manual shall include troubleshooting techniques and procedures for emergency situations. Notes on all special systems or devices shall be included. A List of recommended spare parts (manufacturer, model number, and quantity) shall be furnished. Information explaining any special knowledge or tools the owner will be required to employ shall be inserted into the As-Built documentation.

1.7 SPARE PARTS

A. For mechanical pressed sealed fittings provide tools required for each pipe size used at the facility.

PART 2 - PRODUCTS

2.1 PIPE AND EQUIPMENT SUPPORTS, PIPE SLEEVES, AND WALL AND CEILING PLATES

A. Provide in accordance with Section 23 05 11, COMMON WORK RESULTS FOR HVAC.

23 21 13-5

2.2 PIPE AND TUBING

A. Heating Hot Water Piping:

1. Steel: ASTM A53/A53M Grade B, seamless or ERW, Schedule 40.

2. Copper water tube option: ASTM B88, Type K or L, hard drawn.

B. Pipe supports, including insulation shields, for above ground piping: Section 23 05 11, COMMON

WORK RESULTS FOR HVAC.

2.3 FITTINGS FOR STEEL PIPE

A. 50 mm (2 inches) and Smaller: Screwed or welded joints.

1. Butt welding: ASME B16.9 with same wall thickness as connecting piping.

2. Forged steel, socket welding or threaded: ASME B16.11.

3. Screwed: 150-pound malleable iron, ASME B16.3. 125-pound cast iron, ASME B16.4, may be used in lieu of malleable iron. Bushing reduction of a single pipe size, or use of close nipples, is not acceptable.

4. Unions: ASME B16.39.

5. Water hose connection adapter: Brass, pipe thread to 20 mm (3/4 inch) garden hose thread, with hose cap nut.

B. 65 mm (2-1/2 inches) and Larger: Welded or flanged joints.

1. Butt welding fittings: ASME B16.9 with same wall thickness as connecting piping. Elbows shall be long radius type, unless otherwise noted.

2. Welding flanges and bolting: ASME B16.5:

a. Water service: Weld neck or slip-on, plain face, with 3.2 mm (1/8 inch) thick full-face neoprene gasket suitable for 104 degrees C (220 degrees F).

1) Contractor's option: Convoluted, cold formed 150-pound steel flanges, with Teflon gaskets, may be used for water service.

b. Flange bolting: Carbon steel machine bolts or studs and nuts, ASTM A307, Grade B.

C. Welded Branch and Tap Connections: Forged steel weldolets, or branchlets and threadolets may be used for branch connections up to one pipe size smaller than the main. Forged steel half-couplings, ASME B16.11 may be used for drain, vent and gauge connections.

2.4 FITTINGS FOR COPPER TUBING

A. Joints:

1. Solder Joints: Joints shall be made up in accordance with recommended practices of the materials applied. Apply 95/5 tin and antimony on all copper piping.

2. Mechanical press connect fittings are an acceptable alternative. Fittings shall be as recommended by manufacturer for the system fluid type, operating temperature, etc.

B. Bronze Flanges and Flanged Fittings: ASME B16.24.

C. Fittings: ASME B16.18 cast copper or ASME B16.22 solder wrought copper.

23 21 13-6

2.5 DIELECTRIC FITTINGS

A. Provide where copper tubing and ferrous metal pipe are joined.

B. 50 mm (2 inches) and Smaller: Threaded dielectric union, ASME B16.39.

C. 65 mm (2-1/2 inches) and Larger: Flange union with dielectric gasket and bolt sleeves, ASME

B16.42. Dielectric gasket material shall be compatible with hydronic medium.

D. Temperature Rating, 99 degrees C (210 degrees F).

E. Contractor’s option: On pipe sizes 50 mm (2 inch) and smaller, screwed end brass ball valves may be used in lieu of dielectric unions.

2.6 SCREWED JOINTS

A. Pipe Thread: ASME B1.20.1.

B. Lubricant or Sealant: Oil and graphite or other compound approved for the intended service.

2.7 VALVES

A. Asbestos packing is not acceptable.

B. All valves of the same type shall be products of a single manufacturer.

C. Shut-Off Valves:

1. Ball Valves (Pipe sizes 50 mm (2 inch) and smaller): MSS SP-110, screwed or solder connections, three-piece construction, brass or bronze body with stainless steel ball & stem, with full port and Teflon seat at 2758 kPa (400 psig) working pressure rating. Provide stem extension to allow operation without interfering with pipe insulation.

D. Globe and Angle Valves:

1. Globe Valves:

a. 50 mm (2 inches) and smaller: MSS SP-80, bronze, 1035 kPa (150 psig). Globe valves shall be union bonnet with metal plug type disc.

b. 65 mm (2-1/2 inches) and larger: 861 kPa (125 psig), flanged, iron body, bronze trim, MSS SP-85 for globe valves.

E. Check Valves:

1. Swing Check Valves:

a. 50 mm (2 inches) and smaller: MSS SP-80, bronze, 1035 kPa (150 psig), 45-degree swing disc.

2. Non-Slam or Silent Check Valve: Spring loaded double disc swing check or internally guided flat disc lift type check for bubble tight shut-off. Provide where check valves are shown in heating hot water piping. Check valves incorporating a balancing feature may be used.

a. Body: MSS SP-125 cast iron, ASTM A126, Class B, or steel, ASTM A216/A216M, Class

WCB, or ductile iron, ASTM 536, flanged or wafer type.

b. Seat, disc and spring: 18-8 stainless steel, or bronze, ASTM B62. Seats may be elastomer material.

23 21 13-7

F. Water Flow Balancing Valves: For flow regulation and shut-off. Valves shall be line size rather than reduced to control valve size.

1. Globe style valve.

2. A dual-purpose flow balancing valve and adjustable flow meter, with bronze or cast-iron body, calibrated position pointer, valved pressure taps or quick disconnects with integral check valves and preformed polyurethane insulating enclosure.

3. Provide a readout kit including flow meter, readout probes, hoses, flow charts or calculator, and carrying case.

G. Automatic Balancing Control Valves: Factory calibrated to maintain constant flow (plus or minus five percent) over system pressure fluctuations within the spring range of the valve (2 to 32 psig or 4 to 57 psig). Provide standard pressure taps and four sets of capacity charts. Valves shall be line size and be one of the following designs:

1. Gray iron ASTM A126 or brass body rated 1200 kPa (175 psig) at 93 degrees C (200 degrees F), with stainless steel piston and spring.

2. Brass or ferrous body designed for 2070 kPa (300 psig) service at 121 degrees C (250 degrees F), with corrosion resistant, tamper proof, self-cleaning piston/spring assembly that is easily removable for inspection or replacement.

3. Combination assemblies containing ball type shut-off valves, unions, flow regulators, strainers with blowdown valves and pressure temperature ports shall be acceptable.

4. Provide a readout kit including flow meter, probes, hoses, flow charts and carrying case.

2.8 STRAINERS

A. Y Type.

1. Screens: Bronze, Monel metal or 18-8 stainless steel, free area not less than 2-1/2 times pipe area, with perforations as follows: 1.1 mm (0.045 inch) diameter perforations.

2.9 GAUGES, PRESSURE AND COMPOUND

A. ASME B40.100, Accuracy Grade 1A, (pressure, vacuum, or compound for air, oil or water), initial mid-scale accuracy 1 percent of scale (Qualify grade), metal or phenolic case, 115 mm (4-1/2 inches) in diameter, 6 mm (1/4 inch) NPT bottom connection, white dial with black graduations and pointer, clear glass or acrylic plastic window, suitable for board mounting. Provide red "set hand" to indicate normal working pressure.

B. Provide brass lever handle union cock. Provide brass/bronze pressure snubber for gauges in water service.

C. Range of Gauges: Provide range equal to at least 130 percent of normal operating range.

23 21 13-8

2.10 PRESSURE/TEMPERATURE TEST PROVISIONS

A. Pete's Plug: 6 mm (1/4 inch) MPT by 75 mm (3 inches) long, brass body and cap, with retained safety cap, nordel self-closing valve cores, permanently installed in piping where shown, or in lieu of pressure gauge test connections shown on the drawings.

B. Provide one each of the following test items to the COR:

1. 6 mm (1/4 inch) FPT by 3.2 mm (1/8 inch) diameter stainless steel pressure gauge adapter probe for extra-long test plug.

2. 90 mm (3-1/2 inch) diameter, one percent accuracy, compound gauge, 101 kPa (30 inches

Hg) to 690 kPa (100 psig) range.

3. 0 to 104 degrees C (32 to 220 degrees F) pocket thermometer one-half degree accuracy, 25 mm (1 inch) dial, 125 mm (5 inch) long stainless-steel stem, plastic case.

2.11 FIRESTOPPING MATERIAL

A. Refer to Section 23 05 11, COMMON WORK RESULTS FOR HVAC.

PART 3 - EXECUTION

3.1 GENERAL

A. If an installation is unsatisfactory to the COR, the Contractor shall correct the installation at no additional cost or time to the Government.

B. The drawings show the general arrangement of pipe and equipment but do not show all required fittings and offsets that may be necessary to connect pipes to equipment, fan-coils, coils, radiators, etc., and to coordinate with other trades. Provide all necessary fittings, offsets and pipe runs based on field measurements and at no additional cost or time to the Government.

Coordinate with other trades for space available and relative location of HVAC equipment and accessories to be connected on ceiling grid. Pipe location on the drawings shall be altered by contractor where necessary to avoid interferences and clearance difficulties.

C. Store materials to avoid excessive exposure to weather or foreign materials. Keep inside of piping relatively clean during installation and protect open ends when work is not in progress.

D. Support piping securely. Refer to PART 3, Section 23 05 11, COMMON WORK RESULTS FOR

HVAC.

E. Install piping generally parallel to walls and column center lines, unless shown otherwise on the drawings. Space piping, including insulation, to provide 25 mm (1 inch) minimum clearance between adjacent piping or other surface. Unless shown otherwise, slope drain piping down in the direction of flow not less than 25 mm (1 inch) in 12 m (40 feet). Provide eccentric reducers to keep bottom of sloped piping flat.

F. Locate and orient valves to permit proper operation and access for maintenance of packing, seat and disc. Generally, locate valve stems in overhead piping in horizontal position. Provide a union

23 21 13-9 adjacent to one end of all threaded end valves. Control valves usually require reducers to connect to pipe sizes shown on the drawing.

G. Offset equipment connections to allow valving off for maintenance and repair with minimal removal of piping. Provide flexibility in equipment connections and branch line take-offs with 3-elbow swing joints where appropriate.

H. Tee water piping runouts or branches into the side of mains or other branches. Avoid bull-head tees, which are two return lines entering opposite ends of a tee and exiting out the common side.

I. Provide manual air vent at all piping system high points and drain valves at all low points.

J. Connect piping to equipment as shown on the drawings. Install components furnished by others such as:

1. Flow meter elements, control valve bodies, flow switches, pressure taps with valve, and wells for sensors.

K. Firestopping: Fill openings around uninsulated piping penetrating floors or fire walls, with firestop material. For firestopping insulated piping refer to Section 23 07 11, HVAC AND BOILER PLANT

INSULATION.

L. Where copper piping is connected to steel piping, provide dielectric connections.

3.2 PIPE JOINTS

A. Welded: Beveling, spacing and other details shall conform to ASME B31.9 and AWS B2.1/B2.1M.

See Welder’s qualification requirements under "Quality Assurance" in Section 23 05 11, COMMON WORK RESULTS FOR HVAC.

B. Screwed: Threads shall conform to ASME B1.20.1; joint compound shall be applied to male threads only and joints made up so no more than three threads show. Coat exposed threads on steel pipe with joint compound, or red lead paint for corrosion protection.

C. 125 Pound Cast Iron Flange (Plain Face): Mating flange shall have raised face, if any, removed to avoid overstressing the cast iron flange.

3.3 SEISMIC BRACING ABOVEGROUND PIPING

A. Provide in accordance with Section 13 05 41, SEISMIC RESTRAINT REQUIREMENTS FOR

NON-STRUCTURAL COMPONENTS.

3.33.4 LEAK TESTING ABOVEGROUND PIPING

A. Inspect all joints and connections for leaks and workmanship and make corrections as necessary, to the satisfaction of the COR. Tests may be either of those below, or a combination, as approved by the COR.

B. An operating test at design pressure, and for hot systems, design maximum temperature.

C. A hydrostatic test at 1.5 times design pressure for the new piping systems. Valve off existing piping systems as necessary. For water systems, the design maximum pressure would usually be the static head, or expansion tank maximum pressure, plus pump head. Factory tested

23 21 13-10 equipment (convertors, exchangers, coils, etc.) need not be field tested. Isolate equipment where necessary to avoid excessive pressure on mechanical seals and safety devices.

D. Prepare and submit test and inspection reports to the COR within 5 working days of test completion and prior to covering the pipe.

E. All tests shall be witnessed by the COR or their representative, and be documented by each section tested, date tested, and list or personnel present.

3.43.5 FLUSHING AND CLEANING PIPING SYSTEMS

A. Water Piping: Clean systems as recommended by the existing chemical supplier.

B. Initial Flushing: Remove loose dirt, mill scale, metal chips, weld beads, rust, and like deleterious substances without damage to any system component. Provide temporary piping or hose to bypass coils, control valves, exchangers and other factory cleaned equipment unless acceptable means of protection are provided and subsequent inspection of hide-out areas takes place.

Isolate or protect clean system components, including pumps and pressure vessels, and remove any component which may be damaged. Open all valves, drains, vents and strainers at all system levels. Remove plugs, caps, spool pieces, and components to facilitate early debris discharge from system. Sectionalize system to obtain debris carrying velocity of 1.8 m/s (5.9 f/s), if possible.

Connect dead-end supply and return headers as necessary. Flush bottoms of risers. Install temporary strainers where necessary to protect down-stream equipment. Supply and remove flushing water and drainage by various type hose, temporary and permanent piping and

Contractor's booster pumps. Flush until clean as approved by the COR.

C. Cleaning: Using products recommended by existing chemical supplier, circulate systems at normal temperature to remove adherent organic soil, hydrocarbons, flux, pipe mill varnish, pipe joint compounds, iron oxide, and like deleterious substances not removed by flushing, without chemical or mechanical damage to any system component. Removal of tightly adherent mill scale is not required. Keep isolated equipment which is "clean" and where dead-end debris accumulation cannot occur. Sectionalize system if possible, to circulate at velocities not less than

1.8 m/s (5.9 f/s). Circulate each section for not less than 4 hours. Blow-down all strainers, or remove and clean as frequently as necessary. Drain and prepare for final flushing.

D. Final Flushing: Return systems to conditions required by initial flushing after all cleaning solution has been displaced by clean make-up. Flush all dead ends and isolated clean equipment. Gently operate all valves to dislodge any debris in valve body by throttling velocity. Flush for not less than one hour.

3.53.6 WATER TREATMENT

A. Close and fill system as soon as possible after final flushing to minimize corrosion.

B. Charge systems with chemicals specified in Section 23 25 00, HVAC WATER TREATMENT.

C. Utilize this activity, by arrangement with the COR, for instructing VA operating personnel.

23 21 13-11

3.63.7 STARTUP AND TESTING

A. Perform tests as recommended by product manufacturer and listed standards and under actual or simulated operating conditions and prove full compliance with design and specified requirements.

Tests of the various items of equipment shall be performed simultaneously with the system of which each item is an integral part.

B. When any defects are detected, correct defects and repeat test at no additional cost or time to the

Government.

C. Coordinate the startup and contractor testing schedules with COR. Provide a minimum notice of

10 working days prior to startup and testing.

D. Adjust red set hand on pressure gauges to normal working pressure.

- - - E N D - - -