This document contains a solicitation for a construction project and related federal contract opportunity. The solicitation seeks a contractor to complete renovations at a Veterans Affairs medical center including renovating existing space for plumbing, HVAC, electrical, security and fire protection work. Demolition and site preparation is required. Multiple outages must be coordinated. The estimated value is between $500,000 to $1,000,000. The renovation is located at the Cincinnati VAMC. The IFB is anticipated to publish on August 30th, 2021 with bids due within 30-45 days and work expected to be completed within 180 days of notice to proceed. The solicitation will be set aside for SDVOSB and plans will be available to download with the IFB.

View the file

Other files

File Type Posted
36C25021B0065 0012.pdf PDF
36C25021B0065 0011.pdf PDF
VA Cincinnati IT Amendment 211119.docx DOCX document
General Requirements 010000 update.pdf PDF
36C25021B0065 0010.pdf PDF
RELOCATE IT UPDATED DRAWINGS 211102.pdf PDF
23 05 41.pdf PDF
23 37 00.pdf PDF
26 05 33.pdf PDF
23 36 00.pdf PDF
26 51 00.pdf PDF
36C25021B0065 0009.pdf PDF
010000.pdf PDF
23 21 13.pdf PDF
23 31 00.pdf PDF
270533.pdf PDF
230923 DDC Controls Amendment 1 211019.pdf PDF
000100.pdf PDF
23 05 11.pdf PDF
36C25021B0065 0008.docx DOCX document
Honeywell Siemens JCI Sole Source Justification_Relocate IT (002) - Redacted.pdf PDF
Tridium Niagara Sole Source Justification_Relocate IT - Redacted (002).pdf PDF
36C25021B0065 0007.docx DOCX document
VAAR 852.219-77 SEPT 2021 Deviation.pdf PDF
36C25021B0065 0006.docx DOCX document
230511.pdf PDF
232113.pdf PDF
539 21 208 RELOCATE IT UPDATED DRAWINGS 211015.pdf PDF
36C25021B0065 0005.docx DOCX document
233700.pdf PDF
233100.pdf PDF
233600.pdf PDF
265100.pdf PDF
539 21 208 VA Cincinnati IT Amendment 01 211019.docx DOCX document
260533.pdf PDF
230541.pdf PDF
010000 General Requirements update.pdf PDF
230923 DDC Controls Amendment 211019.pdf PDF
36C25021B0065 0004.docx DOCX document
36C25021B0065 0003.docx DOCX document
36C25021B0065 0002.docx DOCX document
Site Visit -Sign-In.pdf PDF
36C25021B0065 0001.docx DOCX document
Attachment 4- RFI Form.pdf PDF
36C25021B0065_1.docx DOCX document
Attachment 5 - EMR Attachment.pdf PDF
Attahcment 1 -Specifications Updated.pdf PDF
Attachment 3- DBA OH20210082.pdf PDF
Attachment 2 Drawings Updated.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VA CINCINNATI PROJECT NO. 539-21-208

RELOCATE I.T. OFFICES

02-01-20 (Amendment 11/2/21 Revision)

13 05 41 - 1

SECTION 13 05 41

SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS

PART 1 - GENERAL

1.1 DESCRIPTION:

A. Provide seismic restraint in accordance with the requirements of the drawings, VA Handbook H18-8: Seismic Design Requirements and this specification in order to maintain the integrity of non-structural components and equipment of the building so that they remain safe and functional in case of seismic event.

B. The design of seismic restraints of non-structural components to resist seismic load shall be based on Seismic Design parameters indicated below in accordance with VA H-18-8 in conjunction with ASCE 7 as specified in H-18-8 Section 4.0, for existing building retrofit projects. Specific requirements for Critical and Essential facilities are covered in Section 4.0 of H-18-8, including applying Ip = 1.5 for all nonstructural components in Critical facilities.

1. International Building Code 2021 Edition

2. American Society of Civil Engineers Minimum Design Loads and

Associated Criteria for Buildings and Other Structures (ASCE 7)7-16

3. Facility Occupancy Category per VA H-18-8: Critical Facility

4. Site Class: D (Default)

5. Building Risk Category: IV

6. Mapped MCER 0.2 s period Spectral Response Acceleration Parameter

(Ss):0.145

7. Mapped MCER 1.0 s period Spectral Response Acceleration Parameter

(S1): 0.077

8. Short period Spectral Response Acceleration Parameter (Sds): 0.155

9. Short period Spectral Response Acceleration Parameter (Sd1): 0.123

10. Building Seismic Design Category: C

11. Components Importance Factors (Ip): 1.5

12. Components Response Modification Factors(Rp) / Overstrength Factors:

Veneer: limited deformability elements and attachments

2.5 2.0

Veneer: Low-deformability elements and attachments

1.5 2.0

Sign 3.0 2.0

Stair 2.5 2.0

02-01-20 (Amendment 11/2/21 Revision)

13 05 41 - 2

Air side HVACR, fans, air handlers, air conditioning units, cabinet heaters, air distribution boxes, and other mechanical components.

6.0 2.0

Air-cooled heat exchangers, condensing units.

3.0 1.5

Engines, Pumps 2.5 2.0

Components and systems using isolated neoprene elements

2.5 2.0

Components and systems isolated using neoprene elements and neoprene isolated floors with built-in or separate elastomeric snubbing devices or resilient perimeter stops

2.5 2

Spring-isolated components and systems and vibration-isolated floors closely restrained using built-in or separate elastomeric snubbing devices or resilient perimeter stops

2 2

Internally isolated components and systems

2.0 2.0

Suspended vibration-isolated equipment including in-line duct devices

2.5 2.0

Piping in accordance with ASME B31

(2001, 2002, 2008, and 2010), including in-line components with joins made by welding or brazing

12 2

Piping in accordance with ASME B31, including in-line components, constructed of high or limited deformability materials with joints made or by threading, bonding, compression couplings, or grooved couplings.

6 2

Piping and tubing not in accordance with

ASME B31 , including in-line components, constructed of high-deformability

9 2

02-01-20 (Amendment 11/2/21 Revision)

13 05 41 - 3 materials, with joints made by welding or brazing

Piping and tubing not in accordance with

ASME B31, including in-line components, constructed of high- or limited-deformability materials, with joints made by threading, bonding, compression couplings, or grooved couplings

4.5 2

Ductwork, including in-line components, constructed of high-deformability materials, with joints made by welding or brazing

9 2

Ductwork, including in-line components, constructed of high-or limited-deformability materials with joints made by means other than welding or brazing.

6 2

Plumbing 2.5 2

Elevated tanks, vessels, bins or hoppers on symmetrically braced legs.

2.0 2

Elevated tanks, vessels, bins or hoppers on unbraced or asymmetrically braced legs.

3.0 2

Generators, batteries, inverters, motors, transformers, and other electrical components constructed of high-deformability materials.

2.5 2.0

Motor control centers, panel boards, switch gear, instrumentation cabinets, and other components constructed of sheet metal framing.

6.0 2.0

Communication equipment, computers, instrumentation, and controls.

2.5 2.0

Lighting Fixtures 1.5 2.0

Other mechanical or electrical equipment.

1.5 2.0

Electrical conduit and cable tray. 6.0 2.0

Plumbing 2.5 2

02-01-20 (Amendment 11/2/21 Revision)

13 05 41 - 4

C. Definitions: Non-structural building components are components or systems that are not part of the building’s structural system whether inside or outside, above or below grade. Non-structural components of buildings include but are not limited to (Refer to VA H-18-8, ASCE 7 and ASCE 41 for additional examples):

1. Architectural Elements: Facades that are not part of the structural system and its shear resistant elements; cornices and other architectural projections and parapets that do not function structurally; glazing; nonbearing partitions; suspended ceilings;

stairs isolated from the basic structure; cabinets; bookshelves;

medical equipment; and storage racks, etc.

2. Electrical Elements: Power and lighting systems; substations;

switchgear and switchboards; auxiliary engine-generator sets;

transfer switches; motor control centers; motor generators; selector and controller panels; fire protection and alarm systems; special life support systems; and telephone and communication systems, etc.

3. Mechanical Elements: Heating, ventilating, and air-conditioning systems; medical gas systems; plumbing systems; sprinkler systems;

pneumatic systems; boiler/chiller/utility plant/other equipment and components, etc.

4. Transportation Elements: Mechanical, electrical and structural elements for transport systems, i.e., elevators and dumbwaiters, including hoisting equipment and counterweights.

1.2 RELATED WORK:

A. Acoustical Ceilings: Section 09 51 00 ACOUSTICAL CEILINGS

B. Interior Lighting: Section 26 51 00, INTERIOR LIGHTING

1.3 QUALITY CONTROL:

A. Shop-Drawing Preparation:

1. Non-structural seismic restraint systems shop drawings and delegated design calculations shall be prepared by a professional structural engineer with a minimum of 5 years’ experience in the design and detailing of seismic force restraints. The professional structural engineer shall be registered in the state where the project is located and submit qualifications with list of projects illustrating compliance with the experience requirement of this section.

2. Submit design tables and information used for the design-force levels, stamped and signed by a professional structural engineer registered in the State where project is located.

02-01-20 (Amendment 11/2/21 Revision)

13 05 41 - 5

B. Coordination:

1. Do not install seismic restraints until seismic restraint submittals are approved by the Contracting Officers Representative (COR).

2. Coordinate trapezes or other multi-pipe hanger systems prior to submission of shop drawings for review.

C. Seismic Certification:

In structures assigned to Seismic Design Category C, D, E, or F, permanent equipment and components are to have Special Seismic

Certification in accordance with requirements of section 13.2.2 of ASCE

7, including those required in existing buildings within Section

13.7.1.3.3, 13.7.7.3.3 and 13.7.8.3.3 of ASCE 41, except for equipment and components that are considered inherently rugged as listed in

Section 4.2.2 of VA H18-8, and shall comply with section 13.2.6 of ASCE

7.

1.4 SUBMITTALS:

A. Submit a complete and coordinated set of bracing and signed and sealed anchorage drawings and calculations for all non-structural elements requiring seismic restraint by the delegated professional structural engineer mentioned in Section 1.3.A.1 for review prior to installation including:

1. Description, layout, and location of all items to be anchored or braced with anchorage or brace points noted and dimensioned.

2. Details of all anchorage and bracing at large scale with all members, parts brackets shown, together with all connections, bolts, welds etc. clearly identified and specified. Details shall be coordinated with all project conditions and trades prior to shop drawing submission for review.

3. Complete calculations including but not limited to seismic design criteria, computer model input and output, seismic design forces and capacities, design tables and information used for all proprietary design elements such as post installed anchors, stamped and signed by a professional structural engineer specified in section 1.3 A.1.

4. For all post installed anchorages submit the appropriate

International Code Council Engineering Service (ICC-ES) evaluation reports, California’s Office of Statewide Health Planning and

Development(OSHPD) pre-approvals, or lab test reports verifying compliance with OSHPD Interpretation of Regulations 28-6.

5. Delegated professional structural engineer qualifications.

02-01-20 (Amendment 11/2/21 Revision)

13 05 41 - 6

B. Submit for review prior to installation, the following for seismic protection of piping in addition to items noted in Section 1.4.A:

1. Single-line piping diagrams on a floor-by-floor basis. Show all suspended piping for a given floor on the same plain.

2. Type of pipe (Copper, steel, cast iron, insulated, non-insulated, etc.).

3. Pipe contents.

4. Structural framing for the seismic and gravity support and the main superstructure for which the bracing and or anchorage is attached.

5. Location of all gravity load pipe supports and spacing requirements.

6. Numerical value of gravity load reactions.

7. Location of all seismic bracing.

8. Numerical value of applied seismic brace loads.

9. Type of connection (Vertical support, vertical support with seismic brace etc.).

10. Seismic brace reaction type (tension or compression): Details illustrating all support and bracing components, methods of connections, and specific anchors to be used.

C. Submit for review prior to installation, the following items for seismic protection of suspended ductwork and suspended electrical and communication cables, in addition to items noted in Section 1.4.A:

1. Details illustrating all support and bracing components, methods of connection, and specific anchors to be used.

2. Numerical value of applied gravity and seismic loads and seismic loads acting on support and bracing components.

3. Maximum spacing of hangers and bracing.

1.5 APPLICABLE PUBLICATIONS:

A. The Publications listed below (including amendments, addenda revisions, supplements and errata) form a part of this specification to the extent referenced. The publications are referenced in text by basic designation only.

B. American Concrete Institute (ACI):

355.2-19................Qualification for Post-Installed Mechanical

Anchors in Concrete and Commentary

C. American Institute of Steel Construction (AISC):

Load and Resistance Factor Design, Volume 1, Second Edition

D. ASTM International (ASTM):

02-01-20 (Amendment 11/2/21 Revision)

13 05 41 - 7

A36/A36M-19.............Standard Specification for Carbon Structural

Steel

A53/A53M-18.............Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and

Seamless

A307-14e1...............Standard Specifications for Carbon Steel Bolts, Studs, and Threaded Rod 60,000 PSI Tensile

Strength

A325-14.................Standard Specification for Structural Bolts, Steel, Heat Treated, 120/105 ksi Minimum

Tensile Strength

A325M-14................Standard Specification for High-Strength Bolts for Structural Steel Joints [Metric]

A490-14a................Standard Specification for Heat-Treated Steel

Structural Bolts, 150 ksi Minimum Tensile

Strength

A490M-14a...............Standard Specification for High-Strength Steel

Bolts, Classes 10.9 and 10.9.3, for Structural

Steel Joints [Metric]

A500/A500M-18...........Standard Specification for Cold-Formed Welded and Seamless Carbon Steel Structural Tubing in

Rounds and Shapes

A501/A501M-14...........Standard Specification for Hot-Formed Welded and Seamless Carbon Steel Structural Tubing

A615/A615M-20...........Standard Specification for Deformed and Plain

Carbon Steel Bars for Concrete Reinforcement

A992/A992M-11(2015).....Standard Specification for Steel for Structural

Shapes for Use in Building Framing

A996/A996M-16...........Standard Specification for Rail Steel and Axle

Steel Deformed Bars for Concrete Reinforcement

E488/E488M-18...........Standard Test Methods for Strength of Anchors in Concrete Elements

E. American Society of Civil Engineers

1. Minimum Design Loads and Associated Criteria for Buildings and Other

Structures (ASCE 7) Edition as indicated in section 1.1 B of this specification. Associated Criteria for Buildings and Other

Structures (ASCE 7): 7-16

02-01-20 (Amendment 11/2/21 Revision)

13 05 41 - 8

F. International Building Code (IBC) Edition as indicated in Section 1.1 B of this specification.

G. VA Handbook H18-8 Seismic Design Requirements, VA H-18-8, November

2019(REVISED MAY 1,2020)

H. National Uniform Seismic Installation Guidelines (NUSIG)

I. Sheet Metal and Air Conditioning Contractors National Association

J. (SMACNA): Seismic Restraint Manual - Guidelines for Mechanical Systems, 3RD EDITION 2008 and Addendum

1.6 REGULATORY REQUIREMENT:

A. IBC as shown in Section 1.1 B of this specification.

B. Exceptions: The omission of seismic restraints shall be allowed only in accordance with VA H18-8, ASCE 7.

PART 2 - PRODUCTS

2.1 STEEL:

A. Structural Steel: ASTM A36 and A992 SEE DRAWINGS.

B. Structural Tubing: ASTM A500, Grade B.

C. Structural Tubing: ASTM A501.

D. Steel Pipe: ASTM A53/A53M, Grade B.

E. Bolts & Nuts: ASTM A325.

2.2 CAST-IN-PLACE CONCRETE:

A. Concrete: 28 day strength, f’c = 27.5 MPa (4,000 psi)

B. Reinforcing Steel: ASTM A615/615M or ASTM A996/A996M deformed.

PART 3 - EXECUTION

3.1 CONSTRUCTION, GENERAL:

A. Provide equipment supports and anchoring devices to withstand the seismic design forces, so that when seismic design forces are applied, the equipment cannot displace, overturn, or become inoperable.

B. Provide anchorages in conformance with recommendations of the equipment manufacturer and as shown on approved shop drawings and calculations.

C. Construct seismic restraints and anchorage to allow for thermal expansion.

D. Testing Before Final Inspection:

1. Test 10-percent of anchors in masonry and concrete per ASTM E488, and ACI 355.2 to determine that they meet the required load capacity. If any anchor fails to meet the required load, test the next 20 consecutive anchors, which are required to have zero failure, before resuming the 10-percent testing frequency.

02-01-20 (Amendment 11/2/21 Revision)

13 05 41 - 9

2. Before scheduling Final Inspection, submit a report on this testing indicating the number and location of testing, and what anchor-loads were obtained.

3. Construct seismic restraints and anchorages to not interfere with other trades or damage existing or in-situ elements of the constructed building.

3.2 EQUIPMENT RESTRAINT AND BRACING:

A. See drawings for equipment to be restrained or braced.

3.3 MECHANICAL DUCTWORK AND PIPING; BOILER PLANT STACKS AND BREACHING;

ELECTRICAL BUSWAYS, CONDUITS, AND CABLE TRAYS; AND TELECOMMUNICATION WIRES

AND CABLE TRAYS

A. Support and brace mechanical ductwork and piping; electrical busways, conduits and cable trays; and telecommunication wires and cable trays including boiler plant stacks and breeching to resist directional forces (lateral, longitudinal and vertical).

B. Brace duct and breeching branches with a minimum of 1 brace per branch.

C. Provide supports and anchoring so that, upon application of seismic forces, piping remains fully connected as operable systems which will not displace sufficiently to damage adjacent or connecting equipment, or building members.

D. Piping Connections: Provide flexible connections where pipes connect to equipment. Make the connections capable of accommodating relative differential movements between the pipe and equipment under conditions of earthquake shaking.

3.4 PARTITIONS

A. In buildings with flexible structural frames, anchor partitions to only structural element, such as a floor slab, and separate such partition by a physical gap from all other structural elements.

B. Properly anchor masonry walls to the structure for restraint, so as to carry lateral loads imposed due to earthquake along with their own weight and other lateral forces.

3.5 CEILINGS AND LIGHTING FIXTURES

A. At intervals required to meet the seismic demand forces, laterally brace suspended ceilings against lateral and vertical movements, and provide with a physical separation at the walls.

B. Independently support and laterally brace all lighting fixtures. Refer to applicable portion of lighting specification, Section 26 51 00, INTERIOR LIGHTING.

02-01-20 (Amendment 11/2/21 Revision)

13 05 41 - 10

3.6 STORAGE RACKS

A. Install storage racks to withstand earthquake forces and anchored to the floor or laterally braced from the top to the structural elements.

- - - E N D - - -