23 36 00.pdf
PDF 497 KB Posted
- Attached to
- Z1DA--Relocate IT Offices 539-21-208
- Solicitation number
- 36C25021B0065
About this file
This document provides details for a federal solicitation to renovate existing space at the Cincinnati VA Medical Center. The solicitation seeks a contractor to demolish existing elements in the space, install new architectural, mechanical, electrical, information technology, and plumbing systems, and complete all other work as shown in the drawings and specifications. The estimated value of the construction project is between $500,000 and $1,000,000. The solicitation will be set aside for Service-Disabled Veteran Owned Small Businesses. Interested offerors should monitor the solicitation when it is posted on or around August 30, 2021, with bids due within 30-45 days thereafter. The selected contractor must complete all work within 180 days of receiving the notice to proceed.
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA CINCINNATI PROJECT NO. 539-21-208
RELOCATE I.T. OFFICES
02-01-20 (Amendment No. 11/2/21 Revision)
23 36 00 - 1
SECTION 23 36 00
AIR TERMINAL UNITS
PART 1 - GENERAL
1.1 DESCRIPTION
Air terminal units.
1.2 RELATED WORK
A. Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
B. Section 23 05 11, COMMON WORK RESULTS FOR HVAC.
C. Section 23 05 41, NOISE AND VIBRATION CONTROL FOR HVAC PIPING AND EQUIPMENT.
D. Section 23 05 93, TESTING, ADJUSTING, AND BALANCING FOR HVAC.
E. Section 23 09 23, DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC.
F. Section 23 31 00, HVAC DUCTS AND CASINGS.
G. Section 13 05 41, SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL
COMPONENTS.
1.3 QUALITY ASSURANCE
Refer to Article, QUALITY ASSURANCE, in Section 23 05 11, COMMON WORK RESULTS FOR
HVAC.
1.4 SUBMITTALS
A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND
SAMPLES.
B. Manufacturer's Literature and Data:
1. Air Terminal Units: Submit test data.
C. Certificates:
1. Compliance with Article, QUALITY ASSURANCE.
2. Compliance with specified standards.
D. Operation and Maintenance Manuals: Submit in accordance with paragraph, INSTRUCTIONS, in
Section 01 00 00, GENERAL REQUIREMENTS.
1.5 APPLICABLE PUBLICATIONS
A. The publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only.
B. Air Conditioning and Refrigeration Institute (AHRI)/(ARI):
880-2017 .................................... Performance Rating of Air Terminals
C. National Fire Protection Association (NFPA):
90A-2018 .................................... Standard for the Installation of Air Conditioning and Ventilating
Systems
02-01-20 (Amendment 11/2/21 Revision)
23 36 00 - 2
D. Underwriters Laboratories, Inc. (UL):
181-2013 .................................... Standard for Factory-Made Air Ducts and Air Connectors
E. American Society for Testing and Materials (ASTM):
C 665-2006 ................................ Standard Specification for Mineral-Fiber Blanket Thermal
Insulation for Light Frame Construction and Manufactured
Housing
1.6 GUARANTY
In accordance with the GENERAL CONDITIONS
PART 2 - PRODUCTS
2.1 GENERAL
A. Coils:
1. All Air-Handling Units: Provide aluminum fins and copper coils for all hot water reheat coils.
2. Water Heating Coils:
a. ARI certified, continuous plate or spiral fin type, leak tested at 2070 kPa (300 PSI).
b. Capacity: As indicated, based on scheduled entering water temperature.
c. Headers: Copper or Brass.
d. Fins: Aluminum, maximum 315 fins per meter (8 fins per inch).
e. Tubes: Copper, arrange for counter-flow of heating water.
f. Water Flow Rate: Minimum 0.032 Liters/second (0.5 GPM).
g. Provide vent and drain connection at high and low point, respectively of each coil.
h. Coils shall be guaranteed to drain.
B. Labeling: Control box shall be clearly marked with an identification label that lists such information as nominal CFM, maximum and minimum factory-set airflow limits, coil type and coil connection orientation, where applicable.
C. Factory calibrate air terminal units to air flow rate indicated. All settings including maximum and minimum air flow shall be field adjustable.
D. Dampers with internal air volume control: See section 23 31 00 HVAC DUCTS AND CASINGS.
E. Terminal Sound Attenuators: See Section 23 31 00 HVAC DUCTS AND CASINGS.
2.2 AIR TERMINAL UNITS (BOXES)
A. General: Factory built, pressure independent units, factory set-field adjustable air flow rate, suitable for single duct applications. Clearly show on each unit the unit number and factory set air volumes corresponding to the contract drawings. Section 23 05 93, TESTING, ADJUSTING, AND BALANCING FOR HVAC work assumes factory set air volumes. Coordinate flow controller sequence and damper operation details with the drawings and Section 23 09 23, DIRECT-
DIGITAL CONTROL SYSTEM FOR HVAC. All air terminal units shall be brand new products of the same manufacturer.
23 36 00 - 3
B. Sound Power Levels:
Acoustic performance of the air terminal units shall be based on the design noise levels for the spaces stipulated in Section 23 05 41 NOISE AND VIBRATION CONTROL FOR HVAC PIPING
AND EQUIPMENT. Note: Low pressure duct is unlined. Terminal sound attenuators shall be provided where scheduled, and where terminal unit sound levels exceed criteria stated in schedules or in Section 23 05 41. Attenuators shall be Hospital Grade Type.
C. Casing: Unit casing shall be constructed of galvanized steel no lighter than 0.85 mm (22 Gauge).
Provide hanger brackets for attachment of supports.
1. Lining material: Suitable to provide required acoustic performance, thermal insulation and prevent sweating. Meet the requirements of NFPA 90A and comply with UL 181 for erosion as well as ASTM C665 antimicrobial requirements. Insulation shall consist of 13 mm (1/2 IN) thick non-porous foil faced rigid fiberglass insulation of 2-lb/cu.ft, secured by full length galvanized steel z-strips which enclose and seal all edges. Tape and adhesives shall not be used. Materials shall be non-friable and with surfaces, including all edges, fully encapsulated and faced with perforated metal or coated so that the air stream will not detach material.
2. Access panels (or doors): Provide panels large enough for inspection, adjustment and maintenance without disconnecting ducts, and for cleaning heating coils attached to unit, even if there are no moving parts. Panels shall be insulated to same standards as the rest of the casing and shall be secured and gasketed airtight. It shall require no tool other than a screwdriver to remove.
3. Total leakage from casing: Not to exceed 2 percent of the nominal capacity of the unit when subjected to a static pressure of 750 Pa (3 inch WG), with all outlets sealed shut and inlets fully open.
D. Construct dampers and other internal devices of corrosion resisting materials which do not require lubrication or other periodic maintenance.
1. Damper Leakage: Not greater than 2 percent of maximum rated capacity, when closed against inlet static pressure of 1 kPa (4 inch WG).
E. Provide multi-point velocity pressure sensors with external pressure taps.
1. Provide direct reading air flow rate table pasted to box.
F. Provide static pressure tubes.
G. Externally powered DDC variable air volume controller and damper actuator to be furnished under Section 23 09 23, DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC for factory mounting on air terminal units. The DDC controller shall be electrically actuated.
23 36 00 - 4
PART 3 - EXECUTION
3.1 INSTALLATION
A. Work shall be installed as shown and according to the manufacturer’s diagrams and recommendations.
B. Handle and install units in accordance with manufacturer's written instructions.
C. Support units rigidly so they remain stationary at all times. Cross-bracing or other means of stiffening shall be provided as necessary. Method of support shall be such that distortion and malfunction of units cannot occur.
D. Locate air terminal units to provide a straight section of inlet duct for proper functioning of volume controls. See VA Standard Detail on drawings.
3.2 OPERATIONAL TEST
Refer to Section 23 05 11, COMMON WORK RESULTS FOR HVAC.
- - - E N D - - -