23 37 00.pdf
PDF 442 KB Posted
- Attached to
- Z1DA--Relocate IT Offices 539-21-208
- Solicitation number
- 36C25021B0065
About this file
This solicitation package outlines requirements for a renovation project at the Cincinnati VA Medical Center. The contractor will demolish existing space in Building 1 and perform renovations for plumbing, HVAC, electrical, security and fire protection systems. The project budget is estimated between $500,000 to $1,000,000. The solicitation will be set aside for Service-Disabled Veteran Owned Small Businesses. The invitation for bids is expected to be posted on August 30th, 2021 with a bid opening within 30-45 days. The contractor must complete all work within 180 days of receiving the notice to proceed.
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA CINCINNATI PROJECT NO. 539-21-208
RELOCATE I.T. OFFICES
02-01-20 (Amendment No. 11/2/21 Revision)
23 37 00 - 1
SECTION 23 37 00
AIR OUTLETS AND INLETS
PART 1 - GENERAL
1.1 DESCRIPTION
A. Air Outlets and Inlets: Diffusers, Registers, and Grilles.
1.2 RELATED WORK
A. Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
B. Section 23 05 11, COMMON WORK RESULTS FOR HVAC.
C. Section 23 05 41, NOISE AND VIBRATION CONTROL FOR HVAC PIPING AND EQUIPMENT.
D. Section 23 05 93, TESTING, ADJUSTING, AND BALANCING FOR HVAC.
E. Section 13 05 41, SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL
COMPONENTS.
1.3 QUALITY ASSURANCE
A. Refer to Article, QUALITY ASSURANCE, in Section 23 05 11, COMMON WORK RESULTS FOR
HVAC.
B. Fire Safety Code: Comply with NFPA 90A.
1.4 SUBMITTALS
A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND
SAMPLES.
B. Manufacturer's Literature and Data:
1. Diffusers, registers, grilles and accessories.
1.5 APPLICABLE PUBLICATIONS
A. The publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only.
B. Air Diffusion Council Test Code:
1062 GRD-2015 ......................... Certification, Rating, and Test Manual 4th Edition
C. American Society of Civil Engineers (ASCE):
ASCE7-2017 .............................. Minimum Design Loads for Buildings and Other Structures
D. American Society for Testing and Materials (ASTM):
A167-99 2009 ............................. Standard Specification for Stainless and Heat-Resisting
Chromium-Nickel Steel Plate, Sheet and Strip
B209- 2014 ................................. Standard Specification for Aluminum and Aluminum-Alloy Sheet and Plate
E. National Fire Protection Association (NFPA):
90A-2018 .................................... Standard for the Installation of Air Conditioning and Ventilating
Systems
02-01-20 (Amendment 11/2/21 Revision)
23 37 00 - 2
F. Underwriters Laboratories, Inc. (UL):
181-2013 .................................... UL Standard for Safety Factory-Made Air Ducts and Connectors
PART 2 - PRODUCTS
2.1 EQUIPMENT SUPPORTS
Refer to Section 23 05 11, COMMON WORK RESULTS FOR HVAC.
2.2 AIR OUTLETS AND INLETS
A. Materials:
1. Steel or aluminum, as indicated on the drawings.
2. Exposed Fastenings: The same material as the respective inlet or outlet. Fasteners for aluminum may be stainless steel.
3. Contractor shall review all ceiling drawings and details and provide all ceiling mounted devices with appropriate dimensions and trim for the specific locations.
B. Performance Test Data: In accordance with Air Diffusion Council Code 1062GRD. Refer to
Section 23 05 41, NOISE AND VIBRATION CONTROL FOR HVAC PIPING AND EQUIPMENT for NC criteria.
C. Air Supply Outlets:
1. Ceiling Diffusers: Suitable for surface mounting, exposed T-bar or special tile ceilings, off-white finish, square or round neck connection as shown on the drawings. Provide factory installed molded mineral fiber insulation blanket with foil backing on body of ceiling diffusers, minimum R value of 6. Provide plaster frame for units in plaster ceilings.
a. Square plaque face, fixed pattern: Round neck, T-bar or surface mounting as indicated on the drawings.
D. Return Grilles:
1. Finish: Off-white baked enamel.
2. Standard Ceiling Type: Grid Core, 13 mm by 13 mm (1/2 inch by 1/2 inch) core with 30 mm
(1-1/4 inch) margin.
3. Egg Crate Grilles: Aluminum or Painted Steel 1/2 by 1/2 by 1/2 inch grid providing 90% free area.
a. Heavy extruded aluminum frame shall have countersunk screw mounting. Unless otherwise indicated, frame shall have factory applied white finish.
b. Grille shall be suitable for duct or surface mounting as indicated on drawings. All necessary appurtenances shall be provided to allow for mounting.
PART 3 - EXECUTION
3.1 INSTALLATION
A. Comply with provisions of Section 23 05 11, COMMON WORK RESULTS FOR HVAC, particularly regarding coordination with other trades and work in existing buildings.
02-01-20 (Amendment 11/2/21 Revision)
23 37 00 - 3
B. Protection and Cleaning: Protect equipment and materials against physical damage. Place equipment in first class operating condition, or return to source of supply for repair or replacement, as determined by COR. Protect equipment during construction against entry of foreign matter to the inside and clean both inside and outside before operation and painting.
3.2 TESTING, ADJUSTING AND BALANCING (TAB)
Refer to Section 23 05 93, TESTING, ADJUSTING, AND BALANCING FOR HVAC.
3.3 OPERATING AND PERFORMANCE TESTS
Refer to Section 23 05 11, COMMON WORK RESULTS FOR HVAC.
- - - E N D - - -