36C25018B0816-007.pdf
PDF 5 MB Posted
- Attached to
- Reno 4th Fl Bldg 138 610-17-101 Federal contract opportunity
- Solicitation number
- 36C25018B0816
About this file
36C25018B0816 ATTACHMENT 6 - Interior Design Drawings.pdf
View the file
Other files for this federal contract opportunity
Show all 37
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OIT
PT-1
ELEC
PE-1
EQ
PE-1
Waiting
PT-1
Kiosk, Patient
Check-in
WDP-1/PT-1
Alcove, Wheelchair
PT-1
Conference Room
PT-1,2
Storage, Equipment
PE-1
Alcove, Crash Cart
PT-1
Storage Alcove, Wheelchair
PT-1
Office, Ophthalmology
Optometry
Chief
PT-1,2
Workstation, Eyecare Provider
410B
PT-1,2
Workstation, Eyecare Provider
410C
PT-1,2
Workstation, Eyecare Provider
410A PT-1,2 Lounge, Staff
PT-1,2
Toilet, Staff
WT-1,2
Workstation, Clerical
407B
PT-1,2
Workstation, Clerical
407A
PT-1,2
Reception
PT-1,2Support
Equipment Area
PT-1
Waiting
PT-1/WDP-1/WC-1
Reception
PT-1
Eyeglass Fitting, Display, and Dispensing
Room
PT-1,2
Exam
Treatment Room, Optometry
PT-1,2
Exam
Treatment Room, Optometry
PT-1,2
Exam
Treatment Room, Optometry
PT-1,2
Utility Room, Soiled
PE-1
Photography Room
PT-1,2
Supply Room, Clean
PE-1
Pre-testing Room
PT-1,2 Pre-testing
Room
PT-1,2
Instrument Calibration and Storage Room
PT-1,2
Hearing Aid
Fabrication/Modification Room
PT-1,2
Lounge, Staff
PT-1,2Office, Audiology and
Speech Pathology
Service Chief
PT-1,2
Cerumen Management
PT-1,2
Exam/ Consult
Audiology
PT-1,2
Exam/ Consult
Audiology
PT-1,2
Exam/ Consult
Audiology
PT-1,2
Toilet, Patient
WT-1,2
Reception/ Control Clerk
P-1/WC-1
Exam/ Consult
Audiology Technician
PT-1,2
Suite, Audiometric Examination
422B N/A
Suite, Audiometric Examination
423B N/A
Suite, Audiometric Examination
424B N/A
Storage, Equipment and Supplies
PE-1
Visual Fields Room
PT-1,2
Pre-testing Room
PT-1,2
Ultrasound/ Optical
Coherence Tomography
Room
PT-1,2
Waiting, Dilation
PT-1,2
Patient Education/
Contact Lens
Dispensing Room
PT-1,2
BUILDING 172
Toilet, Public
WT-1,2
Toilet, Public
WT-1,2
CORRIDOR
400G
PT-1,2
CORRIDOR
400H
PT-1,2
CORRIDOR
400I
PT-1,2
CORRIDOR
400F
PT-1,2
Exam
Treatment Room, Ophthalmology
PT-1,2
Waiting
PT-1/WC-1
Housekeeping Aides Closet
(HAC)
PE-1
PT-2
P T
-2
P T
-2
P T
-2
P T
-2
P T
-2
PT-2
PT-2
P T
-2
PT-2
PT-2 PT-2
PT-2
P T
-2
P T
-2
PT-2
PT-2
P T
-2
P T
-2P T
-2
P T
-2
P T
-2P T
-2
P T
-2
PT-2
WDP-1
WDP-1
WDP-1
WDP-1
W D
P -1
/W C
-1 W
D P
-1
WC-1
Storage, Equipment
PE-1
Suite, Audiometric Examination
Control
422A N/A
Suite, Audiometric Examination
Control
423A N/A
Suite, Audiometric Examination
Control
424A N/A
CORRIDOR
400A
WDP-1/PT-1,2
CORRIDOR
400J
PT-1,2
Office, Ophthalmology
Service Chief
PT-1,2
Office, Optometry
Service Chief
PT-1,2
CORRIDOR
400A
WDP-1/PT-1,2
WDP-1/WC-1
WDP-1 WDP-1 WDP-1 WDP-1
WDP-1/WC-1 WDP-1/WC-1
PT-2
PT-2
P T
-2
PT-2WDP-1
PT-2
PT-2
PT-2
WC-1
PT-2
WDP-1 WDP-1
WDP-1/WC-1
NIC
NIC
P T
-2
MATCHLINE
MATCHLINE
P H
A S
E
P H
A S
E
P H
A S
E
P H
A S
E
NIC
NIC
PT-2
P T
-2
PT-2
WDP-1/PT-1
W D
P -1
/W C
-1
P T
-2
NIC
PT-2
WDP-1
W D
P -1
/W C
-1
W D
P -1
/W C
-1
WDP-1/WC-1
2'-0"
PATCH TO MATCH
EXISTING PATCH TO MATCH
EXISTING
0 4'-0" 8'-0" 16'-0"
PLAN
NORTH
PHASE 1
KEY PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
C
Phase
ARCHITECT OF RECORD STAMPENGINEERS OF RECORD
321 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
A/E:
C on e ei gh th in ch o ne fo ot
B
A
C
D
E
F th re e in ch es o ne fo ot on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ha lf in ch o ne fo ot
6"
6"
6"
6"
C :\r vt \2
6\
8 3
-A
-C E
N T
R A
L_ V
I S N
-1
-4 th F lo or
_ M
IN
E
LS
O N
.r vt
C :\r vt \2
6\
8 3
-A
-C E
N T
R A
L_ V
I S N
-1
-4 th F lo or
_ M
IN
E
LS
O N
.r vt
/1
/2
:3 :1
P
M
I-104.1
FOURTH FLOOR - INTERIOR WALL
FINISH PLAN - PHASE 1
610-17-101
03/19/18 JR PEP
ISSUED FOR
CONSTRUCTION
Project Director
1700 E. 38TH STREET MARION, IN 46953
VISN 11 MARION B-138: 4TH FLOOR
CONSTRUCTION
SPRINKLERED
HDR ARCHITECTURE, INC.
600 HENNEPIN AVE SUITE 260
MINNEAPOLIS, MN 55403
612.524.6000
TERRY LITTELL SR., RA,
LEED AP
KORDA, INC.
1650 WATERMARK DRIVE, SUITE 200
COLUMBUS, OH 43215
614.487.1650
STAN KMONK
METRIC ENVIRONMENTAL
6971 HILLSDALE COURT
INDIANAPOLIS, IN 46250
1/8" = 1'-0" E1
FOURTH FLOOR - WALL FINISH PLAN - PHASE 1
11. ALL MISCELLANEOUS METALS SHALL BE PAINTED TO
MATCH THE WALL OR CEILING SURFACE IN WHICH THEY...
10. VERIFY VERIFY LENGTH AND HEIGHT OF WALL PROTECTION
WITH BUILT IN CASEWORK AND/OR WALL HUNG EQUIPMENT
9. REFER TO I-501 FOR CORNER GUARD,END GUARD AND
OTHER INTERIOR DETAILS.
8. APPLY JOINT FILLER TO CONCRETE/MASONRY JOINTS
PRIOR TO APPLICATION OF FINAL FINISH.
7. REFER TO I-200 SERIES FOR DIMENSIONED EXTENTS OF
WALL FINISHES.
6. WALL COVERING THAT TERMINATES IN THE MIDDLE OF A
WALL SHALL RECIEVE A U-CHANNEL REVEAL TO PROTECT
EXPOSED EDGE.
5. ALL NECESSARY TILE FLOORING UNDERLAYMENT TO BE
PROVIDED AND INSTALLED BY FLOORING
4. ALIGN FLOORING TRANSITIONS WITH FINISH BASE EXCEPT
AT DOORS, U.N.O.
3. ALL TRANSITION/REDUCER STRIPS AND OTHER
THRESHOLDS TO BE LOCATED AT CENTERLINE OF DOOR
WHEN IN CLOSED POSITION.
2. ALL GYP. BOARD CEILINGS TO BE PAINTED PT-1, U.N.O.
1. LEVEL & FINISH OF GYP. BD WALLS AND SOFFITS TO BE
LEVEL 4 FINISH.
GENERAL FINISH NOTES
PL PLASTIC LAMINATE
VB VINYL COVE BASE
AF RAISED ACCESS FLOORING
SVCT STATIC DISSIPATIVE VINYL COMPOSITION TILE
SC SEALED CONCRETE
RES-B RESINOUS EPOXY FLOOR BASE
RES RESINOUS EPOXY FLOOR
PTW PORCELAIN TILE WALL
PTF PORCELAIN TILE FLOOR
PTB PORCELAIN TILE BASE
PT PAINT
LIN LINOLEUM
GWB GYPSUM WALL BOARD, PAINTED
FRP FIBER REINFORCED PANEL
EXP EXPOSED CONSTRUCTION
EX EXISTING
EP EPOXY PAINT
CPT CARPET MODULAR TILE
CMU CONCRETE MASONRY UNIT
C CONCRETE
AT ACOUSTICAL CEILING
FINISH LEGEND
Mark: Revision: Date:
ISSUED FOR CONSTRUCTION 03/19/2018
03-19-18
PT-1
Laboratory, General Purpose
459A
PE-1,2
Laboratory, Acrylic
Processing
459B
PE-1,2
Laboratory, Acrylic
Finishing
459C
PE-1,2
Workstation, Dental
Technicians
460A
PT-1,2
Workstation, Dental
Technicians
460B
PT-1,2
Workstation, Dental
Technicians
460C
PT-1,2
Dental Equipment Mechanical
Room
PE-1
OFFICE
PE-1
Storage, Dental
Supplies
PE-1
Laboratory, Shipping and Receiving
459D
PE-1,2
Utility Room, Soiled
PE-1
Oral Surgery Room
PE-1,2
Oral Surgery Room
PE-1,2
Clean Supply Room
PE-1
Housekeeping Aides Closet
(HAC)
PE-1
Sub-Waiting
PT-1,2
Storage, Sterile
Instruments
PE-1
Computerized Tomography
(CT)
Room, Cone-Beam Control Room
446A
PT-1
Workstation, Staff
Dentist
456C
PT-1,2
Office, Dental Service Chief
PT-1,2
womens Locker/
Changing Room, Staff
PE-1
mens Locker/
Changing Room, Staff
PE-1
Reception
PT-1/WC-1
Dental Treatment
Room
(DTR),
Multi-Functional
PT-1,2
Dental Treatment
Room
(DTR),
Multi-Functional
PT-1,2
Dental Treatment
Room
(DTR),
Multi-Functional
PT-1,2
Dental Treatment
Room
(DTR),
Multi-Functional
PT-1,2
Dental Treatment
Room
(DTR),
Multi-Functional
PT-1,2
Dental Treatment
Room
(DTR),
Multi-Functional
PT-1,2
Dental Treatment
Room
(DTR),
Special Needs Patient
PT-1,2
Sub-Waiting
PT-1
OFFICE
PE-1
Lounge, Staff
PT-1,2
Computerized Tomography
(CT)
Room, Cone-Beam
446B
PT-1,2
Scrub Area
PE-1
ELEC
PT-1
Toilet, Staff
WT-1,2
P E
-2
P T
-2
P T
-2
P T
-2
P T
-2
P E
-2
P T
-2
PT-2
SHELL
N/A
CORRIDOR
400B
PT-1,2
Corridor
400D
PT-1,2
CORRIDOR
400E
PT-1
P E
-2
PT-2 PT-2 PT-2PT-2
P T
-2
PT-2 PT-2
PT-2
NIC
MATCHLINE
MATCHLINE
P H
A S
E
P H
A S
E
P H
A S
E
P H
A S
E
P T
-2 P
T -2
P T
-2
P T
-2 P
T -2
P T
-2
P T
-2
PT-2
WAITING
475A
PT-1,2
Sub-Waiting
475C
PT-1,2
Toilet, Patient
475B
WT-1,2 P
T -2
CORRIDOR
400C
PT-1,2
W C
-1
P T
-2
PATCH TO MATCH
EXISTING
PATCH TO MATCH
EXISTING
0 4'-0" 8'-0" 16'-0"
PLAN
NORTH
PHASE 2
KEY PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
C
Phase
ARCHITECT OF RECORD STAMPENGINEERS OF RECORD
321 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
A/E:
C on e ei gh th in ch o ne fo ot
B
A
C
D
E
F th re e in ch es o ne fo ot on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ha lf in ch o ne fo ot
6"
6"
6"
6"
C :\r vt \2
6\
8 3
-A
-C E
N T
R A
L_ V
I S N
-1
-4 th F lo or
_ M
IN
E
LS
O N
.r vt
C :\r vt \2
6\
8 3
-A
-C E
N T
R A
L_ V
I S N
-1
-4 th F lo or
_ M
IN
E
LS
O N
.r vt
/1
/2
:3 :2
P
M
I-104.2
FOURTH FLOOR - INTERIOR WALL
FINISH PLAN - PHASE 2
610-17-101
03/19/18 JR PEP
ISSUED FOR
CONSTRUCTION
Project Director
1700 E. 38TH STREET MARION, IN 46953
VISN 11 MARION B-138: 4TH FLOOR
CONSTRUCTION
SPRINKLERED
HDR ARCHITECTURE, INC.
600 HENNEPIN AVE SUITE 260
MINNEAPOLIS, MN 55403
612.524.6000
TERRY LITTELL SR., RA,
LEED AP
KORDA, INC.
1650 WATERMARK DRIVE, SUITE 200
COLUMBUS, OH 43215
614.487.1650
STAN KMONK
METRIC ENVIRONMENTAL
6971 HILLSDALE COURT
INDIANAPOLIS, IN 46250
1/8" = 1'-0" E2
FOURTH FLOOR - WALL FINISH PLAN - PHASE 2
11. ALL MISCELLANEOUS METALS SHALL BE PAINTED TO
MATCH THE WALL OR CEILING SURFACE IN WHICH THEY...
10. VERIFY VERIFY LENGTH AND HEIGHT OF WALL PROTECTION
WITH BUILT IN CASEWORK AND/OR WALL HUNG EQUIPMENT
9. REFER TO I-501 FOR CORNER GUARD,END GUARD AND
OTHER INTERIOR DETAILS.
8. APPLY JOINT FILLER TO CONCRETE/MASONRY JOINTS
PRIOR TO APPLICATION OF FINAL FINISH.
7. REFER TO I-200 SERIES FOR DIMENSIONED EXTENTS OF
WALL FINISHES.
6. WALL COVERING THAT TERMINATES IN THE MIDDLE OF A
WALL SHALL RECIEVE A U-CHANNEL REVEAL TO PROTECT
EXPOSED EDGE.
5. ALL NECESSARY TILE FLOORING UNDERLAYMENT TO BE
PROVIDED AND INSTALLED BY FLOORING
4. ALIGN FLOORING TRANSITIONS WITH FINISH BASE EXCEPT
AT DOORS, U.N.O.
3. ALL TRANSITION/REDUCER STRIPS AND OTHER
THRESHOLDS TO BE LOCATED AT CENTERLINE OF DOOR
WHEN IN CLOSED POSITION.
2. ALL GYP. BOARD CEILINGS TO BE PAINTED PT-1, U.N.O.
1. LEVEL & FINISH OF GYP. BD WALLS AND SOFFITS TO BE
LEVEL 4 FINISH.
GENERAL FINISH NOTES
PL PLASTIC LAMINATE
VB VINYL COVE BASE
AF RAISED ACCESS FLOORING
SVCT STATIC DISSIPATIVE VINYL COMPOSITION TILE
SC SEALED CONCRETE
RES-B RESINOUS EPOXY FLOOR BASE
RES RESINOUS EPOXY FLOOR
PTW PORCELAIN TILE WALL
PTF PORCELAIN TILE FLOOR
PTB PORCELAIN TILE BASE
PT PAINT
LIN LINOLEUM
GWB GYPSUM WALL BOARD, PAINTED
FRP FIBER REINFORCED PANEL
EXP EXPOSED CONSTRUCTION
EX EXISTING
EP EPOXY PAINT
CPT CARPET MODULAR TILE
CMU CONCRETE MASONRY UNIT
C CONCRETE
AT ACOUSTICAL CEILING
FINISH LEGEND
Mark: Revision: Date:
ISSUED FOR CONSTRUCTION 03/19/2018
FT-1
FT-2
FLOOR FINISH LEGEND
RS-1
RS-2
FT-3
LVT-1
LVT-2
CPT-1
SC-1
166 SF
OIT
SC-1
RB-1
42 SF
ELEC
SC-1
RB-1 25 SF
EQ
RS-1
RB-1
36 SF
ELEC
SC-1
RB-1
122 SF
WAITING
CPT-1
TB-1
67 SF
CHECK-IN
KIOSK
CPT-1
TB-1
38 SF
W.C.
ALC.
CPT-1
TB-1
285 SF
CONF.
CPT-1
RB-1
53 SF
HAC
RS-1
RS-1
45 SF
STOR.
EQ.
RS-1
RB-1
11 SF
CRASH
CART
LVT-1
RB-1
31 SF
W.C.
ALC.
LVT-1,2
RB-1
101 SF
OFC,
OPTH.
CHIEF
CPT-1
RB-1
84 SF
OFC,
OPTH./OPT.
CHIEF
CPT-1
RB-1
106 SF
OFC,
OPT.
CHIEF
CPT-1
RB-1
50 SF
EYE
PROV.
410B
CPT-1
RB-1
43 SF
EYE
PROV.
410C
CPT-1
RB-1
50 SF
EYE
PROV.
410A
CPT-1
RB-1
171 SF
LOUNGE
LVT-1
RB-1
TLT,
STAFF
FT-2
TB-2
96 SF
CLERICAL
407B
CPT-1
RB-1
68 SF
CLERICAL
407A
CPT-1
RB-1
59 SF
RECEP.
CPT-1
RB-1
40 SF
SUPP.
EQ.
LVT-1,2
RB-1
547 SF
WAITING
CPT-1
TB-1
80 SF
RECEP.
CPT-1
RB-1
198 SF
EYE
WAIT
CPT-1
TB-1
119 SF
EXAM,
OPTH.
LVT-1
RB-1
135 SF
EXAM,
OPT.
LVT-1
RB-1
126 SF
EXAM,
OPT.
LVT-1
RB-1
123 SF
EXAM,
OPT.
LVT-1
RB-1
105 SF
SOIL
UTIL.
RS-1
RB-1
149 SF
PHOTO
LVT-1
RB-1
127 SF
CLN
SUP
RS-1
RB-1
113 SF
PRETEST
LVT-1
RB-1
100 SF
PRETEST
LVT-1
RB-1
161 SF
INST.
CAL.
RS-2
RB-1
183 SF
HEARING
AID
FAB.
RS-2
RB-1129 SF
LOUNGE
LVT-1
RB-1
132 SF
OFC,
AUD.
CHIEF
CPT-1
RB-1
136 SF
CERUMEN
MGMT.
LVT-1
RB-1
132 SF
EXAM
LVT-1
RB-1
129 SF
EXAM
LVT-1
RB-1
132 SF
EXAM
LVT-1
RB-1
77 SF
TLT,
PAT.
FT-2
TB-2
117 SF
REC.
CPT-1
TB-1
121 SF
EXAM
TECH.
LVT-1
RB-1
64 SF
AUDIO
EXAM
422B
CPT-1
N/A
64 SF
AUDIO
EXAM
423B
CPT-1
N/A
51 SF
AUDIO
EXAM
424B
CPT-1
N/A
104 SF
STOR.
EQ.
RS-1
RB-1
128 SF
VISUAL
FIELDS
LVT-1
RB-1
116 SF
PRETEST
LVT-1
RB-1
161 SF
US /
OPT.
COH.
LVT-1
RB-1
101 SF
DIL.
WAIT
LVT-2
RB-1
793 SF
CORR.
400F
LVT-1,2
RB-1
533 SF
CORR.
400G
LVT-1
RB-1
1442 SF
CORR
400A
FT-1,2
TB-1
166 SF
TLT
FT-2
TB-2
174 SF
TLT
FT-2
TB-2
BUILDING 172
1442 SF
CORR
400A
FT-1,2
TB-1
527 SF
CORR.
400I
LVT-1,2
RB-1
527 SF
CORR.
400I
LVT-1,2
RB-1
499 SF
CORR.
400H
LVT-1,2
RB-1
499 SF
CORR.
400H
LVT-1,2
RB-1
231 SF
CORR
400J
LVT-1
RB-1
793 SF
CORR.
400F
LVT-1,2
RB-1
70 SF
AUDIO
CONTROL
422A
CPT-1
N/A
62 SF
AUDIO
CONTROL
423A
CPT-1
N/A
58 SF
AUDIO
CONTROL
424A
CPT-1
N/A
NIC
ALIGN WITH OUTSIDE
CORNER OF WALL
ALIGN WITH OUTSIDE
CORNER OF WALL
ALIGN WITH OUTSIDE
CORNER
ALIGN WITH
OUTSIDE
CORNERS
97 SF
STOR.
EQ.
RS-1
RB-1
125 SF
PAT.
ED.
LVT-1
RB-1
140 SF
FITTING
CPT-1
RB-1
34 SF
ALCOVE
400X
LVT-1
RB-1
MATCHLINE
MATCHLINE
P H
A S
E
P H
A S
E
P H
A S
E
P H
A S
E
2'-0"
TYP. ALL
FIVE SIDES
2' -0
2'-0"
2'-0"
TYP. ALL
FOUR SIDES
TYP. ALL
FOUR SIDES
2' -0
ALIGN ALIGN
ALIGN WITH OUTSIDE
CORNER OF WALL
NIC
LVT-2
LVT-2
ALIGN WITH
CORNER
2'-0"
0 4'-0" 8'-0" 16'-0"
PLAN
NORTH
PHASE 1
KEY PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
C
Phase
ARCHITECT OF RECORD STAMPENGINEERS OF RECORD
321 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
A/E:
C on e ei gh th in ch o ne fo ot
B
A
C
D
E
F th re e in ch es o ne fo ot on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ha lf in ch o ne fo ot
6"
6"
6"
6"
C :\r vt \2
6\
8 3
-A
-C E
N T
R A
L_ V
I S N
-1
-4 th F lo or
_ M
IN
E
LS
O N
.r vt
C :\r vt \2
6\
8 3
-A
-C E
N T
R A
L_ V
I S N
-1
-4 th F lo or
_ M
IN
E
LS
O N
.r vt
/1
/2
:3 :3
P
M
IN-104.1
FOURTH FLOOR - FLOOR PATTERN
PLAN - PHASE 1
610-17-101
03/19/18 JR PEP
ISSUED FOR
CONSTRUCTION
Project Director
1700 E. 38TH STREET MARION, IN 46953
VISN 11 MARION B-138: 4TH FLOOR
CONSTRUCTION
SPRINKLERED
HDR ARCHITECTURE, INC.
600 HENNEPIN AVE SUITE 260
MINNEAPOLIS, MN 55403
612.524.6000
TERRY LITTELL SR., RA,
LEED AP
KORDA, INC.
1650 WATERMARK DRIVE, SUITE 200
COLUMBUS, OH 43215
614.487.1650
STAN KMONK
METRIC ENVIRONMENTAL
6971 HILLSDALE COURT
INDIANAPOLIS, IN 46250
1/8" = 1'-0" E2
FOURTH FLOOR - FLOOR PATTERN PLAN - PHASE 1
PL PLASTIC LAMINATE
VB VINYL COVE BASE
AF RAISED ACCESS FLOORING
SVCT STATIC DISSIPATIVE VINYL COMPOSITION TILE
SC SEALED CONCRETE
RES-B RESINOUS EPOXY FLOOR BASE
RES RESINOUS EPOXY FLOOR
PTW PORCELAIN TILE WALL
PTF PORCELAIN TILE FLOOR
PTB PORCELAIN TILE BASE
PT PAINT
LIN LINOLEUM
GWB GYPSUM WALL BOARD, PAINTED
FRP FIBER REINFORCED PANEL
EXP EXPOSED CONSTRUCTION
EX EXISTING
EP EPOXY PAINT
CPT CARPET MODULAR TILE
CMU CONCRETE MASONRY UNIT
C CONCRETE
AT ACOUSTICAL CEILING
FINISH LEGEND
11. ALL MISCELLANEOUS METALS SHALL BE PAINTED TO
MATCH THE WALL OR CEILING SURFACE IN WHICH THEY...
10. VERIFY VERIFY LENGTH AND HEIGHT OF WALL PROTECTION
WITH BUILT IN CASEWORK AND/OR WALL HUNG EQUIPMENT
9. REFER TO I-501 FOR CORNER GUARD,END GUARD AND
OTHER INTERIOR DETAILS.
8. APPLY JOINT FILLER TO CONCRETE/MASONRY JOINTS
PRIOR TO APPLICATION OF FINAL FINISH.
7. REFER TO I-200 SERIES FOR DIMENSIONED EXTENTS OF
WALL FINISHES.
6. WALL COVERING THAT TERMINATES IN THE MIDDLE OF A
WALL SHALL RECIEVE A U-CHANNEL REVEAL TO PROTECT
EXPOSED EDGE.
5. ALL NECESSARY TILE FLOORING UNDERLAYMENT TO BE
PROVIDED AND INSTALLED BY FLOORING
4. ALIGN FLOORING TRANSITIONS WITH FINISH BASE EXCEPT
AT DOORS, U.N.O.
3. ALL TRANSITION/REDUCER STRIPS AND OTHER
THRESHOLDS TO BE LOCATED AT CENTERLINE OF DOOR
WHEN IN CLOSED POSITION.
2. ALL GYP. BOARD CEILINGS TO BE PAINTED PT-1, U.N.O.
1. LEVEL & FINISH OF GYP. BD WALLS AND SOFFITS TO BE
LEVEL 4 FINISH.
GENERAL FINISH NOTES
Mark: Revision: Date:
ISSUED FOR CONSTRUCTION 03/19/2018
36 SF
ELEC
SC-1
RB-1
204 SF
OIT
SC-1
RB-1
202 SF
LAB,
GEN.
459A
RS-1
RB-1
47 SF
LAB,
ACR.
PROC.
459B
RS-2
RB-1
47 SF
LAB,
ACR.
FINISH
459C
RS-2
RB-1
56 SF
DENTAL
TECH.
460A
CPT-1
RB-1
59 SF
DENTAL
TECH.
460B
CPT-1
RB-1
54 SF
DENTAL
TECH.
460C
CPT-1
RB-1
105 SF
EQ.
MECH.
SC-1
RB-1
140 SF
OFFICE
CPT-1
RB-1
143 SF
STOR.,
DENTAL
SUPP.
RS-1
RB-1
136 SF
LAB,
SHIP/
REC.
459D
RS-1
RB-1
215 SF
SOIL
UTIL.
RS-1
RB-1
163 SF
ORAL
SURG.
RS-1,2
RB-1
163 SF
ORAL
SURG.
RS-1,2
RB-1
247 SF
CLEAN
RS-1
RB-1
52 SF
HAC
RS-1
RS-1
23 SF
SUB-WAIT
RS-1
RB-1
125 SF
STOR.
STER.
INST.
RS-1
RB-1
40 SF
CT
CONTROL
446A
RS-1,2
RB-1
56 SF
WORK,
STF.
DENTIST
456C
CPT-1
RB-1 142 SF
OFFICE,
DENTAL
CHIEF
CPT-1
RB-1
85 SF
W-LOCKER
LVT-1
RB-1
88 SF
M-LOCKER
LVT-1
RB-1
120 SF
RECEP.
CPT-1
RB-1-1
171 SF
DTR
RS-1,2
RB-1
158 SF
DTR
RS-1,2
RB-1
154 SF
DTR
RS-1,2
RB-1
109 SF
DTR
RS-1,2
RB-1
134 SF
DTR
RS-1,2
RB-1
133 SF
DTR
RS-1,2
RB-1
147 SF
DTR,
SPECIAL
RS-1,2
RB-1
49 SF
S/WAITING
RS-1
RB-1
140 SF
OFFICE
CPT-1
RB-1
129 SF
LOUNGE
LVT-1
RB-1
119 SF
CT,
CONE
BEAM
446B
RS-1,2
RB-1
778 SF
CORR.
400B
LVT-1,2
RB-1
484 SF
CORR.
400E
RS-1
RB-1
301 SF
CORR.
400C
RS-1,2
RB-1
55 SF
TLT,
STAFF
FT-3
TB-2
67 SF
SCRUB
RS-1,2
RB-1
412 SF
CORR.
400D
LVT-1,2
RB-1
U.O.N.
4'-8"
ALIGN WITH
CORNER
5' -2
5' -2
TY
P.90
90°
516 SF
SHELL
N/A N/A
TYPICAL TREATMENT
ROOM DIMENSIONS
ALIGN WITH
COUMN, TYP.
MATCHLINE
MATCHLINE
P H
A S
E
P H
A S
E
P H
A S
E
P H
A S
E
U.O.N.
4'-8"
9' -1
TYP.
90°
ALIGN WITH
DOOR FRAME
1'-0"
TYP. ALL
FOUR SIDES
ALIGN 67 SF
SUB-WAIT
475C
RS-2
RB-1
54 SF
TLT,
PAT.
475B
FT-3
TB-2
357 SF
WAITING
475A
CPT-1
RB-1
2' -0
1'-0"
2' -0
LVT-2
ALIGN WITH
COLUMN
FT-1
FT-2
FLOOR FINISH LEGEND
RS-1
RS-2
FT-3
LVT-1
LVT-2
CPT-1
SC-1
0 4'-0" 8'-0" 16'-0"
PLAN
NORTH
PHASE 2
KEY PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
C
Phase
ARCHITECT OF RECORD STAMPENGINEERS OF RECORD
321 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
A/E:
C on e ei gh th in ch o ne fo ot
B
A
C
D
E
F th re e in ch es o ne fo ot on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ha lf in ch o ne fo ot
6"
6"
6"
6"
C :\r vt \2
6\
8 3
-A
-C E
N T
R A
L_ V
I S N
-1
-4 th F lo or
_ M
IN
E
LS
O N
.r vt
C :\r vt \2
6\
8 3
-A
-C E
N T
R A
L_ V
I S N
-1
-4 th F lo or
_ M
IN
E
LS
O N
.r vt
/1
/2
:3 :3
P
M
IN-104.2
FOURTH FLOOR - FLOOR PATTERN
PLAN - PHASE 2
610-17-101
03/19/18 JR PEP
ISSUED FOR
CONSTRUCTION
Project Director
1700 E. 38TH STREET MARION, IN 46953
VISN 11 MARION B-138: 4TH FLOOR
CONSTRUCTION
SPRINKLERED
HDR ARCHITECTURE, INC.
600 HENNEPIN AVE SUITE 260
MINNEAPOLIS, MN 55403
612.524.6000
TERRY LITTELL SR., RA,
LEED AP
KORDA, INC.
1650 WATERMARK DRIVE, SUITE 200
COLUMBUS, OH 43215
614.487.1650
STAN KMONK
METRIC ENVIRONMENTAL
6971 HILLSDALE COURT
INDIANAPOLIS, IN 46250
1/8" = 1'-0" E2
FOURTH FLOOR - FLOOR PATTERN PLAN - PHASE 2
11. ALL MISCELLANEOUS METALS SHALL BE PAINTED TO
MATCH THE WALL OR CEILING SURFACE IN WHICH THEY...
10. VERIFY VERIFY LENGTH AND HEIGHT OF WALL PROTECTION
WITH BUILT IN CASEWORK AND/OR WALL HUNG EQUIPMENT
9. REFER TO I-501 FOR CORNER GUARD,END GUARD AND
OTHER INTERIOR DETAILS.
8. APPLY JOINT FILLER TO CONCRETE/MASONRY JOINTS
PRIOR TO APPLICATION OF FINAL FINISH.
7. REFER TO I-200 SERIES FOR DIMENSIONED EXTENTS OF
WALL FINISHES.
6. WALL COVERING THAT TERMINATES IN THE MIDDLE OF A
WALL SHALL RECIEVE A U-CHANNEL REVEAL TO PROTECT
EXPOSED EDGE.
5. ALL NECESSARY TILE FLOORING UNDERLAYMENT TO BE
PROVIDED AND INSTALLED BY FLOORING
4. ALIGN FLOORING TRANSITIONS WITH FINISH BASE EXCEPT
AT DOORS, U.N.O.
3. ALL TRANSITION/REDUCER STRIPS AND OTHER
THRESHOLDS TO BE LOCATED AT CENTERLINE OF DOOR
WHEN IN CLOSED POSITION.
2. ALL GYP. BOARD CEILINGS TO BE PAINTED PT-1, U.N.O.
1. LEVEL & FINISH OF GYP. BD WALLS AND SOFFITS TO BE
LEVEL 4 FINISH.
GENERAL FINISH NOTES
PL PLASTIC LAMINATE
VB VINYL COVE BASE
AF RAISED ACCESS FLOORING
SVCT STATIC DISSIPATIVE VINYL COMPOSITION TILE
SC SEALED CONCRETE
RES-B RESINOUS EPOXY FLOOR BASE
RES RESINOUS EPOXY FLOOR
PTW PORCELAIN TILE WALL
PTF PORCELAIN TILE FLOOR
PTB PORCELAIN TILE BASE
PT PAINT
LIN LINOLEUM
GWB GYPSUM WALL BOARD, PAINTED
FRP FIBER REINFORCED PANEL
EXP EXPOSED CONSTRUCTION
EX EXISTING
EP EPOXY PAINT
CPT CARPET MODULAR TILE
CMU CONCRETE MASONRY UNIT
C CONCRETE
AT ACOUSTICAL CEILING
FINISH LEGEND
Mark: Revision: Date:
ISSUED FOR CONSTRUCTION 03/19/2018
416416
415415
ELEC 414414
EQ
433433
WAITING
438438
CHECK-IN
KIOSK
436436
W.C. ALC.
439439
CONF.
478478
HAC
481481
STOR. EQ.
490490
CRASH
CART
491491
W.C. ALC.
413413
OFC,
OPTH.
CHIEF
411411
OFC,
OPTH./OPT.
CHIEF
412412
OFC, OPT.
CHIEF
410B410B
EYE PROV.
410C410C
EYE PROV.
410A410A
EYE PROV.
408408
LOUNGE
409409
TLT,
STAFF
407B407B
CLERICAL
407A407A
CLERICAL
479479
RECEP.
489489
SUPP. EQ.
440440
WAITING
434434
RECEP.
493493
FITTING
483483
EXAM,
OPTH.
482482
EXAM,
OPT.
485485
EXAM,
OPT.
484484
EXAM,
OPT.
405405
SOIL UTIL.
406406
PHOTO
401401
CLN SUP
487487
PRETEST
480480
PRETEST
431431
INST. CAL.
430430
HEARING
AID FAB.
429429
LOUNGE
428428
OFC, AUD.
CHIEF
425425
CERUMEN
MGMT.
417417
EXAM
419419
EXAM
420420
EXAM
426426
TLT, PAT.
432432
REC.
421421
EXAM
TECH.
422B422B
AUDIO
EXAM
423B423B
AUDIO
EXAM 424B424B
AUDIO
EXAM
427427
STOR. EQ.
402402
VISUAL
FIELDS
488488
PRETEST
403403
US / OPT.
COH.
486486
DIL. WAIT
492492
PAT. ED.
BUILDING 172
HR-1
CGCG
CG
CG
423A423A
AUDIO
CONTROL
422A422A
AUDIO
CONTROL 424A424A
AUDIO
CONTROL
400I400I
CORR.
400H400H
CORR.
400J400J
CORR
441441
TLT 442442
TLT
400F400F
CORR.
400G400G
CORR.
400A400A
CORR
CG HR-1
CG
CG CG
CG
CG
CG
HR-1
HR-1 HR-1
HR-1
CG
404404
STOR. EQ.
EG CG
EG
CG
CG CG CG CG
CG
CG
CGCGCG
CG CG
CG
EG
EG
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
CGCG
CG CG
CGCG
CG CG CG
CG
CG
CG
H R
-1
EG
CG
CG
CG
CG
EG
CG
EG
HR-1
H R
-1
435435
EYE WAIT
400A400A
CORR
H R
-1
HR-1
WG-1
WG-1W
G
-1
W G
-1
WG-1
W G
-1
W G
-1
W G
-1 W
G -1
WG-1
W G
-1
WG-1
W G
-1
WG-1
W G
-1
WG-1
WG-1
WG-1
W G
-1
WG-1W
G
-1
HR-1
EXISTNG FE AND
CONNECTIONS HERE
P H
A S
E
P H
A S
E
P H
A S
E
NIC
NIC
MATCHLINE
MATCHLINE
P H
A S
E
400X400X
ALCOVE
CG
CGCGCGCG
CG
HR-1
HR-1
HR-1
CG
CG
WG-1
CG
CG
CG
HR-1 HR-1
CG
HR-1
HR-1
HR-1 HR-1 HR-1 HR-1 HR-1 HR-1
HR-1
CG
CG CG
CG
CG
CG
CG
HR-1WG-1
CG
WG-1
WG-1
WG-1
W G
-1
W G
-1
WG-1
WG-1
WG-1
W G
-1
WG-1
WG-1
W G
-1
2'-0"
0 4'-0" 8'-0" 16'-0"
PLAN
NORTH
PHASE 1
KEY PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
C
Phase
ARCHITECT OF RECORD STAMPENGINEERS OF RECORD
321 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
A/E:
C on e ei gh th in ch o ne fo ot
B
A
C
D
E
F th re e in ch es o ne fo ot on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ha lf in ch o ne fo ot
6"
6"
6"
6"
C :\r vt \2
6\
8 3
-A
-C E
N T
R A
L_ V
I S N
-1
-4 th F lo or
_ M
IN
E
LS
O N
.r vt
C :\r vt \2
6\
8 3
-A
-C E
N T
R A
L_ V
I S N
-1
-4 th F lo or
_ M
IN
E
LS
O N
.r vt
/1
/2
:3 :4
P
M
IP-104.1
FOURTH FLOOR - WALL
PROTECTION PLAN - PHASE 1
610-17-101
03/19/18 JR PEP
ISSUED FOR
CONSTRUCTION
Project Director
1700 E. 38TH STREET MARION, IN 46953
VISN 11 MARION B-138: 4TH FLOOR
CONSTRUCTION
SPRINKLERED
HDR ARCHITECTURE, INC.
600 HENNEPIN AVE SUITE 260
MINNEAPOLIS, MN 55403
612.524.6000
TERRY LITTELL SR., RA,
LEED AP
KORDA, INC.
1650 WATERMARK DRIVE, SUITE 200
COLUMBUS, OH 43215
614.487.1650
STAN KMONK
METRIC ENVIRONMENTAL
6971 HILLSDALE COURT
INDIANAPOLIS, IN 46250
1/8" = 1'-0" F2
FOURTH FLOOR - WALL PROTECTION - PHASE 1
11. ALL MISCELLANEOUS METALS SHALL BE PAINTED TO
MATCH THE WALL OR CEILING SURFACE IN WHICH THEY...
10. VERIFY VERIFY LENGTH AND HEIGHT OF WALL PROTECTION
WITH BUILT IN CASEWORK AND/OR WALL HUNG EQUIPMENT
9. REFER TO I-501 FOR CORNER GUARD,END GUARD AND
OTHER INTERIOR DETAILS.
8. APPLY JOINT FILLER TO CONCRETE/MASONRY JOINTS
PRIOR TO APPLICATION OF FINAL FINISH.
7. REFER TO I-200 SERIES FOR DIMENSIONED EXTENTS OF
WALL FINISHES.
6. WALL COVERING THAT TERMINATES IN THE MIDDLE OF A
WALL SHALL RECIEVE A U-CHANNEL REVEAL TO PROTECT
EXPOSED EDGE.
5. ALL NECESSARY TILE FLOORING UNDERLAYMENT TO BE
PROVIDED AND INSTALLED BY FLOORING
4. ALIGN FLOORING TRANSITIONS WITH FINISH BASE EXCEPT
AT DOORS, U.N.O.
3. ALL TRANSITION/REDUCER STRIPS AND OTHER
THRESHOLDS TO BE LOCATED AT CENTERLINE OF DOOR
WHEN IN CLOSED POSITION.
2. ALL GYP. BOARD CEILINGS TO BE PAINTED PT-1, U.N.O.
1. LEVEL & FINISH OF GYP. BD WALLS AND SOFFITS TO BE
LEVEL 4 FINISH.
GENERAL FINISH NOTES
Mark: Revision: Date:
ISSUED FOR CONSTRUCTION 03/19/2018
477477
ELEC
476476
OIT
459A459A
LAB, GEN.
459B459B
LAB, ACR.
PROC.
459C459C
LAB, ACR.
FINISH
460A460A
DENTAL
TECH.
460B460B
DENTAL
TECH.
460C460C
DENTAL
TECH.
464464
EQ. MECH.
445445
OFFICE
455455
STOR.,
DENTAL
SUPP.
459D459D
LAB, SHIP/
REC.
453453
SOIL UTIL.
452452
ORAL
SURG.
450450
ORAL
SURG.
448448
CLEAN
465465
HAC
466466
SUB-WAIT
447447
STOR.
STER.
INST.
446A446A
CT
CONTROL
456C456C
WORK,
STF.
DENTIST
458458
OFFICE,
DENTAL
CHIEF
463463
W-LOCKER
462462
M-LOCKER
475475
RECEP.
474474
DTR
473473
DTR
472472
DTR
467467
DTR
471471
DTR
469469
DTR
468468
DTR,
SPECIAL
470470
S/WAITING
444444
OFFICE
461461
LOUNGE
446B446B
CT, CONE
BEAM
451451
SCRUB
443443
SHELL
400B400B
CORR.
400E400E
CORR.
400D400D
CORR.
400C400C
CORR.
HR-1 HR-1
CG CG
CG CG
CG
CG
CGCG
EG
CG
CG
CG
CGCGCG
EG
EG
CG
CG WG-1
W G
-1
W G
-1
WG-1 CG CG
CG
WG-1
CG
CG
CG
CG
CG
CG
CG
CG CGCG
WG-1
W G
-1
W G
-1
W G
-1
WG-1
WG-1
W G
-1 W G
-1
WG-1
CG
CG
EG
CG CG
CGCG
CG
CG
CG
CG
CG
CGCG
P H
A S
E
P H
A S
E
P H
A S
E
MATCHLINE
MATCHLINE
P H
A S
E
EG
W G
-1
WG-1
W G
-1
CG
W G
-1
W G
-1
H R
-1
HR-1
H R
-1
H R
-1
WG-1
W G
-1
WG-1 WG-1
W G
-1
W G
-1
CG CG
457457
TLT,
STAFF
CG CG
WG-1
CG
WG-1
WG-1
WG-1
WG-1
CGCG CG
CG
CG WG-1
WG-1
W G
-1
CG 475C475C
SUB-WAIT
475B475B
TLT, PAT.
H R
-1
CG
WG-1W
G
-1
WG-1
475A475A
WAITING
CG
0 4'-0" 8'-0" 16'-0"
PLAN
NORTH
PHASE 2
KEY PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
C
Phase
ARCHITECT OF RECORD STAMPENGINEERS OF RECORD
321 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
A/E:
C on e ei gh th in ch o ne fo ot
B
A
C
D
E
F th re e in ch es o ne fo ot on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ha lf in ch o ne fo ot
6"
6"
6"
6"
C :\r vt \2
6\
8 3
-A
-C E
N T
R A
L_ V
I S N
-1
-4 th F lo or
_ M
IN
E
LS
O N
.r vt
C :\r vt \2
6\
8 3
-A
-C E
N T
R A
L_ V
I S N
-1
-4 th F lo or
_ M
IN
E
LS
O N
.r vt
/1
/2
:3 :4
P
M
IP-104.2
FOURTH FLOOR - WALL
PROTECTION PLAN - PHASE 2
610-17-101
03/19/18 JR PEP
ISSUED FOR
CONSTRUCTION
Project Director
1700 E. 38TH STREET MARION, IN 46953
VISN 11 MARION B-138: 4TH FLOOR
CONSTRUCTION
SPRINKLERED
HDR ARCHITECTURE, INC.
600 HENNEPIN AVE SUITE 260
MINNEAPOLIS, MN 55403
612.524.6000
TERRY LITTELL SR., RA,
LEED AP
KORDA, INC.
1650 WATERMARK DRIVE, SUITE 200
COLUMBUS, OH 43215
614.487.1650
STAN KMONK
METRIC ENVIRONMENTAL
6971 HILLSDALE COURT
INDIANAPOLIS, IN 46250
1/8" = 1'-0" E3
FOURTH FLOOR - WALL PROTECTION PLAN - PHASE 2
11. ALL MISCELLANEOUS METALS SHALL BE PAINTED TO
MATCH THE WALL OR CEILING SURFACE IN WHICH THEY...
10. VERIFY VERIFY LENGTH AND HEIGHT OF WALL PROTECTION
WITH BUILT IN CASEWORK AND/OR WALL HUNG EQUIPMENT
9. REFER TO I-501 FOR CORNER GUARD,END GUARD AND
OTHER INTERIOR DETAILS.
8. APPLY JOINT FILLER TO CONCRETE/MASONRY JOINTS
PRIOR TO APPLICATION OF FINAL FINISH.
7. REFER TO I-200 SERIES FOR DIMENSIONED EXTENTS OF
WALL FINISHES.
6. WALL COVERING THAT TERMINATES IN THE MIDDLE OF A
WALL SHALL RECIEVE A U-CHANNEL REVEAL TO PROTECT
EXPOSED EDGE.
5. ALL NECESSARY TILE FLOORING UNDERLAYMENT TO BE
PROVIDED AND INSTALLED BY FLOORING
4. ALIGN FLOORING TRANSITIONS WITH FINISH BASE EXCEPT
AT DOORS, U.N.O.
3. ALL TRANSITION/REDUCER STRIPS AND OTHER
THRESHOLDS TO BE LOCATED AT CENTERLINE OF DOOR
WHEN IN CLOSED POSITION.
2. ALL GYP. BOARD CEILINGS TO BE PAINTED PT-1, U.N.O.
1. LEVEL & FINISH OF GYP. BD WALLS AND SOFFITS TO BE
LEVEL 4 FINISH.
GENERAL FINISH NOTES
Mark: Revision: Date:
ISSUED FOR CONSTRUCTION 03/19/2018
F2420
F0740
WALL BASE AS SCHEDULED
A6046 CG
F2000
F2420
WALL BASE AS SCHEDULED
F3200
8'-2"
M0506
A5210
A5220
F0305M
A5210
M0506
WALL BASE AS SCHEDULED
EG
3'-0"
A5220
F2000
A5145
WALL BASE AS SCHEDULED
2'-10"
M1825
F0420
F3200
WALL BASE AS SCHEDULED
A6046
2'-5" 2'-5"
WALL BASE AS SCHEDULED
M5555
M5530
M5027
M5500
WALL BASE AS SCHEDULED
M5030
P3100
A5075
A5106
M5545M1620
A1010 M5700
P3100
WALL BASE AS SCHEDULED
1'-10"
E0210
A1066
A5075
CENTER
OVER SINK
A5145
F3200
WALL BASE AS SCHEDULED
6'-0"
4'-6"7"
(2)
WALL BASE AS SCHEDULED
M1620
M5575
M5025
M4100
2'-6" 1'-7"
WALL BASE AS SCHEDULED
F0795M
F0225 F0225
CB020
10"1'-1"1'-6"2'-0"5'-7"
2'-0" 2'-0" 3'-2" C02C0 C02D0
3' -2
2'
-4
3' -1
R7000 K4665
K8250
K1552
A5075
A5080
A6046
CS010WALL BASE AS SCHEDULED
F3200
CG
CT020
CENTER
C04P0M
M0500
A5210
F3025
WALL BASE AS SCHEDULED
F0795M
CG
F2015F0225 F0225
4'-0" 2'-8"
A5220 A1080
A5145A5145
WALL BASE AS SCHEDULED
3 1/2" 8" 3'-3 3/4"
A1010
M1620
WALL BASE AS SCHEDULED
5'-8"
E0210
7" 3'-10"
A5145(2)M1801
E0210
A1016
WALL BASE AS SCHEDULED
P3100
A5080 A5075
A1066
WALL BASE AS SCHEDULED
1'-4"1'-2"1'-2"7"
F3200
A5075
A5106
M5555
M5700
WALL BASE AS SCHEDULED
P3100
1'-9" 6'-2" 3'-6"
M1801
A1011 M1801
A1011E0123 E0123
A5155 A6046
2'-11"
WALL BASE AS SCHEDULEDWALL BASE AS SCHEDULED
A5155
F2005
F2420
A1011 M1801
F0120
F0375
WALL BASE AS SCHEDULED
M1825
F2005
WALL BASE AS SCHEDULED
A5145A5145
A5075
A1066
P3100
A5080 M4200
A5106
A1132
A1012
WALL BASE AS SCHEDULED
6'-6 1/2"
F2000
1'-5" 3'-7" 1'-7" 1'-7" 1'-5" 2'-0"
F3200
E0912E0912 E0906
E0921
WALL BASE AS SCHEDULED
CGCG
WG-1WG-1
M2070M2070
4" 2'
-1 0"
WG-1
WALL BASE AS SCHEDULED
F3200
WALL BASE AS SCHEDULED
F2000
5'-0"
WALL BASE AS SCHEDULED
A1132
M1801
M1802
M1802
M1801
M4100
A1132
A6046
WALL BASE AS SCHEDULED
F0206 F0206
4'-3" 4'-6"
F3200
1'-4"
F2540
M1605
WALL BASE AS SCHEDULED
M1840
F2000
F0740 A-461
D7
A6046 F3200
F2420 F2420
F0740 F0740
A6046
WALL BASE AS SCHEDULED
F0305M
CG
CG
4'-6"4'-4"2'-8"
F3200
M1820
WALL BASE AS SCHEDULED
F0420 F0420 C0046
7'-0"
A-461
D9
C0046
M1801
PL-1 REMOVABLE
PANEL
1'-1 3/4"
4'-0"
1' -0
2'
-6
WALL BASE AS
SCHEDULED
D7
A-461
D9
A-461
M1801 M1825
WALL BASE AS SCHEDULED
F0205
F0420
E0063M
M1825
A5145
WALL BASE AS SCHEDULED
F0420
1'-11 1/4"
E0123 E0123
A6046
F3200
WALL BASE AS SCHEDULED
4'-7"
F0275
E0123
M1801
A1015
C0046
1' -0
2'
-6
WALL BASE AS
SCHEDULED
10" 4'-0"
F0410
D7
A-461
2'-0"
D9
A-461
ASKEW
DOOR
BEYOND
A1067A1067
A5075
P3000P3000
P9050P9050P9050
6"
A5109
WALL BASE AS
SCHEDULED
WT-2
WT-1
1'-6 1/4" 4'-0 3/4" 1'-10" 1'-10" 1'-6" 1'-6" 1'-4" 2'-6"
*SEE A-002 FOR TYPICAL MOUNTING HEIGHTS
2'-6" 1'-9"
D4
I-501
A5082
F2010
A5082
A5109
A5200 A5090
WT-2
WT-1
WALL BASE AS SCHEDULED
6" 4'
-6
NURSE CALL
*SEE A-002 FOR TYPICAL MOUNTING HEIGHTS
METAL WALL
TRIM, TYP.
D4
I-501
P9050
A5082
5' -0
WT-2
WT-1
WALL BASE AS
SCHEDULED
F2010
*SEE A-002 FOR TYPICAL MOUNTING HEIGHTS
D4
I-501
WT-2
WT-1
6" 4'
-6
D4
I-501
F0690
M1801
A1010
M0507
WALL BASE AS SCHEDULED
CG
M0400
SOFFIT
A5145
F3200 A6046
A1010
WALL BASE AS SCHEDULED
CG CGCG
2'-10"
F2000
M0512
WALL BASE AS SCHEDULED
M0400
CENTER
SOFFIT
A5220 A5212
F0305 F0305 F0305
F0740
F2420 HR-1
WALL BASE AS SCHEDULED
F2310
16'-6"
F0305 F0305
F2300
F2000
3' -4
A6046 A6046
WG-1
3' -4
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
C
Phase
ARCHITECT OF RECORD STAMPENGINEERS OF RECORD
321 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
A/E:
C on e ei gh th in ch o ne fo ot
B
A
C
D
E
F th re e in ch es o ne fo ot on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ha lf in ch o ne fo ot
6"
6"
6"
6"
C :\r vt \2
6\
8 3
-A
-C E
N T
R A
L_ V
I S N
-1
-4 th F lo or
_ M
IN
E
LS
O N
.r vt
C :\r vt \2
6\
8 3
-A
-C E
N T
R A
L_ V
I S N
-1
-4 th F lo or
_ M
IN
E
LS
O N
.r vt
/1
/2
:3 :3
P
M
I-201
INTERIOR ELEVATIONS - PHASE 1 610-17-101
03/19/18 JR RG
ISSUED FOR
CONSTRUCTION
Project Director
1700 E. 38TH STREET MARION, IN 46953
VISN 11 MARION B-138: 4TH FLOOR
CONSTRUCTION
SPRINKLERED
HDR ARCHITECTURE, INC.
600 HENNEPIN AVE SUITE 260
MINNEAPOLIS, MN 55403
612.524.6000
TERRY LITTELL SR., RA,
LEED AP
KORDA, INC.
1650 WATERMARK DRIVE, SUITE 200
COLUMBUS, OH 43215
614.487.1650
STAN KMONK
METRIC ENVIRONMENTAL
6971 HILLSDALE COURT
INDIANAPOLIS, IN 46250
1/4" = 1'-0" B8
AUDIOLOGY-WAITING-EAST
1/4" = 1'-0"
B6
AUDIOLOGY-WAITING-NORTH
1/4" = 1'-0" B9
AUDIOLOGY-WAITING-WEST
1/4" = 1'-0" C6
OPTH. CHIEF OFFICE-EAST
1/4" = 1'-0"
C7
OPTH. CHIEF OFFICE-SOUTH
1/4" = 1'-0" C8
OPTH. CHIEF OFFICE-WEST
1/4" = 1'-0" B3
PRETESTING-EAST
1/4" = 1'-0"
B2
PRETESTING-NORTH
1/4" = 1'-0" B4
PRETESTING-SOUTH
1/4" = 1'-0"
B5
PRETESTING-WEST
1/4" = 1'-0" D1
EYE LOUNGE-STAFF-EAST
1/4" = 1'-0" C9
EYE LOUNGE-STAFF-NORTH
1/4" = 1'-0" D2
EYE LOUNGE-STAFF-SOUTH
1/4" = 1'-0"
D4
EYE LOUNGE-STAFF-WEST
1/4" = 1'-0" C2
VISUAL FIELDS-EAST
1/4" = 1'-0"
C1
VISUAL FIELDS-NORTH
1/4" = 1'-0" C3
VISUAL FIELDS-SOUTH
1/4" = 1'-0"
C4
VISUAL FIELDS-WEST
1/4" = 1'-0" E2
EYECARE PROVIDER-SOUTH
1/4" = 1'-0" D6
AUD CHIEF-EAST
1/4" = 1'-0"
D5
AUD CHIEF-NORTH
1/4" = 1'-0" D7
AUD CHIEF-SOUTH
1/4" = 1'-0"
D8
AUD CHIEF-WEST
1/4" = 1'-0" A9
EXAM-AUDIOLOGY-EAST
1/4" = 1'-0" B10
CLN SUP-EAST
1/4" = 1'-0" D10
STORAGE EQ.-SOUTH
1/4" = 1'-0" A8
EXAM-AUDIOLOGY-NORTH
1/4" = 1'-0"
A10
EXAM-AUDIOLOGY-SOUTH
1/4" = 1'-0" B1
EXAM-AUDIOLOGY-WEST
1/4" = 1'-0" A4
AUDIOLOGY-RECPT-NORTH
1/4" = 1'-0" E5
EYE CLINIC WAITING -NORTH
1/4" = 1'-0" A7
AUDIOLOGY-RECPT-SOUTH
1/4" = 1'-0" D9
RECEPTION- NORTH
1/4" = 1'-0" C5
OPTH. CHIEF OFFICE-NORTH
1/4" = 1'-0" E4
EYECARE PROVIDER-WEST
1/4" = 1'-0"
E1
EYECARE PROVIDER-EAST
1/4" = 1'-0" A6
AUDIOLOGY-RECPT-EAST
1/4" = 1'-0" F2
PUBLIC TOILET - EAST
1/4" = 1'-0"
F1
PUBLIC TOILET - NORTH
1/4" = 1'-0" F4
PUBLIC TOILET - SOUTH
1/4" = 1'-0"
F5
PUBLIC TOILET - WEST
1/4" = 1'-0" E7
CONFERENCE ROOM-EAST
1/4" = 1'-0"
E8
CONFERENCE ROOM-SOUTH
1/4" = 1'-0" E10
CONFERENCE ROOM-WEST
1/4" = 1'-0" F7
CLERICAL WKSTN-OPTOMETRY-NORTH
Mark: Revision: Date:
ISSUED FOR CONSTRUCTION 03/19/2018
WDP-1 WDP-1WC-1
EXISTING ELEVATOR
DOORS, PE-5
FRAMES TO REMAIN
STAINLESS STEEL
1'-9"
4" 2'
-1 0"
WDP-1WDP-1 WDP-1
SIGNAGE: SEE
SIGNAGE PLAN
C1
I-501
TYP
C3
I-501
TYP
C2
I-501
TYP
C2
I-501
TYP
C5
I-501
TYP
WDP-1
WALL BASE AS SCHEDULED, TYP.
HR-1HR-1
VERTICAL REVEALS AS REQ.
EQUALLY SPACED, TYP.
PAINT AS
SCHED.
C8
I-501
WDP-1WC-1WDP-1 WDP-1
WDP-1, FULL HEIGHT 3
SIDES OF COLUMN, TYP.
WC-1 WC-1
3' -2
T
Y P
D
O O
R F
R A
M E
T Y
P
A
LI
G N
R E
V E
A L
W
IT
H
A6046 A6046 A6046 A6046 A6046 A6046
4" 2'
-1 0"
HR-1 HR-1
WDP-1
WDP-1
VERTICAL REVEALS AS REQ.
EQUALLY SPACED, TYP.
WDP-1
C2
I-501
TYP
C2
I-501
TYP
C3
I-501
TYP
C1
I-501
TYP
C5
I-501
TYP
WALL BASE AS SCHEDULED
HR-1
EQEQEQEQEQEQEQEQ
D8
I-501
WALL BASE AS SCHEDULED
E0210
A5075
P3100
WALL BASE AS SCHEDULED
A5080
1'-11"
7" 3'-1"
CG
M5555
M1620
M1801
E0210
A1016
WALL BASE AS SCHEDULED
5'-10"
M5555
F3200
M5555 A5080
F3200
M5700
A5145A5145
A5106
WALL BASE AS SCHEDULED
1'-1"
3'-0" 2'-3" 2'-0" 7" 1'-6"
CG
M1620
BRACKET
F3200
WALL BASE AS SCHEDULED
CG
2'-5" 3'-0"
BRACKETS,
SPACE AS
REQUIRED
TYP
9'-6 1/2"
WALL BASE AS SCHEDULED
M1825 A1016
M1801
M5520M5705
M5735
M5525
CT020
D1
A-461
Sim
E0906
A5075
A5080
A5106
WALL BASE AS
SCHEDULED
A1066
P3100
5'-1"
CG
8"11"1'-4"1'-7"3'-6"
4' -8
/2
E1500
6"
WT-2
WT-1
WALL BASE AS SCHEDULED
STALL PARTITION
D4
I-501
6" 4'
-0 A5200
A5109
6" 4'
-6
WALL BASE AS SCHEDULED
WT-2
WT-1
NURSE CALL
*SEE A-002 FOR TYPICAL MOUNTING HEIGHTS
D4
I-501
P9050
F2010
A5082
4' -6
6"
WT-2
WT-1
WALL BASE AS
SCHEDULED
*SEE A-002 FOR TYPICAL
MOUNTING HEIGHTS
3'-3"
D4
I-501
P9050 P9050
A5109A5109
P8150
P3000P3000
A1067 A1067
A5075
WALL BASE AS
SCHEDULED
6" 4'
-6
WT-2
WT-1
2'-6" 1'-4" 1'-6" 1'-7" 1'-11" 1'-8" 4'-2 1/4"
*SEE A-002 FOR TYPICAL MOUNTING HEIGHTS
1'-3" 1'-3"
D4
I-501
F3200
WALL BASE AS SCHEDULED
M1620
M5535
M5016
A1016
A1010
1'-0"
3' -5
/4
WALL BASE AS SCHEDULED
M5535 A5106
A1066
A5075A5080
M5016
M1801
M4200
M5545M5520
P3100
F2000
5'-0" 1'-2" 1'-2" 1'-5" 1'-3"
A1016
WALL BASE AS SCHEDULED
A6046
A5145
F0205
(2)
2'-1" 7" 3'-4"
E0078
M1825
M5525
A1011
M1801
M5520
WALL BASE AS SCHEDULED
F0280
F3200
E0078
M5565 M5705
2' -5
M5735
WALL BASE AS SCHEDULED
1'-0"
M5700
A5145A5145
1'-2" 1'-5" 7"
WALL BASE AS SCHEDULED
M5700 E0906E0912
M1620
A5106 A1066
A5075
A5080
P3100
WALL BASE AS SCHEDULED
6'-10" 1'-2"
F0340
E0078
1'-11"1'-6"11"1'-6"1'-9"1'-4"4'-1"
WALL BASE AS SCHEDULED
SOFFIT
A5210
M0506 A5220
6'-10 1/2"
WALL BASE AS SCHEDULED
F2420
F0740
3'-0" 2'-0" 3'-0"
C02D0C04F0
F3200 M0500
A5220
F3025
A5080 A5075
K1552 K8250K4665
R7000
F2015
CT020
8'-1"
A1012
CS010
1'-3"3'-4"3'-6"4'-4"
C04P0MWALL BASE AS
SCHEDULED
3' -1
CGCG CG
P6350
A50800025
P2000
A5075 A1012
WG-1
CS200
2' -1
0" 4"
3'-5" 2'-8" 1'-1"
C05P0M
C02C0
C2
I-501
TYP
WALL BASE AS SCHEDULED
A5075
2'-0"4'-0"1" C02C0
CT020
CS200
A5106
A5080
P2000
3'-9"
C05P0M
FILLER
PANEL
3' -1
WALL BASE AS
SCHEDULED
A5106
A5080 A5075
CE030
CT020
M3072
X2100
2'-6" 1"
2'-6" 2'-6" 1"
C03P0M C03FO
1'-7" 2'-2" 9"
CS150
WALL BASE AS
SCHEDULED
A1066
M3072 E0945
M5530
3'-4"
F0300
E0210
F3200
M1801
CG CG
WALL BASE AS SCHEDULED
A5080
F3200 E0210
M1801 F0205
4'-6"
WALL BASE AS SCHEDULED
A1012
A5145(2)
E0930
F0355
X2100
7" 1'-9" 3'-4"
WALL BASE AS SCHEDULED
A5106
F3200
WALL BASE AS
SCHEDULED
A5145
M0020
D6550
M0031
E0063
M0005
L0160M
(2)
8" 1'-5"
WALL BASE AS
SCHEDULED
M0020
E0921
C01D0M
1'-6" 1'-6" 1'-6" 1'-6" 3'-1 1/4"
CD040M CD040M CD040M
3'-0" 3'-0" 3'-0"
(4)
2' -1
0" 2'
-2
/4
3' -2
D1
A-461
Sim
CT020
A6046
M1801 L0160M
M0020
M0031D6550
F2000
WALL BASE AS SCHEDULED
2' -1
0"
CD040M
CT020
D1
A-461
Sim
EQ EQ
E0063
A1066
P3100
A1010
F3200 A5106
A1012
A5075
A5080
E0903E0906
E0921
WALL BASE AS SCHEDULED
1'-4 3/4"1'-8 1/4" 1'-8 1/2" 11" 10 3/4" 6'-9 1/4"
F2000
E0912
A6046 F3200
WALL BASE AS SCHEDULED
SOFFIT
D O
O R
F R
A M
E , T
Y P
A
LI
G
N R
E V
E A
L W
IT
H
2' -1
0" 4"
3' -2
T
Y P
WDP-1
EQ EQ 1'-4"
A6046A6046
F2420
CG3'-7"
WC-1
WDP-1
VERTICAL REVEALS AS REQ.
EQUALLY SPACED, TYP.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
C
Phase
ARCHITECT OF RECORD STAMPENGINEERS OF RECORD
321 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
A/E:
C on e ei gh th in ch o ne fo ot
B
A
C
D
E
F th re e in ch es o ne fo ot on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ha lf in ch o ne fo ot
6"
6"
6"
6"
C :\r vt \2
6\
8 3
-A
-C E
N T
R A
L_ V
I S N
-1
-4 th F lo or
_ M
IN
E
LS
O N
.r vt
C :\r vt \2
6\
8 3
-A
-C E
N T
R A
L_ V
I S N
-1
-4 th F lo or
_ M
IN
E
LS
O N
.r vt
/1
/2
:3 :4
P
M
I-202
INTERIOR ELEVATIONS - PHASE 1 610-17-101
03/19/18 JR RG
ISSUED FOR
CONSTRUCTION
Project Director
1700 E. 38TH STREET MARION, IN 46953
VISN 11 MARION B-138: 4TH FLOOR
CONSTRUCTION
SPRINKLERED
HDR ARCHITECTURE, INC.
600 HENNEPIN AVE SUITE 260
MINNEAPOLIS, MN 55403
612.524.6000
TERRY LITTELL SR., RA,
LEED AP
KORDA, INC.
1650 WATERMARK DRIVE, SUITE 200
COLUMBUS, OH 43215
614.487.1650
STAN KMONK
METRIC ENVIRONMENTAL
6971 HILLSDALE COURT
INDIANAPOLIS, IN 46250
1/4" = 1'-0" B7
WAITING/ELEVATOR -SOUTH
1/4" = 1'-0" C6
CORRIDOR- SOUTH
1/4" = 1'-0" F3
PHOTOGRAPHY-EAST
1/4" = 1'-0"
F2
PHOTOGRAPHY-NORTH
1/4" = 1'-0" F4
PHOTOGRAPHY-SOUTH
1/4" = 1'-0"
F5
PHOTOGRAPHY-WEST
1/4" = 1'-0" F8
FITTING - EAST
1/4" = 1'-0"
F6
FITTING - NORTH
1/4" = 1'-0" F9
FITTING - SOUTH
1/4" = 1'-0" E4
FEMALE TLT - EAST
1/4" = 1'-0"
E3
FEMALE TLT - NORTH
1/4" = 1'-0" E6
FEMALE TLT - SOUTH
1/4" = 1'-0"
E7
FEMALE TLT - WEST
1/4" = 1'-0" E9
EXAM-OPTHMOLOGY-NORTH
1/4" = 1'-0"
E10
EXAM-OPTHMOLOGY- EAST
1/4" = 1'-0" F1
EXAM-OPTHMOLOGY-WEST
1/4" = 1'-0" D10
PATIENT ED/CONTACT LENS - WEST
1/4" = 1'-0"
D9
PATIENT ED/CONTACT LENS-SOUTH
1/4" = 1'-0" D7
PATIENT ED/CONTACT LENS-EAST
1/4" = 1'-0"
D5
PATIENT ED/CONTACT LENS-NORTH
1/4" = 1'-0" C1
RECEPTION-DENTAL-WEST
1/4" = 1'-0"
C2
WAITING - NORTH
1/4" = 1'-0" B5
LOUNGE-S-P1
1/4" = 1'-0"
B4
SOIL UTE-E-P1
1/4" = 1'-0" B3
SOIL UTE-N-P1
1/4" = 1'-0"
B2
US-OPT-NORTH-P1
1/4" = 1'-0" A10
US-OPT-EAST-P1
1/4" = 1'-0"
A9
US-OPT-SOUTH-P1
1/4" = 1'-0" A7
US-OPT-WEST-P1
1/4" = 1'-0"
A1
HEARING AID FAB.-NORTH
1/4" = 1'-0" A4
INST CAL-SOUTH
1/4" = 1'-0"
A2
HEARING AID FAB / INST CAL-EAST
1/4" = 1'-0" A5
HEARING AID FAB / INST CAL-WEST
1/4" = 1'-0" C4
WAITING / KIOSK - EAST
Mark: Revision: Date:
ISSUED FOR CONSTRUCTION 03/19/2018
M5530 M5500
M5555
M5027
F0300
E0210
M5520
M5575
M5025
WALL BASE AS
SCHEDULED
P3100
M5030
M1620
E0210
M5575 M5025
M4100A5106
WALL BASE AS
SCHEDULED
A1010
M1801
M5545
A1011
M5520
1'-5"5'-9"3'-4"
A5145 A5075
(2)
P3100
A5080
E0210
A5106
A1011
M5545
F3200
WALL BASE AS
SCHEDULED
2'-6 1/2" 7" 1'-2" 3'-4 1/2"
M4705M4705
WG-1
OPEN TO BEYOND
CG
WALL BASE AS SCHEDULED
2' -1
0" 4"
CG SOFFIT
CGCG
M1820
M1801
A1015
F0280
C06MO
F2540
F3200 M1110
E0954 M8770
WG-1
CGCG
WALL BASE AS SCHEDULED
CT020
D1
A-461
Sim
F3200
M1605
F2540F0280
A1015 M1801
C06MO
3'-1 1/2"
WALL BASE AS
SCHEDULED
CG
M1605
SOFFIT
WALL BASE AS SCHEDULED
P4700
F0500
A5080
A5107
P2000A5075
A5135
9" 9" 1'-2"
P2450
WALL BASE AS SCHEDULED
WG-1
WG-1
M2070
WG-1
WALL BASE AS
SCHEDULED
(4)
M2070
WALL BASE AS SCHEDULED
F3200
CGCGCG
A5145 E0123
E0123
10 1/2"
WALL BASE AS SCHEDULED
E0123
A1011
M1801
WALL BASE AS SCHEDULED F0420F0420
F0205
E0123
F2000
WALL BASE AS SCHEDULED
M1801
E0123
CG
F0420
A1011
WALL BASE AS
SCHEDULED
F0205F0205
WALL BASE AS SCHEDULED
F3200
E0063M
WALL BASE AS
SCHEDULED
E0063M
WALL BASE
AS SCHEDULED
E0063M
M1825
F0205
F0420
M1801
A1015
WALL BASE AS SCHEDULED
A1066
A5080
M9025F0205
A5145 A5075
P3100
WALL BASE AS SCHEDULED
1'-10" 1'-1 1/2"
1'-3" 1'-7" 1'-5"
CG
WALL BASE AS SCHEDULED
A5106
M7400
F0205
CG
P3100
A5075
A1066
M9025
E0948 F2000
M1620
M4200
11"
WALL BASE AS SCHEDULED
P3100
A5080
F3200
A1066
1'-0"
WALL BASE AS SCHEDULED
E0948
M1620
M4200
F2000
F3200
2'-4"
CG
A1066 A5106
A5075
P3100
M1801
M5520
M5545
M1620
M5016
A1016
M5535
F2000
A5080
WALL BASE AS SCHEDULED
1'-4 3/4" 1'-2" 10 3/4"
M1100
M1110
E0954
WG-1
M8770
M7660
WALL BASE AS SCHEDULED
2' -1
0" 4"
8" 6 1/4"CG
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
C
Phase
ARCHITECT OF RECORD STAMPENGINEERS OF RECORD
321 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
A/E:
C on e ei gh th in ch o ne fo ot
B
A
C
D
E
F th re e in ch es o ne fo ot on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ha lf in ch o ne fo ot
6"
6"
6"
6"
C :\r vt \2
6\
8 3
-A
-C E
N T
R A
L_ V
I S N
-1
-4 th F lo or
_ M
IN
E
LS
O N
.r vt
C :\r vt \2
6\
8 3
-A
-C E
N T
R A
L_ V
I S N
-1
-4 th F lo or
_ M
IN
E
LS
O N
.r vt
/1
/2
:3 :5
P
M
I-203
INTERIOR ELEVATIONS - PHASE 1 610-17-101
03/19/18 Checker RG
ISSUED FOR
CONSTRUCTION
Project Director
1700 E. 38TH STREET MARION, IN 46953
VISN 11 MARION B-138: 4TH FLOOR
CONSTRUCTION
SPRINKLERED
HDR ARCHITECTURE, INC.
600 HENNEPIN AVE SUITE 260
MINNEAPOLIS, MN 55403
612.524.6000
TERRY LITTELL SR., RA,
LEED AP
KORDA, INC.
1650 WATERMARK DRIVE, SUITE 200
COLUMBUS, OH 43215
614.487.1650
STAN KMONK
METRIC ENVIRONMENTAL
6971 HILLSDALE COURT
INDIANAPOLIS, IN 46250
1/4" = 1'-0" F3
PRETEST-EYE-WEST
1/4" = 1'-0"
F2
PRETEST-EYE-SOUTH
1/4" = 1'-0" F1
PRETEST-EYE-EAST
1/4" = 1'-0"
F4
W.C. ALC.-EYE-EAST
1/4" = 1'-0" F6
RECEP-EYE-NORTH
1/4" = 1'-0"
F8
RECEP-EYE-EAST
1/4" = 1'-0" F9
RECEP-EYE-SOUTH
1/4" = 1'-0"
F10
HAC -EYE- EAST
1/4" = 1'-0" D10
STOR. EQ. WEST
1/4" = 1'-0"
D9
STOR. EQ. NORTH
1/4" = 1'-0" E5
CLERICAL- AUDIO-WEST
1/4" = 1'-0"
E2
CLERICAL- AUDIO-NORTH
1/4" = 1'-0" E3
CLERICAL- AUDIO-EAST
1/4" = 1'-0"
E4
CLERICAL- AUDIO-SOUTH
1/4" = 1'-0" E7
EXAM TECH- AUDIO-NORTH
1/4" = 1'-0"
E8
EXAM TECH- AUDIO-EAST
1/4" = 1'-0" E9
EXAM TECH- AUDIO-SOUTH
1/4" = 1'-0"
E10
EXAM TECH- AUDIO-WEST
1/4" = 1'-0" D3
CERUMEN MGMT-AUDIO-EAST
1/4" = 1'-0"
D2
CERUMEN MGMT-AUDIO-NORTH
1/4" = 1'-0" D4
CERUMEN MGMT-AUDIO-SOUTH
1/4" = 1'-0"
D5
CERUMEN MGMT-AUDIO-WEST
1/4" = 1'-0" D7
EXAM, OPT.-EYE-WEST
1/4" = 1'-0" F5
SUPPLY EQUIPMENT
Mark: Revision: Date:
ISSUED FOR CONSTRUCTION 03/19/2018
8 1/2"
3'-0" 3'-0" 3'-0" 2'-6"
L2337
C04F0 C04F0 C04F0
2'-0"
C02C0
3' -1
P7650 D2540
D4500
D0755
D4360
D8510
P1965
CS200
F2000
D4260
D0904
D8060 D0942
D0980
M2700 D4310
-0036
A1015 -0029M1830D6250
M1801
D4260
D3560
WALL BASE AS
SCHEDULED
CG CG
A5075
CT020
CT020
CT020
1'-0"
C03P0M
D1
A-461
Sim F3010
2 1/4" 3'-6"
3' -1
/4
M2015 D4100
A5080
A5075
CS200
D0904
D6250D6250
D0904
WALL BASE SEE SCHEDULE
F0350
A1012
CG
WG-1
6'-1" 1'-4"
C03P0M
F3200
CT020
1'-6"
2'-0"3'-0"3'-0"
C04F0 C04F0 C02C0
3' -1
/4
D9035 D6650
D6600
P7650
F3200
2'-6"
D4100
A5080
CG090
1'-0"3'-0"
C06M0 1'-6"1'-6"2'-6"1'-6"
C03P0C06M0 C06M0
M1801
3' -8
2'
-0
3' -0
A5080 A1130
M0755
M0765 M0750
CT020
A1200
WALL BASE AS
SCHEDULED
M8805
D3320
F3200
WALL BASED AS SCHEDULED
D8560
6'-0"
M8805 X6610
X6600
3' -0
M3072
WG-1
CS200
WALL BASE AS SCHEDULED
E0948
A5080 A5075
CG
CT020
A1066
D8560
1'-10" 1'-5" 1'-2" 6'-3"
2'-6" 1"
C03P0M
3' -2
FILLER PANEL
A5080
CS200
D0100
A5106
A5145A5145
F2010
M4266
WALL BASE AS SCHEDULED
3' -0
A1012
CT020
NURSE
CALL
5'-4" 2'-4" 3" 5'-7"
C03P0M 1" 2'-6"
A1066 A5145A5145
F2010
A5075
A5077
P3100
A5080
A5107
6'-5 1/2" WALL BASE AS SCHEDULED
E0948
CG
CG
3'-6" 1'-2" 1'-9 1/4"1'-3 3/4" 9" 1'-9" 10"
CG
M1801
D0670
M1803
D3390
X6600 sim F5
AC-501
OPEN TO BEYOND
EG
OPEN TO BEYOND
CG
WALL BASE AS SCHEDULEDWALL BASE AS SCHEDULED
D3380
D7090
D0670
SOFFIT
CGCG
A5080
A1012
A5077
A5075
A1066
D0685 M1803
D0680
2'-9 1/2"6"2'-3 1/2"1'-0"8"
A1066
11 1/4" 2'-6" 1'-2 1/4"1'-11 1/2" 3'-11"
WALL BASE AS SCHEDULED
A5075
A5077
A5080
X6600
A5106
F2000 D0680
D0685
EG
4' -6
D9060
X6610
F3200
WALL BASE AS SCHEDULED
A5145(2) D6050
M8541
1'-0" 8" 6'-1"
F0350
WALL BASE AS SCHEDULED
WG-1
WALL BASE AS SCHEDULED
3' -2
M2055 M2055
WG-1
WG-1
WALL BASE AS SCHEDULED
2' -1
0" 4"
M2055 M2055
M2055
M2055
2' -1
0" 4"
WALL BASE AS SCHEDULED
WG-1
A1067 A5082
P3000
WALL BASE AS SCHEDULED
6" 4'
-6
WT-2
WT-1
1'-8" 1'-3"
*SEE A-002 FOR TYPICAL MOUNTING HEIGHTS
D4
I-501
CENTER
ON SINK
F2010
4' -6
6"
WT-2
WT-1
WALL BASE AS SCHEDULED
*SEE A-002 FOR TYPICAL MOUNTING HEIGHTS
A5145
D4
I-501
P9050
A5109
6" 4'
-6
WT-2
WT-1
*SEE A-002 FOR TYPICAL MOUNTING HEIGHTS
SWING UP
GRAB BAR
SEE F4/A550
WALL BASE AS SCHEDULED
D4
I-501
A5200
A5090
A5075
5' -0
WT-2
WT-1
A5109
NURSE CALL
*SEE A-002 FOR TYPICAL MOUNTING HEIGHTS
10 3/4"
WT-1
WALL BASE AS SCHEDULED
D4
I-501
P9050
X3150
X6150 A1012
A1010
CG
EG
5'-7" 5'-6"
WALL BASE AS SCHEDULED
F3200 E0948
F0205
CG
1'-8"
WALL BASE AS SCHEDULED
CG
CG
INT
WALL BASE AS SCHEDULED
5' -0
5"
2' -7
CT020
M1801
EQ.3'-0"EQ.
WALL BASE AS SCHEDULED
SUPPORT BRACKETS
M1840
A1015
F0275
WALL BASE AS
SCHEDULED
F0420
SOFFIT
F2420 F2420 F2420
F0740F0740
A-461
D7
F0740
FURNITURE AS SCHEDULED FURNITURE AS
SCHEDULED
WALL BASE AS
SCHEDULED
A6046 A6046
SOFFIT
CGCG
6'-8 3/4" 3'-5"
F2420
F0740
FURNITURE AS
SCHEDULED
M1801 M1801 M1840
D7
A-461
D9
A-461
WALL BASE AS
SCHEDULED
M0506
A5210 A5220
M0506
F3200A6046
CG
F2300
F0305
F0206
HR-1
WG-1WG-1
WALL BASE AS SCHEDULED
1'-10 1/2"1'-0"
A5210 A5220
A6046
M0506
A5210
F0305 F0206
F0305F0206
WG-1
WALL BASE AS SCHEDULED
EQ EQ
CG
HR-1 F0206
F0305WG-1
A6046
WALL BASE AS SCHEDULED
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
C
Phase
ARCHITECT OF RECORD STAMPENGINEERS OF RECORD
321 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
A/E:
C on e ei gh th in ch o ne fo ot
B
A
C
D
E
F th re e in ch es o ne fo ot on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ha lf in ch o ne fo ot
6"
6"
6"
6"
C :\r vt \2
6\
8 3
-A
-C E
N T
R A
L_ V
I S N
-1
-4 th F lo or
_ M
IN
E
LS
O N
.r vt
C :\r vt \2
6\
8 3
-A
-C E
N T
R A
L_ V
I S N
-1
-4 th F lo or
_ M
IN
E
LS
O N
.r vt
/1
/2
:3 :0
P
M
I-210
INTERIOR ELEVATIONS - PHASE 2 610-17-101
03/19/18 JR RG
ISSUED FOR
CONSTRUCTION
Project Director
1700 E. 38TH STREET MARION, IN 46953
VISN 11 MARION B-138: 4TH FLOOR
CONSTRUCTION
SPRINKLERED
HDR ARCHITECTURE, INC.
600 HENNEPIN AVE SUITE 260
MINNEAPOLIS, MN 55403
612.524.6000
TERRY LITTELL SR., RA,
LEED AP
KORDA, INC.
1650 WATERMARK DRIVE, SUITE 200
COLUMBUS, OH 43215
614.487.1650
STAN KMONK
METRIC ENVIRONMENTAL
6971 HILLSDALE COURT
INDIANAPOLIS, IN 46250
1/4" = 1'-0" B4
GENERAL LAB - EAST
1/4" = 1'-0"
B8
GENERAL LAB - WEST
1/4" = 1'-0" B2
GENERAL LAB - NORTH
1/4" = 1'-0" C6
ORAL SURGERY - NORTH
1/4" = 1'-0"
C8
ORAL SURGERY - SOUTH
1/4" = 1'-0" C7
ORAL SURGERY - EAST
1/4" = 1'-0"
C10
ORAL SURGERY - WEST
1/4" = 1'-0" A5
CT ROOM CONE BEAM - WEST
1/4" = 1'-0" E7
DTR-EAST
1/4" = 1'-0"
E6
DTR-NORTH
1/4" = 1'-0" E8
DTR-SOUTH
1/4" = 1'-0"
E10
DTR-WEST
1/4" = 1'-0" B7
GENERAL LAB - SOUTH
1/4" = 1'-0" C4
DENTAL STORAGE SUPPLY - WEST
1/4" = 1'-0"
C3
DENTAL STORAGE SUPPLY - EAST
1/4" = 1'-0" D6
DENTAL STERILE STORAGE - WEST
1/4" = 1'-0" A10
TLT STAFF -WEST
1/4" = 1'-0"
A9
TLT STAFF -SOUTH
1/4" = 1'-0" A8
TLT STAFF -EAST
1/4" = 1'-0"
A7
TLT STAFF -NORTH
1/4" = 1'-0" A3
CT ROOM CONE BEAM - EAST
1/4" = 1'-0"
A2
CT ROOM CONE BEAM - NORTH
1/4" = 1'-0" A4
CT ROOM CONE BEAM - SOUTH
1/4" = 1'-0"
A1
CT ROOM CTRL - NORTH
1/4" = 1'-0" F7
DENTAL WAITING - SOUTH
1/4" = 1'-0"
F10
DENTAL WAITING - WEST
1/4" = 1'-0" F6
DENTAL WAITNG/RECEPT - EAST
1/4" = 1'-0" D10
SUB-WAIT-DENTAL- SOUTH
1/4" = 1'-0"
D8
SUB-WAIT-DENTAL-EAST
1/4" = 1'-0" D7
SUB-WAIT-DENTAL-NORTH
Mark: Revision: Date:
ISSUED FOR CONSTRUCTION 03/19/2018
E0903 E0903 E0903 E0912 E0912
WALL BASE AS SCHEDULED
E1500E0906
WG-1
2' -1
0" 4"
F0510
WALL BASE AS SCHEDULED M3072
WG-1P6350WG-1
2' -1
0"
1/
2"
M3070 F2020
WALL BASE AS SCHEDULED
F3200
CG
1'-0"
2' -1
0" 4" F0510
A5080
A5106
C04F0
CS200 A5075
WALL BASE AS
SCHEDULED
2' -1
0"
CT050
C05P0M 4'-6" 4'-0" 3'-0"
1"
FILLER END PANEL
M3072
1'-4" 1'-6" 1'-4"
P6350
PARTITION
A5077
A5080
P3100
P2000
CG
WALL BASE AS SCHEDULED
WG-1
C2
I-501
TYP
A1012
4"3'-8"9"1'-4"
3'-0"
A1010
P8710
WALL BASE AS SCHEDULED
7'-5"
E0912
E1500
WALL BASE AS SCHEDULED
CG
F0515
CG
F0515
M7300
E0906 E0906
F2000
WALL BASE AS SCHEDULED
CG
CGCG
A1010
A5145A5145
WALL BASE AS SCHEDULED
CB020
C02D0 C02C0
2'-0"
1" 2'-0"2'-0"3'-0"
3' -1
2'
-4
3' -2
F2015
K4665 K1552
A5080
CS010
A5075
CT020
1'-2"9"
C04P0M
CLEAR
WALL BASE AS
SCHEDULED
F3065
WALL BASE AS SCHEDULED
A1012
5'-9" 4'-2"
F3200
R7250
M0515
A5210
K1552
_0033_0033
_0032
WALL BASE AS SCHEDULED
D4001
_0034 A1000
D4001D4001
_0034
_0033
WALL BASE AS SCHEDULED
8"
A1030A1030A1030A1030A1030
WALL BASE AS SCHEDULED
A5025
A1012
A1030A1030A1030A1030A1030
WALL BASE AS SCHEDULED
CG
A1030
F3200
WALL BASE AS SCHEDULED
2'-3"2'-3"3'-3"
F2000
A1030
WALL BASE AS SCHEDULED
A5025
PROVIDE
WINDOW FILM
A1080
A1012
P6980
M3110
A1012
A5070
A5160
3' -0
/2
WALL BASE AS SCHEDULED
2'-0" 3'-0"
A5070
P6980
HR-1
3' -0
/2
A5160
CG
WALL BASE AS SCHEDULED
2'-8"
E0051 E0051
M1801M1801
A1015 A1015
F2000
WALL BASE AS SCHEDULED
E0051
M1801
A1015 F0420
F3200
WALL BASE AS
SCHEDULED
F0420
F3200 E0051
M1801
F2000
A1015
WALL BASE AS
SCHEDULED
4'-5"
M1801
A1015
E0051 E0051
M1801
A1015
F2000F2000
WALL BASE AS SCHEDULED
M1825
F0420
F2000
E0123
A1015
M1801
CG
F3200
WALL BASE AS SCHEDULED
E0123 E0123
F2000F2000
BASE AS SCHEDULED
M1801 M1801
F3200
E0123 E0123
A1015 A1015
F2000F2000
WALL BASE AS SCHEDULED
E0123
F2000
F0275
E0123
CG
F3200
5'-5"
BASE AS SCHEDULED
A5082
A5075
F2010
A5109
A1067
SWING UP
GRAB BAR
SEE F4/A550
D4
I-501
WALL BASE AS SCHEDULED
*SEE A-002 FOR TYPICAL
MOUINTING HEIGHTS
P3000
P9050
CENTER LIGHT OVER
SINK
A4995
A5109
A5200
A5090
NURSE CALL
4' -6
WT-1
WT-2
D4
I-501
WALL BASE AS SCHEDULED
*SEE A-002 FOR TYPICAL
MOUNTING HEIGHTS
P9050
WT-1
WT-2
A5082
F2010
A5075
A1067
6" 4'
-6
WALL BASE AS SCHEDULED
*SEE A-002 FOR TYPICAL
MOUNTING HEIGHTS
TILE TYPICAL
ALL WALLS
D4
I-501
P3000
WALL BASE AS
SCHEDULED
A1012
A1080
A1030
A5025
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
C
Phase
ARCHITECT OF RECORD STAMPENGINEERS OF RECORD
321 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
A/E:
C on e ei gh th in ch o ne fo ot
B
A
C
D
E
F th re e in ch es o ne fo ot on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ha lf in ch o ne fo ot
6"
6"
6"
6"
C :\r vt \2
6\
8 3
-A
-C E
N T
R A
L_ V
I S N
-1
-4 th F lo or
_ M
IN
E
LS
O N
.r vt
C :\r vt \2
6\
8 3
-A
-C E
N T
R A
L_ V
I S N
-1
-4 th F lo or
_ M
IN
E
LS
O N
.r vt
/1
/2
:3 :1
P
M
I-211
INTERIOR ELEVATIONS - PHASE 2 610-17-101
03/19/18 Checker Author
ISSUED FOR
CONSTRUCTION
Project Director
1700 E. 38TH STREET MARION, IN 46953
VISN 11 MARION B-138: 4TH FLOOR
CONSTRUCTION
SPRINKLERED
HDR ARCHITECTURE, INC.
600 HENNEPIN AVE SUITE 260
MINNEAPOLIS, MN 55403
612.524.6000
TERRY LITTELL SR., RA,
LEED AP
KORDA, INC.
1650 WATERMARK DRIVE, SUITE 200
COLUMBUS, OH 43215
614.487.1650
STAN KMONK
METRIC ENVIRONMENTAL
6971 HILLSDALE COURT
INDIANAPOLIS, IN 46250
1/4" = 1'-0" A5
CLEAN LINEN-DENTAL-NORTH
1/4" = 1'-0" B10
SOILED UTILITY ROOM - WEST
1/4" = 1'-0"
B6
SOILED UTILITY-DENTAL-EAST
1/4" = 1'-0" B5
SOILED UTILITY-DENTAL-NORTH
1/4" = 1'-0"
B8
SOILED UTILITY ROOM - SOUTH
1/4" = 1'-0" A6
CLEAN SUPPLY-DENTAL-EAST
1/4" = 1'-0"
A8
CLEAN SUPPLY-DENTAL-SOUTH
1/4" = 1'-0" A9
CLEAN LINEN-DENTAL-WEST
1/4" = 1'-0" C10
DENTAL LOUNGE-STAFF-WEST
1/4" = 1'-0"
C8
DENTAL LOUNGE-STAFF-SOUTH
1/4" = 1'-0" C7
DENTAL LOUNGE-STAFF-EAST
1/4" = 1'-0" A4
DENTAL MECH ROOM - EAST
1/4" = 1'-0"
A3
DENTAL MECH ROOM - SOUTH
1/4" = 1'-0" B4
LOCKER-N-DENTAL-NORTH
1/4" = 1'-0"
B3
LOCKER-N-DENTAL-WEST
1/4" = 1'-0" C3
LOCKER-S-DENTAL-NORTH
1/4" = 1'-0"
C5
LOCKER-S-DENTAL-SOUTH
1/4" = 1'-0" D3
SCRUB - DENTAL - EAST
1/4" = 1'-0"
D4
SCRUB - DENTAL - WEST
1/4" = 1'-0" D6
WORK STAFF DENTIST -NORTH
1/4" = 1'-0"
D7
WORK STAFF DENTIST -EAST
1/4" = 1'-0" D8
WORK STAFF DENTIST -SOUTH
1/4" = 1'-0"
D10
WORK STAFF DENTIST -WEST
1/4" = 1'-0" E10
DENTAL TECH-DENTAL-WEST
1/4" = 1'-0"
E8
DENTAL…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.