36C25018B0816 ATTACHMENT 5. Fire Protection Drawings.pdf
View the file
Other files for this federal contract opportunity
Show all 37
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
419 418
C405
423 425
429 430
C402
415 414
S402
410 409
406 405 404 403
431A
403A 402
C401
436A
477B
477A
481 473 472
438A
435A
437B
437A
403B
BUILDING 172
P H
A S
E
P H
A S
E
MATCH LINE
P H
A S
E
NIC
1.
C
E
F
H
I.1
J.1
2 3 4N 5N 6N 7N 8 9 10 11 12 13 14 15 16 17 18
B
A.
4.5 5.1 6.1 7.1
B.1
A.1
H.
C.1
D
G
I.
I.2
J.2
(E)SPR
(E)SPR
(E)SPR
(E)3"(E)3" 1
(E)1 1/2" (E)3" 1
(E)6" SP UP
(E)2" DR
DN.
(E)2"
(E)1 1/4"
ELEV. ELEV.
(E)3"(E)3"(E)3"
FFF
(E)SPR
(E)3"1
(E )S
P R
(E)SPR
2 2
2 2 2 2 3
2 2
2 2 2
2 2
(E)SPR
(E)1"
(E)1 1/4"
(E)1"
(E)1 1/2"
(E)1"(E)1"
(E)2"
(E)1 1/2"
(E)1"
(E)1 1/4"
(R)1 1/2"
(E)1 1/2"
(E)1 1/2"
(E)1 1/2" (E)2"
(R)1"
(E)1 1/4"
(E)1"
(E)1 1/4"
(R)1"
(R)1 1/4"
(E)1 1/2"
(E)1 1/2"
(E)1 1/2"
(E)1 1/4"
(R)1 1/4"
(E)1 1/4"
(E)1 1/2"
(E)2"
(R)1"
1"
(E)1 1/4"
(E)1 1/2"
(E)1"
(E)1 1/4"
(E)2"
(E)2"
(E)1 1/2"
(E)1 1/2"
(E)2"
(E)1 1/4"
(E)1"
(E)1 1/2"
(E)1"
(R)1"
(E)1"
(E)1 1/4"
(E)1 1/4"
(E)1 1/2"
BLDG 172-E
(R )S
P R
(E)3"
(E)1"
(E)1 1/4"
(E)1 1/4"
(R)1"(R)1"
(E)1 1/4" (R)1"
(E)1 1/4" (E)1 1/4"
(E)1 1/4"
(E)2"
(E)SPR
(E)3"
PHASE 1 PHASE 2
PHASE 1 PHASE 2
PHASE 2
PHASE 1 PHASE 2
PHASE 2
PHASE 1 PHASE 2
N. I. C.
FULLY
SPRINKLERED
M A
T C
H L
IN
E M
A T
C H
L
IN
E M
A T
C H
L
IN
E M
A T
C H
L
IN
E M
A T
C H
L
IN
E M
A T
C H
L
IN
E M
A T
C H
L
IN
E M
A T
C H
L
IN
E
A3
FX5013
PROJECT NUMBER:
CHECKED BY:
DESIGNED BY:
1650 WATERMARK DRIVE
COLUMBUS, OHIO 43215
SUITE 200
DRAWN BY:
0 4'-0" 8'-0" 16'-0"
PLAN
NORTH
PHASE 1
KEY PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
Phase
ARCHITECT OF RECORD STAMPENGINEERS OF RECORD
321 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
A/E:
2016-0205
C :\L
O C
A L
R E
V
IT
\1 6-
-V
A M ar io n B ld g
4 t h
F lr
R en o M
E C
H J
E S
S E
.r vt
/1
/2
:2
:2
P
M
FX-104.1
610-17-101
03/19/2018 W. Phil Stafa C. Jesse Whitehead
Project Director
1700 E. 38TH STREET MARION, IN 46953
VISN 11 MARION B-138: 4TH FLOOR
CONSTRUCTION
SPRINKLERED
HDR ARCHITECTURE, INC.
600 HENNEPIN AVE SUITE 260
MINNEAPOLIS, MN 55403
612.524.6000
TERRY LITTELL SR., RA,
LEED AP
KORDA, INC.
1650 WATERMARK DRIVE, SUITE 200
COLUMBUS, OH 43215
614.487.1650
STAN KMONK
C. Jesse Whitehead
Steve Glinsky
W. Phil Stafa
METRIC ENVIRONMENTAL
6971 HILLSDALE COURT
INDIANAPOLIS, IN 46250
FOURTH FLOOR FIRE PROTECTION
DEMOLITION PLAN PHASE 1
ISSUED FOR
CONSTRUCTION
N 0' 4' 8'2'1'
SCALE: 1/8" = 1'-0"E1
FOURTH FLOOR PHASE 1
DEMOLITION PLAN
CODED NOTES
1. EXISTING SPRINKLER MAIN TO REMAIN.
2. EXISTING SPRINKLER TO BE REMOVED, REMOVE ASSOCIATED PIPING
AS INDICATED.
3. EXISTING SPRINKLER TO REMAIN.
4. EXISTING ZONE VALVE.
FIRE PROTECTION GENERAL NOTES:
1. EXISTING SPRINKLER SYSTEM AND ALL ASSOCIATED
EQUIPMENT SHALL BE MAINTAINED FULLY OPERATIONAL
UNTIL THE NEW EQUIPMENT HAS BEEN TESTED AND
ACCEPTED BY THE VA. THE EXISTING SPRINKLER SYSTEM
AND EQUIPMENT CAN BE TAKEN OUT OF SERVICE ONLY
DURING CONSTRUCTION PERIODS IN WHICH THE
SPRINKLER SYSTEM IS BEING MODIFIED AND THE
CONTRACTOR IS AT THE WORK SITE. PRIOR TO LEAVING
THE WORK SITE EACH DAY, THE CONTRACTOR SHALL
RESTORE THE SPRINKLER SYSTEM TO SERVICE. ALL
AREAS OUTSIDE OF THE PROJECT CONSTRUCTION AREA
SHALL HAVE THEIR EXISTING FIRE PROTECTION
SPRINKLER SYSTEM IN FULL SERVICE PRIOR TO LEAVING
THE WORK SITE EACH DAY OR A FIRE WATCH SHALL BE
ESTABLISHED AT THE CONTRACTOR'S EXPENSE UNTIL THE
SYSTEM IS RETURNED TO FULL COVERAGE, OPERATION ,
ETC. COORDINATE ALL NECESSARY SYSTEM SHUTDOWNS
WITH VA PROPERTY MANAGER.
2. REFER TO SPECIFICATION SECTION 21 13 13 "SPRINKLER
SYSTEMS MODIFICATION" FOR ADDITIONAL DEMOLITION
WORK REQUIREMENTS.
Mark: Revision: Date:
ISSUED FOR CONSTRUCTION 03/19/2018
477B
477A
470 469
468A 468 467
464 461
459 458 457
446445
443B
449 450 451 452
453454
463 462
442B441440
442A
P H
A S
E
P H
A S
E
MATCH LINE
MATCH LINE
P H
A S
E
P H
A S
E
C
E
F
H
I.1
J.1
19 20 21 22 23.2 24N 25.5 26N 27 28 29
B
A.
24.123.522.5
B.1
A.1
H.
C.1
D
G
I.
I.2
J.2
(E)SPR
(E)3" 1
(E)SPR
F
22.7
(E)SPR
(E)3"1
2 2 2
2 22
1 2 3
2 2
2 2
2 22
2 2
(E)1 1/4"
(E)2"
(E)2" (E)2"
(E)2"
(E)2"(E)2"
(E)2"
(E)1" (E)1"
(E)1 1/2" (E)1"
(E)1" (R)1"
(E)1"
(R)1 1/4"
(R)1 1/2"
(R)1"
(E)2"
(E)3"1
(E)1 1/4"
(E)1 1/4"
PHASE 1 PHASE 2
PHASE 1 PHASE 2
PHASE 2
PHASE 1 PHASE 2
PHASE 2
PHASE 1 PHASE 2
M A
T C
H L
IN
E M
A T
C H
L
IN
E M
A T
C H
L
IN
E M
A T
C H
L
IN
E M
A T
C H
L
IN
E M
A T
C H
L
IN
E M
A T
C H
L
IN
E M
A T
C H
L
IN
E
A3
FX501
PROJECT NUMBER:
CHECKED BY:
DESIGNED BY:
1650 WATERMARK DRIVE
COLUMBUS, OHIO 43215
SUITE 200
DRAWN BY:
0 4'-0" 8'-0" 16'-0"
PLAN
NORTH
PHASE 2
KEY PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
Phase
ARCHITECT OF RECORD STAMPENGINEERS OF RECORD
321 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
A/E:
2016-0205
C :\L
O C
A L
R E
V
IT
\1 6-
-V
A M ar io n B ld g
4 t h
F lr
R en o M
E C
H J
E S
S E
.r vt
/1
/2
:2
:1
P
M
FX-104.2
610-17-101
03/19/2018 W. Phil Stafa C. Jesse Whitehead
Project Director
1700 E. 38TH STREET MARION, IN 46953
VISN 11 MARION B-138: 4TH FLOOR
CONSTRUCTION
SPRINKLERED
HDR ARCHITECTURE, INC.
600 HENNEPIN AVE SUITE 260
MINNEAPOLIS, MN 55403
612.524.6000
TERRY LITTELL SR., RA,
LEED AP
KORDA, INC.
1650 WATERMARK DRIVE, SUITE 200
COLUMBUS, OH 43215
614.487.1650
STAN KMONK
C. Jesse Whitehead
Steve Glinsky
W. Phil Stafa
METRIC ENVIRONMENTAL
6971 HILLSDALE COURT
INDIANAPOLIS, IN 46250
FOURTH FLOOR FIRE PROTECTION
DEMOLITION PLAN PHASE 2
ISSUED FOR
CONSTRUCTION
N 0' 4' 8'2'1'
SCALE: 1/8" = 1'-0"E1
FOURTH FLOOR PHASE 2
DEMOLITION PLAN
CODED NOTES
1. EXISTING SPRINKLER MAIN TO REMAIN.
2. EXISTING SPRINKLER TO BE REMOVED, REMOVE ASSOCIATED PIPING
AS INDICATED.
3. EXISTING SPRINKLER TO REMAIN.
4. PHASE 1 STOPS AT THIS POINT.
FIRE PROTECTION GENERAL NOTES:
1. EXISTING SPRINKLER SYSTEM AND ALL ASSOCIATED
EQUIPMENT SHALL BE MAINTAINED FULLY OPERATIONAL
UNTIL THE NEW EQUIPMENT HAS BEEN TESTED AND
ACCEPTED BY THE VA. THE EXISTING SPRINKLER SYSTEM
AND EQUIPMENT CAN BE TAKEN OUT OF SERVICE ONLY
DURING CONSTRUCTION PERIODS IN WHICH THE
SPRINKLER SYSTEM IS BEING MODIFIED AND THE
CONTRACTOR IS AT THE WORK SITE. PRIOR TO LEAVING
THE WORK SITE EACH DAY, THE CONTRACTOR SHALL
RESTORE THE SPRINKLER SYSTEM TO SERVICE. ALL
AREAS OUTSIDE OF THE PROJECT CONSTRUCTION AREA
SHALL HAVE THEIR EXISTING FIRE PROTECTION
SPRINKLER SYSTEM IN FULL SERVICE PRIOR TO LEAVING
THE WORK SITE EACH DAY OR A FIRE WATCH SHALL BE
ESTABLISHED AT THE CONTRACTOR'S EXPENSE UNTIL THE
SYSTEM IS RETURNED TO FULL COVERAGE, OPERATION ,
ETC. COORDINATE ALL NECESSARY SYSTEM SHUTDOWNS
WITH VA PROPERTY MANAGER.
2. REFER TO SPECIFICATION SECTION 21 13 13 "SPRINKLER
SYSTEMS MODIFICATION" FOR ADDITIONAL DEMOLITION
WORK REQUIREMENTS.
Mark: Revision: Date:
UP
DN
EXISTING STAIR
AND PLATFORM
OVER PARAPET
MATCHLINE
EXISTING
WALKING
PADS
EXISTING
SLOPE
EXISTING
SLOPE
E X
IS
T
IN
G
S L O
P E
E X
IS
T
IN
G
S L O
P E
E X
IS
T
IN
G
S L O
P E
EXISTING
SLOPE
EXISTING
SLOPE
E X
IS
T
IN
G
S L O
P E
P1P1
FUTURE
EXISTING
WALKING PADS
P H
A S
E
P H
A S
E
P H
A S
E
1.
C
E
F
H
I.1
J.1
4N 5N 6N 7N 8 9 10 11 12 13 14 15 16 17
B
A.
B.1
A.1
H.
C.1
D
G
I.
I.2
J.2
(E )S
P R
(E)3"
(E)4"
(E)3"
(E)SPR
PHASE 1 PHASE 2
PHASE 1 PHASE 2
PHASE 1 PHASE 2
PHASE 1 PHASE 2
M A
T C
H L
IN
E M
A T
C H
L
IN
E M
A T
C H
L
IN
E M
A T
C H
L
IN
E
PROJECT NUMBER:
CHECKED BY:
DESIGNED BY:
1650 WATERMARK DRIVE
COLUMBUS, OHIO 43215
SUITE 200
DRAWN BY:
0 4'-0" 8'-0" 16'-0"
PLAN
NORTH
PHASE 1
KEY PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
Phase
ARCHITECT OF RECORD STAMPENGINEERS OF RECORD
321 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
A/E:
2016-0205
C :\L
O C
A L
R E
V
IT
\1 6-
-V
A M ar io n B ld g
4 t h
F lr
R en o M
E C
H J
E S
S E
.r vt
/1
/2
:2
:4
P
M
FX-105.1
610-17-101
03/19/2018 W. Phil Stafa C. Jesse Whitehead
Project Director
1700 E. 38TH STREET MARION, IN 46953
VISN 11 MARION B-138: 4TH FLOOR
CONSTRUCTION
SPRINKLERED
HDR ARCHITECTURE, INC.
600 HENNEPIN AVE SUITE 260
MINNEAPOLIS, MN 55403
612.524.6000
TERRY LITTELL SR., RA,
LEED AP
KORDA, INC.
1650 WATERMARK DRIVE, SUITE 200
COLUMBUS, OH 43215
614.487.1650
STAN KMONK
C. Jesse Whitehead
Steve Glinsky
W. Phil Stafa
METRIC ENVIRONMENTAL
6971 HILLSDALE COURT
INDIANAPOLIS, IN 46250
ROOF FIRE PROTECTION
DEMOLITION PLAN PHASE 1
ISSUED FOR
CONSTRUCTION
N 0' 4' 8'2'1'
SCALE: 1/8" = 1'-0"E1
ROOF PLAN PHASE 1
DEMOLITION PLAN
CODED NOTES
1. (E)6" STANDPIPE W/ 2½" FIRE HOSE VALVE APPROXIMATELY 4'-0"
ABOVE FINISHED FLOOR.
2. (E)4" SPR FROM BELOW.
3. NO FIRE SUPPRESSION SYSTEM WORK IS REQUIRED IN PENTHOUSE.
FIRE PROTECTION GENERAL NOTES:
1. EXISTING SPRINKLER SYSTEM AND ALL ASSOCIATED
EQUIPMENT SHALL BE MAINTAINED FULLY OPERATIONAL
UNTIL THE NEW EQUIPMENT HAS BEEN TESTED AND
ACCEPTED BY THE VA. THE EXISTING SPRINKLER SYSTEM
AND EQUIPMENT CAN BE TAKEN OUT OF SERVICE ONLY
DURING CONSTRUCTION PERIODS IN WHICH THE
SPRINKLER SYSTEM IS BEING MODIFIED AND THE
CONTRACTOR IS AT THE WORK SITE. PRIOR TO LEAVING
THE WORK SITE EACH DAY, THE CONTRACTOR SHALL
RESTORE THE SPRINKLER SYSTEM TO SERVICE. ALL
AREAS OUTSIDE OF THE PROJECT CONSTRUCTION AREA
SHALL HAVE THEIR EXISTING FIRE PROTECTION
SPRINKLER SYSTEM IN FULL SERVICE PRIOR TO LEAVING
THE WORK SITE EACH DAY OR A FIRE WATCH SHALL BE
ESTABLISHED AT THE CONTRACTOR'S EXPENSE UNTIL ALL
SYSTEM ARE RETURN TO FULL COVERAGE, OPERATION ,
ETC. COORDINATE ALL NECESSARY SYSTEM
SHUTDOWNS WITH VA PROPERTY MANAGER
2. REFER TO SPECIFICATION SECTION 21 13 13 "SPRINKLER
SYSTEM MODIFICATIONS" FOR ADDITIONAL DEMOLITION
WORK REQUIREMENTS.
Mark: Revision: Date:
416416
OIT
415415
ELEC
414414
EQ
477477
ELEC
433433
WAITING
438438
CHECK-IN
KIOSK
436436
W.C. ALC.
439439
CONF.
478478
HAC
481481
STOR. EQ.
490490
CRASH
CART
491491
W.C. ALC.
413413
OFC,
OPTH.
CHIEF
411411
OFC,
OPTH./OPT.
CHIEF
412412
OFC, OPT.
CHIEF
410B410B
EYE PROV.
410C410C
EYE PROV.
410A410A
EYE PROV.
408408
LOUNGE
409409
TLT,
STAFF
407B407B
CLERICAL
407A407A
CLERICAL
479479
RECEP.
489489
SUPP. EQ.
440440
WAITING
434434
RECEP.
435435
EYE WAIT
493493
FITTING
483483
EXAM,
OPTH.
482482
EXAM,
OPT.
485485
EXAM,
OPT.
484484
EXAM,
OPT.
405405
SOIL UTIL.
406406
PHOTO
401401
CLN SUP
487487
PRETEST
480480
PRETEST
431431
INST. CAL.
430430
HEARING
AID FAB.429429
LOUNGE
428428
OFC, AUD.
CHIEF
425425
CERUMEN
MGMT.
417417
EXAM
419419
EXAM
420420
EXAM
426426
TLT, PAT.
432432
REC.
421421
EXAM
TECH.
422B422B
AUDIO
EXAM
423B423B
AUDIO
EXAM
424B424B
AUDIO
EXAM
427427
STOR. EQ.
402402
VISUAL
FIELDS
488488
PRETEST
403403
US / OPT.
COH.
486486
DIL. WAIT
492492
PAT. ED.
404404
STOR. EQ. 400A400A
CORR
400F400F
CORR.
400G400G
CORR.
400A400A
CORR
443443
SHELL
400H400H
CORR.
400I400I
CORR.
422A422A
AUDIO
CONTROL
423A423A
AUDIO
CONTROL
424A424A
AUDIO
CONTROL
441441
TLT
442442
TLT
400J400J
CORR
1.
C
E
F
H
I.1
J.1
2 3 4N 5N 6N 7N 8 9 10 11 12 13 14 15 16 17 18
B
A.
B.1
A.1
H.
C.1
D
G
I.
I.2
J.2
(E)SPR
(E)SPR
(E)SPR
(E)SPR
FFF
(E)4" SPR UP
SERVES PENTHOUSE
6 6
6 6
BLDG 172-E
6 6 6
8 8
8 8 8
6 6
6 6 6
(E)1 1/2"
(E)3"
(E)1 1/4"
(E)2"
(E)1 1/4"
(E)1 1/4" (E)1 1/4"
(E)1 1/2"
(E)1 1/2"
(E)2"
1" 1"
1"1"
1"
(E)3"(E)3"
(E)3"
PHASE 1 PHASE 2
PHASE 1 PHASE 2
PHASE 1 PHASE 2
PHASE 1 PHASE 2
PHASE 1 PHASE 2
PHASE 1 PHASE 2
PHASE 1 PHASE 2
PHASE 1 PHASE 2
M A
T C
H L
IN
E M
A T
C H
L
IN
E M
A T
C H
L
IN
E M
A T
C H
L
IN
E M
A T
C H
L
IN
E M
A T
C H
L
IN
E
N. I. C.
FULLY
SPRINKLERED
1"
1"
1"
1"
1"
1"
1"
1"1"
1"
1"
1"
1"
1"
1"
1"
1"
1"
1"
1"
1"
1"
1"
1"
1"
1"
1"
1"
1"
1"
1"
1"
1"
1"
1"
1"
1"
1"
1"1"
1"
1"
1"
1"
1"
1"
1"
1"
1"
1"
1"
1"1"
1"
1"
2 1/2"
1"
1"
1"
1"
1"
1"
1"
1"
1"
1"
1"
1" 1"
1" 1"
1"
1" 1"
1"
1"
1"
1"1"
1"
1"
1"
1"
1"
1"
1"
1"
C
E
F
5N 6N 7N
B
6.1
B.1
D
S P
R
NEW UPRIGHT
SPRINKLER (TYP.)
2½" SPR FROM
BELOW
1"
(TYP.)
1¼"
(TYP.)
1"
(TYP.)
1½"
(TYP.)
2"
PROJECT NUMBER:
CHECKED BY:
DESIGNED BY:
1650 WATERMARK DRIVE
COLUMBUS, OHIO 43215
SUITE 200
DRAWN BY:
0 4'-0" 8'-0" 16'-0"
PLAN
NORTH
PHASE 1
KEY PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
Phase
ARCHITECT OF RECORD STAMPENGINEERS OF RECORD
321 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
A/E:
2016-0205
C :\L
O C
A L
R E
V
IT
\1 6-
-V
A M ar io n B ld g
4 t h
F lr
R en o M
E C
H J
E S
S E
.r vt
/1
/2
:2
:4
P
M
FX-204.1
610-17-101
03/19/2018 W. Phil Stafa C. Jesse Whitehead
Project Director
1700 E. 38TH STREET MARION, IN 46953
VISN 11 MARION B-138: 4TH FLOOR
CONSTRUCTION
SPRINKLERED
HDR ARCHITECTURE, INC.
600 HENNEPIN AVE SUITE 260
MINNEAPOLIS, MN 55403
612.524.6000
TERRY LITTELL SR., RA,
LEED AP
KORDA, INC.
1650 WATERMARK DRIVE, SUITE 200
COLUMBUS, OH 43215
614.487.1650
STAN KMONK
C. Jesse Whitehead
Steve Glinsky
W. Phil Stafa
METRIC ENVIRONMENTAL
6971 HILLSDALE COURT
INDIANAPOLIS, IN 46250
FOURTH FLOOR & PENTHOUSE FIRE
PROTECTION NEW WORK PH. 1
ISSUED FOR
CONSTRUCTION
N 0' 4' 8'2'1'
SCALE: 1/8" = 1'-0"E1
FOURTH FLOOR PHASE 1
NEW WORK PLAN
FIRE PROTECTION GENERAL NOTES
1. THIS AREA OF THE BUILDING ON THIS FLOOR WILL BE FULLY
SPRINKLERED AT THE COMPLETION OF CONSTRUCTION.
2. SPRINKLER SYSTEM DESIGN, INSTALLATION AND TESTING
SHALL MEET THE REQUIREMENTS OF NFPA 13 LATEST
EDITION AND ALL STATE AND LOCAL CODES.
3. REFER TO SPECIFICATION SECTION 21 13 13 WET PIPE
SPRINKLER SYSTEMS FOR SPRINKLER HAZARD
CLASSIFICATIONS.
4. RUN NEW PIPING WITHIN JOIST SPACE. COORDINATE PIPING
AND EQUIPMENT LOCATIONS WITH ALL OTHER TRADES.
5. REFER TO ARCHITECTURAL DRAWINGS FOR REFLECTED
CEILING PLANS AND CONSTRUCTION. COORDINATE
SPRINKLER LOCATIONS WITH ALL CEILING DEVICES
(LIGHTING, DIFFUSERS, ETC.).
6. SPRINKLERS IN ALL AREAS WITH FINISHED CEILINGS SHALL
BE QUICK RESPONSE CHROME PLATED RECESSED
PENDANT TYPE. SPRINKLERS IN AREAS WITHOUT CEILINGS
SHALL BE QUICK RESPONSE UPRIGHT TYPE WITH BRASS
FINISH AND GUARD.
7. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR ALL
CUTTING, CORE DRILLING AND PATCHING REQUIRED FOR HIS
WORK. PATCH TO MATCH SURROUNDING CONDITIONS WITH
MATERIALS AND WORKMANSHIP ACCEPTABLE TO THE VA
PROJECT MANAGER.
8. THIS CONTRACTOR SHALL COMPLY WITH ALL OSHA
STANDARDS.
9. PROVIDE DRAIN VALVES AND PIPING TO ALLOW COMPLETE
DRAINAGE OF FIRE PROTECTION SYSTEM.
10. THE CONTRACTOR SHALL ENSURE THAT THE INTEGRITY OF
ALL CONCRETE SOUND ISOLATION ASSEMBLIES OR
CONSTRUCTIONS CONFORMS TO THE DRAWINGS AND
SPECIFICATIONS. ALL PENETRATIONS OF SUCH
ASSEMBLIES SHALL BE INSTALLED IN A MANNER THAT
RESULTS IN COMPLETED AIR TIGHTNESS THROUGH THE
STRUCTURE. PENETRATIONS THROUGH FIRE - RATED
PARTITIONS SHALL BE SEALED IN ACCORDANCE WITH ASTM
E-814 AND THE CORRESPONDING UL REQUIREMENTS.
SHOULD CONDITIONS OCCUR WHERE PENETRATIONS OF
SOUND ISOLATION ASSEMBLIES (OR DESCRIBED IN THE
SPECIFICATIONS), THE CONTRACTOR SHALL IMMEDIATELY
REQUEST CLARIFICATION REGARDING THE METHOD
NECESSARY TO INSTALL SUCH ITEMS, THE FOLLOWING
SHALL TO ALL PENETRATIONS OF PARTITIONS IN SOUND
CRITICAL SPACES.
11. PENETRATIONS OF ACOUSTICALLY SENSITIVE MASONRY
AND CONCRETE CONSTRUCTIONS.
A. PIPE/CONDUIT DIAMETER = 1" OR LARGER:
INSTALL A METAL SLEEVE AT THE PENETRATION
SIZE THE SLEEVE TO ALLOW FOR 1/2" THICK PIPE
INSULATION AND NORMAL PIPE CLEARANCES.
LINE THE SLEEVE WITH 1/2" THICK ELASTOMERIC
CLOSED CELL NEOPRENE PIPE INSULATION (AP
ARMAFLEX SS SELF-SEAL PIPE INSULATION
FROM ARMSTRONG, OR APPROVED EQUAL).
INSTALL PIPE/CONDUIT THROUGH LINED SLEEVE
AND SEAL AIRTIGHT WITH ACOUSTICAL SEALANT
OR FIRE - RATED ACOUSTICAL SEALANT (3M
CORPORATION CP 25 OR EQUAL) IF PARTITION IS
FIRE - RATED DO NOT RIGIDLY SECURE
PIPE/CONDUIT TO WALL WITH ANGLES.
B. PIPE/CONDUIT DIAMETER <1":WRAP
PIPE/CONDUIT WITH 1/2" THICK ELASTOMERIC
CLOSED CELL NEOPRENE PIPE INSULATION (AP
ARMAFLEX SS SELF - SEAL PIPE INSULATION
FROM ARMSTRONG, OR APPROVED EQUAL).
EXTEND WRAPPING MINIMUM OF 2" BEYOND THE
WIDTH OF THE PARTITION ON EITHER SIDE.
GROUT TIGHTLY. TO THE NEOPRENE PIPE
INSULATION ON THE PIPE/CONDUIT. TRIM
NEOPRENE PIPE INSULATION TO THE WIDTH OF
THE PARTITION, AND SEAL AIRTIGHT WITH
ACOUSTICAL SEALANT OR FIRE - RATED
ACOUSTICAL SEALANT (3M CORPORATION
CP 25 OR EQUAL) IF PARTITION IS FIRE - RATED.
12. EXTENT OF WORK DESCRIBED WAS PROVIDED FOR
ESTIMATING AND PRICING. CONTRACTOR SHALL VERIFY
LATEST FLOW TEST INFORMATION (ON RECORD) BEFORE
SUBMITTING FINAL HYDRAULIC CALCULATIONS AND
SPRINKLER PIPING SHOP DRAWINGS.
13. SPRINKLERS SHALL BE CENTERED IN CEILING TILES.
14. WHERE AREAS ARE NOT PHYSICALLY SEPARATED BY A
DRAFT CURTAIN, BARRIER OR PARTITION CAPABLE OF
DELAYING HEAT FROM A FIRE IN ONE AREA FROM FUSING
SPRINKLERS IN THE ADJACENT AREA, THE REQUIRED
SPRINKLER PROTECTION FOR THE MORE DEMANDING DESIGN
BASIS SHALL EXTEND 15 FT. BEYOND ITS PERIMETER.
15. ALL AREAS OF THIS FLOOR SHALL BE CLASSIFIED AS LIGHT
HAZARD OCCUPANCY UNLESS NOTED OTHERWISE.
16. FINAL SPRINKLER LOCATIONS AND BRANCH PIPING
CONFIGURATION SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR.
17. VERIFY LOCATIONS OF EXISTING SPRINKLERS TO REMAIN,
SPRINKLER MAIN, AND BRANCH PIPING PRIOR TO FINAL
SYSTEM LAYOUT.
CODED NOTES:
1. ONE (1) HOUR RATED SMOKE BARRIER.
2. ONE (1) HOUR RATED FIRE PARTITION.
3. ORDINARY HAZARD GROUP 1 OCCUPANCY.
4. ORDINARY HAZARD GROUP 2 OCCUPANCY.
5. 2½" SPR UP TO SERVE NEW PENTHOUSE.
6. NEW SPRINKLER.
7. TWO (2) HOUR FIRE RATED WALL.
8. EXISTING SPRINKLER.
9. EXISTING SPRINKLER MAIN TO REMAIN.
10. PROVIDE PRE-FABRICATED FIRE-RATED SLEEVE AND
FIRE-RATED ELASTOMERIC SEAL AT ROOF PENETRATION.
N 0' 4' 8'2'1'
SCALE: 1/8" = 1'-0"F1
PENTHOUSE FLOOR PLAN PHASE 1
NEW WORK PLAN
NOTE:
ALTERNATE BID REMOVES PENTHOUSE AND NO FIRE
PROTECTION IS REQUIRED.
Mark: Revision: Date:
477477
ELEC
476476
OIT
459A459A
LAB, GEN.
460A460A
DENTAL
TECH.
460B460B
DENTAL
TECH.
460C460C
DENTAL
TECH.
464464
EQ. MECH.
445445
OFFICE
455455
STOR.,
DENTAL
SUPP.
459D459D
LAB, SHIP/
REC.
453453
SOIL UTIL.
452452
ORAL
SURG.
450450
ORAL
SURG.
448448
CLEAN
465465
HAC
466466
SUB-WAIT
447447
STOR.
STER.
INST.
446A446A
CT
CONTROL
456C456C
WORK,
STF.
DENTIST
458458
OFFICE,
DENTAL
CHIEF
463463
W-LOCKER
462462
M-LOCKER
475475
RECEP. 474474
DTR
473473
DTR
472472
DTR
467467
DTR
471471
DTR
469469
DTR
468468
DTR,
SPECIAL
470470
S/WAITING
444444
OFFICE
461461
LOUNGE
446B446B
CT, CONE
BEAM
400B400B
CORR.
400C400C
CORR.
400E400E
CORR.
451451
SCRUB
443443
SHELL
456B456B
WORK,
STF.
DENTIST
456A456A
WORK,
STF.
DENTIST
400D400D
CORR.
457457
TLT,
STAFF475B475B
TLT, PAT.
475C475C
SUB-WAIT
C
E
F
H
I.1
J.1
18 19 20 21 22 23.2 24N
25.5
26N 27 28 29
B
A.
24.123.522.5
B.1
A.1
H.
C.1
D
G
I.
I.2
J.2
(E)SPR
22.7
6 6
6 6
6 6
6 6
(E)3"(E)3"
(E)1 1/4"
(E)3"
(E)1 1/4"
(E)3"
PHASE 1 PHASE 2
PHASE 1 PHASE 2
PHASE 1 PHASE 2
PHASE 1 PHASE 2
PHASE 1 PHASE 2
PHASE 1 PHASE 2
PHASE 1 PHASE 2
PHASE 1 PHASE 2
M A
T C
H L
IN
E M
A T
C H
L
IN
E M
A T
C H
L
IN
E M
A T
C H
L
IN
E M
A T
C H
L
IN
E M
A T
C H
L
IN
E
1" 1"
1"
1"
1"
1"
1" 1"
1"
1"
1"
1"
1"
1"
1" 1"
1"
1"
1" 1"1"
2 1/2"
1"
1"
1"
1"
1"
1"
1"
1"
1"
(E)1" 1"
1"
1"
1"
1"
1"
1"
1"
1"
1"
1"
1"
1"
1"
1"
1"
1"
1"
1"
1"
1"
1"
1"
1" 1"
1"
1"1"
C
E
F
23.2
B
24.123.5
B.1
D
22.7
S P
R S
P R
2½" SPR FROM
BELOW
UPRIGHT
SPRINKLER (TYP.)
1¼"
(TYP.)
1"
(TYP.)
1"
(TYP.)
1 1/2"
2"
PROJECT NUMBER:
CHECKED BY:
DESIGNED BY:
1650 WATERMARK DRIVE
COLUMBUS, OHIO 43215
SUITE 200
DRAWN BY:
0 4'-0" 8'-0" 16'-0"
PLAN
NORTH
PHASE 2
KEY PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
Phase
ARCHITECT OF RECORD STAMPENGINEERS OF RECORD
321 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
A/E:
2016-0205
C :\L
O C
A L
R E
V
IT
\1 6-
-V
A M ar io n B ld g
4 t h
F lr
R en o M
E C
H J
E S
S E
.r vt
/1
/2
:2
:3
P
M
FX-204.2
610-17-101
03/19/2018 W. Phil Stafa C. Jesse Whitehead
Project Director
1700 E. 38TH STREET MARION, IN 46953
VISN 11 MARION B-138: 4TH FLOOR
CONSTRUCTION
SPRINKLERED
HDR ARCHITECTURE, INC.
600 HENNEPIN AVE SUITE 260
MINNEAPOLIS, MN 55403
612.524.6000
TERRY LITTELL SR., RA,
LEED AP
KORDA, INC.
1650 WATERMARK DRIVE, SUITE 200
COLUMBUS, OH 43215
614.487.1650
STAN KMONK
C. Jesse Whitehead
Steve Glinsky
W. Phil Stafa
METRIC ENVIRONMENTAL
6971 HILLSDALE COURT
INDIANAPOLIS, IN 46250
FOURTH FLOOR & PENTHOUSE FIRE
PROTECTION NEW WORK PH 2
ISSUED FOR
CONSTRUCTION
N 0' 4' 8'2'1'
SCALE: 1/8" = 1'-0"E1
FOURTH FLOOR PHASE 2
NEW WORK PLAN
N 0' 4' 8'2'1'
SCALE: 1/8" = 1'-0"F1
PENTHOUSE FLOOR PLAN PHASE 2
NEW WORK PLAN
FIRE PROTECTION GENERAL NOTES
1. THIS AREA OF THE BUILDING ON THIS FLOOR WILL BE FULLY
SPRINKLERED AT THE COMPLETION OF CONSTRUCTION.
2. SPRINKLER SYSTEM DESIGN, INSTALLATION AND TESTING
SHALL MEET THE REQUIREMENTS OF NFPA 13 LATEST
EDITION AND ALL STATE AND LOCAL CODES.
3. REFER TO SPECIFICATION SECTION 21 13 13 WET PIPE
SPRINKLER SYSTEMS FOR SPRINKLER HAZARD
CLASSIFICATIONS.
4. RUN NEW PIPING WITHIN JOIST SPACE. COORDINATE PIPING
AND EQUIPMENT LOCATIONS WITH ALL OTHER TRADES.
5. REFER TO ARCHITECTURAL DRAWINGS FOR REFLECTED
CEILING PLANS AND CONSTRUCTION. COORDINATE
SPRINKLER LOCATIONS WITH ALL CEILING DEVICES
(LIGHTING, DIFFUSERS, ETC.).
6. SPRINKLERS IN ALL AREAS WITH FINISHED CEILINGS SHALL
BE QUICK RESPONSE CHROME PLATED RECESSED
PENDANT TYPE. SPRINKLERS IN AREAS WITHOUT CEILINGS
SHALL BE QUICK RESPONSE UPRIGHT TYPE WITH BRASS
FINISH AND GUARD.
7. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR ALL
CUTTING, CORE DRILLING AND PATCHING REQUIRED FOR HIS
WORK. PATCH TO MATCH SURROUNDING CONDITIONS WITH
MATERIALS AND WORKMANSHIP ACCEPTABLE TO THE VA
ROJECT MANAGER.
8. THIS CONTRACTOR SHALL COMPLY WITH ALL OSHA
STANDARDS.
9. PROVIDE DRAIN VALVES AND PIPING TO ALLOW COMPLETE
DRAINAGE OF FIRE PROTECTION SYSTEM.
10. THE CONTRACTOR SHALL ENSURE THAT THE INTEGRITY OF
ALL CONCRETE SOUND ISOLATION ASSEMBLIES OR
CONSTRUCTIONS CONFORMS TO THE DRAWINGS AND
SPECIFICATIONS. ALL PENETRATIONS OF SUCH
ASSEMBLIES SHALL BE INSTALLED IN A MANNER THAT
RESULTS IN COMPLETED AIR TIGHTNESS THROUGH THE
STRUCTURE. PENETRATIONS THROUGH FIRE - RATED
PARTITIONS SHALL BE SEALED IN ACCORDANCE WITH ASTM
E-814 AND THE CORRESPONDING UL REQUIREMENTS.
SHOULD CONDITIONS OCCUR WHERE PENETRATIONS OF
SOUND ISOLATION ASSEMBLIES (OR DESCRIBED IN THE
SPECIFICATIONS), THE CONTRACTOR SHALL IMMEDIATELY
REQUEST CLARIFICATION REGARDING THE METHOD
NECESSARY TO INSTALL SUCH ITEMS, THE FOLLOWING
SHALL TO ALL PENETRATIONS OF PARTITIONS IN SOUND
CRITICAL SPACES.
11. PENETRATIONS OF ACOUSTICALLY SENSITIVE MASONRY
AND CONCRETE CONSTRUCTIONS.
A. PIPE/CONDUIT DIAMETER = 1" OR LARGER:
INSTALL A METAL SLEEVE AT THE PENETRATION
SIZE THE SLEEVE TO ALLOW FOR 1/2" THICK PIPE
INSULATION AND NORMAL PIPE CLEARANCES.
LINE THE SLEEVE WITH 1/2" THICK ELASTOMERIC
CLOSED CELL NEOPRENE PIPE INSULATION (AP
ARMAFLEX SS SELF-SEAL PIPE INSULATION
FROM ARMSTRONG, OR APPROVED EQUAL).
INSTALL PIPE/CONDUIT THROUGH LINED SLEEVE
AND SEAL AIRTIGHT WITH ACOUSTICAL SEALANT
OR FIRE - RATED ACOUSTICAL SEALANT (3M
CORPORATION CP 25 OR EQUAL) IF PARTITION IS
FIRE - RATED DO NOT RIGIDLY SECURE
PIPE/CONDUIT TO WALL WITH ANGLES.
B. PIPE/CONDUIT DIAMETER <1":WRAP
PIPE/CONDUIT WITH 1/2" THICK ELASTOMERIC
CLOSED CELL NEOPRENE PIPE INSULATION (AP
ARMAFLEX SS SELF - SEAL PIPE INSULATION
FROM ARMSTRONG, OR APPROVED EQUAL).
EXTEND WRAPPING MINIMUM OF 2" BEYOND THE
WIDTH OF THE PARTITION ON EITHER SIDE.
GROUT TIGHTLY. TO THE NEOPRENE PIPE
INSULATION ON THE PIPE/CONDUIT. TRIM
NEOPRENE PIPE INSULATION TO THE WIDTH OF
THE PARTITION, AND SEAL AIRTIGHT WITH
ACOUSTICAL SEALANT OR FIRE - RATED
ACOUSTICAL SEALANT (3M CORPORATION
CP 25 OR EQUAL) IF PARTITION IS FIRE - RATED.
12. EXTENT OF WORK DESCRIBED WAS PROVIDED FOR
ESTIMATING AND PRICING. CONTRACTOR SHALL VERIFY
LATEST FLOW TEST INFORMATION (ON RECORD) BEFORE
SUBMITTING FINAL HYDRAULIC CALCULATIONS AND
SPRINKLER PIPING SHOP DRAWINGS.
13. SPRINKLERS SHALL BE CENTERED IN CEILING TILES.
14. WHERE AREAS ARE NOT PHYSICALLY SEPARATED BY A
DRAFT CURTAIN, BARRIER OR PARTITION CAPABLE OF
DELAYING HEAT FROM A FIRE IN ONE AREA FROM FUSING
SPRINKLERS IN THE ADJACENT AREA, THE REQUIRED
SPRINKLER PROTECTION FOR THE MORE DEMANDING DESIGN
BASIS SHALL EXTEND 15 FT. BEYOND ITS PERIMETER.
15. ALL AREAS OF THIS FLOOR SHALL BE CLASSIFIED AS LIGHT
HAZARD OCCUPANCY UNLESS NOTED OTHERWISE.
16. FINAL SPRINKLER LOCATIONS AND BRANCH PIPING
CONFIGURATION SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR.
17. VERIFY LOCATIONS OF EXISTING SPRINKLERS TO REMAIN,
SPRINKLER MAIN, AND BRANCH PIPING PRIOR TO FINAL
SYSTEM LAYOUT.
CODED NOTES:
1. ONE (1) HOUR RATED SMOKE BARRIER.
2. ONE (1) HOUR RATED FIRE PARTITION.
3. ORDINARY HAZARD GROUP 1 OCCUPANCY.
4. ORDINARY HAZARD GROUP 2 OCCUPANCY.
5. 2½" SPR UP TO SERVE NEW PENTHOUSE.
6. NEW SPRINKLER.
7. TWO (2) HOUR FIRE RATED WALL.
8. EXISTING SPRINKLER.
9. EXISTING SPRINKLER MAIN TO REMAIN.
10. PROVIDE PRE-FABRICATED FIRE RATED SLEEVE AND
FIRE-RATED ELASTOMERIC SEAL AT ROOF PENETRATION.
11. PHASE 1 STOPS AT THIS POINT.
NOTE:
ALTERNATE BID REMOVES PENTHOUSE AND NO FIRE
PROTECTION IS REQUIRED.
Mark: Revision: Date:
PS
DC
DC
M
T
A1
DETAIL
WALL PENETRATIONS N.T.S.
A2
DETAIL
SPRINKLER LOCATIONS IN VARIOUS CEILING
TILE TYPES
N.T.S.
A3
DETAIL
RISER DIAGRAM
SHOWN FOR REFERENCE ONLY
N.T.S.4
(E
D
(E
S P
R
PH
(E )S
P R
(E )S
PR
(E )S
PR
(E )S
PR
PIPE THRU 3 HR. MASONRY WALL
PIPE THRU 2 HR. GYP. BD. WALL
EXISTING SPRINKLER
EXISTING SPRINKLER
SPRINKLER HEAD WITH DEFLECTOR
EXTENDED THROW SIDEWALL
NON-FREEZE SIDEWALL
NON-FREEZE PENDANT
INSPECTOR'S TEST CONNECTION
FIRE DEPARTMENT VALVE
DRY PIPE ALARM VALVE
ELECTRICALLY SUPERVISED VALVE
WET PIPE ALARM VALVE
PRESSURE REDUCING VALVE
WALL INDICATOR VALVE
SPRINKLER HEADS
FIRE PROTECTION SYMBOLS LIST
NOTE: ALL SYMBOLS NOT NECESSARILY USED
FIRE HOSE/EXTINGUISHER CABINET
CONNECT TO EXISTINGWITH BYPASS METER
DETECTOR CHECK VALVE
DETECTOR CHECK VALVE
FIRE RATED OR WATER TIGHT
SIGHT GLASS
ROOF HYDRANT
TEST CONNECTION
WALL TYPE SIAMESE CONNECTION
ELECTRIC ALARM BELL
WATER MOTOR GONG
FIRE VALVE CABINET
FIRE HOSE RACK
PIPE SLEEVE
UNION
GAUGE
TO BE REMOVED
TO REMAIN
SIDEWALL
RECESSED
FLUSH/CONCEALED
PENDANT
UPRIGHT
FIRE HOSE CABINET
FIRE EXTINGUISHER CABINET
FIRE EXTINGUISHER
EXISTING TO BE REMOVED
EXISTING TO REMAIN
COMB. SRINKLER & STANDPIPE
SPRINKLER PIPE
COMB. FIRE & WATER SERVICE
STANDPIPE
DRY PIPE
DELUGE
DRAIN
ANTIFREEZE
FIRE MAIN
GLOBE VALVESP
SPECIALTIES
DP
(E)
(R)
DL
D
S
SPR
PRESSURE SWITCH
STRAINER
FLOOR STAND VALVE
FLOW SWITCH
FEC
DELUGE VALVE
PIPING
AF
FW
F
GATE VALVE
CHECK VALVE
R
E
VALVES
N
N
OC
FOR COORDINATION OR REFERENCE
DENOTES ITEM PROVIDED BY
ANOTHER CONTRACTOR, SHOWN
FE
FHC
FHEC
FHR
FVC
MISCELLANEOUS
VALVE IN DROP
VALVE IN RISE
GENERAL NOTES (APPLY TO ALL SHEETS)
VARIOUS CEILING TILE CONFIGURATIONS. COORDINATE WITH
ARCHITECTURAL FINISH SCHEDULES AND DETAILS.
NOTE: NO. 2 TYPICAL FOR ANY STYLE OF CEILING TILE.
CEILING PLAN FOR COORDINATION OF THE SPRINKLER LOCATIONS.
SEE SKETCHES ABOVE FOR TYPICAL SPRINKLER LOCATION FOR
THE FIRE PROTECTION CONTRACTOR SHALL REFER TO THE REFLECTED
1.
2.
CENTER IN
PARTIAL TILE
IN TILE
CENTER
CENTER IN ONE
12 X 12 SECTION
CENTER IN 24 X 24
OR 24 X 48 SECTION
CENTER IN
24 X 24 SECTION
CENTER
IN TILE
DIFF., LIGHT,
GRILLE, ETC.
PIPE SLEEVE
FIRE BARRIER CAULK.
THICKNESS BASED ON
MANUFACTURERS
RECOMMENDATIONS
AND PRODUCT LISTING
PIPE
BACKER ROD OR MINERAL
WOOL DAMMING MATERIAL
FIRE BARRIER CAULK.
THICKNESS BASED ON
MANUFACTURERS
RECOMMENDATIONS
AND PRODUCT LISTING
PIPE SLEEVE
BACKER ROD OR MINERAL
WOOL DAMMING MATERIAL
PIPE
(E) FLOOR
PENETRATION
(E)2"
(E)2½" FEMALE x MALE
HOSE VALVE (TYP.)
(E)6"
(E) DRAIN VALVE (TYP.)
(E)6"
(E) 4" SPR TO
SERVE PENTHOUSE
FIRE SUPPRESSION
(E)4"
(E)FS
(E)3"
TOP OF RISER
(E) PRESSURE GAUGE
(E)3"
(E)3"
(E)3"
SERVES WEST ZONE
FIRE SUPPRESSION
SYSTEM
SERVES EAST ZONE
FIRE SUPPRESSION
SYSTEM
SERVES CENTRAL ZONE
FIRE SUPPRESSION
SYSTEM
(E) WALL PENETRATION (TYP.)
(E) ZONE VALVE
(E)FS
F
PROJECT NUMBER:
CHECKED BY:
DESIGNED BY:
1650 WATERMARK DRIVE
COLUMBUS, OHIO 43215
SUITE 200
DRAWN BY:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
Phase
ARCHITECT OF RECORD STAMPENGINEERS OF RECORD
321 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
A/E:
2016-0205
C :\L
O C
A L
R E
V
IT
\1 6-
-V
A M ar io n B ld g
4 t h
F lr
R en o M
E C
H J
E S
S E
.r vt
/1
/2
:2
:0
P
M
FX-501
610-17-101
03/19/2018 W. Phil Stafa C. Jesse Whitehead
Project Director
1700 E. 38TH STREET MARION, IN 46953
VISN 11 MARION B-138: 4TH FLOOR
CONSTRUCTION
SPRINKLERED
HDR ARCHITECTURE, INC.
600 HENNEPIN AVE SUITE 260
MINNEAPOLIS, MN 55403
612.524.6000
TERRY LITTELL SR., RA,
LEED AP
KORDA, INC.
1650 WATERMARK DRIVE, SUITE 200
COLUMBUS, OH 43215
614.487.1650
STAN KMONK
C. Jesse Whitehead
Steve Glinsky
W. Phil Stafa
METRIC ENVIRONMENTAL
6971 HILLSDALE COURT
INDIANAPOLIS, IN 46250
FIRE PROTECTION DETAILS &
SYMBOLS LIST
ISSUED FOR
CONSTRUCTION
Mark: Revision: Date:
317A317B
317C 317D
319A
319B
327A
302A 303304
313 312
303A
C305 C302 C302
C
C
C
S302
UP
DN
UP
DN
TRASHTRASH
333A
335A
335B
369370
372A
372B
372C
372D
372E
BUILDING 172
C307
C301
C300
334A
S301
333B
1.
C
E
F
H
I.1
J.1
2 3 4N 5N 6N 7N 8 9 10 11 12 13 14 15 16 17 18
B
A.
4.5
5.1 6.1 7.1
B.1
A.1
H.
C.1
D
G
I.
I.2
J.2
(E)3" VENT UP
& (E)4" SAN DN
(R)3"V
(E)1½" VENT UP
& (E) 1½" SAN DN
(E)3" VENT UP
& (E)4" SAN DN
(E)3" VENT UP
& (E)4" SAN DN
(R)3"SAN
(R)3"SAN
(R)3"SAN
(R)3"
(R)2"
(R)4" SAN UP
& (E)4" SAN DN
(R)3"SAN
(R)3"
(R)2"
(E)2" VENT UP
& (E)3" SAN DN
(R)1 1/2"SAN
(E)4" SAN UP
& (E)4" SAN DN
(R)3"SAN
(R)1 1/2"
(R)1 1/2"
(R)2"
(R)3"SAN
(R)2" (R)3"(R)1 1/2"
(R)1 1/2"
(R)1 1/2"
(R)1 1/2"
(R)3"
(R)1 1/2"
(R)3"
(R)1 1/2"SAN
(R)3"SAN
(R)3" (R)3"
(R)1 1/2"
(E)4" VENT
(R)1 1/2"V(R)1 1/2"V
PHASE 1 PHASE 2
PHASE 1 PHASE 2
PHASE 1 PHASE 2
PHASE 1 PHASE 2
PHASE 1 PHASE 2
PHASE 1 PHASE 2
M A
T C
H L
IN
E M
A T
C H
L
IN
E M
A T
C H
L
IN
E M
A T
C H
L
IN
E M
A T
C H
L
IN
E M
A T
C H
L
IN
E
(E)1½" V
(E)1½"
VENT UP
5 9
(E)3/4"DHW
(E)3/4"DCW
(R)1/2"DCW
(R)1/2"DHW
(E)1 1/2"V
(R)1/2"DHW
(R)1/2"DCW
(E)1 1/2"V
(E)4"V
(R)3"SAN
(E)V (E)V (E)V
EXISTING WATER RISERS
(R)3"V
PROJECT NUMBER:
CHECKED BY:
DESIGNED BY:
1650 WATERMARK DRIVE
COLUMBUS, OHIO 43215
SUITE 200
DRAWN BY:
0 4'-0" 8'-0" 16'-0"
PLAN
NORTH
PHASE 1
KEY PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
Phase
ARCHITECT OF RECORD STAMPENGINEERS OF RECORD
321 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
A/E:
2016-0205
C :\L
O C
A L
R E
V
IT
\1 6-
-V
A M ar io n B ld g
4 t h
F lr
R en o M
E C
H J
E S
S E
.r vt
/1
/2
:2
:3
P
M
PD-103.1
610-17-101
03/19/2018 W. Phil Stafa C. Jesse Whitehead
Project Director
1700 E. 38TH STREET MARION, IN 46953
VISN 11 MARION B-138: 4TH FLOOR
CONSTRUCTION
SPRINKLERED
HDR ARCHITECTURE, INC.
600 HENNEPIN AVE SUITE 260
MINNEAPOLIS, MN 55403
612.524.6000
TERRY LITTELL SR., RA,
LEED AP
KORDA, INC.
1650 WATERMARK DRIVE, SUITE 200
COLUMBUS, OH 43215
614.487.1650
STAN KMONK
C. Jesse Whitehead
Steve Glinsky
W. Phil Stafa
METRIC ENVIRONMENTAL
6971 HILLSDALE COURT
INDIANAPOLIS, IN 46250
THIRD FLOOR PLUMBING
DEMOLITION PLAN PHASE 1
ISSUED FOR
CONSTRUCTION
N 0' 4' 8'2'1'
SCALE: 1/8" = 1'-0"E1
THIRD FLOOR PHASE 1
DEMOLITION PLAN
PLUMBING DEMOLITION GENERAL NOTES:
1. THE ENTIRE PLUMBING SYSTEM SHALL CONFORM TO THE INDIANA
PLUMBING CODE ALONG WITH ALL VA STANDARDS.
2. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS PRIOR TO
CUTTING EXISTING WALLS AND FLOOR SLABS. IF EXISTING TO REMAIN
SERVICES ARE CUT/DAMAGED, IT IS THE CONTRACTORS
RESPONSIBILITY TO PATCH AND REPAIR THE SERVICE AT NO
ADDITIONAL COST TO THE OWNER.
3. CONTRACTOR IS TO REMOVE ALL EXISTING PLUMBING SYSTEMS MADE
OBSOLETE BY NEW CONSTRUCTION: ALL WATER, WASTE AND VENT
PIPING, FIXTURES, TRIM, AND ACCESSORIES. REFERENCE THE
ARCHITECTURAL DEMOLITION AND DOCUMENTS AND FIELD VERIFY ALL
EXISTING CONDITIONS PRIOR TO BID AND INCLUDE ALL COSTS IN BID.
4. ALL EXISTING SANITARY PIPING TO REMAIN IS TO BE CLEANED AND
RODDED TO ENSURE PROPER FLOW. PIPING SHOWN AS DASHED IS TO
BE REMOVED COMPLETE INCLUDING ALL HANGERS AND SUPPORTS.
5. ALL OPENINGS SHALL BE SEALED AFTER REMOVAL OF PLUMBING
FIXTURES. EQUIPMENT AND PIPING IN ROOF, WALLS, AND FLOORS IN AN
IMPROVED MANNER AND IN ACCORDANCE WITH PLANS AND
SPECIFICATIONS. PATCH ALL FLOORS, WALLS AND CEILINGS AS
REQUIRED TO MEET FIRE RATING AND TO RECEIVE NEW FINISHES.
6. REFERENCE THE ARCHITECTURAL SPECIFICATIONS AND DRAWINGS
FOR THE WALL CONSTRUCTION TYPES, FIRE RATING INFORMATION,
ASBESTOS ABATEMENT AND ICRA REQUIREMENTS.
7. ALL EXISTING PIPING SHOWN IS FROM EXISTING DRAWINGS AND FIELD
OBSERVATIONS. CONTRACTOR SHALL VERIFY ALL EXISTING
CONDITIONS PRIOR TO BEGINNING WORK. IF CONDITIONS ARE
DIFFERENT THAN INDICATED, CONTACT COR BEFORE CONTINUING
WORK.
8. ALL DEMOLISHED PIPING AND EQUIPMENT SHALL BECOME PROPERTY
OF THE CONTRACTOR AND SHALL BE DISPOSED OF ACCORDANCE WITH
ALL VAMC REQUIREMENTS AND ENVIRONMENTAL REGULATIONS.
9. ALL WORK ACTIVITIES REQUIRED ON THE 3RD FLOOR SHALL BE
PERFORMED BETWEEN 4:30 PM & 6:00 AM OR ON WEEKENDS. ALL
CEILING TILES REMOVED DURING WORK SHALL BE REINSTALLED PRIOR
TO CONTRACTOR LEAVING THE SITE.
10. ALL EXISTING WATER, WASTE AND VENT PIPING, FITTINGS, HANGERS,
SUPPORTS SHALL BE REMOVED COMPLETELY. CUT & PATCH WALLS,
FLOORS, CEILING TO MATCH EXISTING CONSTRUCTION. HOLES IN FLOOR
SLABS SHALL BE FIRE CAULKED/STOPPED PER RATING.
CODED NOTES:
1. 2½" DCW, 1½" DHW & 1" DHWR FROM BELOW ARE CAPPED OFF 12"
ABOVE FINISHED FLOOR.
2. NOT USED.
3. PLUG SANITARY ABOVE FLOOR.
4. REMOVE SAN TO THIS LOCATION.
5. REMOVE VENT STACK TO A POINT BELOW FOURTH FLOOR AND
PREPARE FOR NEW CONNECTION.
6. PLUG HORIZONTAL CONNECTIONS AT RISER.
7. REMOVE WATER SUPPLIES AT FLOOR AND CAP TO ELIMINATE DEAD
LEGS. PLUG / CAP SAN AT FLOOR.
8. (E)3" SANITARY DOWN. (E)3" VENT UP TO JUST BELOW FOURTH FLOOR.
CUT AND PREPARE FOR REUSE.
9. CAP WATER SUPPLIES ABOVE THIRD FLOOR FIXTURE, REPAIR WALL TO
MATCH EXISTING WALL SURFACE.
10. (E)4" SAN DOWN, 4" VENT UP.
11. (E)1½" VENT TO BE RELOCATED.
12. REMOVE 1½" SAN ABOVE CEILING THAT SERVED DEMOLISHED FIXTURE
ON FOURTH FLOOR TO POINT WHERE IT WILL SERVE AS VENT FOR
THIRD FLOOR FIXTURE.
13. REMOVE WATER SUPPLIES AT FLOOR AND CAP. REMOVE SAN/VENT AT
FLOOR AND PLUG. REPAIR WALL TO MATCH SURROUNDING WALL
SURFACES.
14. REMOVE SAN DOWN TO FIXTURE SUPPORT AND PREPARE FOR NEW
CONNECTION.
LEGEND
(R) EXISTING TO BE REMOVED
(E) EXISTING TO REMAIN
Mark: Revision: Date:
M A T C H L
IN
E
M A T C H L
IN
E
M A T C H L
IN
E
M A T C H L
IN
E
UP
DN
336A
336B
337A
337B
338A
339A
340A
348349
352353354
365A
366A
365C
S303
359a
346A
367A
S301
C
E
F
H
I.1
J.1
19 20 21 22 23.2 24N
25.5
26N 27 28 29
B
A.
24.123.522.5
B.1
A.1
H.
C.1
D
G
I.
I.2
J.2
22.7
(E)4"SAN
(E)4"V
(R)1 1/2"SAN
7 7
(E)4"V
(E)SAN
(R)1 1/2"
(R)2"
(R)3"
(R)3"
(E)2"
(R)1 1/2"
(R)1 1/2"
(R)1 1/2" (R)1 1/2"
(R)2"
(R)SAN
PHASE 1 PHASE 2
PHASE 1 PHASE 2
PHASE 1 PHASE 2
PHASE 1 PHASE 2
PHASE 1 PHASE 2
PHASE 1 PHASE 2
M A
T C
H L
IN
E M
A T
C H
L
IN
E M
A T
C H
L
IN
E M
A T
C H
L
IN
E M
A T
C H
L
IN
E M
A T
C H
L
IN
E
(R)1 1/2"
(E)1 1/2"
(R)4"SAN
(R)3"SAN
(R)1 1/2"SAN
(R)4"SAN
(R)2"SAN
(R)2"SAN
(R)4"SAN
(R)1 1/2"(E)1 1/2"
(R)1 1/2"SAN
(R)4"SAN
(E)1/2" DHW8
(E)1/2" DCW
(E)1/2" DHW
(E)1/2" DCW
(E)1/2" DHW
(E)1/2" DCW 8
(R)1/2" DHW
(R)1/2" DCW 8
(E)1/2" DHW
(E)1/2" DCW
(R)1/2" DHW
(R)1/2" DCW8
(E)1/2" DHW
(E)1/2" DCW
(E)1/2" DHW 8
(E)1/2" DCW 8
(E)1/2" DCW 8
(E)1/2" DHW 8
(R)1 1/2"SAN
UP
(E)1 1/2" DN
(E) 4" SAN UP
(E) 4" SAN DN
PROJECT NUMBER:
CHECKED BY:
DESIGNED BY:
1650 WATERMARK DRIVE
COLUMBUS, OHIO 43215
SUITE 200
DRAWN BY:
0 4'-0" 8'-0" 16'-0"
PLAN
NORTH
PHASE 2
KEY PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
Phase
ARCHITECT OF RECORD STAMPENGINEERS OF RECORD
321 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
A/E:
2016-0205
C :\L
O C
A L
R E
V
IT
\1 6-
-V
A M ar io n B ld g
4 t h
F lr
R en o M
E C
H J
E S
S E
.r vt
/1
/2
:2
:2
P
M
PD-103.2
610-17-101
03/19/2018 W. Phil Stafa C. Jesse Whitehead
Project Director
1700 E. 38TH STREET MARION, IN 46953
VISN 11 MARION B-138: 4TH FLOOR
CONSTRUCTION
SPRINKLERED
HDR ARCHITECTURE, INC.
600 HENNEPIN AVE SUITE 260
MINNEAPOLIS, MN 55403
612.524.6000
TERRY LITTELL SR., RA,
LEED AP
KORDA, INC.
1650 WATERMARK DRIVE, SUITE 200
COLUMBUS, OH 43215
614.487.1650
STAN KMONK
C. Jesse Whitehead
Steve Glinsky
W. Phil Stafa
METRIC ENVIRONMENTAL
6971 HILLSDALE COURT
INDIANAPOLIS, IN 46250
THIRD FLOOR PLUMBING
DEMOLITION PLAN PHASE 2
ISSUED FOR
CONSTRUCTION
N 0' 4' 8'2'1'
SCALE: 1/8" = 1'-0"E1
THIRD FLOOR PHASE 2
DEMOLITION PLAN
CODED NOTES:
1. (E)1½" SAN UP, (E)1½" SAN DOWN.
2. REMOVE SAN TO THIS POINT.
3. (E)2" SAN DOWN, 1½" VENT UP.
4. (E)1½"VENT UP, (E)1½" SAN DOWN. CUT VENT PIPE ABOVE CEILING AND
PREPARE FOR REUSE.
5. REMOVE SAN TO ABOVE CEILING AND PLUG.
6. PLUG.
7. REMOVE VENT ABOVE CEILING AND PREPARE FOR REUSE.
8. CUT AND CAP DOMESTIC WATER LINE ABOVE THIRD FLOOR FIXTURE SUPPLIES.
REPAIR WALL TO MATCH SURROUNDING WALL SURFACES.
9. REMOVE 1½" SANITARY FROM SINKS ABOVE.
10. (E) 1" GAS.
11. (E) 4" SAN DOWN, 4" SAN UP.
LEGEND
(R) EXISTING TO BE REMOVED
(E) EXISTING TO REMAIN
PLUMBING DEMOLITION GENERAL NOTES:
1. THE ENTIRE PLUMBING SYSTEM SHALL CONFORM TO THE INDIANA
PLUMBING CODE ALONG WITH ALL VA STANDARDS.
2. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS PRIOR TO
CUTTING EXISTING WALLS AND FLOOR SLABS. IF EXISTING TO REMAIN
SERVICES ARE CUT/DAMAGED, IT IS THE CONTRACTORS
RESPONSIBILITY TO PATCH AND REPAIR THE SERVICE AT NO
ADDITIONAL COST TO THE OWNER.
3. CONTRACTOR IS TO REMOVE ALL EXISTING PLUMBING SYSTEMS MADE
OBSOLETE BY NEW CONSTRUCTION: ALL WATER, WASTE AND VENT
PIPING, FIXTURES, TRIM, AND ACCESSORIES. REFERENCE THE
ARCHITECTURAL DEMOLITION AND DOCUMENTS AND FIELD VERIFY ALL
EXISTING CONDITIONS PRIOR TO BID AND INCLUDE ALL COSTS IN BID.
4. ALL EXISTING SANITARY PIPING TO REMAIN IS TO BE CLEANED AND
RODDED TO ENSURE PROPER FLOW. PIPING SHOWN AS DASHED IS TO
BE REMOVED COMPLETE INCLUDING ALL HANGERS AND SUPPORTS.
5. ALL OPENINGS SHALL BE SEALED AFTER REMOVAL OF PLUMBING
FIXTURES. EQUIPMENT AND PIPING IN ROOF, WALLS, AND FLOORS IN AN
IMPROVED MANNER AND IN ACCORDANCE WITH PLANS AND
SPECIFICATIONS. PATCH ALL FLOORS, WALLS AND CEILINGS AS
REQUIRED TO MEET FIRE RATING AND TO RECEIVE NEW FINISHES.
6. REFERENCE THE ARCHITECTURAL SPECIFICATIONS AND DRAWINGS
FOR THE WALL CONSTRUCTION TYPES, FIRE RATING INFORMATION,
ASBESTOS ABATEMENT AND ICRA REQUIREMENTS.
7. ALL EXISTING PIPING SHOWN IS FROM EXISTING DRAWINGS AND FIELD
OBSERVATIONS. CONTRACTOR SHALL VERIFY ALL EXISTING
CONDITIONS PRIOR TO BEGINNING WORK. IF CONDITIONS ARE
DIFFERENT THAN INDICATED, CONTACT COR BEFORE CONTINUING
WORK.
8. ALL DEMOLISHED PIPING AND EQUIPMENT SHALL BECOME PROPERTY
OF THE CONTRACTOR AND SHALL BE DISPOSED OF ACCORDANCE WITH
ALL VAMC REQUIREMENTS AND ENVIRONMENTAL REGULATIONS.
9. ALL WORK ACTIVITIES REQUIRED ON THE 3RD FLOOR SHALL BE
PERFORMED BETWEEN 4:30 PM & 6:00 AM OR ON WEEKENDS. ALL
CEILING TILES REMOVED DURING WORK SHALL BE REINSTALLED PRIOR
TO CONTRACTOR LEAVING THE SITE.
10. ALL EXISTING WATER, WASTE AND VENT PIPING, FITTINGS, HANGERS,
SUPPORTS SHALL BE REMOVED COMPLETELY. CUT & PATCH WALLS,
FLOORS, CEILING TO MATCH EXISTING CONSTRUCTION. HOLES IN FLOOR
SLABS SHALL BE FIRE CAULKED/STOPPED PER RATING.
Mark: Revision: Date:
419 418
C405
423 425
429 430
C402
415 414
S402
410 409
406 405 404 403
431A
403A 402
C401
436A
477B
477A
481 473 472
438A
435A
437B
437A
403B
BUILDING 172
P H
A S
E
P H
A S
E
MATCH LINE
P H
A S
E
NIC
1.
C
E
F
H
I.1
J.1
4N 5N 6N 7N 8 9 10 11 12 13 14 15 16 17 18
B
A.
4.5 5.1 6.1 7.1
B.1
A.1
H.
C.1
D
G
I.
I.2
J.2
1 2
4 4
ICE
MACHINE
(E)3" VENT UP TO REMAIN
& (E)4" SAN DN TO REMAIN
(R)1½" VENT UP
& (E) 1½" SAN DN
(R)1 1/2"
(E)2"V
(R)1 1/2"V
(R)4"VTR
(R)4" SAN DN, 4" V UP
(E)2"V
(R)DHWR
(E )V
(R)3"V
(E)4" SAN DN
(E)3" V UP
(E)4"VTR
(R)2"V
(R)DCW
(R)DHW
(R)2"V
(R)4"V
(E)3"V
(E)4"V
(E)4"V
(R)DHWR
(R)DHW
(R)DCW
(R)V
(R)1 1/2"
(R)1 1/2"
(R)TW
(E)V
(R)1 1/2"
(R)1 1/2"
(E)3"VTR
(R) FD
(R) FD
13 13
(E)3"V
(R)1 1/2"V
(R)4"V
3" VENT FROM
BELOW
PHASE 1 PHASE 2PHASE 1 PHASE 2PHASE 1 PHASE 2
N.I.C.
M A
T C
H L
IN
E M
A T
C H
L
IN
E M
A T
C H
L
IN
E
(E)4"V
(R)2"V
(R)1 1/2"V
(R)1 1/2"V
(E)1 1/2" V
(R)1/2"DCW(R)3" VTR
(R)2" VENT
FROM BELOW
(E)V (E)V
(E)V
(R)2"
PLUMBING DEMOLITION GENERAL NOTES:
1. THE ENTIRE PLUMBING SYSTEM SHALL CONFORM TO THE
INDIANA PLUMBING CODE ALONG WITH ALL VA STANDARDS.
2. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS
PRIOR TO CUTTING EXISTING WALLS AND FLOOR SLABS. IF
EXISTING TO REMAIN SERVICES ARE CUT/DAMAGED, IT IS THE
CONTRACTORS RESPONSIBILITY TO PATCH AND REPAIR THE
SERVICE AT NO ADDITIONAL COST TO THE OWNER.
3. CONTRACTOR IS TO REMOVE ALL EXISTING PLUMBING SYSTEMS
MADE OBSOLETE BY NEW CONSTRUCTION: ALL WATER, WASTE
AND VENT PIPING, FIXTURES, TRIM, AND ACCESSORIES.
REFERENCE THE ARCHITECTURAL DEMOLITION AND
DOCUMENTS AND FIELD VERIFY ALL EXISTING CONDITIONS
PRIOR TO BID AND INCLUDE ALL COSTS IN BID.
4. ALL EXISTING SANITARY PIPING TO REMAIN IS TO BE CLEANED
AND RODDED TO ENSURE PROPER FLOW. PIPING SHOWN AS
DASHED IS TO BE REMOVED COMPLETE INCLUDING ALL
HANGERS AND SUPPORTS.
5. ALL OPENINGS SHALL BE SEALED AFTER REMOVAL OF
PLUMBING FIXTURES. EQUIPMENT AND PIPING IN ROOF, WALLS,
AND FLOORS IN AN IMPROVED MANNER AND IN ACCORDANCE
WITH PLANS AND SPECIFICATIONS. PATCH ALL FLOORS, WALLS
AND CEILINGS AS REQUIRED TO MEET FIRE RATING AND TO
RECEIVE NEW FINISHES.
6. REFERENCE THE ARCHITECTURAL SPECIFICATIONS AND
DRAWINGS FOR THE WALL CONSTRUCTION TYPES, FIRE RATING
INFORMATION, ASBESTOS ABATEMENT AND ICRA
REQUIREMENTS.
7. ALL EXISTING PIPING SHOWN IS FROM EXISTING DRAWINGS AND
FIELD OBSERVATIONS. CONTRACTOR SHALL VERIFY ALL
EXISTING CONDITIONS PRIOR TO BEGINNING WORK. IF
CONDITIONS ARE DIFFERENT THAN INDICATED, CONTACT COR
BEFORE CONTINUING WORK.
8. ALL DEMOLISHED PIPING AND EQUIPMENT SHALL BECOME
PROPERTY OF THE CONTRACTOR AND SHALL BE DISPOSED OF
ACCORDANCE WITH ALL VAMC REQUIREMENTS AND
ENVIRONMENTAL REGULATIONS.
9. ALL WORK ACTIVITIES REQUIRED ON THE 3RD FLOOR SHALL BE
PERFORMED BETWEEN 5:00 PM & 6:00 AM OR ON WEEKENDS.
ALL CEILING TILES REMOVED DURING WORK SHALL BE
REINSTALLED PRIOR TO CONTRACTOR LEAVING THE SITE.
10. ALL EXISTING WATER, WASTE AND VENT PIPING, FITTINGS,
HANGERS, SUPPORTS SHALL BE REMOVED COMPLETELY. CUT
& PATCH WALLS, FLOORS, CEILING TO MATCH EXISTING
CONSTRUCTION. HOLES IN FLOOR SLABS SHALL BE FIRE
CAULKED/STOPPED PER RATING.
PROJECT NUMBER:
CHECKED BY:
DESIGNED BY:
1650 WATERMARK DRIVE
COLUMBUS, OHIO 43215
SUITE 200
DRAWN BY:
0 4'-0" 8'-0" 16'-0"
PLAN
NORTH
PHASE 1
KEY PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
Phase
ARCHITECT OF RECORD STAMPENGINEERS OF RECORD
321 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
A/E:
2016-0205
C :\L
O C
A L
R E
V
IT
\1 6-
-V
A M ar io n B ld g
4 t h
F lr
R en o M
E C
H J
E S
S E
.r vt
/1
/2
:2
:5
P
M
PD-104.1
610-17-101
03/19/2018 W. Phil Stafa C. Jesse Whitehead
Project Director
1700 E. 38TH STREET MARION, IN 46953
VISN 11 MARION B-138: 4TH FLOOR
CONSTRUCTION
SPRINKLERED
HDR ARCHITECTURE, INC.
600 HENNEPIN AVE SUITE 260
MINNEAPOLIS, MN 55403
612.524.6000
TERRY LITTELL SR., RA,
LEED AP
KORDA, INC.
1650 WATERMARK DRIVE, SUITE 200
COLUMBUS, OH 43215
614.487.1650
STAN KMONK
C. Jesse Whitehead
Steve Glinsky
W. Phil Stafa
METRIC ENVIRONMENTAL
6971 HILLSDALE COURT
INDIANAPOLIS, IN 46250
FOURTH FLOOR PLUMBING
DEMOLITION PLAN PHASE 1
ISSUED FOR
CONSTRUCTION
N 0' 4' 8'2'1'
SCALE: 1/8" = 1'-0"E1
FOURTH FLOOR PHASE 1
DEMOLITION PLAN
CODED NOTES
1. REMOVE WATER CLOSET AND FLUSH VALVE. REMOVE WATER SUPPLIES AS
INDICATED. REMOVE SANITARY TO POINT INDICATED BELOW FLOOR.
2. REMOVE LAVATORY, FAUCET, FLEXIBLE WATER SUPPLIES AND STOPS.
REMOVE TAILPIECE, TRAP AND WASTE ARM. REMOVE SANITARY TO POINT
INDICATED BELOW FLOOR.
3. REMOVE URINAL AND FLUSH VALVE. REMOVE SANITARY TO POINT
INDICATED BELOW FLOOR.
4. REMOVE SINK, FAUCET, FLEXIBLE WATER SUPPLIES AND STOPS. REMOVE
TAILPIECE, TRAP AND WASTE ARM. REMOVE SANITARY TO POINT
INDICATED BELOW FLOOR. REMOVE WATER SUPPLIES TO POINT INDICATED
BELOW FLOOR.
5. REMOVE FLOOR SINK, FAUCET AND WATER SUPPLIES. REMOVE SANITARY
TO POINT INDICATED BELOW FLOOR.
6. REMOVE BATH, FAUCET AND WATER SUPPLIES AS INDICATED.
7. REMOVE SHOWER, CONTROLS, SHOWER HEAD AND WATER SUPPLIES.
REMOVE SANITARY TO POINT INDICATED BELOW FLOOR.
8. REMOVE ELECTRIC WATER COOLER, TAILPIECE,TRAP AND WASTE ARM.
REMOVE WATER SUPPLIES. REMOVE VENT AND SANITARY AT MAIN TO
ELIMINATE DEAD LEG.
9. ABANDONED WATER SUPPLY RISERS TO BE DEMOLISHED.
10. REMOVE SAN TO THIS POINT.
11. REMOVE CEILING ACCESS PANEL.
12. REMOVE ½" DCW DOWN TO SERVE ICE MACHINE.
13. REMOVE CABINET, TEMPERING VALVE, HOSE BIBB AND SUPPLIES.
14. REMOVE MIXING/TEMPERING VALVE.
15. PLUG SANITARY TEE.
16. REMOVE VENT TO THIS POINT.
17. REMOVE HOSE BIBB AND WATER SUPPLY LINES BACK TO MAIN AND CAP TO
ELIMINATE DEAD LEGS.
18. REMOVE EXISTING WATER SUPPLIES FROM BELOW, CAP BACK AT MAIN OR
AT FIXTURE BELOW TO ELIMINATE DEAD LEGS.
19. REMOVE MEDICAL PROCEDURES CABINET, REMOVE EXISTING WATER
SUPPLIES FROM BELOW, CAP ABOVE THIRD FLOOR CEILING.
20. REMOVE ¾" DCW CONNECTION SERVING WALL HYDRANT IN PENTHOUSE.
21. REMOVE FLOOR DRAIN, PATCH FLOOR TO MATCH SURROUNDING FLOOR
SURFACES.
22. REMOVE WATER SUPPLIES BELOW PENTHOUSE FLOOR AND PREPARE FOR
NEW WATER SUPPLY CONNECTIONS.
23. 4" SAN DOWN, 4" VTR TO REMAIN.
24. REMOVE SANITARY TO JUST BELOW FOURTH FLOOR AND PREPARE FOR
REUSE. THIS PIPE WILL SERVE AS VENT FOR FIXTURES ON THIRD FLOOR.
25. REMOVE ELECTRIC WATER COOLER, TAILPIECE, TRAP AND WASTE ARM.
REMOVE WATER SUPPLY AS INDICATED. PLUG SANITARY AND VENT TEES
MAINTAINING VENTING FOR THIRD FLOOR WATER COOLER.
26. (E) VENT TO BE RELOCATED.
27. REMOVE VENT TO POINT INDICATED BELOW FLOOR.
28. REMOVE DOMESTIC WATER PIPING TO THIS APPROXIMATE LOCATION.
LEGEND
(R) EXISTING TO BE REMOVED
(E) EXISTING TO REMAIN
Mark: Revision: Date:
B
TYPICAL STACK DIAGRAMS
DEMOLITION N.T.S.
(R)SK
(E)1½"
(E)1½"
(R)SK
(E)SK
3" MINIMUM
VENT (TYP.)
(R)SK
(E)1½"
(E)1½"
(E)SK
PLUG
INSIDE
WALL (TYP.)
(E)SK
(R)SK
470 469
468A 468 467
464 461
459 458 457
446445
443B
449 450 451 452
453454
463 462
442B441440
442A
P H
A S
E
P H
A S
E
MATCH LINE
MATCH LINE
P H
A S
E
P H
A S
E
C
E
F
H
I.1
J.1
19 20 21 22 23.2 24N 25.5 26N 27 28 29
B
A.
24.123.522.5
B.1
A.1
H.
C.1
D
G
I.
I.2
J.2
(R) FD
22.7
10 9
(R)DHW
(R)DHWR
(R)DCW
(R)DHW
(R)DHWR
(R)2" (R)1"
(R)3/4"(R)3/4"
(R)1 1/4"(R)1 1/4"
4"VTR
(R)3/4"(R)3/4"
(R)1 1/2"
(R)1 1/2"
(E)V (R)V
13 1313
(E)V
(R)2"VTR 14
(E)4"VTR
(R)1/2"(R)1/2"
(R)V
(E)4"VTR
(R)3/4"(R)3/4"
(E)V
(R )V
(E)3"VTR
(E)4"VTR
(R)2"
PHASE 1 PHASE 2
PHASE 1 PHASE 2
PHASE 1 PHASE 2
PHASE 1 PHASE 2
PHASE 1 PHASE 2
PHASE 1 PHASE 2
M A
T C
H L
IN
E M
A T
C H
L
IN
E M
A T
C H
L
IN
E M
A T
C H
L
IN
E M
A T
C H
L
IN
E M
A T
C H
L
IN
E
(R )V
(E)1 1/2"V(E)1 1/2"V
(E)1 1/2" V
(E)4"V
(E)1 1/2"(E)2"
(E)2"
(E)4" SAN DOWN
(E)4" V FROM BELOW
(R)1/2"(R)1/2"
(E)4V DN
(R)1/2"
(R)1"
(E) 4" V UP
(R)1/2"
(R)1/2"
(R) 1½" V UP
(R) 1½" V UP
(R)V
(E)2"
PLUMBING DEMOLITION GENERAL NOTES:
1. THE ENTIRE PLUMBING SYSTEM SHALL CONFORM TO THE
INDIANA PLUMBING CODE ALONG WITH ALL VA STANDARDS.
2. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS
PRIOR TO CUTTING EXISTING WALLS AND FLOOR SLABS. IF
EXISTING TO REMAIN SERVICES ARE CUT/DAMAGED, IT IS THE
CONTRACTORS RESPONSIBILITY TO PATCH AND REPAIR THE
SERVICE AT NO ADDITIONAL COST TO THE OWNER.
3. CONTRACTOR IS TO REMOVE ALL EXISTING PLUMBING SYSTEMS
MADE OBSOLETE BY NEW CONSTRUCTION: ALL WATER, WASTE
AND VENT PIPING, FIXTURES, TRIM, AND ACCESSORIES.
REFERENCE THE ARCHITECTURAL DEMOLITION AND
DOCUMENTS AND FIELD VERIFY ALL EXISTING CONDITIONS
PRIOR TO BID AND INCLUDE ALL COSTS IN BID.
4. ALL EXISTING SANITARY PIPING TO REMAIN IS TO BE CLEANED
AND RODDED TO ENSURE PROPER FLOW. PIPING SHOWN AS
DASHED IS TO BE REMOVED COMPLETE INCLUDING ALL
HANGERS AND SUPPORTS.
5. ALL OPENINGS SHALL BE SEALED AFTER REMOVAL OF
PLUMBING FIXTURES. EQUIPMENT AND PIPING IN ROOF, WALLS,
AND FLOORS IN AN IMPROVED MANNER AND IN ACCORDANCE
WITH PLANS AND SPECIFICATIONS. PATCH ALL FLOORS, WALLS
AND CEILINGS AS REQUIRED TO MEET FIRE RATING AND TO
RECEIVE NEW FINISHES.
6. REFERENCE THE ARCHITECTURAL SPECIFICATIONS AND
DRAWINGS FOR THE WALL CONSTRUCTION TYPES, FIRE RATING
INFORMATION, ASBESTOS ABATEMENT AND ICRA
REQUIREMENTS.
7. ALL EXISTING PIPING SHOWN IS FROM EXISTING DRAWINGS AND
FIELD OBSERVATIONS. CONTRACTOR SHALL VERIFY ALL
EXISTING CONDITIONS PRIOR TO BEGINNING WORK. IF
CONDITIONS ARE DIFFERENT THAN INDICATED, CONTACT COR
BEFORE CONTINUING WORK.
8. ALL DEMOLISHED PIPING AND EQUIPMENT SHALL BECOME
PROPERTY OF THE CONTRACTOR AND SHALL BE DISPOSED OF
ACCORDANCE WITH ALL VAMC REQUIREMENTS AND
ENVIRONMENTAL REGULATIONS.
9. ALL WORK ACTIVITIES REQUIRED ON THE 3RD FLOOR SHALL BE
PERFORMED BETWEEN 5:00 PM & 6:00 AM OR ON WEEKENDS.
ALL CEILING TILES REMOVED DURING WORK SHALL BE
REINSTALLED PRIOR TO CONTRACTOR LEAVING THE SITE.
10. ALL EXISTING WATER, WASTE AND VENT PIPING, FITTINGS,
HANGERS, SUPPORTS SHALL BE REMOVED COMPLETELY. CUT
& PATCH WALLS, FLOORS, CEILING TO MATCH EXISTING
CONSTRUCTION. HOLES IN FLOOR SLABS SHALL BE FIRE
CAULKED/STOPPED PER RATING.
PROJECT NUMBER:
CHECKED BY:
DESIGNED BY:
1650 WATERMARK DRIVE
COLUMBUS, OHIO 43215
SUITE 200
DRAWN BY:
0 4'-0" 8'-0" 16'-0"
PLAN
NORTH
PHASE 2
KEY PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
Phase
ARCHITECT OF RECORD STAMPENGINEERS OF RECORD
321 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
A/E:
2016-0205
C :\L
O C
A L
R E
V
IT
\1 6-
-V
A M ar io n B ld g
4 t h
F lr
R en o M
E C
H J
E S
S E
.r vt
/1
/2
:2
:4
P
M
PD-104.2
610-17-101
03/19/2018 W. Phil Stafa C. Jesse Whitehead
Project Director
1700 E. 38TH STREET MARION, IN 46953
VISN 11 MARION B-138: 4TH FLOOR
CONSTRUCTION
SPRINKLERED
HDR ARCHITECTURE, INC.
600 HENNEPIN AVE SUITE 260
MINNEAPOLIS, MN 55403
612.524.6000
TERRY LITTELL SR., RA,
LEED AP
KORDA, INC.
1650 WATERMARK DRIVE, SUITE 200
COLUMBUS, OH 43215
614.487.1650
STAN KMONK
C. Jesse Whitehead
Steve Glinsky
W. Phil Stafa
METRIC ENVIRONMENTAL
6971 HILLSDALE COURT
INDIANAPOLIS, IN 46250
FOURTH FLOOR PLUMBING
DEMOLITION PLAN PHASE 2
ISSUED FOR
CONSTRUCTION
N 0' 4' 8'2'1'
SCALE: 1/8" = 1'-0"E1
FOURTH FLOOR PHASE 2
DEMOLITION PLAN
CODED NOTES
1. REMOVE WATER CLOSET AND FLUSH VALVE. REMOVE WATER
SUPPLIES AS INDICATED. REMOVE SANITARY TO POINT INDICATED
BELOW FLOOR.
2. REMOVE LAVATORY, FAUCET, FLEXIBLE WATER SUPPLIES AND
STOPS. REMOVE TAILPIECE, TRAP AND WASTE ARM. REMOVE
SANITARY TO POINT INDICATED BELOW FLOOR.
3. REMOVE URINAL AND FLUSH VALVE. REMOVE SANITARY TO POINT
INDICATED BELOW FLOOR.
4. REMOVE SINK, FAUCET, FLEXIBLE WATER SUPPLIES AND
STOPS.REMOVE TAILPIECE, TRAP AND WASTE ARM. REMOVE
SANITARY TO POINT INDICATED BELOW FLOOR.
5. REMOVE FLOOR SINK, FAUCET AND WATER SUPPLIES AS INDICATED.
6. REMOVE DRINKING FOUNTAIN, WATER SUPPLY AND SANITARY
WASTE LINE. REMOVE SANITARY TO POINT INDICATED BELOW FLOOR.
7. WATER SUPPLY RISERS TO REMAIN.
8. REMOVE WATER SUPPLIES TO THIS POINT.
9. REMOVE CEILING ACCESS PANEL.
10. REMOVE CABINET, TEMPERING VALVE, HOSE BIBB, SUPPLIES, AND
TEMPERED WATER SUPPLY TO SHOWERS.
11. REMOVE ROUGH-IN PLUMBING AND ACCESS DOOR.
12. REMOVE EXISTING WATER SUPPLIES FROM BELOW. CAP ABOVE THIRD
FLOOR CEILING OR AT FIXTURE BELOW.
13. REMOVE VENT TO THIS POINT.
14. REMOVE 2" VENT THROUGH ROOF (TO BE REPLACED WITH 3" VTR).
15. REMOVE SINK, WATER SUPPLIES, SANITARY WASTE AND VENT PIPING.
16. REMOVE ¾" DCW CONNECTION SERVING WALL HYDRANT IN
PENTHOUSE.
17. EXISTING 1½" LINE TO SERVE AS VENT LINE FOR THIRD FLOOR
PLUMBING FIXTURE. PROVIDE PLUG IN TEE THAT SERVED FOURTH
FLOOR PLUMBING FIXTURE.
18. (E) 4" SAN DN.
LEGEND
(R) EXISTING TO BE REMOVED
(E) EXISTING TO REMAIN
Mark: Revision: Date:
EXISTING STAIR
AND PLATFORM
OVER PARAPET
MATCHLINE
EXISTING
WALKING
PADS
EXISTING
SLOPE
EXISTING
SLOPE
E X
IS
T
IN
G
S L O
P E
E X
IS
T
IN
G
S L O
P E
E X
IS
T
IN
G
S L O
P E
EXISTING
SLOPE
EXISTING
SLOPE
E X
IS
T
IN
G
S L O
P E
P1P1
FUTURE
EXISTING
WALKING PADS
P H
A S
E
P H
A S
E
P H
A S
E
1.
C
E
F
H
I.1
J.1
2 3 4N 5N 6N 7N 8 9 10 11 12 13 14 15 16 17 18
B
A.
4.5 5.1 6.1 7.1
B.1
A.1
H.
C.1
D
G
I.
I.2
J.2
(E)1¼" LAB AIR
(E)2" COPPER
EXHAUST
(E)1½" DN.
(E)2"
OUTSIDE AIR
(E)1¼"
MEDICAL AIR
(E)1 1/2"VAC
(E)2"V
(E)FS
(E)3" STM
UP TO RD
(E)1½" DR
(E)MEDICAL
AIR SYSTEM
(E)MEDICAL
VACUUM
SYSTEM
(E)3" V UP
(E)LABORATORY
AIR SYSTEM
(E)3"V
PENTHOUSE
(R)4"V
(E)2"V
(E)3"V
(R)3"V
(E)4"V
(E)4"V
(R)1 1/2"V
(E)4"V(R)4"V
(R)4"V
(E)MSB
(E)3" STM DN
(E)1¼" LA DN
LA DN
PHASE 1 PHASE 2
PHASE 1 PHASE 2
PHASE 1 PHASE 2
PHASE 1 PHASE 2
PHASE 1 PHASE 2
PHASE 1 PHASE 2
M A
T C
H L
IN
E M
A T
C H
L
IN
E M
A T
C H
L
IN
E M
A T
C H
L
IN
E M
A T
C H
L
IN
E…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.