36C25018B0816 ATTACHMENT 3. Mechanical Drawings.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Reno 4th Fl Bldg 138 610-17-101, newest first.
File Type Posted
36C25018B0816-0005000.docx DOCX document
36C25018B0816-0004000.docx DOCX document
36C25018B0816-0003012.doc DOC document
36C25018B0816-0003004.pdf PDF
36C25018B0816-0003009.pdf PDF
36C25018B0816-0003001.pdf PDF
36C25018B0816-0003002.doc DOC document
36C25018B0816-0003010.doc DOC document
36C25018B0816-0003006.doc DOC document
36C25018B0816-0003014.pdf PDF
36C25018B0816-0003000.docx DOCX document
36C25018B0816-0003008.pdf PDF
36C25018B0816-0003011.pdf PDF
36C25018B0816-0003005.doc DOC document
36C25018B0816-0003013.doc DOC document
36C25018B0816-0003003.doc DOC document
36C25018B0816-0003007.doc DOC document
36C25018B0816-0002003.pdf PDF
36C25018B0816-0002002.pdf PDF
36C25018B0816-0002001.docx DOCX document
36C25018B0816-0002000.docx DOCX document
36C25018B0816-0001004.pdf PDF
36C25018B0816-0001003.docx DOCX document
36C25018B0816-0001000.docx DOCX document
36C25018B0816-0001002.pdf PDF
36C25018B0816-0001001.pdf PDF
36C25018B0816-001.docx DOCX document
36C25018B0816-003.pdf PDF
36C25018B0816-005.pdf PDF
36C25018B0816-010.docx DOCX document
36C25018B0816-007.pdf PDF
36C25018B0816-006.pdf PDF
36C25018B0816-011.doc DOC document
36C25018B0816-002.pdf PDF
36C25018B0816-009.pdf PDF
36C25018B0816-008.pdf PDF
36C25018B0816-000.docx DOCX document
Show all 37

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1.

C

E

F

H

I.1

J.1

2 3 4N 5N 6N 7N 8 10 11 12 13 14 15 16 17 18

B

A.

4.5 5.1 6.1 7.1

B.1

A.1

H.

C.1

D

G

I.

I.2

J.2

1 2

1 2

1 21 2 1

1 2

1 2

1 2

1 21

1 2

1 2

1 2

1 2

11 211 21

1 1 2 1 1 2

(R)8/8

6 3

(R)18/12

(R)40/12(R)26/12

(R )2

/1

(R)28/12

(R)20/12 (R)40/12

(R)12/12

(R)6/6

(R)6/6

(R)R (R)R

(R)6/6

(R)6/6

(R)10/10

(R)R

(R)R

(R)8/8

(R)R2

(R)6/6

(R)R

(R)R

(R)6/6

(R)R

(R)8/8

(R)16/12

(R)6/6

(R)8/8

(R)10/12

(R)6"Ø(R)R

(R)10/12 (R)10/12

(R)24/12

(R )2

/1

(R)8/8

(R)R

(R)12/12

(R)12/12 UP

(R)20/12

(R)20/12

(R)10"Ø

(R)20/12

(R)12"Ø

(R)10"Ø

(R)D(R)D

(R)D

(R)D

(R)6/6

(R)R1

(R)16"Ø

(R)R1 (R)R1

(R)6/6

(R)R1

(R)12/12

(R)6/6 (R)6/6

(R)R1 (R)R1

(R)8/8

(R)12/12

(R)R1

(R)8/8

(R)20/12

(R)R1

(R)6/6

(R)R1

(R)6/6

(R)24/12

(R)10/10

(R)6/6 (R )2

/1

(R)10/10

(R)6/6

(R)R1

(R)R1

(R)R1

(R)20/20

(E)36/16

(R)D

(R)12"Ø

(R)D

(E)18/36

(R)D (R)8/8(R)8/8

(R)6/6

(R)8/8 (R)R

(R)R

(R)18/18

(E)38/12

(R)6/6

(R)20/12

(R )2

/1

(R)6/6

CAP HERE

(R )2

/1

CAP EXISTING

MAIN HERE

(R)R1

(R)6/6

(R)6/6

(R)R

(R)R

(R)8/8

(R)R

(E)14/42

CAP HERE

(R)D

(R)D

(E)36/16 UP

(R) 18/18

PHASE 1 PHASE 2

PHASE 1 PHASE 2

PHASE 1 PHASE 2

PHASE 1 PHASE 2

PHASE 1 PHASE 2

PHASE 1 PHASE 2

M A

T C

H L

IN

E M

A T

C H

L

IN

E M

A T

C H

L

IN

E M

A T

C H

L

IN

E M

A T

C H

L

IN

E M

A T

C H

L

IN

E

(R)16/12

(R) 1" LPR

(R) 1" LPR

PROJECT NUMBER:

CHECKED BY:

DESIGNED BY:

1650 WATERMARK DRIVE

COLUMBUS, OHIO 43215

SUITE 200

DRAWN BY:

0 4'-0" 8'-0" 16'-0"

PLAN

NORTH

PHASE 1

KEY PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

Phase

ARCHITECT OF RECORD STAMPENGINEERS OF RECORD

321 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

A/E:

2016-0205

C :\L

O C

A L

R E

V

IT

\1 6-

-V

A M ar io n B ld g

4 t h

F lr

R en o M

E C

H J

E S

S E

.r vt

/1

/2

:2

:1

P

M

MD-104.1

610-17-101

03/19/2018 W. Phil Stafa C. Jesse Whitehead

Project Director

1700 E. 38TH STREET MARION, IN 46953

VISN 11 MARION B-138: 4TH FLOOR

CONSTRUCTION

SPRINKLERED

HDR ARCHITECTURE, INC.

600 HENNEPIN AVE SUITE 260

MINNEAPOLIS, MN 55403

612.524.6000

TERRY LITTELL SR., RA,

LEED AP

KORDA, INC.

1650 WATERMARK DRIVE, SUITE 200

COLUMBUS, OH 43215

614.487.1650

STAN KMONK

C. Jesse Whitehead

Dan Edwartoski

W. Phil Stafa

METRIC ENVIRONMENTAL

6971 HILLSDALE COURT

INDIANAPOLIS, IN 46250

FOURTH FLOOR HVAC DEMOLITION

PLAN PHASE 1

ISSUED FOR

CONSTRUCTION

N 0' 4' 8'2'1'

SCALE: 1/8" = 1'-0"E1

FOURTH FLOOR PHASE 1

DEMOLITION PLAN

CODED NOTES

1. REMOVE EXISTING STEAM RADIATOR AND SUPPORTS. REMOVE EXISTING

PIPING, ASSOCIATED VALVES AND SUPPORTS. REMOVE PIPING DOWN THROUGH

FLOOR AND CAP IN THIRD FLOOR CEILING SPACE WHERE REQUIRED. ALL OPENINGS

SHALL BE SEALED AFTER REMOVAL OF HVAC PIPING. FLOOR SHALL BE MADE

READY TO RECEIVE NEW FINISHES.

2. REMOVE EXISTING AIR CONDITIONING UNIT, ELECTRICAL JUNCTIONS AND

WINDOW SUPPORTS. REMOVE ELECTRICAL WIRING AND CONDUITS BACK TO

PANELS.

3. REMOVE EXISTING DUCTWORK AND AIR DEVICES BACK TO VERTICAL MAIN.

4. REMOVE EXISTING DUCTWORK AND AIR DEVICES IN ITS ENTIRETY UP TO

PENTHOUSE.

5. EXISTING EXHAUST DUCT IN SHAFT TO REMAIN. PROTECT DURING CONSTRUCTION.

6. VERTICAL DUCT MAIN UP TO EF AND DOWN TO LOWER FLOORS TO REMAIN. PRIOR

TO DEMOLITION OF 4TH FLOOR BRANCH DUCT. M.C. SHALL MEASURE FLOW ABOVE

AND BELOW 4TH FLOOR BRANCH DUCT AND RECORD THIS DATA FOR FAN

REBALANCE.

7. EXHAUST FAN ON ROOF SERVING THIRD FLOOR TO REMIAN. DISCONNECT 8/8 DUCT

BELOW ROOF AND REMOVE DOWN THROUGH 4TH FLOOR SLAB. EXISTING 6/6

EXHAUST GRILLES (2) AND BRANCH DUCTWORK IN 3RD FLOOR CEILING TO REMAIN

FOR RECONNECTION.

8. SECOND FLOOR LAB EXHAUST FANS ON ROOF TO REMAIN. DISCONNECT

DUCTS. DUCTS SHALL BE REROUTED IN NEW MECHANICAL CHASE.

9. REMOVE ABANDONED DUCTWORK SYSTEM.

10. REMOVE EXHAUST DUCT THROUGH THIRD FLOOR.

11. VERTICAL DUCT UP THROUGH ROOF TO EXHAUST FAN TO REMAIN.

12. EXISTING VERTICAL DUCT MAIN TO REMAIN. CAP DEMOLISHED BRANCH

CONNECTIONS TO ENSURE MAIN IS AIR TIGHT.

13. EXISTING 1" LOW PRESSURE CONDENSATE UP THROUGH ROOF SLAB TO

PENTHOUSE TO REMAIN FOR FUTURE CONNECTION.

14. EXISTING 1" LOW PRESSURE CONDENSATE UP THROUGH ROOF SLAB TO

PENTHOUSE TO REMAIN FOR FUTURE CONNECTION. REMOVE CONDENSATE

PIPE FROM 12 INCHES BELOW ROOF DOWN THROUGH FOURTH FLOOR SLAB.

CAP PIPE IN THIRD FLOOR CEILING SPACE.

15. EXISTING 4" LOW PRESSURE STEAM UP THROUGH ROOF SLAB TO

PENTHOUSE TO REMAIN FOR FUTURE CONNECTION. REMOVE STEAM PIPE

FROM 12 INCHES BELOW ROOF DOWN THROUGH FOURTH FLOOR SLAB. CAP

PIPE IN THIRD FLOOR CEILING SPACE.

16. DEMOLITION PART OF PHASE 1.

17. REMOVE EXISTING EXHAUST SYSTEM IN ITS ENTIRETY.

Mark: Revision: Date:

ISSUED FOR CONSTRUCTION 03/19/2018

E

F

H

I.1

J.1

18 19 21 22 23.2 24N 25.5 26N 27 28 29

B

A.

24.123.522.5

B.1

A.1

H.

C.1

D

G

I.

I.2

J.2

1 1 2

1 21

1 2

1 2

1 2

1 2

1 21 1 1 2

1 2

1 2

1 2

1 2

22.7

(E)18/36

(R)10"Ø

(R)10/10 (R)12/12

(R)18/12 (R)20/12

(R)34/24 (R)8/8

(R)16/12(R)R

(R)R

(R)R

(R)R

(R)R

(R)8/8

(R)6/6

(R)6/6

(R)10/10

(R)6/6

(R)R

(R)6/6

(R)R

(R)6/6

(R)8/8

(R)6/6 (R)R

(R)R

(R)R1

(R)6/6

(R)R

(R)D

(R)6/6

(R)R1

(E)24/10

PHASE 1 PHASE 2

PHASE 1 PHASE 2

PHASE 1 PHASE 2

PHASE 1 PHASE 2

PHASE 1 PHASE 2

PHASE 1 PHASE 2

M A

T C

H L

IN

E M

A T

C H

L

IN

E M

A T

C H

L

IN

E M

A T

C H

L

IN

E M

A T

C H

L

IN

E M

A T

C H

L

IN

E

CAP EXISTING

MAIN HERE 8

CAP EXISTING

MAIN HERE 8

PROJECT NUMBER:

CHECKED BY:

DESIGNED BY:

1650 WATERMARK DRIVE

COLUMBUS, OHIO 43215

SUITE 200

DRAWN BY:

0 4'-0" 8'-0" 16'-0"

PLAN

NORTH

PHASE 2

KEY PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

Phase

ARCHITECT OF RECORD STAMPENGINEERS OF RECORD

321 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

A/E:

2016-0205

C :\L

O C

A L

R E

V

IT

\1 6-

-V

A M ar io n B ld g

4 t h

F lr

R en o M

E C

H J

E S

S E

.r vt

/1

/2

:2

:1

P

M

MD-104.2

610-17-101

03/19/2018 W. Phil Stafa C. Jesse Whitehead

Project Director

1700 E. 38TH STREET MARION, IN 46953

VISN 11 MARION B-138: 4TH FLOOR

CONSTRUCTION

SPRINKLERED

HDR ARCHITECTURE, INC.

600 HENNEPIN AVE SUITE 260

MINNEAPOLIS, MN 55403

612.524.6000

TERRY LITTELL SR., RA,

LEED AP

KORDA, INC.

1650 WATERMARK DRIVE, SUITE 200

COLUMBUS, OH 43215

614.487.1650

STAN KMONK

C. Jesse Whitehead

Dan Edwartoski

W. Phil Stafa

METRIC ENVIRONMENTAL

6971 HILLSDALE COURT

INDIANAPOLIS, IN 46250

FOURTH FLOOR HVAC DEMOLITION

PLAN PHASE 2

ISSUED FOR

CONSTRUCTION

N 0' 4' 8'2'1'

SCALE: 1/8" = 1'-0"E1

FOURTH FLOOR PHASE 2

DEMOLITION PLAN

CODED NOTES

1. REMOVE EXISTING STEAM RADIATOR AND SUPPORTS. REMOVE EXISTING

PIPING, ASSOCIATED VALVES AND SUPPORTS. REMOVE PIPING DOWN

THROUGH FLOOR AND CAP IN THIRD FLOOR CEILING SPACE WHERE

REQUIRED. ALL OPENINGS SHALL BE SEALED AFTER REMOVAL OF HVAC

PIPING. FLOOR SHALL BE MADE READY TO RECEIVE NEW FINISHES.

2. REMOVE EXISTING AIR CONDITIONING UNIT, ELECTRICAL JUNCTIONS AND

WINDOW SUPPORTS.

3. REMOVE EXISTING DUCTWORK AND AIR DEVICES BACK TO VERTICAL MAIN.

4. REMOVE EXISTING DUCT IN ITS ENTIRETY UP THROUGH ROOF. PATCH

AND SEAL ROOF WATER TIGHT WITH NEW ROOFING MEMBRANE AND

INSULATION MATCHING EXISTING SIZES.

5. VERTICAL DUCT MAIN UP TO EF AND DOWN TO LOWER FLOORS TO

REMAIN. PRIOR TO DEMOLITION OF 4TH FLOOR BRANCH DUCT. M.C. SHALL

MEASURE FLOW ABOVE AND BELOW 4TH FLOOR BRANCH DUCT AND

RECORD THIS DATA FOR FAN REBALANCE.

6. EXHAUST DUCT SERVING FLOORS BELOW TO REMAIN.

7. REMOVE EXISTING ABANDONED DUCT IN ITS ENTIRETY.

8. EXISTING VERTICAL DUCT MAIN TO REMAIN. CAP DEMOLISHED BRANCH

CONNECTIONS TO ENSURE MAIN IS AIR TIGHT.

9. THIS DEMOLITION SCOPE SHALL BE PERFORMED IN PHASE 1.

Mark: Revision: Date:

E

F

H

I.1

J.1

2 3 4N 5N 6N 7N 8

11 12 13 14 15 16 17 18

B

A.

4.5 5.1 6.1 7.1

B.1

A.1

H.

C.1

D

G

I.

I.2

J.2

(E)36/18

(R)24/12

CAP

(R)EF

(E)EF

(E)EF9

PHASE 1 PHASE 2

PHASE 1 PHASE 2

PHASE 1 PHASE 2

PHASE 1 PHASE 2

PHASE 1 PHASE 2

PHASE 1 PHASE 2

M A

T C

H L

IN

E M

A T

C H

L

IN

E M

A T

C H

L

IN

E M

A T

C H

L

IN

E M

A T

C H

L

IN

E M

A T

C H

L

IN

E

(E)EF

(E)EF

(E)EF

PROJECT NUMBER:

CHECKED BY:

DESIGNED BY:

1650 WATERMARK DRIVE

COLUMBUS, OHIO 43215

SUITE 200

DRAWN BY:

0 4'-0" 8'-0" 16'-0"

PLAN

NORTH

PHASE 1

KEY PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

Phase

ARCHITECT OF RECORD STAMPENGINEERS OF RECORD

321 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

A/E:

2016-0205

C :\L

O C

A L

R E

V

IT

\1 6-

-V

A M ar io n B ld g

4 t h

F lr

R en o M

E C

H J

E S

S E

.r vt

/1

/2

:2

:0

P

M

MD-105.1

610-17-101

03/19/2018 W. Phil Stafa C. Jesse Whitehead

Project Director

1700 E. 38TH STREET MARION, IN 46953

VISN 11 MARION B-138: 4TH FLOOR

CONSTRUCTION

SPRINKLERED

HDR ARCHITECTURE, INC.

600 HENNEPIN AVE SUITE 260

MINNEAPOLIS, MN 55403

612.524.6000

TERRY LITTELL SR., RA,

LEED AP

KORDA, INC.

1650 WATERMARK DRIVE, SUITE 200

COLUMBUS, OH 43215

614.487.1650

STAN KMONK

C. Jesse Whitehead

Dan Edwartoski

W. Phil Stafa

METRIC ENVIRONMENTAL

6971 HILLSDALE COURT

INDIANAPOLIS, IN 46250

ROOF HVAC DEMOLITION PLAN

PHASE 1

ISSUED FOR

CONSTRUCTION

N 0' 4' 8'2'1'

SCALE: 1/8" = 1'-0"E1

ROOF PLAN PHASE 1

DEMOLITION PLAN

CODED NOTES:

1. REMOVE EXHAUST FAN AND DUCTWORK THROUGH ROOF. PATCH ROOF

TO MATCH EXISTING MATERIALS, INCLUDING INSULATION. MATCH

EXISTING SIZES.

2. EXISTING SECOND FLOOR LAB EXHAUST FAN AND VERTICAL DUCT

THROUGH ROOF TO REMAIN.

3. EXISTING EXHAUST SYSTEM SERVING FLOORS BELOW TO REMAIN.

4. EXISTING EXHAUST DUCT DOWN EXTERIOR OF BUILDING TO REMAIN.

5. EXISTING MORGUE/ TB EXHAUST DUCT UP TO FILTER AND EXHAUST FAN

IN EXISTING PENTHOUSE TO REMAIN.

6. REMOVE EXISTING 24/12 DUCT UP TO THE WYE FITTING IN THE

PENTHOUSE DOWN TO FOURTH FLOOR. PATCH HOLE IN PENTHOUSE

FLOOR. MAINTAIN FIRE RATING.

7. EXISTING 34/18 DUCT DOWN TO FOURTH FLOOR TO REMAIN.

8. PRIOR TO THE START OF MECHANICAL WORK, THE MECHANICAL

CONTRACTOR SHALL TAKE AIRFLOW MEASUREMENTS IN EACH BRANCH

OF THE EXISTING SYSTEM.

9. EXHAUST FAN IN PENTHOUSE TO REMAIN AND BE REBALANCED AFTER

DEMOLITION IS COMPLETE.

Mark: Revision: Date:

F

H

I.1

J.1

18 19 21 22 23.2

25.5

26N 27 28

B

A.

24.123.522.5

B.1

A.1

H.

C.1

D

G

I.

I.2

J.2

(E)36/18

(E)L

(R)EF

(R)EF

(E)EF2

22.7

(E)36/18 DN

PHASE 1 PHASE 2

PHASE 1 PHASE 2

PHASE 1 PHASE 2

PHASE 1 PHASE 2

PHASE 1 PHASE 2

PHASE 1 PHASE 2

M A

T C

H L

IN

E M

A T

C H

L

IN

E M

A T

C H

L

IN

E M

A T

C H

L

IN

E M

A T

C H

L

IN

E M

A T

C H

L

IN

E

(E)EF

PROJECT NUMBER:

CHECKED BY:

DESIGNED BY:

1650 WATERMARK DRIVE

COLUMBUS, OHIO 43215

SUITE 200

DRAWN BY:

0 4'-0" 8'-0" 16'-0"

PLAN

NORTH

PHASE 2

KEY PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

Phase

ARCHITECT OF RECORD STAMPENGINEERS OF RECORD

321 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

A/E:

2016-0205

C :\L

O C

A L

R E

V

IT

\1 6-

-V

A M ar io n B ld g

4 t h

F lr

R en o M

E C

H J

E S

S E

.r vt

/1

/2

:2

:0

P

M

MD-105.2

610-17-101

03/19/2018 W. Phil Stafa C. Jesse Whitehead

Project Director

1700 E. 38TH STREET MARION, IN 46953

VISN 11 MARION B-138: 4TH FLOOR

CONSTRUCTION

SPRINKLERED

HDR ARCHITECTURE, INC.

600 HENNEPIN AVE SUITE 260

MINNEAPOLIS, MN 55403

612.524.6000

TERRY LITTELL SR., RA,

LEED AP

KORDA, INC.

1650 WATERMARK DRIVE, SUITE 200

COLUMBUS, OH 43215

614.487.1650

STAN KMONK

C. Jesse Whitehead

Dan Edwartoski

W. Phil Stafa

METRIC ENVIRONMENTAL

6971 HILLSDALE COURT

INDIANAPOLIS, IN 46250

ROOF HVAC DEMOLITION PLAN

PHASE 2

ISSUED FOR

CONSTRUCTION

N 0' 4' 8'2'1'

SCALE: 1/8" = 1'-0"E1

ROOF PLAN PHASE 2

DEMOLITION PLAN

CODED NOTES:

1. REMOVE EXHAUST FAN AND DUCTWORK THROUGH ROOF. PATCH ROOF TO

MATCH EXISTING MATERIALS, INCLUDING INSULATION. MATCH EXISTING

SIZES.

2. EXISTING BIOHAZARD EXHAUST FAN AND DUCTWORK THROUGH ROOF TO

REMAIN.

3. EXISTING EXHAUST SYSTEM SERVING FLOORS BELOW TO REMAIN.

Mark: Revision: Date:

416416

OIT

415415

ELEC

414414

EQ

477477

ELEC

433433

WAITING

438438

CHECK-IN

KIOSK

436436

W.C. ALC.

439439

CONF.

478478

HAC

481481

STOR. EQ.

490490

CRASH

CART

491491

W.C. ALC.

413413

OFC,

OPTH.

CHIEF

411411

OFC,

OPTH./OPT.

CHIEF

412412

OFC, OPT.

CHIEF

410B410B

EYE PROV.

410C410C

EYE PROV.

410A410A

EYE PROV.

408408

LOUNGE

409409

TLT,

STAFF

407B407B

CLERICAL

407A407A

CLERICAL

479479

RECEP.

489489

SUPP. EQ.

440440

WAITING

434434

RECEP.

435435

EYE WAIT

493493

FITTING

483483

EXAM,

OPTH.

482482

EXAM,

OPT.

485485

EXAM,

OPT.

484484

EXAM,

OPT.

405405

SOIL UTIL.

406406

PHOTO

401401

CLN SUP

487487

PRETEST

480480

PRETEST

431431

INST. CAL.

430430

HEARING

AID FAB.429429

LOUNGE

428428

OFC, AUD.

CHIEF

425425

CERUMEN

MGMT.

417417

EXAM

419419

EXAM

420420

EXAM

426426

TLT, PAT.

432432

REC.

421421

EXAM

TECH.

422B422B

AUDIO

EXAM

423B423B

AUDIO

EXAM

424B424B

AUDIO

EXAM

427427

STOR. EQ.

402402

VISUAL

FIELDS

488488

PRETEST

403403

US / OPT.

COH.

486486

DIL. WAIT

492492

PAT. ED.

404404

STOR. EQ. 400A400A

CORR

400F400F

CORR.

400G400G

CORR.

400A400A

CORR

400H400H

CORR.

400I400I

CORR.

422A422A

AUDIO

CONTROL

423A423A

AUDIO

CONTROL

424A424A

AUDIO

CONTROL

441441

TLT

442442

TLT

400J400J

CORR

1.

C

E

F

H

I.1

J.1

2 3 4N 5N 6N 7N 8 9 10 11 12 13 14 15 16 17 18

B

A.

4.5 5.1 6.1 7.1

B.1

A.1

H.

C.1

D

G

I.

I.2

J.2

/1

S

A

16/12 20/12 SA 24/16 SA

40/12 SA

/1

12/10

/1

D1-10"Ø

D1-8"Ø

D1-8"Ø

D1-8"Ø

TB2(1,1.27)

490/240

D1-8"Ø

D2-8"Ø

D2-8"Ø

TB2(1,1.01)

520/240

D1-8"Ø

D2-8"Ø

D2-8"Ø

TB2(1,1.02)

350/300

D2-8"Ø

D2-8"Ø

8/10

TB1(1,1.04)

160/80

D1-8"Ø

D1-8"Ø

D1-10"Ø

TB2(1,1.12)

600/300

TB3(1,1.05)

630/370

TB1(1,1.06)

220/100

TB2(1,1.03)

330/301

D1-8"Ø

D1-8"Ø

D1-8"Ø

D1-8"Ø

D1-8"Ø

D1-6"Ø

TB2(1,1.11)

300/300 D1-8"Ø

D1-8"Ø

D1-8"Ø

40/12 SA

D1-8"Ø

TB2(1,1.19)

335/100

D1-8"Ø

D1-6"Ø

TB2(1,1.13)

480/301

D1-8"Ø

D1-8"Ø

D1-8"Ø

D1-8"Ø

TB1(1,1.14)

240/140 TB1(1,1.16)

220/80

D1-10"Ø

D1-8"Ø

D1-8"Ø

D1-8"Ø

135 D1-6"Ø

D1-8"Ø

TB2(1,1.08)

310/300

TB2(1,1.10)

280/80

D1-8"Ø

D1-8"Ø

12/10 SA

10/10

10/12

10/10

12/10

12/10

(TYP. 2)

D1-8"Ø

D1-8"Ø

D1-10"Ø

D1-10"Ø

D1-8"Ø

D2-8"Ø

D1-8"Ø

D1-8"Ø

D1-8"Ø

D1-8"Ø

D2-8"Ø

D1-6"Ø

D1-8"Ø

D1-8"Ø

D1-8"Ø

D1-8"Ø

D1-6"Ø

D1-8"Ø

TB2(1,1.31)

410/300

TB4(1,1.23)

1080/1080

TB2(1,1.22)

400/300

TB2(1,1.28)

260/130

14/10

/1

D1-10"Ø

D1-8"Ø

R2-22/10

R2-22/10

R2-10/22

8/8

AC13

CD

R2-22/10

R1-22/10

12/10

8/6

TB2(1,1.20)

380/260

/1

TB3(1,1.15)

665/600

8/8

N.I.C.

16/14

TB1(1,1.32)

300/120

TB2(1,1.25)

390/150

18/18

CD

TB2(1,1.09)

420/410

16/12

TB2(1,1.29)

310/160

D1-6"Ø

(TYP. 2)

10/10

/1

D1-6"Ø

(TYP. 4)

TB2(1,1.17)

600/430

26/20

8/10

D1-10"Ø

TB2(1,1.24)

520/380

12/8

R2-22/10

12/10

10/10

/1

30/12

/1

12/10

8/8 8/6

8/88/88/8 8/8

10/8

10/810/8

8/8

/1

8/8

8/8

8/88/8

8/8

8/8

8/8

10/8

72/20

64/20 34/20

/1

18/20

30/12 20/8

/1

/1

12/10

12/10

12/10

14/20

12/8

12/8

8/8

8/8

8/8

R1-22/22

R1-22/10

R1-22/10

R1-22/10

R1-22/10

R1-22/10

R1-22/10

TB2(1,1.18)

440/440

TB2(1,1.07)

320/301

PHASE 1 PHASE 2

PHASE 1 PHASE 2

PHASE 1 PHASE 2

PHASE 1 PHASE 2

PHASE 1 PHASE 2

PHASE 1 PHASE 2

M A

T C

H L

IN

E M

A T

C H

L

IN

E M

A T

C H

L

IN

E M

A T

C H

L

IN

E M

A T

C H

L

IN

E M

A T

C H

L

IN

E

8/8

12/10 10/10

10/12

30/12

R1-22/10

/1

R1-22/10

R1-22/22

R1-22/22

R1-22/22

R1-22/10

R1-22/10

R1-22/10

R1-22/10

R1-22/10

R1-22/10

TB2(1,1.21)

420/300

8/8

R1-22/10

R1-22/10

R1-22/10

8/8

8/8

R1-22/10

R1-22/22

R1-22/10

R1-22/10

R1-10/22

R1-22/10

14/12

R1-22/10

R1-22/10

R1-22/10

R1-22/22

(TYP. 3)

R1-22/10

(TYP. 3)R1-22/10

R2-22/10

R2-22/10

R2-22/10

R2-22/10

R2-22/10

(TYP. 3)

R2-22/10

R1-22/10

R1-22/10

R1-22/10

R1-22/10

/1

R1-22/10

R1-22/10

R1-22/10

10/10

24/10 72/20

72/20

30/42

18/16

B1

MH-403

D2-6"Ø

TB2(1,1.30)

360/300

T

T

T T

T

T

T

T

T

T

T

T

T T

T

T

T

T

T

T

T

T

T

T T

T

CD

D1-6"Ø

40/12

/1

D1-6"Ø

D1-8"Ø

D1-8"Ø

12/10

20/8

12/8

8/12

10/8

8"Ø

8/8

12/12

8/88/8 8/88/8 8/8

/1

8/8

20/12

8/8

8/8

/1

16/10

8/6

8/8 10/10

8/8

/1

10/8

8/8

8/88/8 8/8

8/8

12/10

10/8

8/8

TB2(1,1.26)

290/130

T

T

T

T

T

TB2(1,2.34)

650/550

14/10

T

T /1

/2

8/6

R1-22/10

D1-8"Ø

D1-8"Ø

"Ø

D1-6"Ø

12/10

D1-8"Ø

D1-8"Ø

8/8

12/10

12/10

10/10

10/8

CD

14/8

(TYP)

19 (TYP)

PROJECT NUMBER:

CHECKED BY:

DESIGNED BY:

1650 WATERMARK DRIVE

COLUMBUS, OHIO 43215

SUITE 200

DRAWN BY:

0 4'-0" 8'-0" 16'-0"

PLAN

NORTH

PHASE 1

KEY PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

Phase

ARCHITECT OF RECORD STAMPENGINEERS OF RECORD

321 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

A/E:

2016-0205

C :\L

O C

A L

R E

V

IT

\1 6-

-V

A M ar io n B ld g

4 t h

F lr

R en o M

E C

H J

E S

S E

.r vt

/1

/2

:2

:3

P

M

MH-204.1

610-17-101

03/19/2018 W. Phil Stafa C. Jesse Whitehead

Project Director

1700 E. 38TH STREET MARION, IN 46953

VISN 11 MARION B-138: 4TH FLOOR

CONSTRUCTION

SPRINKLERED

HDR ARCHITECTURE, INC.

600 HENNEPIN AVE SUITE 260

MINNEAPOLIS, MN 55403

612.524.6000

TERRY LITTELL SR., RA,

LEED AP

KORDA, INC.

1650 WATERMARK DRIVE, SUITE 200

COLUMBUS, OH 43215

614.487.1650

STAN KMONK

C. Jesse Whitehead

Dan Edwartoski

W. Phil Stafa

METRIC ENVIRONMENTAL

6971 HILLSDALE COURT

INDIANAPOLIS, IN 46250

FOURTH FLOOR HVAC NEW WORK

PLAN PHASE 1

ISSUED FOR

CONSTRUCTION

N 0' 4' 8'2'1'

SCALE: 1/8" = 1'-0"E1

FOURTH FLOOR PHASE 1

NEW WORK PLAN

CODED NOTES

1. RETURN DUCT UP TO AHU IN NEW PENTHOUSE.

2. SUPPLY DUCT UP TO AHU IN NEW PENTHOUSE.

3. AC UNIT ON WALL. CORRESPONDING ACCU ON ROOF.

4. SUPPLY DUCT UP TO NEW PENTHOUSE AND DOWN TO THIRD FLOOR CEILING

SPACE. CAP IN PENTHOUSE AND IN THIRD FLOOR CEILING SPACE FOR

FUTURE CONNECTION.

5. RETURN DUCT UP TO NEW PENTHOUSE. CAP IN PENTHOUSE FOR FUTURE

CONNECTION.

6. 12/12 EXHAUST DUCT UP TO EF1 ON ROOF.

7. RETURN DUCT DOWN TO THIRD FLOOR CEILING SPACE. CAP IN THIRD

FLOOR CEILING SPACE FOR FUTURE CONNECTION.

8. EXISTING DUCT IN SHAFT TO REMAIN.

9. 16/16 DUCT UP TO EF3 ON ROOF.

10. EXISTING DUCT UP TO EXHAUST FAN IN PENTHOUSE.

11. EXHAUST DUCT DOWN THROUGH FOURTH FLOOR SLAB. CONNECT

TO EXISTING EXHAUST DUCT IN THIRD FLOOR CEILING SPACE.

12. COMBINE RETURN AIR REGISTERS IN ONE 44/22 PLENUM.

13. EXISTING EXHAUST DUCT IN SHAFT TO REMAIN. PROTECT DURING

CONSTRUCTION.

14. EXISTING DUCT TO BE REROUTING INTO NEW CHASE. COORDINATE

REQUIRED SHUTDOWN WITH VA AT LEAST TWO WEEKS IN ADVANCE.

15. COMBINATION FIRE SMOKE DAMPER LOCATED HERE. ENSURE ACTUATOR,

CONTROLS, AND SMOKE DETECTOR ARE ACCESSIBLE VIA WALL ACCESS

PANEL AT THIS LOCATION. COORDINATE SHAFT/WALL FRAMING WITH

GENERAL TRADES CONTRACTOR.

16. REFER TO MH601 DETAIL D1 FOR 3-WAY VALVE PIPING.

17. CONNECT TO EXISTING EXHAUST DUCT BELOW ROOF.

18. ROUTE NEW EXHAUST DUCT DOWN THROUGH CHASE TO THIRD FLOOR

CEILING SPACE. CONNECT TO EXISTING EXHAUST DUCT, SEE CODED NOTE 7

ON DEMOLITION PLAN.

19. LOW ROOF STRUCTURE ALONG COLUMN H. PROVIDE DUCT

TRANSITIONS AS REQUIRED TO AVOID CONFLICT WITH STRUCTURE.

GENERAL NOTES

1. INSTALL DUCTWORK AND TERMINAL BOXES AS HIGH AS POSSIBLE. COORDINATE

DUCT LOCATIONS AND ELEVATIONS WITH HVAC PIPING. COORDINATE WITH CABLE

TRAY LOCATIONS IN CORRIDORS. COORDINATE WITH FIRE PROTECTION PIPING,

PULMBING AND ELECTRICAL CONDUITS.

2. COORDINATE EXACT LOCATION OF DIFFUSERS, GRILLES AND REGISTERS WITH

ARCHITECTURAL REFLECTED CEILING PLANS.

3. UNLESS NOTED OTHERWISE, PROVIDE BRANCH DUCT TO DIFFUSERS SAME SIZE

AS DIFFUSER NECK. FLEXIBLE DUCT CONNECTION TO THE DIFFUSER SHALL BE NO

MORE THAN 5 FEET IN LENGTH.

4. UNLESS NOTED OTHERWISE, PROVIDE BRANCH DUCT TO TERMINAL BOXES SAME

SIZE AS TERMINAL NECK. PROVIDE TRANSITION FROM TERMINAL BOX OUTLET TO

DISTRIBUTING DUCTWORK, AS REQUIRED.

5. PROVIDE VOLUME DAMPERS AS REQUIRED BY THE SPECIFICATIONS AND SHOWN

IN TYPICAL DETAILS. LOCATE VOLUME DAMPERS IN ACCESSIBLE LOCATIONS.

6. PROVIDE TEMPERATURE SENSORS TO ALL AIR TERMINAL BOXES. PREFERRED

LOCATIONS ARE SHOWN ON THE PLANS.

Mark: Revision: Date:

477477

ELEC

476476

OIT

459A459A

LAB, GEN.

460A460A

DENTAL

TECH.

460B460B

DENTAL

TECH.

460C460C

DENTAL

TECH.

464464

EQ. MECH.

445445

OFFICE

455455

STOR.,

DENTAL

SUPP.

459D459D

LAB, SHIP/

REC.

453453

SOIL UTIL.

452452

ORAL

SURG.

450450

ORAL

SURG.

448448

CLEAN

465465

HAC

466466

SUB-WAIT

447447

STOR.

STER.

INST.

446A446A

CT

CONTROL

456C456C

WORK,

STF.

DENTIST

458458

OFFICE,

DENTAL

CHIEF

463463

W-LOCKER

462462

M-LOCKER

475475

RECEP. 474474

DTR

473473

DTR

472472

DTR

467467

DTR

471471

DTR

469469

DTR

468468

DTR,

SPECIAL

470470

S/WAITING

444444

OFFICE

461461

LOUNGE

478478

HAC

446B446B

CT, CONE

BEAM

400B400B

CORR.

400C400C

CORR.

400E400E

CORR.

451451

SCRUB

443443

SHELL

456B456B

WORK,

STF.

DENTIST

456A456A

WORK,

STF.

DENTIST

400D400D

CORR.

457457

TLT,

STAFF

442442

TLT

475B475B

TLT, PAT.

475C475C

SUB-WAIT

C

E

F

H

I.1

J.1

18 19 20 21 22 23.2 24N 25.5 26N 27 28 29

B

A.

24.123.522.5

B.1

A.1

H.

C.1

D

G

I.

I.2

J.2

30/20 SA

/1

S

A

/1

12/10

D1-8"Ø

D1-8"Ø

D1-8"Ø

D1-8"Ø

D1-8"Ø

D1-8"Ø

D2-6"Ø

TB3(2,2.34)

500/420

D1-10"Ø

D1-8"Ø

D1-8"Ø

D1-10"Ø

D1-10"Ø

D1-8"Ø

D1-10"Ø

D1-8"Ø

D1-8"Ø

TB3(2,2.39)

645/520

D1-8"Ø

D1-8"Ø

D1-8"Ø

TB2(2,2.36)

260/260

TB2(2,2.37)

400/150

TB1(2,2.38)

120/120

D1-8"Ø

D1-6"Ø

D1-12"Ø

D1-6"Ø

D1-12"Ø

D1-8"Ø

D1-8"Ø

D1-8"Ø

D1-8"Ø

D1-8"Ø

D1-8"Ø

TB2(2,2.50)

260/420

D1-6"Ø

D1-8"Ø

D1-8"Ø

D1-8"Ø

D1-8"Ø

D1-10"Ø

TB2(2,2.52)

660/430

TB2(2,2.49)

570/400

D1-10"Ø

TB3(2,2.42)

580/330

TB4(2,2.41)

915/901

TB3(2,2.43)

760/601

D1-8"Ø

R2-10/22

D1-6"Ø

D1-8"Ø

D1-8"Ø

TB2(2,2.47)

540/410

TB2(2,2.46)

260/260

22.7

3AC2

R1-10/22

12/10 12/10

TB1(2,2.40)

180/80

/1

/1

10/10

10/10

R2-10/22

TB2(2,2.51)

630/300

/1

/1

/1

CD

/1

16/14 SA

TB2(2,2.35)

375/370

12/10

D1-8"Ø

(TYP. 3)

14/14

D1-6"Ø

R1-22/22

10/8

/1

50/20

/1

18/12

/1

8/8

8/8

8/8

8/8 8/8

/8

10/10 12/12

30/1030/14

/8

8/8

8/8

8/8

8/8

12/10 12/10

/1

8/8

R1-22/10

R1-22/10

R1-22/10

R1-22/10

R1-22/10

PHASE 1 PHASE 2

PHASE 1 PHASE 2

PHASE 1 PHASE 2

PHASE 1 PHASE 2

PHASE 1 PHASE 2

PHASE 1 PHASE 2

M A

T C

H L

IN

E M

A T

C H

L

IN

E M

A T

C H

L

IN

E M

A T

C H

L

IN

E M

A T

C H

L

IN

E M

A T

C H

L

IN

E

14/10

/1

R1-22/22

R1-22/22

6/10

14/10

R1-22/10

R1-22/10

R1-22/10

R1-22/10

R1-10/22

R1-22/10

R1-22/10

R1-22/10

R1-22/10

R1-22/10

12/10

R1-22/10

R1-22/10

8/8

8/8

8/8

14/12

12/10

R1-22/10

R1-22/22

10/8

R1-22/10

R1-22/10

M

M

10/8

6/6

10/10

14/10

/2

R1-22/10

14/10

R2-10/22

R2-10/22

44/30

72/20

B4

MH-403

12/10

R1-22/10

R1-22/22

580 1 /1

/8

TB2(2,2.45)

540/410

8/6

R1-10/22

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

CD

D1-6"Ø

D2-6"Ø

14/10

R1-22/22

CD

12/10

10/10

44/14 44/14

TB2(2,2.48)

230/200

10/8

/1

T

T

T

D1-8"Ø

8/88/8

10/10

12/12 SA

D1-8"Ø

D1-8"Ø

10/10

TB2(2,2.53)

320/200

TB2(2,2.44)

425/425

/1

PROJECT NUMBER:

CHECKED BY:

DESIGNED BY:

1650 WATERMARK DRIVE

COLUMBUS, OHIO 43215

SUITE 200

DRAWN BY:

0 4'-0" 8'-0" 16'-0"

PLAN

NORTH

PHASE 2

KEY PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

Phase

ARCHITECT OF RECORD STAMPENGINEERS OF RECORD

321 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

A/E:

2016-0205

C :\L

O C

A L

R E

V

IT

\1 6-

-V

A M ar io n B ld g

4 t h

F lr

R en o M

E C

H J

E S

S E

.r vt

/1

/2

:2

:2

P

M

MH-204.2

610-17-101

03/19/2018 W. Phil Stafa C. Jesse Whitehead

Project Director

1700 E. 38TH STREET MARION, IN 46953

VISN 11 MARION B-138: 4TH FLOOR

CONSTRUCTION

SPRINKLERED

HDR ARCHITECTURE, INC.

600 HENNEPIN AVE SUITE 260

MINNEAPOLIS, MN 55403

612.524.6000

TERRY LITTELL SR., RA,

LEED AP

KORDA, INC.

1650 WATERMARK DRIVE, SUITE 200

COLUMBUS, OH 43215

614.487.1650

STAN KMONK

C. Jesse Whitehead

Dan Edwartoski

W. Phil Stafa

METRIC ENVIRONMENTAL

6971 HILLSDALE COURT

INDIANAPOLIS, IN 46250

FOURTH FLOOR HVAC NEW WORK

PLAN PHASE 2

ISSUED FOR

CONSTRUCTION

N 0' 4' 8'2'1'

SCALE: 1/8" = 1'-0"E1

FOURTH FLOOR PHASE 2

NEW WORK PLAN

CODED NOTES

1. RETURN DUCT UP TO AHU IN NEW PENTHOUSE.

2. SUPPLY DUCT UP TO AHU IN NEW PENTHOUSE.

3. AC UNIT ON WALL. CORRESPONDING ACCU ON ROOF.

4. SUPPLY DUCT UP TO NEW PENTHOUSE AND DOWN TO THIRD FLOOR

CEILING SPACE. CAP IN PENTHOUSE AND IN THIRD FLOOR CEILING

SPACE FOR FUTURE CONNECTION.

5. RETURN DUCT UP TO NEW PENTHOUSE AND DOWN TO THIRD FLOOR

CEILING SPACE. CAP IN PENTHOUSE AND IN THIRD FLOOR CEILING

SPACE FOR FUTURE CONNECTION.

6. 14/14 EXHAUST DUCT UP TO EF2 ON ROOF.

7. EXISTING DUCT IN SHAFT TO REMAIN.

8. 12/12 EXHAUST DUCT UP TO EF4 ON ROOF.

9. EXHAUST HOOD VENTILATING AT 660 CFM. MOTORIZED DAMPER TO

HOOD SHALL CLOSE WHEN HOOD IS POWERED OFF. MOTORIZE

DAMPER TO EXHAUST GRILL ACROSS ROOM SHALL THEN OPEN.

10. COMBINATION FIRE SMOKE DAMPER LOCATED HERE. ENSURE

ACTUATOR, CONTROLS, AND SMOKE DETECTOR ARE ACCESSIBLE VIA

WALL ACCESS PANEL AT THIS LOCATION. COORDINATE SHAFT/WALL

FRAMING WITH GENERAL TRADES CONTRACTOR.

11. THIS WORK SHALL BE PART OF PHASE 1.

12. REFER TO MH601 DETAIL D1 FOR 3-WAY VALVE PIPING.

GENERAL NOTES

1. INSTALL DUCTWORK AND TERMINAL BOXES AS HIGH AS POSSIBLE. COORDINATE

DUCT LOCATIONS AND ELEVATIONS WITH HVAC PIPING. COORDINATE WITH CABLE

TRAY LOCATIONS IN CORRIDORS. COORDINATE WITH FIRE PROTECTION PIPING,

PULMBING AND ELECTRICAL CONDUITS.

2. COORDINATE EXACT LOCATION OF DIFFUSERS, GRILLES AND REGISTERS WITH

ARCHITECTURAL REFLECTED CEILING PLANS.

3. UNLESS NOTED OTHERWISE, PROVIDE BRANCH DUCT TO DIFFUSERS SAME SIZE

AS DIFFUSER NECK. FLEXIBLE DUCT CONNECTION TO THE DIFFUSER SHALL BE NO

MORE THAN 5 FEET IN LENGTH.

4. UNLESS NOTED OTHERWISE, PROVIDE BRANCH DUCT TO TERMINAL BOXES SAME

SIZE AS TERMINAL NECK. PROVIDE TRANSITION FROM TERMINAL BOX OUTLET TO

DISTRIBUTING DUCTWORK, AS REQUIRED.

5. PROVIDE VOLUME DAMPERS AS REQUIRED BY THE SPECIFICATIONS AND SHOWN

IN TYPICAL DETAILS. LOCATE VOLUME DAMPERS IN ACCESSIBLE LOCATIONS.

6. PROVIDE TEMPERATURE SENSORS TO ALL AIR TERMINAL BOXES. PREFERRED

LOCATIONS ARE SHOWN ON THE PLANS.

Mark: Revision: Date:

E

F

H

I.1

J.1

2 3 4N 5N 6N 7N 8 9 10 11 12 13 14 15 16 17

B

A.

4.5 5.1 6.1 7.1

B.1

A.1

H.

C.1

D

G

I.

I.2

J.2

MH-401

E1 EF3EF1

ACCU11

(E) EF

(E) EF

(E) EF

PHASE 1 PHASE 2

PHASE 1 PHASE 2

PHASE 1 PHASE 2

PHASE 1 PHASE 2

PHASE 1 PHASE 2

PHASE 1 PHASE 2

M A

T C

H L

IN

E M

A T

C H

L

IN

E M

A T

C H

L

IN

E M

A T

C H

L

IN

E M

A T

C H

L

IN

E M

A T

C H

L

IN

E

(E)LOUVEREXISTING HAZARDOUS

EXHAUST SYSTEM

(E) EF

MH-404

E1

(E) EF2

PROJECT NUMBER:

CHECKED BY:

DESIGNED BY:

1650 WATERMARK DRIVE

COLUMBUS, OHIO 43215

SUITE 200

DRAWN BY:

0 4'-0" 8'-0" 16'-0"

PLAN

NORTH

PHASE 1

KEY PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

Phase

ARCHITECT OF RECORD STAMPENGINEERS OF RECORD

321 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

A/E:

2016-0205

C :\L

O C

A L

R E

V

IT

\1 6-

-V

A M ar io n B ld g

4 t h

F lr

R en o M

E C

H J

E S

S E

.r vt

/1

/2

:2

:1

P

M

MH-205.1

610-17-101

03/19/2018 W. Phil Stafa C. Jesse Whitehead

Project Director

1700 E. 38TH STREET MARION, IN 46953

VISN 11 MARION B-138: 4TH FLOOR

CONSTRUCTION

SPRINKLERED

HDR ARCHITECTURE, INC.

600 HENNEPIN AVE SUITE 260

MINNEAPOLIS, MN 55403

612.524.6000

TERRY LITTELL SR., RA,

LEED AP

KORDA, INC.

1650 WATERMARK DRIVE, SUITE 200

COLUMBUS, OH 43215

614.487.1650

STAN KMONK

C. Jesse Whitehead

Dan Edwartoski

W. Phil Stafa

METRIC ENVIRONMENTAL

6971 HILLSDALE COURT

INDIANAPOLIS, IN 46250

ROOF HVAC NEW WORK PLAN

PHASE 1

ISSUED FOR

CONSTRUCTION

N 0' 4' 8'2'1'

SCALE: 1/8" = 1'-0"E1

ROOF PLAN PHASE 1

NEW WORK PLAN

CODED NOTES:

1. ACCU1 SERVING AC1 IN O.I.T. 416.

2. REBALANCE FAN TO NEW AIRFLOW AS RECORDED IN PRE-DEMOLITION

BALANCE REPORT.

Mark: Revision: Date:

F

H

I.1

J.1

19 20 21 22 23.2 24N

25.5

26N 27 28

B

A.

24.123.522.5

B.1

A.1

H.

C.1

D

G

I.

I.2

J.2

MH-401

E5

EF2

22.7

(E) EF

(E) EF

ACCU2 1

PHASE 1 PHASE 2

PHASE 1 PHASE 2

PHASE 1 PHASE 2

PHASE 1 PHASE 2

PHASE 1 PHASE 2

PHASE 1 PHASE 2

M A

T C

H L

IN

E M

A T

C H

L

IN

E M

A T

C H

L

IN

E

EF4

MH-404

E5

PROJECT NUMBER:

CHECKED BY:

DESIGNED BY:

1650 WATERMARK DRIVE

COLUMBUS, OHIO 43215

SUITE 200

DRAWN BY:

0 4'-0" 8'-0" 16'-0"

PLAN

NORTH

PHASE 2

KEY PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

Phase

ARCHITECT OF RECORD STAMPENGINEERS OF RECORD

321 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

A/E:

2016-0205

C :\L

O C

A L

R E

V

IT

\1 6-

-V

A M ar io n B ld g

4 t h

F lr

R en o M

E C

H J

E S

S E

.r vt

/1

/2

:2

:0

P

M

MH-205.2

610-17-101

03/19/2018 W. Phil Stafa C. Jesse Whitehead

Project Director

1700 E. 38TH STREET MARION, IN 46953

VISN 11 MARION B-138: 4TH FLOOR

CONSTRUCTION

SPRINKLERED

HDR ARCHITECTURE, INC.

600 HENNEPIN AVE SUITE 260

MINNEAPOLIS, MN 55403

612.524.6000

TERRY LITTELL SR., RA,

LEED AP

KORDA, INC.

1650 WATERMARK DRIVE, SUITE 200

COLUMBUS, OH 43215

614.487.1650

STAN KMONK

C. Jesse Whitehead

Dan Edwartoski

W. Phil Stafa

METRIC ENVIRONMENTAL

6971 HILLSDALE COURT

INDIANAPOLIS, IN 46250

ROOF HVAC NEW WORK PLAN

PHASE 2

ISSUED FOR

CONSTRUCTION

N 0' 4' 8'2'1'

SCALE: 1/8" = 1'-0"E1

ROOF PLAN PHASE 2

NEW WORK PLAN

CODED NOTES:

1. ACCU2 SERVING AC2 IN O.I.T. 477.

2. REBALANCE FAN TO NEW AIRFLOW AS RECORDED IN PRE-DEMOLITION

BALANCE REPORT.

Mark: Revision: Date:

F

5N 6N 7N

B

4.5 5.1 6.1 7.1

B.1

C.1

D

M M

UH1

1"1"

2 1/2"2 1/2"

3"3"

2 1/2"2 1/2"

H W

S

H W

R

96/28

72/24

60/24

M

UH1

1 1/4"

L3-96/84

L1-96/72

L2-72/36

H1

(F)H

D7

MH603

(F)AH

AH1

3"HWS

1 1/2"LPS

2"LPR

4"CWR

4"CWS

3"HWR

1 1/4"

(F)72/20 5 4

C1

MH604

24/24

72/20

1"LPS

3" CLEAN

STEAM

(F)24/24(F)24/24

24/24

42/30

20/2220/26

B7

MH-403

E5

MH-403

1" 16

17 17

12/12

12/12

10/10 T

10/10

DN

1810/10

DN

EF5

F8

MH601

10/10 ABOVEABOVE

C

E

F

23.2 24N 25.5

B

24.123.522.5

B.1

C.1

D

UH2

UH2

L4-96/72

L6-96/84

(F)AH

3"3"

C W

R C

W S

H W

R H

W S

1 1/4"1 1/4"4

L5-72/362

1"1"

2 1/2"2 1/2"

2 1/2"2 1/2"

(F)2 1/2"

(F)3"(F)3"

3"3" 12

22.7

D7

MH603 H2

(F)H

1"LPS

1"

(F)1"LPS

(F )3

"L P

S

AH2

4"CWR

4"CWS

2"LPR

1 1/2"LPS

3"HWS3"HWR

C3

MH604

11 11

M

96/28

72/24

60/24

(F)72/20

M

3" CLEAN

STEAM

24/24

(F)24/24(F)24/24

24/24

H W

SH

W

R

M

16/14

20/30

72/20

1"16

10/10 DN18

10/10 DN 18

10/1010/10

12/12

EF619

F8

MH601

T

12/12

ABOVE ABOVE

PROJECT NUMBER:

CHECKED BY:

DESIGNED BY:

1650 WATERMARK DRIVE

COLUMBUS, OHIO 43215

SUITE 200

DRAWN BY:

0 4'-0" 8'-0" 16'-0"

PLAN

NORTH

KEY PLAN

W E

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

Phase

ARCHITECT OF RECORD STAMPENGINEERS OF RECORD

321 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

A/E:

2016-0205

C :\L

O C

A L

R E

V

IT

\1 6-

-V

A M ar io n B ld g

4 t h

F lr

R en o M

E C

H J

E S

S E

.r vt

/1

/2

:2

:0

P

M

MH-401

610-17-101

03/19/2018 W. Phil Stafa C. Jesse Whitehead

Project Director

1700 E. 38TH STREET MARION, IN 46953

VISN 11 MARION B-138: 4TH FLOOR

CONSTRUCTION

SPRINKLERED

HDR ARCHITECTURE, INC.

600 HENNEPIN AVE SUITE 260

MINNEAPOLIS, MN 55403

612.524.6000

TERRY LITTELL SR., RA,

LEED AP

KORDA, INC.

1650 WATERMARK DRIVE, SUITE 200

COLUMBUS, OH 43215

614.487.1650

STAN KMONK

C. Jesse Whitehead

Dan Edwartoski

W. Phil Stafa

METRIC ENVIRONMENTAL

6971 HILLSDALE COURT

INDIANAPOLIS, IN 46250

HVAC ENLARGED PLANS ISSUED FOR

CONSTRUCTION

N 0' 2' 4'1'

SCALE: 1/4" = 1'-0"E1

ENLARGED PLAN

PENTHOUSE PLAN PHASE 1

N 0' 2' 4'1'

SCALE: 1/4" = 1'-0"E5

ENLARGED PLAN

PENTHOUSE PLAN PHASE 2

CODED NOTES:

1. ECONOMIZER RELIEF LOUVER WITH 24" DUCT AND MOTORIZED DAMPER.

INSTALL BOTTOM OF LOUVER APPROXIMATELY 12 INCHES ABOVE

FINISHED PENTHOUSE FLOOR.

2. RELIEF LOUVER WITH GRAVITY BACKDRAFT DAMPER. INSTALL BOTTOM

OF LOUVER APPROXIMATELY 80 INCHES ABOVE FINISHED PENTHOUSE

FLOOR.

3. O/A INTAKE LOUVER WITH 24" DEEP PLENUM. INSTALL BOTTOM OF

LOUVER APPROXIMATELY 36 INCHES ABOVE PENTHOUSE FLOOR.

4. DUCT DOWN THROUGH PENTHOUSE FLOOR TO SERVE FLOOR 4.

5. DUCT DOWN THROUGH PENTHOUSE FLOOR TO SERVE FLOOR 3. CAP AT

FLOOR FOR CONNECTION TO FUTURE AIR HANDLING UNIT. TRANSITION

TO UNIT WITH FLEXIBLE DUCT CONNECTION.

6. FUTURE AIR HANDLING UNIT, FUTURE PIPING, AND FUTURE DUCTWORK

SHOWN TO INDICATE SPACE REQUIREMENTS.

7. 3" CWS/R VALVED AND CAPPED FOR FUTURE CONNECTION.

8. 96/28 O/A DUCT CAPPED FOR FUTURE CONNECTION.

9. SUSPEND UNIT HEATER FROM STRUCTURE SO BOTTOM OF HEATER IS

NO LOWER THAN 8'-0" ABOVE PENTHOUSE FLOOR.

10. AIR HANDLING UNIT ON 4" HOUSEKEEPING PAD. COIL PULL AND

SERVICE CLEARANCES SHALL BE IN THE WALKWAY IN THE CENTER OF

THE PENTHOUSE.

11. 4" CWS/R, 3" HWS/R 1.5" LPS AND 2" LPR DOWN THROUGH CHASE TO

FLOOR 4 CEILING SPACE.

12. CWS/R AND HWS/R BELOW DUCTWORK. MAINTAIN 7'-0" A.F.F.

CLEARANCE.

13. 1" LPS VALVED AND CAPPED FOR FUTURE CONNECTION.

14. 2-1/2" HWS/R VALVED AND CAPPED FOR FUTURE CONNECTION.

15. 1" LPR VALVED AND CAPPED FOR FUTURE CONNECTION. ROUTE

ADJACENT TO WALL APPROXIMATELY 6 INCHES A.F.F.

16. 1" LPR DOWN THROUGH PENTHOUSE FLOOR TO FLOOR 4 CEILING

SPACE. HEAT TRACE AND INSULATE PIPE BETWEEN PENTHOUSE FLOOR

AND ROOF.

17. 10/10 TRANSFER DUCT DOWN THROUGH PENTHOUSE FLOOR. EXTEND 12

INCHES BELOW PENTHOUSE FLOOR. PROVIDE 90º ELBOW 24 INCHES

ABOVE PENTHOUSE FLOOR.

18. 10/10 EXHAUST DUCT DOWN THROUGH PENTHOUSE FLOOR. EXTEND 12

INCHES BELOW PENTHOUSE FLOOR.

19. SUSPEND EXHAUST FAN NO LOWER THAN 8'-0" ABOVE PENTHOUSE

FLOOR.

20. INSTALL EF THERMOSTAT BELOW PENTHOUSE FLOOR ADJACENT TO

EXHAUST DUCT.

Mark: Revision: Date:

F.1F.1

S.2 T.2 U x xW xY xF xH xI xJB x1 xJ

T U.2R.2 S X xHB

(E) UTILITY PIT

6" CWS

6" CWR

4" HWS

4" HWR

P1 VFD

P2 VFD

4" HWS UP

4" HWR UP

6" CWS UP

6" CWR UP

P4 VFD

P3 VFD

3" (TYP. 4)

HWS

CWR

4" 6"

6"CWS

6"CWS

3"

(TYP. 4)

3"3"

C6

MH603

B7

MH602

C6

MH603

(E) DOMESTIC HW EQP.

(E) LPS

(E) LPR4 (E) 6"FP 6

(E) LPS 5

(E) LPR

LPR(15#)

LPS(15#)

(E) 6"FP

ET

HEX2

HEX1

P4

P3

P2

P1

AS2

AS1

(E)6"CWR

(E)6"CWS

4"HWS

4"HWR

3"HWS

3"HWR

B7

MH602

B7

MH602

B7

MH602

3"LPR

4"LPS

UP

UP

E1

MH-403

2 1/2"

2 1/2"

1"

2 1/2"

(E)

HVAC

PIPING

RPZ ASSEMBLY

(BY P.C.)

(E) 2" SOFTENED

WATER

1" NPW SERVING

HEATING HOT

WATER SYSTEM

1" NPW

1" SOFTENED

WATER

CHEM

E1

MH605

C6

MH605

C3

MH605

A1

MH605

PROJECT NUMBER:

CHECKED BY:

DESIGNED BY:

1650 WATERMARK DRIVE

COLUMBUS, OHIO 43215

SUITE 200

DRAWN BY:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

Phase

ARCHITECT OF RECORD STAMPENGINEERS OF RECORD

321 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

A/E:

2016-0205

C :\L

O C

A L

R E

V

IT

\1 6-

-V

A M ar io n B ld g

4 t h

F lr

R en o M

E C

H J

E S

S E

.r vt

/1

/2

:2

:5

P

M

MH-402

610-17-101

03/19/2018 W. Phil Stafa C. Jesse Whitehead

Project Director

1700 E. 38TH STREET MARION, IN 46953

VISN 11 MARION B-138: 4TH FLOOR

CONSTRUCTION

SPRINKLERED

HDR ARCHITECTURE, INC.

600 HENNEPIN AVE SUITE 260

MINNEAPOLIS, MN 55403

612.524.6000

TERRY LITTELL SR., RA,

LEED AP

KORDA, INC.

1650 WATERMARK DRIVE, SUITE 200

COLUMBUS, OH 43215

614.487.1650

STAN KMONK

C. Jesse Whitehead

Dan Edwartoski

W. Phil Stafa

METRIC ENVIRONMENTAL

6971 HILLSDALE COURT

INDIANAPOLIS, IN 46250

HVAC ENLARGED PLANS ISSUED FOR

CONSTRUCTION

N 0' 2' 4'1'

SCALE: 1/4" = 1'-0"E3

ENLARGED PLAN

BASEMENT

CODED NOTES:

1. INSTALL CHILLED WATER AND HOT WATER PIPES IN THIS APPROXIMATE

LOCATION. PIPES SHALL BE RACK MOUNTED VERTICALLY AND SHALL PASS

ABOVE EXISTING PIPING IN UTILITY PIT. SEAL PIPING PENETRATIONS IN WALLS TO

MAINTAIN FIRE RATING.

2. HOT WATER AIR SEPARATOR SUSPENDED BELOW CHILLED WATER RETURN PIPE.

3. INSTALL HOT WATER CONVERTER IN THE OPEN AREA ADJACENT TO THE

DOMESTIC HOT WATER CONVERTERS.

4. EXISTING LOW PRESSURE CONDENSATE RETURN PIPE AT FLOOR.

5. EXISTING LOW PRESSURE STEAM HEADER OVERHEAD.

6. EXISTING FIRE PROTECTION MAIN AT FLOOR.

7. CONNECT TO EXISTING LOW PRESSURE STEAM DROP AT CAPPED CONNECTION

POINT.

8. EXSITING LOW PRESSURE CONDENSATE RETURN INTO UTILITY PIT.

9. ELEVATOR SHAFT AND ELEVATOR VESTIBULE DEMOLITION DEMOLITION SHALL BE

PERFORMED BY THE GENERAL TRADES CONTRACTOR.

10. COORDINATE PIPE ELEVATIONS AND LOCATIONS WITH EXISTING HVAC PIPING AND

PLUMBING LINES IN THIS ROOM.

11. CONNECT TO EXISTING SOFTENED WATER IN THIS APPROXIMATE LOCATION.

12. REDUCED PRESSURE ZONE BACKFLOW ASSEMBLY SHALL BE PROVIDED BY

PLUMBING CONTRACTOR. PROVIDE ONE BRONZE BODY REDUCED PRESSURE ZONE

ASSEMBLY CONTAINING TWO IN-LINE INDEPENDENT CHECK VALVES, BALL TYPE

TEST COCKS, CAPTURED SPRINGS AND REPLACEABLE CHECK SEATS WITH

INTERMEDIATE RELIEF VALVE, 1" DIAMETER THREADED CONNECTIONS WITH BALL

TYPE ISOLATION VALVES. PLUMB WATER OUTLED TO DISCHARGE 2" ABOVE THE

NEAREST FLOOR DRAIN.

13. HOT WATER CHEMICAL SHOT FEEDER ON 24" X 24" X 4" CONCRETE HOUSEKEEPING

PAD.

GENERAL NOTES

1. ALL HOT WATER PIPE RUN OUTS TO TERMINAL BOXES SHALL BE 3/4" UNLESS

NOTED ON PLAN.

2. INSTALL HVAC PIPING AS HIGH AS POSSIBLE. COORDINATE PIPE ROUTING

AND PIPE ELEVATIONS WITH SHEET METAL DRAWINGS AND WITH CABLE

TRAY.

Mark: Revision: Date:

04_FOURTH FLOOR

137' - 9 3/4"

FH G

04_FOURTH FLOOR

137' - 9 3/4"

05_ROOF SLAB

150' - 4"

8/8

40/12

50/12

12/10

D1-8"Ø

TB2(1,1.18)

440/440

8/8

04_FOURTH FLOOR

137' - 9 3/4"

04_FOURTH FLOOR

137' - 9 3/4"

EF

04_FOURTH FLOOR

137' - 9 3/4"

05_ROOF SLAB

150' - 4"

D1-8"Ø

TB2(2,2.35)

375/370

16/14

R1-22/10

10/10

CABLE TRAY BELOW

HVAC. REFER TO

TECH DWGS.

5N 6N 7N5.8 6.6

PENTHOUSE

165' - 2 3/4"

NEW PENTHOUSE

PLAN

154' - 0"

4.7 7.3

NEW PENTHOUSE

ROOFING

165' - 6"

4.6 7.4

07_xROOFTOP

PENTHOUSE

162' - 4"

06_TO STONE COPING

153' - 6 1/4"

28/96 72/24

L3-96/84

AH1 84/96

3" 1 1/4"

2 1/2"HWS

2 1/2"HWR

(F)24/72(F)72/24

(F)AH

E5

MH-403

1 1/4"

LEVEL 1

100' - 0"

00_BASEMENT

87' - 4 3/4"

LEVEL 1

100' - 0"

14 15

00_BASEMENT

87' - 4 3/4"

01_FIRST FLOOR

100' - 0"

BASEMENT

87' - 4 3/4"

AS1

4" 4"

P1

P2

4"

6"CWS

4"HWR

4"HWS

P4 P3

4"HWR

3"3"

6"CWS

6"CWR

CHEM

05_ROOF SLAB

150' - 4"

07_xROOFTOP

PENTHOUSE

162' - 4"

06_TO STONE COPING

153' - 6 1/4"

B7

MH-403

(F)72/24 24/6024/72

/2

/7

36/72

UH1

AH1

3"

1 1/4"1 1/4"

1"

MD

L1-96/72

L2-72/36

MD

EF5

BD

PROJECT NUMBER:

CHECKED BY:

DESIGNED BY:

1650 WATERMARK DRIVE

COLUMBUS, OHIO 43215

SUITE 200

DRAWN BY:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

Phase

ARCHITECT OF RECORD STAMPENGINEERS OF RECORD

321 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

A/E:

2016-0205

C :\L

O C

A L

R E

V

IT

\1 6-

-V

A M ar io n B ld g

4 t h

F lr

R en o M

E C

H J

E S

S E

.r vt

/1

/2

:2

:1

P

M

MH-403

610-17-101

03/19/2018 W. Phil Stafa C. Jesse Whitehead

Project Director

1700 E. 38TH STREET MARION, IN 46953

VISN 11 MARION B-138: 4TH FLOOR

CONSTRUCTION

SPRINKLERED

HDR ARCHITECTURE, INC.

600 HENNEPIN AVE SUITE 260

MINNEAPOLIS, MN 55403

612.524.6000

TERRY LITTELL SR., RA,

LEED AP

KORDA, INC.

1650 WATERMARK DRIVE, SUITE 200

COLUMBUS, OH 43215

614.487.1650

STAN KMONK

C. Jesse Whitehead

Dan Edwartoski

W. Phil Stafa

METRIC ENVIRONMENTAL

6971 HILLSDALE COURT

INDIANAPOLIS, IN 46250

HVAC SECTIONS ISSUED FOR

CONSTRUCTION

0' 2' 4'1'

SECTION

SCALE: 1/4" = 1'-0"B1

CORRIDOR 400A

0' 2' 4'1'

SECTION

SCALE: 1/4" = 1'-0"B4

CORRIDOR 400B

0' 2' 4'1'

SECTION

SCALE: 1/4" = 1'-0"B7

PENTHOUSE PHASE 1

0' 2' 4'1'

SECTION

SCALE: 1/4" = 1'-0"E1

BASEMENT

0' 2' 4'1'

SECTION

SCALE: 1/4" = 1'-0"E5

PENTHOUSE PHASE 1

Mark: Revision: Date:

F

5N 6N 7N

B

4.5 5.1 6.1 7.1

B.1

C.1

D

1"1"

3"3"

H W

S

H W

R

(F)72/20 2 1

24/24

72/20

(F)24/24(F)24/24

24/24

42/30

20/22

20/26

4"CWR

4"CWS

3"HWR

3"HWS

1 1/2"LPS

UH1

H1

(F)H

(F)RTU

RTU1

1"

2 1/2"2 1/2"

3"

C

E

F

23.2 24N 25.5

B

24.123.522.5

B.1

C.1

D

22.7

C W

R C

W S

H W

R H

W S

1"1"

3"3"

(F)72/20

24/24 (F)24/24(F)24/2424/24

H W

SH

W

R

(F)30/44

16/14

20/30

72/20

H2

(F)H

UH2

4"CWR 3"HWS

1 1/2"LPS4"CWS

3"HWR

(F)RTU

RTU2

1"

3"

PROJECT NUMBER:

CHECKED BY:

DESIGNED BY:

1650 WATERMARK DRIVE

COLUMBUS, OHIO 43215

SUITE 200

DRAWN BY:

0 4'-0" 8'-0" 16'-0"

PLAN

NORTH

KEY PLAN

W E

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

Phase

ARCHITECT OF RECORD STAMPENGINEERS OF RECORD

321 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

A/E:

2016-0205

C :\L

O C

A L

R E

V

IT

\1 6-

-V

A M ar io n B ld g

4 t h

F lr

R en o M

E C

H J

E S

S E

.r vt

/1

/2

:2

:1

P

M

MH-404

610-17-101

03/19/2018 W. Phil Stafa C. Jesse Whitehead

Project Director

1700 E. 38TH STREET MARION, IN 46953

VISN 11 MARION B-138: 4TH FLOOR

CONSTRUCTION

SPRINKLERED

HDR ARCHITECTURE, INC.

600 HENNEPIN AVE SUITE 260

MINNEAPOLIS, MN 55403

612.524.6000

TERRY LITTELL SR., RA,

LEED AP

KORDA, INC.

1650 WATERMARK DRIVE, SUITE 200

COLUMBUS, OH 43215

614.487.1650

STAN KMONK

C. Jesse Whitehead

Dan Edwartoski

W. Phil Stafa

METRIC ENVIRONMENTAL

6971 HILLSDALE COURT

INDIANAPOLIS, IN 46250

HVAC ENLARGED PLANS -

ALTERNATE ROOFTOP UNITS

ISSUED FOR

CONSTRUCTION

N 0' 2' 4'1'

SCALE: 1/4" = 1'-0"E1

ENLARGED PLAN

ROOF PLAN PHASE 1 - ALTERNATE N

0' 2' 4'1'

SCALE: 1/4" = 1'-0"E5

ENLARGED PLAN

ROOF PLAN PHASE 2 - ALTERNATE

CODED NOTES:

1. DUCT DOWN THROUGH ROOF TO SERVE FLOOR 4.

2. DUCT DOWN THROUGH ROOF TO SERVE FLOOR 3. CAP ABOVE ROOF FOR

CONNECTION TO FUTURE AIR HANDLING UNIT. SEAL WATER TIGHT.

3. FUTURE ROOFTOP UNIT, FUTURE PIPING, AND FUTURE DUCTWORK SHOWN

TO INDICATE SPACE REQUIREMENTS.

4. 3" CWS/R VALVED AND CAPPED FOR FUTURE CONNECTION.

5. SUSPEND UNIT HEATER FROM VETIBULE STRUCTURE SO BOTTOM OF

HEATER IS NO LOWER THAN 8'-0" ABOVE VESTIBULE FLOOR.

6. 4" CWS/R, 3" HWS/R AND 1.5" LPS DOWN THROUGH CHASE TO FLOOR 4

CEILING SPACE.

7. INSTALL HVAC PIPING A MINIMUM OF 7'-0" VESTIBULE FLOOR.

8. 1" LPS VALVED AND CAPPED FOR FUTURE CONNECTION.

9. 2-1/2" HWS/R VALVED AND CAPPED FOR FUTURE CONNECTION.

10. 1" LPR DOWN THROUGH VESTIBULE FLOOR TO FLOOR 4 CEILING SPACE.

HEAT TRACE AND INSULATE PIPE BETWEEN VESTIBULE FLOOR AND ROOF.

CAP 12 INCHES ABOVE PENTHOUSE FLOOR FOR FUTURE CONNECTION.

11. 1" LPR DOWN THROUGH VESTIBULE FLOOR TO FLOOR 4 CEILING SPACE.

HEAT TRACE AND INSULATE PIPE BETWEEN PENTHOUSE FLOOR AND ROOF.

12. FUTURE 3" CLEAN STEAM LINE.

ALTERNATE NOTES (ROOF MOUNTED AHU):

1. THE PROPOSED ALTERNATE IS TO PROVIDE EXTERNAL ROOF MOUNTED

AIR HANDLING UNITS THAT UTILIZE THE SAME UTILITIES (HWS/R, CWS/R AND

LPS/R) AS THE BASE BID AIR HANDLING UNITS. THE UNITS SHALL BE

CAPABLE OF DELIVERING THE SPECIFIED PERFORMANCE LISTED FOR THE

BASE BID AIR HANDLING UNITS. THE AIR HANDLING UNITS SHALL SIT ON A

STRUCTURE RAISED ABOVE THE ROOF. A WEATHER TIGHT INSULATED

VESTIBULE MANUFACTURED AS PART OF THE ROOFTOP UNIT WILL HOUSE

THE ELECTRICAL PANELS, HVAC PIPING, CLEAN STEAM HUMIDIFIERS AND

SHALL BE HEATED FOR FREEZE PROTECTION AND SHALL BE VENTILATED.

PLANNING FOR FUTURE EQUIPMENT TO SUPPORT THE FUTURE AIR

HANDLING UNIT SHALL BE ACCOMMODATED. THE VESTIBULE SHALL HAVE A

MAN DOOR, ACCESS STAIR WITH HAND RAILS, EXHAUST FAN AND INTAKE

LOUVER. THE STRUCTURE SHALL BE DESIGNED TO ACCOMMODATE A

FUTURE ROOFTOP UNIT THAT WILL SERVE THE THIRDS FLOOR. THE

VESTIBULE WALLS SHALL BE REMOVABLE TO ACCOMMODATE THE

ADDITION OF THE FUTURE THIRD FLOOR AIR HANDLING UNIT. COIL PULLS

SHALL BE FROM THE ROOF OF THE UNIT. HVAC PIPING SHALL ENTER THE

FLOOR OF THE VESTIBULE AND SHALL BE INSULATED AND HEAT TRACED.

Mark: Revision: Date:

NOTE: ALL SYMBOLS NOT NECESSARILY USED

HVAC SYMBOLS LIST

HEAT PUMP WATER SUPPLY

HEAT PUMP WATER RETURN

UNDERFLOOR PIPING

EXISTING TO REMAIN

EXISTING TO BE REMOVED

EXISTING TO BE ABANDONDED

SPECIALTIES

HEATING WATER SUPPLY

PIPING

DUCTWORK AND MISCELLANEOUS

HEATING WATER RETURN

CHILLED WATER SUPPLY

CHILLED WATER RETURN

CONDENSER WATER SUPPLY

CONDENSER WATER RETURN

PROCESS WATER SUPPLY

PROCESS WATER RETURN

HEAT RECOVERY SUPPLY

HEAT RECOVERY RETURN

LOW PRESSURE STEAM

LOW PRESSURE CONDENSATE

HIGH PRESSURE STEAM

HIGH PRESSURE CONDENSATE

CONDENSATE PUMP DISCHARGE

REFRIGERANT LIQUID

REFRIGERANT SUCTION

REFRIGERANT HOT GAS

COOLING COIL CONDENSATE

VENT

HWS

HWR

CWS

CWR

CS

CR

PWS

PWR

HRS

HRR

LPS( #)

LPR( #)

HPS(# )

HPR(# )

CPD

L

S

HG

C

V

HPWS

HPWR

(E)

(R)

(AB)

SOLENOID VALVE

PRESSURE RELIEF VALVE

PRESSURE REDUCING VALVE

PLUG VALVE

GLOBE VALVE

ISOLATION VALVE - SEE PROJECT

EXPANSION VALVE

CHECK VALVE

BUTTERFLY VALVE

BALL VALVE

BALANCE/SHUT-OFF VALVE

3-WAY CONTROL VALVE

2-WAY CONTROL VALVE

VALVES

SIGHT GLASS

FIRE RATED PIPE SLEEVE

PIPE ALIGNMENT GUIDE

PRESSURE/TEMPERATURE TEST PLUG

RISE

DROP

CAP

PIPE ANCHOR

METER

HEAT TRACED PIPE

GAUGE WITH BALL VALVE

FLOW SWITCH

FLOW ARROW

FLEXIBLE CONNECTION

FILL FUNNEL

ECCENTRIC REDUCER

ECCENTRIC INCREASER

CONCENTRIC REDUCER

CONCENTRIC INCREASER

AUTOMATIC AIR VENT WITH

VACUUM BREAKER

UNION OR FLANGE

STEAM TRAP

THRUST BLOCK

THERMOMETER

STRAINER

VALVE IN RISER/DROP

ACCESS DOOR A.D.

A.D.

SMOKE DAMPER

MOTOR OPERATED DAMPER

COMB. FIRE/SMOKE DAMPER

VOLUME DAMPER

DUCT CHANGE IN ELEVATION UP (OR DOWN)

FLEX DUCT

HUMIDISTAT OR HUMIDITY SENSOR

DIFFUSER

RETURN AIR DEVICE

TERMINAL BOXES, WITH/WITHOUT REHEAT

TURNING VANES

DUCT SECTIONS

POSITIVE PRESSURE (SUPPLY/OUTSIDE)

NEGATIVE PRESSURE (RETURN/RELIEF)

SPIN-IN FITTING

CONNECT TO EXISTING

(MOUNT 48" A.F.F. U.N.O.)

THERMOSTAT OR SPACE TEMPERATURE

SENSOR (MOUNT 48" A.F.F. U.N.O.)

SMOKE DETECTOR BY DIV. 26

DOOR AT EACH OF THESE LOCATIONS

DIV 23 TO PROVIDE DUCT ACCESS

CD

SD

FD

FIRE DAMPER

OC

FOR COORDINATION OR REFERENCE

DENOTES ITEM PROVIDED BY

ANOTHER CONTRACTOR, SHOWN

SPECIFICATIONS FOR REQUIREMENTS

GATE VALVE

MANUAL AIR VENT

BALL VALVE M

NEGATIVE PRESSURE (EXHAUST)

RISE

DROP

RISE

DROP

RISE

DROP

TAG MODEL TYPELOCATION

MIN. O.A.

CFM

UNIT DATA

AIR HANDLING UNIT SCHEDULE

KEY: F.C.-FORWARD CURVED, B.I.-BACKWARD INCLINED, A.F.-AIRFOIL,

CFM

E.S.P.

IN. W.G. TYPE

WHEEL

S.F. MOTOR DATA

VOLTSHPRPM PHASE

REMARKS

SUPPLY FAN DATA

T.S.P.

IN. W.G.

AH1 PENTHOUSE PHASE 1

AREA SERVED TAG

R.F. MOTOR DATARETURN FAN DATA RELATED COMPONENT TAGS

(COILS, FILTERS, ETC.)

= THERMOSTAT

= PLUG-IN UNIT

= CONTROL PANEL WITH INTEGRAL DISCONNECT SWITCH

= DISCONNECT SWITCH

INDICATED ELECTRICAL COMPONENTS:

B = TWO SPEED STARTERS

= CONTROL PANEL

= LINE VOLTAGE STARTERD

C

F

E = STARTER

= EMERGENCY POWER

= VARIABLE FREQUENCY DRIVE

H

G

K

J = WALL SWITCHLA

E.C.H.C.

FOURTH FLOOR SOUTH CSAA 30 INDOOR 4,200

SF1A/

2.5 4.90 B.I. 1,994 7.5

208 3 G A CC1, HC1, PF1, FF1

H.C.-HVAC CONTRACTOR, E.C.-ELECTRICAL CONTRACTOR

PROVIDED BY

12,500

CFM

E.S.P.

IN. W.G. TYPE

WHEEL

VOLTSHPRPM PHASE

T.S.P.

IN. W.G.

TAG

E.C.H.C.

RF1 2.0 2.5 B.I. 1,673

208 3 G A

PROVIDED BY

12,500

TAG LOCATION

CHILLED WATER COIL SCHEDULE

CFM

TOTAL

MBH MBH

SENSIBLE

FT. HD.

W.P.D.

°F°F

E.W.T. L.W.T.

E.A.T. °F

W.B.2IN. W.G. D.B.FT

A.P.D. TOTAL

D.B. W.B.

ROWS

L.A.T. °F

FINS/

VELOCITY

FACE

REMARKS

HIGH

NO. OF SECTIONS

WIDEGPM

TOTAL

CC1 AH1 12,500 500 345 100 45 55 12.5 0.462 29.90 80.0 67.0 55.0 54.1 6 78 1 1 418

HEATING HOT WATER COIL SCHEDULE

MIN. O.A.

CFM

HEATING CFMTAG LOCATION CFM MBH

FT. HD.

W.P.D.

°F°F

E.W.T. L.W.T.

E.A.T. °F

2IN. W.G. FT

A.P.D. TOTAL

ROWSL.A.T. °F FINS/

VELOCITY

FACE

REMARKS

HIGH

NO. OF SECTIONS

WIDEGPM

TOTAL

HC1 AH1 12,500 4,200 377 25 180 150 1.34 0.053 28.69 1 80 1 1 43612,500 45 75

LOCATIONTAG TYPE MBH CFM

E.A.T. L.A.T. E.W.T.

RPM

L.W.T.

GPM

W.P.D.

FT. HD.

HP VOLTS PHASE

UNIT DATA AIR DATA WATER DATA MOTOR DATA

HOT WATER UNIT HEATER SCHEDULE

REMARKS

°F °F °F °F

(2)UH1 PENTHOUSE PHASE 1 HORIZ. 51.7 1,400 50 84 180 150 3.6 0.1 1/12 1,000 120 1

= PLUG-IN UNIT

= EMERGENCY POWER

= VARIABLE FREQUENCY DRIVE= CONTROL PANEL= DISCONNECT SWITCH

= CONTROL PANEL WITH INTEGRAL DISCONNECT SWITCH

CODED NOTES:

B

CA

= LINE VOLTAGE PANEL = TWO SPEED STARTERS

= REDUCED VOLTAGE STARTERE

FD H

JG = WALL SWITCH

= THERMOSTAT

L

K

DIV 23

INDICATED

COMPONENTS

PROVIDED BY

DIV 26

TAG

AIR FILTER SCHEDULE

FACE

VELOCITY

AREA

(SF)

A.P.D.

CFM

(FPM)

MERV

EFF %

PF1

AH UNIT

SERVED

TYPEDESCRIPTION REMARKS

AH1 PRE-FILTER 12,500

PLEATED FLAT

8 443 28.22 0.627

TAG

AIR FLOW MEASURING STATION SCHEDULE

LOCATION INLET

PROBE

FAN DUCT

TYPE DIMENSION

REC.

(H X W)

FLT. OVL. ROUND

(DIA.)

REMARKS

(H X W)

AFMD1R AH1 RETURN

LOCATIONTAG

UNIT DATA

FAN SCHEDULE

FUNCTION

FAN

TYPE

WHEEL

TYPE

TIP SPEED

FPM

T.S.P.

IN. W.G.

TYPE

OF CONTROL

CFM RPM

TYPE

OF DRIVE

TYPE

OF DAMPER

RPMHP VOLTS PHASE

MOTOR DATA

KEY: CENT.-CENTRIFUGAL, PROP.-PROPELLER, F.C.-FORWARD CURVED,

B.I.-BACKWARD, INCLINED, A.F.-AIRFOIL.

REMARKS

SOUND

RATING

IN SONES

EF1 ROOF AREA PHASE 1 TOILET EXHAUST B.I. CENT. 5,063 0.625 300 1,934 BELT MOTORIZED 1/3 1,725 120 1 14.8

= PLUG-IN UNIT

= EMERGENCY POWER

= VARIABLE FREQUENCY DRIVE= CONTROL PANEL= DISCONNECT SWITCH

= CONTROL PANEL WITH INTEGRAL DISCONNECT SWITCH

CODED NOTES:

B

CA

= LINE VOLTAGE PANEL = TWO SPEED STARTERS

= REDUCED VOLTAGE STARTERE

FD H

JG = WALL SWITCH

= THERMOSTAT

L

K

INDICATED

COMPONENTS

PROVIDED BY

DIV 23 DIV 26

AH2 PENTHOUSE PHASE 2

FOURTH FLOOR NORTH

SF1B (QTY 2) (QTY 2)

CSAA 30 INDOOR 3,200

SF2A/

2.5 4.20 B.I. 1,741 7.5

208 3 G A CC2, HC2, PF2, FF29,500 RF2 2.0 2.3 B.I. 1,428

208 3 G A9,500

SF2B (QTY 2) (QTY 2)

PF2 AH2

FILTER

FF1 AH1

FINAL FILTER 9,500 12" CARTRIDGE 15 337 28.22 0.706FF2 AH2

FT

CC2 AH2 9,500

FT

9,500 3,200 333 22 180 150 1.05 0.032 28.69 1 80 1 1 3319,500 45 78HC2 AH2

K A

(2)UH2 PENTHOUSE PHASE 2 HORIZ. 51.7 1,400 50 84 180 150 3.6 0.1 1/12 1,000 120 1 K A

A D

EF2 ROOF AREA PHASE 2 TOILET EXHAUST B.I. CENT. 3,601 0.500 1,000 1,019 BELT 1/6 1,574 120 1 6.6 - A D

EF3 ROOF AREA PHASE 1 TOILET EXHAUST B.I. CENT. 3,911 0.500 600 1,494 BELT 1/6 1,725 120 1 8.4 - A D

MOTORIZED

MOTORIZED

410 275 82 45 55 8.7 0.29 29.90 80.0 67.0 54.1 53.3 6 72 1 1 318

ALL DUCT SIZES ARE RECTANGULAR UNLESS NOTED OTHERWISE

AFMD1O

AFMD1S

AFMD2R

AFMD2O

AFMD2S

AH1 MIN. O.A.

AH1 SUPPLY

AH2 RETURN

AH2 MIN. O.A.

AH2 SUPPLY

X

X

X

X

X

X

EF4 ROOF AREA PHASE 2 LAB EXHAUST B.I. CENT. 5,178 1.000 700 1,978 BELT 1/3 1,725 120 1 13.2 - A DMOTORIZEDL

= B.A.S. INPUTM

M

M

M

PRE-FILTER

FINAL FILTER

9,500

PLEATED FLAT

8 337 28.22 0.587

FILTER

12,500 12" CARTRIDGE 15 443 28.22 0.749

(IN. W.G.)

SPARE VFDS FOR BOTH SUPPLY AND

RETURN FANS.

SPARE VFDS FOR BOTH SUPPLY AND

RETURN FANS.

EF5

EF6

PENTHOUSE PHASE 1 VENTILATION B.I. CENT. 5,192 0.25 1,000 1,989 BELT 1/3 1,725 120 1 12.6 A D-K

PENTHOUSE PHASE 2 VENTILATION B.I. CENT. 5,192 0.25 1,000 1,989 BELT 1/3 1,725 120 1 12.6 A D-K

K

K

ROOF MOUNTED AHU ALTERNATE : THE ALTERNATE ROOFTOP AHU PERFORMANCE SHALL MATCH THE BASE BID PERFORMANCE.

F

M

T

V

S

T

H

M

PROJECT NUMBER:

CHECKED BY:

DESIGNED BY:

1650 WATERMARK DRIVE

COLUMBUS, OHIO 43215

SUITE 200

DRAWN BY:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

Phase

ARCHITECT OF RECORD STAMPENGINEERS OF RECORD

321 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

A/E:

2016-0205

C :\L

O C

A L

R E

V

IT

\1 6-

-V

A M ar io n B ld g

4 t h

F lr

R en o M

E C

H J

E S

S E

.r vt

/1

/2

:2

:4

P

M

MH-501

610-17-101

03/19/2018 W. Phil Stafa C. Jesse Whitehead

Project Director

1700 E. 38TH STREET MARION, IN 46953

VISN 11 MARION B-138: 4TH FLOOR

CONSTRUCTION

SPRINKLERED

HDR ARCHITECTURE, INC.

600 HENNEPIN AVE SUITE 260

MINNEAPOLIS, MN 55403

612.524.6000

TERRY LITTELL SR., RA,

LEED AP

KORDA, INC.

1650 WATERMARK DRIVE, SUITE 200

COLUMBUS, OH 43215

614.487.1650

STAN KMONK

C. Jesse Whitehead

Dan Edwartoski

W. Phil Stafa

METRIC ENVIRONMENTAL

6971 HILLSDALE COURT

INDIANAPOLIS, IN 46250

HVAC SCHEDULES & SYMBOLS LIST ISSUED FOR

CONSTRUCTION

Mark: Revision: Date:

0.332ESVTB2

TB4 ESV

TB3 ESV

0.533

0.529

VARIABLE AND CONSTANT AIR VOLUME TERMINAL BOXES WITH HEATING COILS

TB1 ESV 0.326

PD (FTHD)

MAX COIL

°F

L.A.T.

REHEAT TERMINAL BOX SCHEDULE

°F

E.A.T.

WATER

HEATING COIL (BASED ON 180°F EWT)

OF ROWS

MIN. #

GPM

UNIT DATA

TAG SIZE

NECK

MODEL

MAX. S.P.

DROP

@ 2" ∆ P

N.C. LEVEL

MAX. DISCH

CFM

RANGE

SHEETMETAL PLANS

MAX.CFM/MIN.CFM

TAG

REMARKS

PIPING PLANS

TAG

301-600

901-1,500

601-900

80-300

W/ COIL ∆ T

30 55 100

30 55 100

30 55 100

30 55 100

= THERMOSTAT

= PLUG-IN UNITJ

K= TWO SPEED STARTERS

= REDUCED VOLTAGE STRTR.= DISCONNECT SWITCH

= CTRL. PANEL WITH INTEGRAL DISCON. SWITCH

INDICATED ELECTRICAL COMPONENTS:

= LINE VOLTAGE STRTR.

= CONTROL PANEL = VARI. FREQUENCY DRIVE

= EMERGENCY POWER

C

D

E

F

G

H

A

B

LOCATIONTAG

LOUVER SCHEDULE

FUNCTION CFM DAMPER

DIMENSIONS

H X W X D

MAXIMUM

A.P.D.

MAXIMUM

VELOCITY

FPM

REMARKSFACE

FREE

AREA IN. W.G.

L1 PENTHOUSE PHASE 1

ECONOMIZER

84" X 96" X 6" 31.82 25,000 0.1 786 MOTORIZED

LOCATIONTAG

GRILLE, REGISTER & DIFFUSER SCHEDULE

FUNCTION

FACE TYPE/

DESCRIPTION

FRAME

TYPE

LOUVER

TYPE

MATERIAL FINISH DAMPER N.C. MAX. REMARKS

D1 AS NOTED SUPPLY PLAQUE LAYIN - STEEL WHITE IN DUCT 30

-D2 AS NOTED SUPPLY PLAQUE DRYWALL - STEEL WHITE IN DUCT 30

R1 AS NOTED

RETURN/

EGGCRATE LAYIN 1/2"X1/2"X1/2" ALUMINUM WHITE IN DUCT 30

EXHAUST

R2 AS NOTED

RETURN/

EGGCRATE DRYWALL 1/2"X1/2"X1/2" ALUMINUM WHITE IN DUCT 30

EXHAUST

R3 AS NOTED SURFACE STEEL WHITE OBD 30SUPPLY

DEFLECTION

DOUBLE

SPACING

3/4" BLADE

TAG AC LOCATION

NO. FANS

ELECTRICAL DATA

REMARKS

AIR COOLED SPLIT SYSTEM - COOLING ONLY

CAPACITY

MBH

REFRIGERANT VOLTS PHASEM.C.A.

INDICATED

COMPONENTS

PROVIDED BY

HVAC ELEC

CONDENSER DATA

= DISCONNECT SWITCH

= CTRL. PANEL WITH INTEGRAL DISCON. SWITCH

INDICATED ELECTRICAL COMPONENTS:

= LINE VOLTAGE STRTR.

= CONTROL PANELC

D

A

B

B D A24 R410A 1 208 1

COOLING

CAPACITY

MBH

N/A

HEATING

18.3AC1 /

ACCU1

ROOF

ACCU

LOCATION

REMARKS:

CONDENSATE PUMP SHALL BE FURNISHED BY HVAC CONTRACTOR

AND FIELD INSTALLED IN AC BY HVAC CONTRACTOR. PUMP SHALL

BE POWERED FROM A/C UNIT.

OIT

2 UNIT SHALL BE CAPABLE OF 0°F AMBIENT OPERATION.

COL D/3

NECK SIZES ARE GIVEN ON DRAWINGS.

RELIEF

L2 PENTHOUSE PHASE 1 36" X 72" X 6" 8.83 5,000 0.1 566 BACKDRAFTRELIEF

L3 PENTHOUSE PHASE 1 72" X 96" X 6" 26.85 16,000 0.1 596

MOTORIZED

INTAKE

L4 PENTHOUSE PHASE 2

L5 PENTHOUSE PHASE 2

L6 PENTHOUSE PHASE 2

ECONOMIZER

84" X 96" X 6" 31.82 25,000 0.1 786 MOTORIZED

RELIEF

36" X 72" X 6" 8.83 5,000 0.1 566 BACKDRAFTRELIEF

72" X 96" X 6" 26.85 16,000 0.1 596INTAKE

B D A24 R410A 1 208 1N/A 18.3AC2 /

ACCU2

ROOF

1OIT

COL D/19

LOCATIONTAG

PUMP SCHEDULE

FUNCTION TYPE GPM EFF. %

FT.

HD.

SUCTION

SIZE

DISCHARGE

SIZE

IMPELLER

DIAMETER

RPM HP VOLTS PHASE

MOTOR DATA

REMARKS

KEY: C.C.-CLOSE COUPLED END SUCTION,…