36C25018B0816-0003006.doc
DOC document 40 KB Posted
- Attached to
- Reno 4th Fl Bldg 138 610-17-101 Federal contract opportunity
- Solicitation number
- 36C25018B0816
About this file
36C25018B0816 0003 RFI#6 - 36C25018B0816.doc
View the file
Other files for this federal contract opportunity
Show all 37
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR INFORMATION (RFI)
36C25018B0816
| PROJECT NUMBER: |
| 610-17-101 |
| Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents. When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner. |
| PROJECT TITLE: |
| Renovate 4th Floor, Bldg. 138 |
| PROJECT LOCATION: |
| Department of Veterans Affairs |
VA Northern Indiana HCS 1700 E. 38th Street Marion, IN 46953
| SUBMITTED BY: |
| IMS Contracting – Dale LaMarche |
| CITY/STATE: |
| Escanaba, MI. |
| PHONE: |
| 906-789-9021 Ext. 26 |
TO:
Felecia Beamen, Contracting Officer Department of Veterans Affairs Network 10 Contracting Office
8888 Keystone Crossing, Suite 1100
Indianapolis, IN 46240 Felecia.Beamen@va.gov
| RFI NO.: 003 |
| DATE: 09/14/2018 |
| SPEC/DWG. REFERENCE(s): |
Demolition drawings AD103, AD104.1, AD104.2
REPLY NEEDED BY:
1. Drawing AD104.1 & 2-Terrazzo flooring was noted under existing VCT in various rooms during site visit. Terrazzo wall base appears in many rooms. Will terrazzo flooring under the VCT remain?
2. Drawing AD104.1 & 2-Does the 4th floor have 2-3” of lightweight concrete throughout over structural concrete floor?
3. Drawing AD104.1 & 2-Clay tile walls with terrazzo base which are scheduled for demolition typically bear on the structural concrete. Will the depressions left from all wall demolition require concrete floor infills?
4. Drawing AD103- are there any plaster ceilings above ACT ceiling on 3rd floor that will require removal for access? If so how many sqft.?
5. Drawing AD103- Keynotes Y3 and Y4 require wall demolition on 3rd floor. Are all walls clay tile on 3rd floor? And if so can they be patched with steel stud and 5/8 drywall?
REPLY:
1. Terrazzo/topping to remain and be patched as needed as noted in Demolition Note 11 & 17. Terrazzo base is to be removed.
2. From original construction documents, there appears to be 1” terrazzo/topping on the structural deck.
3. As noted in Demolition Note 11 & 17.
4. Where ceiling tile is noted to be removed, plan to remove plaster ceiling in addition to ACT ceiling as needed to access, remove, reconfigure, replace plumbing.
5. It is believed most walls are clay tile. Steel study and 5/8” gypsum board infill are acceptable and as noted in the specification for specific finishes.
REPLY FROM:
DATE:
ATTACHMENTS:
COPY TO: