36C25018B0816-0003007.doc
DOC document 39 KB Posted
- Attached to
- Reno 4th Fl Bldg 138 610-17-101 Federal contract opportunity
- Solicitation number
- 36C25018B0816
About this file
36C25018B0816 0003 RFI#7 - 36C25018B0816.doc
View the file
Other files for this federal contract opportunity
Show all 37
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR INFORMATION (RFI)
36C25018B0816
| PROJECT NUMBER: |
| 610-17-101 |
| Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents. When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner. |
| PROJECT TITLE: |
| Renovate 4th Floor, Bldg. 138 |
| PROJECT LOCATION: |
| Department of Veterans Affairs |
VA Northern Indiana HCS 1700 E. 38th Street Marion, IN 46953
| SUBMITTED BY: |
| IMS Contracting – Dale LaMarche |
| CITY/STATE: |
| Escanaba, MI. |
| PHONE: |
| 906-789-9021 Ext. 26 |
TO:
Felecia Beamen, Contracting Officer Department of Veterans Affairs Network 10 Contracting Office
8888 Keystone Crossing, Suite 1100
Indianapolis, IN 46240 Felecia.Beamen@va.gov
| RFI NO.: 004 |
| DATE: 09/14/2018 |
| SPEC/DWG. REFERENCE(s): |
Spec 02 83 33.13, Drawing AD104.2 * AD104.2
REPLY NEEDED BY:
1. Spec section 02 83 33.13, 1.1A indicates to remove lead-based paint as indicated on existing conditions report. Can this report be furnished?
2. AD104.1 & 2-During site visit it was noted that several areas of exterior walls have peeling paint. Will all paint need to be removed from walls to remain in these rooms since the substrate and paint is no longer bonded in various areas?
3. AD104.1 & 2-In rooms that paint does not appear as peeling will paint need to be removed from walls to remain?
REPLY:
1. The specification section was in error. A report such as this has not been performed.
2. Most of the walls are being covered with new framing and drywall. In some locations, the existing wall will be visible. Where this will be exposed to view, prep and paint per specification 09 91 00.
3. See response to question 2.
REPLY FROM:
DATE:
ATTACHMENTS:
COPY TO: