This is a Work Order document for the Utility Extension Program 07 (UEP 07), a water utility infrastructure project in Texas. The work involves a 6-inch and 8-inch water main replacement along New Jersey Avenue from Colorado Street to Main Street, with a project start date of October 1, 2022, and completion date of October 30, 2022. The scope includes removal and disposal of existing utility mains (126.5 linear feet), installation of AWWA C-900 DR 18 PVC pipe (1,120 linear feet of 6-inch pipe and 83.5 linear feet of 8-inch pipe), installation of ductile iron fittings (535 pounds), gate valves with boxes and vaults, tapping saddles, fire hydrants, water service connections, trenching at various depths, flowable fill for abandoned pipe (21 cubic yards), asphalt and concrete utility cut repairs (535 square feet), traffic control, erosion/sediment control, and job site safety measures. The work order was prepared by Example Construction Company and includes detailed calculations verifying all material quantities.

The document serves as a quantification and verification sheet for work performed under the 2026-2029 term water main extension contract. It contains detailed sketches, measurements, and calculations that substantiate each line item, including pipe removal totals, trench repair dimensions, flowable fill volume computations, and fittings weight calculations. The document is dated October 30, 2022, with fields for both city verification and contractor agreement of quantities, providing a formal record of work scope and material quantities for contract administration and payment purposes.

View the file

Other files

File Type Posted
20-016 Payment Bond.pdf PDF
24-019 HB23 Notice.pdf PDF
8-007 08 Pref Afft.pdf PDF
27-004 Bid Notice.pdf PDF
14-021 Special Provisions.pdf PDF
19-024 Program Details Cover.pdf PDF
22-020 Form CIQ Rev 11.30.15.pdf PDF
18-018 General Conditions.pdf PDF
21-015 Performance Bond.pdf PDF
28-003 AMessageForOurVendors.pdf PDF
7-012 WO Cover.pdf PDF
16-002 Table of Contents.pdf PDF
17-023 COM Specifications.pdf PDF
4-009 Bid Items.pdf PDF
1-010 Pay Notes.pdf PDF
6-012.1.1 UEP 07 WO - Blank.pdf PDF
15-013 Bid Bond.pdf PDF
26-025 Program Details.pdf PDF
23-022 CoM Specs Cover Page.pdf PDF
12-012.1.3 2022.09.13 U22-01 UEP05 - New Jersey Ave WL - Sealed.pdf PDF
5-005 InstructionsInfoForBidders.pdf PDF
25-001 Cover Page (Sealed).pdf PDF
13-006 Notice To Bidders.pdf PDF
11-014 Contract.pdf PDF
10-017 Certificate of Payment.pdf PDF
9-008 Proposal.pdf PDF
2-011 Anticipated Equip List.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sketch/Measurements (Attach additional sheet if necessary)

See Attached Sketch

Calculations (Attach additional sheet if necessary)

See Attached Calculations

(Attach concrete/asphalt tickets)

Quantities verified (City): ## Quantities Agreed (Contractor): ## initial date initial date

( ) Traffic Control

( )" Water Service Connection (Long > 20')

Erosion/Sediment Control 5

Contractor Name (Print): Example Construction Company

Removal & Disposal of Existing Utility Main 126.5

Fire Hydrant (≤ 5' Bury Depth) Fire Hydrant Riser (> 5' Water Main Bury Depth) Ductile Iron Fittings

Description of work:

( x )" Tapping Saddle

GIS Sketch Complete: 10/30/2022

Anchor Coupling / Foster Adapter 1

Total

6" Water Main replacement along New Jersey Avenue from Colorado Street to

-EXAMPLE ONLY-

Unit Price Comment/DescriptionPay Quantities

2026-2029 Term - Water Main Extension - UEP 07 Work Order

10/1/2022 10/30/2022

Start Date:

Completion Date:

Address: New Jersey Avenue

Quantity

Main Street.

( 8 )" AWWA C-900 DR 18 PVC

( 6x1 )" Tapping Saddle 1

( )" DIP Pressure Class 150

( 6 )" AWWA C-900 DR 18 PVC

( )" Pipe Casing ( )

Base Rock Utility Cut Repair

( )" Tapping Sleeve ( )" Tapping Sleeve ( )" Gate Valve & Vault (MJxMJ/FL)

( 1 )" Water Service Connection (Short ≤ 20')

( 6 )" Gate Valve & Box (MJxMJ/FL) ( 8 )" Gate Valve & Box (MJxMJ/FL)

TOTAL = ------ ------

83.5 1,120.0

Trenching Depth ( Deep)

Flowable Fill for Ex. Pipe Abandoned in Place

( Local Street ) Traffic Control

Flowable Fill / 2-Sack Backfill

Trenching Depth ( 0' - 5' Deep) 1,203.5

Asphalt Utility Cut Repair

10/30/2022 10/30/2022

Concrete Utility Cut Repair

Job Site Safety

P:\Engineering Services\Engineering Projects\2026\U26-01 UEP 07\02 LEGAL\2.3 Bid Packet\012.1 UEP 07 WO

Total 8" Pipe = 27.46' + 55.81' = 83.27' ~ (round up) ~ 83.5' Total 6" Pipe = 8.14' + 23.47' + 13.00' + 198.46' + 51.38' + 13.24' + 211.49' + 17.50' + 167.64' + 5.76' + 46.28' + 11.31' + 204.40' + 17.27' + 18.38' + 6.72' + 43.62' + 7.98' + 12.50' + 41.10' = 1,119.64' ~ (round up) ~ 1,120.0' Total Pipe Removed = 27.46' + 55.81' + 13.00' + 17.50' + 12.50' = 126.27' ~ (round up) ~ 126.5' Flowable Fill = 443.00' (6" pipe) + 623.00' (4" pipe) = (π * (6" / 12) ^ 2 * 443') / 27 + (π * (4" / 12) ^ 2 * 623') / 27 = 20.94-cy ~ (round up) ~ 21.0-cy Trench Repair = 83.5' + 1,120.0' = 1,203.50' length >> Width = 4.0' per detail >> 1,203.5' * 4.0' / 9 = 534.9-sf ~ (round up) ~ 535.0-sf Fittings = 12 * (6", 45° bend) + 1 * (8" x 6" cross) + 1 * (6" x 6" cross) + 1 * (8" x 6" tee) + (4 * 6" x 6" tee) = 12 * (39-lbs) + 1 * (98-lbs) + 1 * (79-lbs) + 1 * (81-lbs) + 4 * (68-lbs) = 998.0-lbs

Sketch/Measurements

Calculations

P:\Engineering Services\Engineering Projects\2026\U26-01 UEP 07\02 LEGAL\2.3 Bid Packet\012.1 UEP 07 WO

Water Main