This is a technical specifications document for a Utility Extension Program 07 project in Texas, detailing comprehensive construction standards for right-of-way preparation, excavation, subgrade work, concrete structures, flexible base materials, bituminous treatments, hot mix asphaltic concrete paving, and water line infrastructure. The project encompasses the preparation and construction of streets, sidewalks, curbs, gutters, driveways, valley gutters, center drains, concrete structures including junction boxes and culverts, caliche base courses, bituminous prime and tack coats, hot mix asphaltic concrete surface courses in multiple types (A through F), PVC pipe casings, and complete water distribution systems including PVC pressure pipe, ductile iron pipe, concrete cylinder pipe, valves, valve boxes, and fire hydrants. The specifications establish detailed material requirements, construction methods, tolerances, testing procedures, and quality control standards for each component, with field density tests, surface tolerance testing with rolling straightedges, thickness coring, and compaction verification required throughout construction.
The specifications require strict adherence to AWWA standards for water systems, Texas Highway Department specifications for pavement materials, and ASTM testing standards for all components. Quality factors and payment adjustments apply based on surface tolerance, thickness, and compaction test results, with specific reduction schedules detailed for deficiencies. Contractors must provide proof of material sources, submit job mix formulas, and demonstrate equipment capability through test strips. The City bears costs for initial density and quality control tests, with subsequent testing costs borne by the contractor if initial tests fail. All work must include proper bedding, encasement, and backfill materials meeting specified gradations, with metallic warning tape required for non-metallic pipelines. Contractors are responsible for locating and protecting existing utilities, repairing any damage caused by construction, and complying with all safety and environmental regulations during excavation, trenching, and installation activities.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PREPARATION OF RIGHT OF WAY
1. GENERAL
Includes the preparation of right-of-way for construction by clearing, grubbing, removing and disposing of all obstructions and objectionable material from the right-of-way and designated easements, which is not specifically provided for on the plans.
Obstructions and objectionable material refer to all objects or material that do not meet the quality of standards for the courses of pavement to be constructed or which protrude into the excavation for slopes.
Measurement and Payment - Measurement and payment will be at the units and prices for the applicable bid item in the proposal.
When no specific bid items are included in the bid proposal for work specified under this section this work shall be considered as incidental to other items of work and the cost shall be included in the bid for these items. No separate payment will be made.
2. CONSTRUCTION METHODS
Removal - Obstructions and objectionable material to be removed by blading, plowing, bulldozing, or other methods approved in writing by the Engineer. The use of explosives will not be permitted. Solid objects must be removed to a depth of at least one (1) foot below the finished slope or subgrade elevation. Hollow objects must be removed entirely.
Disposal - Material to be removed from the right-of-way becomes the property of the Contractor. If disposal areas are available, they will be indicated on the plans.
Preservation of Trees and Shrubs - Trees and shrubs to be preserved in the right of way are shown on the plans and must be protected from injury during construction.
Removal of Concrete - Cut concrete at the right-of-way line straight and vertical by sawing or other approved methods prior to the removal of concrete in the right-of-way.
8/07
Subgrade 1
EXCAVATION, EMBANKMENT AND PREPARATION OF SUBGRADE
1. GENERAL
2. CONSTRUCTION METHODS
Subgrade 2
EXCAVATION, EMBANKMENT AND PREPARATION OF SUBGRADE
1. GENERAL
Includes the excavation, embankment and preparation of subgrade determined by the lines, grades and sections shown on the plans and in accordance with the provisions of the specifications.
Excavation - Includes excavation to planned grade, disposal of the material, removal of unsuitable subgrade material and borrow material when required in the construction. All excavation to be classified as common.
Embankment - Consists of excavated or borrow materials placed and compacted in horizontal layers in accordance with the specifications.
Subgrade - The upper eight inches (8") of embankment or the upper eight inches (8") below the roadway excavation finished grade. The subgrade shall extend from six inches (6") back of curb to six inches (6") back of curb where curb and gutter is to be constructed.
Measurement and Payment - Measurement and payment to be at the units and prices for the applicable bid items in the proposal.
2. CONSTRUCTION METHODS
Excavation - Made at the location and to the lines and grades shown on the plans in areas previously prepared in accordance with provisions of Section 2A.
Dispose of excess material not required in the embankment and material that is unsuitable for subgrade. Excavation tolerance to be plus or minus 1/10 foot from the plan grade.
The area between the curb and property line shall be excavated or filled, whichever is necessary, to curb height at back of curb and finished to a straight even surface to the property line. The minimum elevation at the property line shall be the elevation of the top of the curb. The maximum elevation at the property line shall be equal to a rise of 1/4 inch per foot from the back of the curb to the property line.
During the excavation of this project, it will be required that all parkways be excavated and shaped at the same time the roadway is excavated. Excess excavation will be disposed of at locations approved by the Engineer.
Embankment shall be constructed at the locations and to the lines and grades shown on the plans in areas previously prepared in accordance with Section 2A of these specifications. Top eight inches (8") of natural ground to be compacted
Subgrade 3 to embankment density requirements. Embankment shall be constructed from suitable material obtained from the excavation or borrow free of roots, rocks in excess of three inches (3"), debris and other objectionable material. Excavation deficiencies shall be supplemented from a borrow source approved by the Engineer. Embankment shall be constructed in uniform horizontal layers not to exceed eight inches (8") of loose depth and compact with suitable equipment to a minimum of ninety percent (90%) AASHTO T180. The materials shall be processed by aeration or watering to bring the material to the approximate optimum moisture. Dry layers will not be permitted. Soft spots that develop in the embankment shall be removed and replaced with suitable material. No payment will be made for removal of soft spots. Tolerance for embankment grading shall be one-half foot (1/2) plus or minus the plan grade.
Preparation of Subgrade - Eight inches (8") of the upper portion of the embankment or excavation shall be shaped and compacted to a minimum density of 95 percent (95%) AASHTO T180 and finished within a tolerance of one-half inch (1/2") in ten feet (10'). The finished subgrade shall be protected and maintained in a satisfactory condition until covered by succeeding construction.
Compaction Tests - Field density tests will be made by the Owner or by a laboratory selected by the Owner. The Contractor shall notify the Engineer when compaction has been achieved. The Contractor shall allow 24 hours for scheduling of test. Prior to the taking of subgrade density test, the entire subgrade will be tested by proof-rolling using a pneumatic roller weighing not less than 50,000 lbs. gross with tire pressure being not less than 110 psi. Any soft spots, pumping, or other evidence of weakness shall be remedied before density tests are made. Proof rolling shall be in the presence of the Engineer or his duly authorized representative.
The City will pay the cost of initial density tests made on the subgrade. If the subgrade fails to meet the density requirements on the first test, the contractor will be required to have subsequent density tests made by the commercial lab selected by owner. The cost of all subsequent density tests will be born by the contractor.
08/07
Concrete 1
CONCRETE CURB AND GUTTER, SIDEWALKS AND DRIVEWAYS,
VALLEY GUTTERS, CENTER DRAINS AND RIP RAP
1. GENERAL
Includes the construction of concrete curb and gutter, sidewalks, driveways, valley gutters, center drains and rip rap in accordance with lines, grades and the sections shown on the plans and constructed in full compliance with provisions of the specifications.
A proven performance record by the Texas Highway Department shall be supplied by material producers for all materials supplied by them.
2. MATERIALS
Concrete - All concrete other than rip rap shall be Class "A" concrete in accordance with Texas Highway Department specifications Item No. 421. Concrete for rip rap shall be the class as shown on the plans and detail drawings. When no concrete class is shown the plans concrete for rip rap shall be Class "B" concrete.
Concrete batch designs shall be furnished for each project and shall include all classes of concrete proposed for use on the project.
Reinforcing Steel - Reinforcing steel shall be deformed bars or wire mesh fabric conforming to the requirements of "Texas State Department of Highways and Public Transportation 1982 Standard Specifications for Construction of Highways, Streets and Bridges" Item No.
440 and shall be of the sizes and grades as shown on the plans.
The contractor, at his option, may use fiber reinforcing in lieu of the wire mesh for all concrete slab on grade. When fiber reinforcing is used, it shall be "Fiber Mesh" or "Caprolan RC" or approved equal. The material and rate of application shall be approved by the Engineer prior to its use.
Expansion Joints - Bituminous pre-molded joint filler shall be composed of top grade fiber, treated by special impregnation system with water repellent bituminous materials. It shall be a non-extruding type, resilient, expanding on release of compression, preventing open joint crevices. The pre-molded joint filler shall be of such character, that it will not be deformed by handling during hot weather, nor shall it become brittle in cold weather. It shall be free from visible external defects such as holes, ragged or untrue edges, breaks, cracks or tears. It may be covered on both sides with paper to facilitate handling.
The joint filler shall be accurately cut to the dimensions and shapes required. It shall be of the thickness required by the plans, or as specified elsewhere.
Concrete 2
3. CONSTRUCTION METHODS
GENERAL
No concrete shall be placed when, in the Engineers opinion, weather or other conditions would be detrimental to the structure placed. No concrete shall be placed on grade when the ground temperature is 35o F or lower. Concrete may be placed when the ground temperature is rising from 35o F. Concrete placed in cold weather shall be protected from freezing for 72 hours after being placed.
CURB AND GUTTER
EXCAVATION AND SUBGRADE - Excavation for curb, gutter, and combined curb and gutter shall be done with the subgrade excavation for the street. Street subgrade shall extend from six inches (6") back of curb to (6") back of curb and shall be compacted for a full width to a minimum of 95% AASHTO T180-61. Where subgrade is more than three inches (3") below bottom of curb, fill shall be compacted caliche base constructed from six inches (6") back of curb to six inches (6") back of curb as specified for base course.
Whenever subgrade or base is dry or dusty, it shall be thoroughly moistened, not made muddy, before the concrete is placed.
Forms - Forms shall be of steel, of a type to be approved by the Engineer, except that curves may be formed with wood sections built up or laminated, upon prior approval by the Engineer.
The forms shall be attached securely to stakes, shall be set true to line and grade, and braced sufficiently to remain true during the placing and tamping of the concrete. Forms shall be thoroughly cleaned and oiled before each use.
Curves - All changes in direction of the curbs shall be by means of true circular curves of the radii as shown on the plans.
Expansion Joints - Expansion joints shall be placed between curb and gutter sections at the tangent points of all curves, at each side of the inlet boxes, drives, alleyways, and at intervals of not more than forty feet (40') in straight runs. The expansion material shall be pre-molded three-fourths inch (3/4") in thickness, and shall conform to the requirements of expansion material as specified herein. It shall be cut to the full size and shape or the cross section of the curb and gutter, less one-half inch (1/2") from the finished surface thereof. The edges of sections against the joint shall be finished with an edging tool and the joint raked clean of concrete.
Finishing - There shall be provided on the job a metal screed or mule designed to give proper shape to the curb and gutter. It shall be bent to the exact shape of the finished curb and gutter and the forward edge turned up slightly to prevent disturbing the mortar. It shall be designed to ride on the forms and when properly manipulated shall leave the curb and gutter in its proper shaped condition. An "S" trowel shall be used to finish the surface and minor imperfections shall be corrected with a mason's trowel. Care shall be taken to finish
Concrete 3 the gutter flow line to a true, uniform grade. All edges shall be finished with an edging tool, and joints marked with a jointer. Joint marks shall coincide with actual joints and shall be straight and true.
Curing - The completed curb and gutter, shall be cured in accordance with the requirements of the item "Membrane Curing", Texas Highway Department Item 531.
DRIVEWAYS AND ALLEY RETURNS
Driveways and alley returns shall be constructed of Class "A" concrete to the lines and grades as shown on the plans and detail sheets. All driveways and alley returns shall be reinforced as shown on the detail drawings.
Excavation and Subgrade - Excavation shall be accomplished in the same manner as for streets and curbs. The subgrade for all driveways and alley returns shall be compacted to 95% modified proctor density for 8 inches depth.
Driveways for single family residences and property used for two family residential purposes (duplexes) may be placed on the compacted subgrade. All other driveways shall be considered as commercial driveways and shall be constructed on 6 inches compacted flexible base.
Flexible Base - Commercial driveways and alley returns shall be constructed on 6 inches of flexible base conforming to Section 2-C- Flexible Base, Caliche.
Forms - Forms shall be constructed of steel or, when approved by the engineer, wood conforming to the requirements for curb and gutter forms.
Expansion Joints - Expansion joints shall be placed at the ends of abutting curb and gutter at the end of radii for all driveways and alley returns. In addition, expansion joints shall be placed at the ends of abutting sidewalk sections and at any point where the driveway or alley return abuts another concrete structure. Expansion joint material shall be pre-molded three fourths inch (3/4") in thickness, cut to the shape and dimensions required and shall extend the full depth of the concrete.
Finishing - Shaping and finishing of driveways and alley returns shall be accomplished by using a screed to shape the driveway or alley return to the lines and grade required.
Finishing shall be accomplished by use of wooden floats and stiff bristled brushes or brooms. The last finish shall be by brushing or brooming in A direction transverse to the direction of traffic.
During the entire finishing process care shall be taken to maintain the true gutter invert in line with the street curb and gutter.
Curing - Finished driveways and alley returns shall be cured in accordance with the requirements "membrane curing" "Texas Department of Highways and Public Transportation, 1982 Standard Specifications for Highways, Streets and Bridges", Item Number 531.
Concrete 4
CONCRETE VALLEY GUTTERS, CENTER DRAINS AND DRAINWAYS
Concrete slab type street drainage structures with or without curbs, shall be constructed of Class "A" concrete to the lines and grades as shown on the plans and detail sheets or as may be established in the field by the engineer.
Subgrade excavation preparation and compaction and flexible base shall be the same as specified for street construction. All drainage structures within the roadway shall be constructed on a flexible caliche base so that the thickness of the concrete slab plus base is equal to the thickness of the hot mix asphaltic concrete surface plus base.
Forms - Forms shall be as specified for curb and gutter.
Reinforcing - All slab type drainage structures shall be reinforced as shown on the plans and detail drawings. Care shall be taken to maintain all reinforcing in good condition and at its proper location within the slab.
Expansion Joints - Expansion joint material shall be as specified for curb and gutter and for driveways and alley returns.
Expansion joints for valley gutter shall be placed at the ends of radii and at the juncture between the fillet and the cross valley as shown on the detail sheet.
For center drains, expansion joints shall be placed at the ends of widened or transition sections and at each end of a section containing a manhole or other structure and at intervals of sixty feet (60') measured along the center line of the drain.
Additional expansion joints shall be placed where drainage slabs abut backs of curbs, sidewalks and at contact points with other concrete structures.
Contraction Joints - Contraction joints shall be spaced at 15' intervals along the center line of center drains. These contraction joints shall be saw cut 3/8" wide minimum and 1/4 the depth of the slab using an approved concrete saw.
Saw cut contraction joints shall be made after the concrete has set sufficiently to prevent excessive raveling during sawing and shall be completed before the concrete is 48 hours old.
Finishing - Finishing shall be the same as for alley returns and driveways with the last finishing operation for structures subject to vehicular traffic being by broom or stiff brush in a direction transverse to the direction of traffic.
Curing - Curing shall be the same as for curb and gutter and driveways and alley returns.
SIDEWALKS
Sidewalks shall be constructed of Class A" concrete to the lines and grades as shown on the plans and detail drawings or as may be established in the field by the engineer.
Sidewalks shall be constructed parallel to the back of the curb and on a grade parallel to
Concrete 5 the top of curb grade. The minimum thickness for any sidewalk is 4 inches. The minimum width of any sidewalk is 4 feet.
Excavation and Subgrade - Excavation for sidewalk shall be made with street excavation where applicable. Care shall be exercised in excavating for sidewalks. Any over excavation or any fill required for sidewalk must be brought to grade in lifts not to exceed two inches (2") and thoroughly tamped. Subgrade for sidewalks shall be compacted to at least the density of the adjacent soil or to 85% modified proctor whichever is greater.
When a sidewalk is to be constructed on an embankment the fill must extend at least 3 feet beyond the edge of the sidewalk.
If the subgrade is dry or dusty it must be thoroughly moistened but not made muddy before concrete is placed.
Forms - Forms for sidewalks may be either steel or wood. Forms must be in good shape and true to line and grade. If nominal 2" x 4" lumber is used the subgrade must be finished one half inch (1/2") below the bottom of the form to provide the required 4 inch thickness.
Expansion Joints - Expansion joint material shall be pre-molded conforming to these specifications and shall be one half inch (1/2") thick. The expansion joint shall extend the full depth of the sidewalk.
Expansion joints shall be placed at points where the sidewalk contacts the back of curb, at all junctures between sidewalks all directions, and at all points where the sidewalk abuts a driveway, alley return or other concrete structure including fence foundations.
Transverse expansion joints shall be constructed in the sidewalk at intervals not exceeding twenty eight feet (28') as measured along the centerline of the walk except for sidewalks that are constructed wider than four feet (4') in which case expansion joints may be placed at intervals that are multiples of the width but not exceeding thirty feet (30').
Contraction Joints - Contraction joints consisting of trowel cuts one and one half inches (1-1/2") deep shall be spaced at four foot (4') intervals along the sidewalk. Contraction joints shall be edged using an edging tool with a 1/4 inch or 3/8 inch radius.
For sidewalks wider than four feet (4') contraction joints may be placed at intervals equal to the width of the walk up to but not exceeding ten feet (10').
Finishing - Sidewalks shall be "struck off" with a screed to provide an even surface and float finished using a wooden float.
The final finish on the sidewalk shall be accomplished by brooming or brushing using a stiff bristled brush or broom with the final strokes being in the transverse direction.
Curing - Curing shall be as specified for curb and gutter and driveways and alley returns.
Concrete 6
CONCRETE RIP RAP
Concrete rip rap shall be constructed of concrete of the class and to the line and grades as shown on the plans.
Excavation and Subgrade - Care shall be taken not to over excavate for rip rap. The subgrade for rip rap shall be compacted to at least the density of the adjacent undisturbed soil or 85% modified proctor whichever is higher.
Forms - Forms, where required, may be either steel or wood. Forms must be in good condition and true to line and grade.
Expansion Joints - Expansion joints, where required, will meet the requirements of expansion joints materials as specified herein and will be placed as shown on the plans or directed by the engineer.
Finishing - Finishing shall be by screed and wooden float to produce true uniform surface.
Curing - Curing shall be as specified for other concrete herein.
Slope Paving - Slope paving may be required behind the curb or behind sidewalks where street paving requires deeper cuts in developed areas. Slope paving shall be constructed of Class "A" concrete and shall be constructed to the lines and grades as shown on the plans or as established in the field. Slope pavement shall be four inches (4") thick and shall be constructed in accord with the specifications for sidewalks.
When no slope grade is given on the plans the slope gradient shall be l:l.
Unless listed separately on the bid proposal, slope pavement shall be measured and paid for as sidewalk.
4. BACKFILL AND CLEANUP
GENERAL
Backfill and clean up are an integral part of the various items covered by this specification and must be completed for each item before that item will be considered for payment.
CONCRETE STRUCTURES WITHIN THE PAVED AREA OF STREETS
Backfill and clean up for concrete structures within the paved areas of streets, alleys, etc.
shall receive special attention to assure the integrity of the street pavement.
Structures constructed in previously paved areas shall have sufficient surface removed along with base and subgrade where necessary to set full face forms for the concrete. As soon as the forms are removed all loose material shall be removed from the form trench and the trench filled to the base level with Portland cement stabilized backfill material
Concrete 7 consisting of two (2) sacks Portland cement to one (l) cubic yard of caliche base material or one (l) cubic yard "blow sand". When the cement stabilized backfill has cured the pavement edge shall be saw cut to provide true and straight lines and the pavement restored to its original or revised grade using Hot mix asphaltic concrete conforming to the requirements of Section 2-F of these specifications.
For structures constructed on previously prepared subgrade or base course, clean up and backfill shall be considered complete when the subgrade or base course has been made ready to receive the next course.
When a structure is constructed on a finished base course and it is necessary to remove base material to set forms, backfill and cleanup shall be as described for previously paved areas and shall be considered complete when the base course is made ready to receive the surface course or courses.
BACKFILL BEHIND CURBS AND ALONG SIDEWALKS
Backfill behind curbs and along sidewalks that is to be grassed shall be made using good top soil. Top soil shall be free of caliche, rocks, clods, lumps, debris and other objectionable material. This backfill shall be compacted to at least the density of undisturbed adjacent soil but not less than 85% modified proctor.
Backfill behind curbs and along sidewalks that is to receive paving shall be constructed to conform to the base and subgrade of the adjacent paving and shall be compacted to 95% modified proctor. Or the contractor may elect to backfill to the top of the base with two (2) sack cement stabilized backfill.
In undeveloped areas and in areas where no sidewalks exist the contractor shall slope from the back of the curb to a maximum height of 1/4 inch per foot rise from the top of the curb to the property line on a straight line grade. The minimum elevation at the property lines shall be top of curb elevation.
In deeper cut areas slope paving may be required. When slope paving is required it shall be constructed to the lines and grades shown on the plans. Backfill and shaping beyond the slope paving shall be in accord with the applicable portions of this specification.
Concrete 8
CONCRETE CURB AND GUTTER, SIDEWALKS AND DRIVEWAYS
VALLEY GUTTERS, CENTER DRAINS AND RIP RAP
1. GENERAL
2. MATERIALS
3. CONSTRUCTION METHODS
GENERAL
CURB AND GUTTER
DRIVEWAYS AND ALLEY RETURNS
CONCRETE VALLEY GUTTERS, CENTER DRAINS AND DRAINWAYS
SIDEWALKS
CONCRETE RIP RAP
4. BACKFILL AND CLEANUP
GENERAL
CONCRETE STRUCTURES WITHIN THE PAVED AREA OF STREETS
BACKFILL BEHIND CURBS AND ALONG SIDEWALKS
Updated 3/06
CONCRETE STRUCTURES
1. GENERAL
This specification covers concrete structures including but not limited to junction boxes, culverts, head walls, cast in place manholes, valve vaults, meter vaults and retaining walls.
2. MATERIALS
CONCRETE
Concrete for cast in place manholes, junction boxes, storm sewer inlet boxes, valve vaults and direct traffic culvert and bridge decks shall be a modified class “C” concrete using a minimum of 6 sacks cement per cubic yard with a maximum water content of 5 gallons per sack of cement and producing a concrete with 4000 psi 28 day compressive strength.
Concrete for other structures shall be class “A” as specified in “Texas State Department of Highways and Public Transportation 1982 Standard Specifications for Construction of Highways, Streets and Bridges” item number
421. Concrete for riprap shall be class “B”.
Reinforcing steel shall conform to the requirements of item number 440 or “Texas State Department of Highways and Public Transportation 1982 Standard Specifications for Construction of Highways, Streets and Bridges” and shall be of the sizes and grades as shown on the plans.
3. CONSTRUCTION
Construction of concrete structures shall be in accordance with the provisions of item 420 “Texas State Department of Highways and Public Transportation 1982 Standard Specifications for Construction of Highways, Streets and Bridges”.
Caliche 1
FLEXIBLE BASE, CALICHE
1. GENERAL
2. MATERIALS
3. CONSTRUCTION
4. TESTING
Caliche 2
FLEXIBLE BASE, CALICHE
1. GENERAL
This item consists of the construction of a caliche flexible base course to the lines, grades and thickness shown on the plans and in accordance with the provisions of the specifications.
Qualification of Material Source - There will be no designated material sources, but the source proposed by the Contractor must be approved by the Engineer. The contractor shall furnish evidence of capability to crush and screen the material with suitable equipment.
Measurement and Payment - Measurement and payment to be at the units and price for the applicable bid item in the proposal.
2. MATERIALS
Material from the approved source shall meet the following requirements when tested in accordance with the referenced testing standards:
Gradation - Tested by ASTM C 136-67 to meet the following gradation limits:
Sieve Size Percent Passing
1-3/4" 100.0 7/8" 65-90 3/8" 50-70 No. 4 30-60 No. 40 15-35
Liquid Limit and Plasticity Index - Tested by ASTM D423-66 and D 424-59.
Liquid Limit - 30.0 Maximum Plasticity Index - 10.0 Maximum Triaxial Classification - Tested by Texas Highway Department Method TEX 117-E, Part II - minimum class 3.0.
Source Quality Control - The contractor shall exercise caution in the operation of the material source to prevent the inclusion of inferior materials.
Caliche 3
3. CONSTRUCTION
A. The subgrade shall be finished true to the lines and grades as shown on the plans or as established by the Engineer and finished within specified tolerances and properly maintained to prevent drying and/or loosening of the surface.
No base material may be dumped on any subgrade until it has been tested and approved by the Engineer.
B. Flexible caliche base material shall be placed in uniform courses and processed to provide a uniformly mixed base course of the proper moisture content for compaction. The processing and compaction procedure used shall provide a uniform base course compacted to ninety-five percent (95%) modified proctor density (YACHT T180) minimum. The minimum thickness of any one compacted course shall be three inches (3"). The maximum thickness of any one compacted course shall be eight inches (8").
Any soft or segregated spots that appear in the base shall be removed, replaced or reprocessed and recompacted prior to final finishing of the base.
The finished base shall conform to the lines and grades as shown on the plans or established by the Engineer. Finished tolerances shall not exceed one half inch (1/2") in ten feet (10').
The finished base shall be primed as soon after finishing as practical and shall be protected until the hot mix asphaltic concrete surface is applied. In no case will prime be applied until the finished base has been approved by the Engineer.
4. TESTING
A. All test for approval of the source shall be performed by a commercial lab selected by the owner and shall be paid for by the contractor.
B. Gradation and soil constants tests (ASTM C-136, D423 and D424) and THD Triaxial Test (THD TEX117-E Part II) will be performed for source approval.
Should the appearance, workability or other visual checks indicate a possible change in the material being furnished, the Engineer may require the contractor to retest the material for source approval.
Caliche 4
C. Field quality control test will consist of the finish tolerance test and density test.
The finish tolerance test will be performed by the contractor at his expense using a 10' rolling straight edge. This test shall be performed at the direction of the Engineer or his representative. When required, the test shall consist of checking one path in each lane with the rolling straight edge.
Density test will be made by the City or a commercial laboratory chosen by the City using Troxler 3411-B nuclear density gauges or approved equal at the minimum rate of one test for each 1000 square yards of base. In no case shall less than three tests be run on any one area processed as a unit.
The City will bear the cost of the first test or set of tests only. If the base fails the first test the contractor, at his own expense, will be required to have all subsequent tests performed by the commercial laboratory chosen by the city.
Caliche 5
BITUMINOUS PRIME
This item consists of the application of a bituminous prime coat to the finished caliche base in accordance with the provisions of the Specifications.
Qualification of Material Source - Material shall be supplied by a producer with a proven performance record of acceptance by the Texas Highway Department.
Measurement and Payment - Measurement and payment will be at the units and price for the applicable bid item in the proposal.
2. MATERIALS
Cut-back asphalt grade MC-30, Texas Highway Department Item 300.
Source Quality Control - Certificates of compliance to be furnished by the producer to the Engineer.
3. CONSTRUCTION METHODS
Condition of Base - The surface of the base shall be tightly compacted to the line and grade shown on the plans and within the tolerances of the specifications. The surface shall be clean and the base shall contain sufficient moisture to assure the proper penetration of the prime.
The prime shall be applied with an approved distributor to the surface of the base at a rate of between 0.15 and 0.40 gallon per square yard. The application rate shall be varied to meet field conditions and to obtain uniform coverage, and adequate penetration. Properly applied prime coat should penetrate from 3/8" to 1/2" into the base and should cure in approximately 72 hours with ambient temperatures at or near 70 degrees F. The prime shall be applied at a temperature within the range of temperatures recommended in Item 300 of Texas Highway Department Standard Specifications. The temperature shall be varied within this range to provide a viscosity that will assure even spreading and penetration of the base. Air Temperatures at the time of application shall be above 50'F.
BITUMINOUS TACK
This item consists of the application of a bituminous tack coat to the primed base or existing asphaltic concrete or Portland cement concrete pavement in accordance with the provisions of the specification.
Qualification of Material Source - Material shall be supplied by producer with a proven performance record of acceptance by the Texas Highway Department.
Measurement and Payment - Measurement and payment will be at the units and price for the applicable bid item in the proposal.
2. MATERIALS
Cut-back asphalt grade RC-250, Texas Highway Department Item 300.
3. CONSTRUCTION METHODS
Conditions of Surface - Prior to application of tack to the base course the prime must be completely penetrated into the base and the surface cleaned of foreign objects.
The tack shall be applied with an approved distributor at a rate of between 0.05 and
0.10 gallons per square yard. The temperature of application shall be within the range recommended by the Texas Highway Department in Item 300. The surface temperature to which tack is being applied shall be above 50 degrees F. at the time of application.
When the asphaltic concrete surface is being placed on primed caliche base, use of the tack coat may be waived by the Engineer if the contractor can show that adequate adhesion of the surface being placed to the base course is achieved without it.
Tack coat shall be placed on all asphaltic concrete or portland cement concrete surfaces on which an additional course of asphaltic concrete surfacing is to be placed. The tack coat shall be rolled with a pneumatic roller to assure even distribution over the entire surface and to achieve proper penetration into and adhesion to the surface being overlayed.
HOT MIX ASPHALTIC CONCRETE
l. GENERAL
Includes the construction of the hot mix asphaltic concrete surface in accordance with lines, grades and the sections shown on the plans and with the provisions of the specifications.
Qualification of Material Sources - Producers of oil asphaltic concrete mixture to have a proven record of acceptance by the Texas Highway Department.
Measurement and Payment - Measurement and payment to be at the units and price for the applicable bid item in the proposal.
2. MATERIALS
Oil Asphalt - Oil asphalt grade AC-l0 or AC-20, Texas Highway Department Item
300. When no asphalt grade is shown on the plans, and unless directed otherwise by the Engineer, asphalt for this project shall be grade AC-10.
Coarse Aggregate - Crushed stone or crushed gravel with a minimum of 75 percent of the aggregates having two or more crushed faces. Additional requirements:
(a) Los Angeles Abrasion: ASTM C l3l, Wear not to exceed 40.
(b) Decantation: Maximum 2.0 percent by weight
Fine Aggregates - Natural sand and screenings crushed from the same or similar material meeting the requirements of the course aggregates. Additional requirements.
(a) Plasticity Index: Maximum of 6.
(b) Sand Equivalents: Minimum of 50 for each individual fine aggregate.
Paving Mixtures - The paving mixture(s) shall be as shown on the plans and details.
If no mixtures are shown on the plans surface or wearing courses up to l-3/4 inches thick shall be Type D, base courses up to 2 inches thick shall be Type C and base courses over 2 inches thick shall be Type B or Type A.
(a) Gradation: The master gradations for the paving mixtures are:
Percent Aggregate TYPE "A" (Coarse Graded Base Course): by weight or volume
Passing 2" sieve 100 Passing l-3/4" sieve 95 to 100 Passing l-3/4" sieve, retained on 7/8" sieve 16 to 42 Passing 7/8" sieve, retained on 3/8" sieve 16 to 42 Passing 3/8" sieve, retained on No. 4 sieve 10 to 26 Passing No. 4 sieve, retained on No. l0 sieve 5 to 21
Total retained on No. l0 sieve 68 to 84
Passing No. l0 sieve, retained on No. 40 sieve 5 to 21 Passing No. 40 sieve, retained on No. 80 sieve 3 to 16 Passing No. 80 sieve, retained on No. 200 sieve 2 to 16 Passing No. 200 sieve 1 to 8
The asphaltic material shall form from 3.5 to 7 percent of the mixture by weight.
TYPE "B" (Fine graded Base or Percent Aggregate Leveling-up course) by Weight or Volume
Passing l" sieve 100 Passing 78" sieve 95 to 100 Passing 7/8" sieve, retained on 3/8" sieve 21 to 53 Passing 3/8" sieve, retained on No. 4 sieve 11 to 42 Passing No. 4 sieve, retained on No. l0 sieve 5 to 26
Total retained on No. l0 sieve 58 to 74
Passing No. l0 sieve, retained on No. 40 sieve 6 to 32 Passing No. 40 sieve, retained on No. 80 sieve 4 to 21 Passing No. 80 sieve, retained on No. 200 sieve 3 to 21 Passing No. 200 sieve 1 to 8
The asphaltic material shall form from 3.5 to 7 percent of the mixture by weight.
Type "C" (Coarse Graded Surface Course): Percent Aggregate by Weight or Volume
Passing 7/8" sieve 100 Passing 5/8" sieve 95 to 100 Passing 5/8" sieve, retained on 3/8" sieve 16 to 42 Passing No. 4 sieve, retained on No. l0 sieve 11 to 37
Total retained on No. l0 sieve 54 to 74
Passing No. l0 sieve, retained on No. 40 sieve 6 to 32 Passing No. 40 sieve, retained on No. 80 sieve 4 to 27 Passing No. 80 sieve, retained on No. 200 Sieve 3 to 27 Passing No. 200 sieve 1 to 8
The asphaltic material shall form from 3.5 to 7 percent of the mixture by weight.
Percent Aggregate TYPE "D" (Fine Graded Surface Course): by Weight or Volume
Passing l/2" sieve 100 Passing 3/8" sieve 85 to 100 Passing 3/8" sieve, retained on 4" sieve 21 to 53 Passing No. 4 sieve, retained on No. l0 sieve 54 to 74 Total retained on No. l0 sieve 54 to 74 Passing No. l0 sieve, retained on No. 40 sieve 6 to 32 Passing No. 40 sieve, retained on No. 80 sieve 4 to 27 Passing No. 80 sieve, retained on No. 200 sieve 3 to 27 Passing No. 200 sieve 1 to 8
The asphaltic material shall form from 4 to 8 percent of the mixture by weight.
Percent Aggregate TYPE "F" (Fine Graded Surface Course): by Weight or Volume
Passing 3/8" sieve 100 Passing No. 4 sieve 95 to 100 Passing No. 4 sieve, retained on No. l0 sieve 58 to 73 Passing No. l0 sieve, retained on No. 40 sieve 6 to 26 Passing No. 40 sieve, retained on No. 80 sieve 3 to 13 Passing No. 80 sieve, retained on No. 200 sieve 2 to 11 Passing No. 200 sieve 1 to 8
The asphaltic material shall form from 3.5 to 6.5 percent of the mixture by weight.
(b) Tolerances: Deviations from job mix formula limited to:
(l) Sizes larger than the l0 sieve- Plus or Minus 4 percent.
(2) No. l0 sieve and smaller - Plus or Minus 3 percent.
(3) The deviation from the job mix formula shall be further limited in that the total deviation from the job mix formula between any two adjacent aggregate grades shall not exceed the allowable deviation for either one.
(4) Asphalt - Plus or Minus 0.3 percent.
(c) Density - The mixture shall be designed to produce an acceptable mixture within tolerance, at or near optimum density. The mixture molded in the laboratory should have the following percent of maximum theoretical density:
Minimum Maximum Optimum 96 98 97
(d) Stability: Minimum of 35 Hveem
Source Quality Control - Paving mixture and plant tests to be performed by laboratory selected and paid by the Owner, except as noted.
Job Mix Formula - The contractor shall submit a job mix formula, prepared by laboratory chosen by the owner, at least l0 days in advance of laying operations to allow time for review by the engineer. Substitution of one or more materials will require a new job mix formula and must be approved by the engineer.
The design of job mix formula whether for original submittal or revisions shall be paid for by the contractor.
Plant Tests - Check of raw material uniformity, quality and flow, hot bin gradations, temperature of mixture, mixture tests for density, stability and percent asphalt and other necessary tests to be performed bythe laboratory selected by the owner for each day's production.
Oil Asphalt - Producer to furnish certificates of compliance to the Engineer.
3. CONSTRUCTION METHODS
A. GENERAL
Condition of Base - The surface of the base shall be tight and free of debris. The prime coat shall be uniformly distributed, well penetrated and completely cured prior to application of the tack coat. If the mixture will adhere to the surface of the base without the application of a tack coat, the tack coat can be eliminated. If the surface of the base is one half (l/2") inch or more lower than the proposed bottom of the asphaltic concrete it shall be corrected by placing and compacting a level up course of the asphaltic concrete before the mat is placed on it.
Stockpiling, Storage, Batching and Mixing - Shall meet the requirements of Item 340, "Texas Highway Department l982 Standard Specifications for Road and Bridge Construction.
Weather Limitations - Shall be the requirements of Item 340,"Texas Highway Department l982 Standard Specifications for Road and Bridge Construction." With the added provision that no asphaltic concrete shall be placed when the surface on which the mat is to be placed is below 50 degrees F.
Thickness - Shall be as shown on plans. Unless shown otherwise on the plans, the maximum compacted thickness of any one course of asphaltic concrete shall be two and one-half (2-l/2) times the maximum aggregate size of the mixture being placed.
The minimum shall be one (l) inch or one and one fourth (1-1/4) times the maximum particle size which ever is greater.
B. PLACING
Placing of Asphaltic Concrete shall be accomplished using an approved self propelled spreading and finishing machine with a heated vibrating screed capable of producing a surface that will meet the requirements of the typical cross section and the surface test, and when the mixture is dumped directly into the finishing machine shall have adequate power to propel the delivery vehicles in a satisfactory manner.
The finishing machine shall be equipped with a flexible spring and/or hydraulic type hitch sufficient in design and capacity to maintain contact between the rear wheels of the hauling equipment and the pusher rollers of the finishing machine while the mixture is being unloaded.
The use of any vehicle which requires dumping directly into the finishing machine and which the finishing machine cannot push or propel in such a manner as to obtain the desired lines and grades without resorting to hand finishing will not be allowed. Vehicles dumping directly or indirectly into the finishing machine shall be so designed and equipped that unloading into the finishing machine can be mechanically and/or automatically operated in such a manner that overloading the finishing machine being used cannot occur and the required lines and grades shall be obtained without resorting to hand finishing.
Automatic screed controls will be required and shall meet the requirements item, 528 "automatic screed controls for asphaltic concrete spreading and finishing machines "Texas Department of Highways and Public Transportation 1982 Specifications for Construction of Highways, Streets and Bridges".
The screed shall be ski controlled using a ski of not less than l8' in length. Curb shoe control will not be allowed.
The spreading and finishing machine shall be maintained in good working order and operated by competent trained personnel.
The Engineer may require the contractor to place a test strip to prove the capability of the machine and the competency of the operating personnel to produce a satisfactory finished surface.
In dips and on curved surfaces where the ski control cannot be used, the surface will be controlled using a l0' straight edge.
Fillet areas, turn outs and other areas not accessible to the spreading machine may be hand laid provided a satisfactory surface is produced.
C. COMPACTION AND FINISHING
Compaction Requirements - The asphaltic concrete surface shall be compacted so that the compacted mixture will contain not more than seven percent (7%) nor less than three percent (3%) air voids.
The surface of the pavement, after compaction, shall be smooth and true to the established line, grade and cross section, and when tested with a l0 foot rolling straightedge, except as provided herein, the maximum deviation shall not exceed l/8 inch in l0 feet, and any surface not meeting this requirement shall be corrected as directed by the engineer.
Raking and Leveling - Minor leveling may be accomplished using asphalt rakes prior to compacting the surface. The surface shall be leveled by loosening the surface of the asphaltic concrete using an asphalt rake then adding or removing material and smoothing the surface. Any large aggregate worked to the surface in this process shall be removed before compaction. The large aggregate shall not be spread over the new asphaltic concrete surface.
Edges and joints with compacted asphalt or concrete gutters shall be carefully squared and excess material removed before compaction. Care shall be taken to see that NO excess material laps over onto the surface of existing asphaltic concrete paving or concrete gutters. Large aggregate worked to the surface in this process shall be removed. It shall not be spread over the new asphaltic concrete surface.
Rolling - In general rolling shall conform to the requirements of item 340 of the Texas Department of Highways and Transportation 1982 Specifications for Construction of Highways, Streets an Bridges except as modified herein.
It shall be the responsibility of the contractor to have rolling equipment available on the job to properly compact the paving mixture in place as required without delay to the lay down operation. Rollers provided shall meet the qualifications for their type as follows:
PNEUMATIC TIRE ROLLERS: The rollers shall be acceptable medium pneumatic tire rollers conforming to the requirements of the item, "Rolling (pneumatic tire)", Type B, unless otherwise specified on plans.
TWO AXLE TANDEM ROLLER: This roller shall be an acceptable power driven tandem roller weighing not less than 8 tons.
THREE WHEEL ROLLER: This roller shall be an acceptable power driven three wheel roller weighing not less than l0 tons.
THREE AXLE TANDEM ROLLER: This roller shall be an acceptable power driven three axle roller weighing not less than l0 tons.
Vibrating rollers will not be used without prior written approval of the engineer.
Written approval will be granted only upon demonstration by the contractor that the roller and operator can produce a satisfactory surface within the tolerances of these specifications. Only the operator or operators thus approved will be allowed to operate the vibrating roller on this project.
Areas not accessible to standard rollers shall be compacted using trench rollers, impact tampers, hand tamps or other approved means that will produce the density and surface required.
JOINTS- Shall be carefully rolled to provide compaction of the asphalt against the existing surface or face of the concrete gutter. Joints between concrete gutters and Hot Mix Asphaltic Concrete shall be placed so that the HMAC will be approximately l/2 inch higher than the concrete when compaction is completed. At transverse joints such as valley gutters and fillet areas where finishing asphalt paving 1/2 inch above the edge of concrete will adversely affect ride quality the asphalt shall be finished 1/4 inch above the edge of the concrete.
Transverse joints shall be rolled in the transverse direction with the first pass extending approximately six (6") inches onto the new asphalt each additional pass shall extend approximately twelve (12") inches further onto the new asphalt until the full width of the roller is on the new asphalt. Longitudinal rolling may begin then.
All transverse joints shall be checked with a l0" straight edge while the material is still hot enough to roll. Any corrections shall be made by loosening the material using an asphalt rake and adding or removing material and recompacting the surface. The surface shall be rechecked and when the joint is acceptable the asphalt spreading machine may proceed with the pass.
Final or finish rolling shall be accomplished using a two axle tandem roller to remove roller marks. This rolling shall be accomplished after the surface has cooled sufficient to minimize further marking but before it is too cool to respond to rolling.
STRAIGHTEDGES AND TEMPLATES - The contractor shall provide acceptable l0 foot straightedge for surface testing. Satisfactory templates shall be provided as required by the Engineer.
4. FIELD QUALITY CONTROL
Test Lots - Field Quality Control Tests shall be made by lot with a lot being the amount of contiguous surface laid in one day. No lot shall exceed l0,000 S.Y. If a days laying exceeds l0,000 S.Y., that days laying shall be divided into two approximately equal lots. The same lot divisions shall be used for all Quality Control Tests. Each separate block or combination of contingeous (blocks) of paving shall be considered as a separate lot even though they may be placed in a single day and do not comprise l0,000 S.Y. of surface.
Surface Tests - Surface tolerance tests will be performed in both longitudinal and transverse directions. The test for longitudinal surface tolerance will be performed with a ten-foot rolling straightedge furnished by the contractor, and calibrated and used in accordance with the manufacturer's recommendation or other approved method.
The maximum allowable deviation in surface shall be 1/8 inch in 10 feet. Tests for longitudinal surface tolerance will be performed by the contractor, accompanied by the engineer within 24 hours of the completion of a lot. One path in each lane for the length of the entire lot will be tested. The location of the test path (Distance from centerline or pavement edge) will be determined by the engineer through the use of random numbers. Any deviations in the surface finish of a roadway wearing course which exceeds l/4 inch must be corrected. After corrections have been made, the entire lot must meet the l/8 inch surface tolerance.
Thin course "scab on" patching will NOT be permitted. Corrections may be made by planning, milling and patching or by removing and replacing affected surface area.
When milling and patching is used to correct surface defects the minimum depth of removal shall be l".
For milling and patching or surface removal the area removed or milled shall be sufficiently large to avoid the appearance of patching.
When planning is used to correct defects the thickness of the remaining paving shall meet the thickness requirements as shown on the plans.
Surface tolerance test will be performed on the…