About this file
This is an Anticipated Equipment List memo issued by the City of Midland Engineering Services Division for the Utility Expansion Program 07 project. The memo, dated June 10, 2026, was prepared by Joshua C. Ferguson, P.E., and distributed to all project bidders to outline equipment that contractors may require for project completion. The equipment list is organized by work category and includes water improvements equipment (water pump, backhoe or trenching machine, dump truck, crimpers, and tapping machines), wastewater improvements equipment (clay cutters, backhoe with ramhoe, dump truck, water pump, chop saw, hole saws, clay shell cutter, and closed circuit televising equipment), pavement patching equipment (pneumatic roller, excavator, jack-hammer, and pavement saws), and safety equipment (shoring, steel plates, traffic control devices, ladders, and personnel safety gear). The City explicitly notes that this list is not final and does not relieve contractors of their obligation to acquire any additional equipment necessary to complete the project work.
The memo serves as guidance for bidders to understand anticipated project requirements but carries no binding obligations regarding specific equipment specifications or quantities. Contractors are responsible for determining their own equipment needs and procurement strategies. The City encourages bidders to contact Joshua C. Ferguson at the Engineering Services Division (432.685.7286) with questions regarding equipment requirements or other engineering-related project issues.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
City of Midland ■ Engineering Services 300 N. Loraine Street ■ Suite 510 ■ Midland, TX 79701 ■ T 432.685.7286 ♦ F 432.685.1786
P:\Engineering Services\Engineering Projects\2026\U26-01 UEP 07\02 LEGAL\2.3 Bid Packet\011 Anticipated Equip List.docx
MEMO
TO: All Project Bidders FR: Joshua C. Ferguson, P.E. / City of Midland DA: June 10, 2026 RE: Utility Expansion Program 07 – Anticipated Equipment List
To discuss the comments outlined below, or any other engineering issues related to this project, please call
432.685.7286 to speak with Josh Ferguson. Thank you.
Dept of Engineering Services, Engineering Services Division, has put together an Anticipated Equipment List for the City of Midland Water Rehab Program 02. The list includes equipment that the contractor may need but is in no way meant to be a final list of all necessary equipment, nor does it relieve the contractor of their obligation to have or acquire any additional equipment necessary to complete the project work. Below is a summary of the list:
Water Improvements
• Water Pump
• Backhoe or Trenching Machine
• Dump Truck
• Crimpers
• Tapping Machine (different sizes)
Wastewater Improvements
• Clay Cutters
• Backhoe with Ramhoe and Trenching Machine
• Dump Truck
• Water Pump
• Chop Saw
• Hole Saw (4” & 6")
• Clay Shell Cutter
• Closed Circuit Televising
Pavement Patching
• Pneumatic Roller
• Excavator and Jack-Hammer
• Pavement Saw (Asphalt & Concrete)
Safety
• Shoring
• Steel Plates
• Traffic Control Devices
• Ladders
• Personnel Safety Gear
If you have any questions, please feel free to call Josh Ferguson at our office.
— JCF
| MEMO |
| FR: Joshua C. Ferguson, P.E. / City of Midland |
| DA: June 10, 2026 |
| RE: Utility Expansion Program 07 – Anticipated Equipment List |
| — JCF |