1-010 Pay Notes.pdf

PDF 163 KB Posted

Attached to
26005663 U26-01 Utility Extension Program 07
Solicitation number
26005663
Issued by
Mason County, Texas

About this file

Pay Notes Summary: U26-01 Utility Extension Program 07

This document is a Pay Notes schedule for the City of Midland's Utility Extension Program 07, detailing measurement and payment specifications for water, wastewater, and related utility infrastructure improvements in Texas. The project encompasses a comprehensive range of utility work including the installation of water mains in various sizes (from 6" to 16" diameter) using both Ductile Iron Pipe and PVC materials, wastewater infrastructure including 8" PVC mains and fiberglass manholes, and associated appurtenances such as gate valves, fire hydrants, tapping sleeves, and service connections. The scope also includes demolition and removal of existing utility infrastructure, pavement repairs (concrete, asphalt, and base rock), traffic control, erosion and sediment control, and job site safety measures. The pay notes establish unit prices and measurement methodologies for 49 individual water items, 6 wastewater items, 5 paving items, 5 demolition items, and 9 miscellaneous items, with measurements based on linear footage, each unit installed, or square yardage depending on the specific work category.

Payment terms are structured with specialized pay items including mark-ups for materials, labor, and equipment rental, allowing contractors to claim compensation for work not specifically covered by standard bid items upon approval by the Engineer of Record or City of Midland designee. Additional labor premiums apply specifically for improvements within the downtown Midland area, defined as the region bordered by Kansas Avenue to the north, Lamesa Road to the east, Front Street to the south, and A Street to the west. The City of Midland will provide certain materials including water meters, flushing stations, and sampling stations. All work must comply with City of Midland standards and specifications, relevant ASTM standards for pipe materials, and applicable federal, state, and local regulations including OSHA requirements, with contractors bearing full responsibility for job site safety and worker protection.

View the file

Other files

Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pay Quantity Note

Miscellaneous Items 1 20" Steel Pipe Casing (1/4" Wall Thickness) M1 2 16" Steel Pipe Casing (1/4" Wall Thickness) M1 3 12" Steel Pipe Casing (1/4" Wall Thickness) M1 4 16" PVC Pipe Casing, SDR 26 ASTM D2241 M1 5 12" PVC Pipe Casing, SDR 26 ASTM D2241 M1 6 Cement Stabilized Bedding (2.5-Sack) M2 7 Erosion/Sediment Control M3 8 Traffic Control for Collector/Local Road Conditions M4 9 Traffic Control for Alley/Easement Conditions M5 10 Job Site Safety M6 11 Additional Labor, Downtown Area, Water Improvements M7 12 Additional Labor, Downtown Area, Wastewater Improvements M8 13 Material Mark-up M9 14 Labor Mark-up (Regular Work Hours) M10 15 Equipment Rental Mark-up (Non-Standard Equipment Only) M11

Demolition Items 1 Removal & Disposal of Existing Utility Mains D1 2 Flowable Fill for Existing Pipes Abandoned In Place D2 3 Removal & Disposal of Existing Fire Hydrant Assembly D3 4 Removal & Disposal of Existing Manhole (0'-5' Deep) D4 5 Removal & Disposal of Existing Manhole (>5' Deep) D5

U26-01

PAY NOTES

Utility Extension Program 07 Bid Item

Water Items 1 16" Ductile Iron Pipe Pressure Class 150, Water Main W1 2 12" Ductile Iron Pipe Pressure Class 150, Water Main W1 3 10" Ductile Iron Pipe Pressure Class 150, Water Main W1 4 8" Ductile Iron Pipe Pressure Class 150, Water Main W1 5 6" Ductile Iron Pipe Pressure Class 150, Water Main W1 6 16" AWWA C-900 DR18, PVC, Water Main W1 7 12" AWWA C-900 DR18, PVC, Water Main W1 8 10" AWWA C-900 DR18, PVC, Water Main W1 9 8" AWWA C-900 DR18, PVC, Water Main W1 10 6" AWWA C-900 DR18, PVC, Water Main W1 11 16" Tapping Sleeve W2 12 12" Tapping Sleeve W2 13 10" Tapping Sleeve W2 14 8" Tapping Sleeve W2 15 6" Tapping Sleeve W2 16 16" Gate Valve & Vault (MJxMJ/FL) W3 17 12" Gate Valve & Box (MJxMJ/FL) W4 18 10" Gate Valve & Box (MJxMJ/FL) W4 19 8" Gate Valve & Box (MJxMJ/FL) W4 20 6" Gate Valve & Box (MJxMJ/FL) W4 21 Air Relief Valve & Vault (Water Main) W5 22 Fire Hydrant Assembly (≤ 5' Water Main Bury Depth) W6 23 Fire Hydrant Riser (> 5' Water Main Bury Depth) W7 24 Ductile Iron Fittings W8 25 Dresser Coupling W9 26 Connect to Existing Water Main W10 27 16" Tapping Saddle (2" or 1") W11 28 12" Tapping Saddle (2" or 1") W11 29 10" Tapping Saddle (2" or 1") W11 30 8" Tapping Saddle (2" or 1") W11 31 6" Tapping Saddle (2" or 1") W11 32 2" Water Service Connection, Long (>20') W12 33 2" Water Service Connection, Short (≤20') W12 34 1" Water Service Connection, Long (>20') W12 35 1" Water Service Connection, Short (≤20') W12 36 Flushing Station Installation, Long (>20') W13 37 Flushing Station Installation , Short (≤20') W13 38 Sampling Station Installation, Long (>20') W14 39 Sampling Station Installation, Short (≤20') W14 40 Water Meter Installation (New Service Lateral) W15 41 Water Meter & Meter Box Installation (Existing Service Lateral) W16 42 Replace Water Meter In Existing Vault W17 43 Stand Alone Gate Valve & Vault Replacement / Installation Add-On W18 44 Stand Alone Gate Valve & Box Replacement / Installation Add-On W19 45 Stand Alone Water Service Connection Add-On W20 46 Open Trenching of Water Main (0' - 5' Deep) W21 47 Open Trenching of Water Main (5' - 8' Deep) W21 48 Open Trenching of Water Main (8' - 10' Deep) W21 49 Open Trenching of Water Main (10' - 12' Deep) W21

Wastewater Items 1 8" SDR 26 ASTM D2241, PVC, Wastewater Main WW1 2 48" Fiberglass Manhole & Cover (0'-5' Deep) WW2 3 48" Fiberglass Manhole Additional Bury Depth (> 5' Deep) WW3 4 Connect To Existing Manhole WW4 5 Connect to Existing Wastewater Main WW5 6 Open Excavation WW6

Paving Items 1 6" Concrete Pavement Repair P1 2 4" Concrete Sidewalk Repair P2 3 2" Asphalt Pavement Repair P3 4 6" Base Rock Pavement Repair P4 5 Flowable Fill / 2-Sack Backfill P5

M1

M2

M3

M4

M5

M6

M7

M8

M9 Includes the Material Mark-up for materials and material sizes (pipe, valve, manhole, etc.) required to complete work for improvements not covered by the bid items listed in the Proposal for this project per the construction drawings and the City of Midland standards and specifications. Measurement and payment to be made per the cost of the material in question plus the set percent increase established by this bid item. The Contractor must provide a copy of the invoice for the material cost from the supplier to the Engineer of Record or

Includes the necessary equipment, labor, materials, and incidentals to implement the Traffic Control for Collector/Local Road Conditions per the approved Traffic Control Plan. Any required traffic control devices are to meet the City of Midland Traffic Division Standards. Measurement and payment to be made per each block measured from street intersection to street intersection, or per each collector/local road crossed.

Includes the necessary equipment, labor, materials, and incidentals to implement the Traffic Control for Alley/Easement Conditions per the approved Traffic Control Plan. Any required traffic control devices are to meet the City of Midland Traffic Division Standards. Measurement and payment to be made per each block measured from street intersection to street intersection, or per each alley/easement crossed.

Includes the necessary equipment, labor, materials, and incidentals for the installation of Pipe Casing per the construction drawings and City of Midland standards and specifications, including all spacers, grout, embedment, detector wire, tracer tape, and appurtenances. Measurement and payment to be per linear foot measured along the ground surface following the pipe centerline through all valves, fittings, structures, and appurtenances.

Includes the necessary equipment, labor, materials, and incidentals for the installation of Cement Stabilized Bedding Encasement (Portland Cement 2.5 Sack Cement = 235 LBS/CY) per the construction drawings and City of Midland standards and specifications, including all embedment, detector wire, tracer tape, and appurtenances. Measurement and payment to be per linear foot measured along the ground surface following the pipe centerline through all valves, fittings, structures, and appurtenances.

Includes the necessary equipment, labor, materials, and incidentals to complete work for water improvements in the downtown Midland area per the construction drawings and City of Midland standards and specifications. The downtown Midland area is considered to be the area bordered by Kansas Avenue to the north, Lamesa Road to the east, Front Street to the south, and 'A' Street to the west. Measurement and payment to be per linear foot measured along the ground surface following the water pipe centerline through all valves, fittings, structures, and appurtenances. This will be applied solely at the discretion of the Engineer or Records or the City of MIdland designee.

Includes the necessary equipment, labor, materials, and incidentals to complete work for wastewater improvements in the downtown Midland area per the construction drawings and City of Midland standards and specifications. The downtown Midland area is considered to be the area bordered by Kansas Avenue to the north, Lamesa Road to the east, Front Street to the south, and 'A' Street to the west. Measurement and payment to be per linear foot measured along the ground surface following the wastewater pipe centerline through all structures and appurtenances. This will be applied solely at the discretion of the Engineer or Records or the City of MIdland designee.

PAY QUANTITY NOTES

Includes the necessary equipment, labor, materials, and incidentals to implement the Erosion Control Plan per the construction drawings and City of Midland standards and specifications. Measurement and payment to be made per each block measured from street intersection to street intersection, or per each street crossing between blocks.

Includes the necessary equipment, labor, materials, and incidentals to implement Job Site Safety and to provide a safe work environment for the project work area (including all personal protection equipment, trench safety, etc.) per the construction drawings and in compliance with all applicable Federal, State, and Local requirements or regulations including those of OSHA and the City of Midland. JOB SITE SAFETY IS THE RESPONSABILITY OF THE CONTRACTOR. Measurement and payment to be made per each blck measured from street intersection to street intersection, or per each street crossing between intersection.

M10

M11

D1

D2

D3

D4

D5

W1

W2

Includes the necessary equipment, labor, materials, and incidentals for the installation of Water Mains per the construction drawings and City of Midland standards and specifications, including all embedment, detector wire, tracer tape, necessary testing, and appurtenances. Measurement and payment to be made per linear foot measured along the ground surface following the pipe centerline through all valves, fittings, structures, and appurtenances.

Includes the necessary equipment, labor, materials, and incidentals for the installation of a Tapping Sleeve per the construction drawings and City of Midland standards and specifications, including all joint restraints, embedment, thrust blocking, and appurtenances. Valves are addressed in a separate pay note.

Measurement and payment to be made per each tapping sleeve installed.

Includes the Labor Mark-up (Regular Work Hours) for labor required to complete work for improvements not covered by the bid items listed in the Proposal for this project per the construction drawings and the City of Midland standards and specifications. Measurement and payment to be made per the cost of labor in question plus the set percent increase established by this bid item. The Contractor must provide a typical hourly pay rate for work crews prior to the percent increase along with the number of workers on the crew and the number of hours worked by the crew for the project in question to the Engineer of Record or the City of Midland designee before this bid item may be claimed for any labor. This will be applied solely at the discretion of the Engineer of Record or the City of Midland designee.

Includes the Equipment Rental Mark-up (non-standard equipment only) required to complete work for improvements not covered by the bid items listed in the Proposal for this project per the construction drawings and the City of Midland standards and specifications. Measurement and payment to be made per the cost of the equipment rental in question plus the set percent increase established by this bid item. The Contractor must provide a copy of the invoice for the rented equipment from the equipment supplier to the Engineer of Record or the City of Midland designee before this bid item may be claimed for any rented equipment. This will be applied solely at the discretion of the Engineer of Record or the City of Midland designee.

Includes the necessary equipment, labor, materials, and incidentals for the Removal & Disposal of Existing Fire Hydrant Assembly per the construction drawings and City of Midland standards and specifications. Fire hydrant assemblies are to be returned to the City Utility Maintenance Department unless otherwise directed by the Engineer of Record or their representative. This includes removal and disposal of all structures, fittings, pipes, and appurtenances. Measurement and payment to be per each fire hydrant assembly removed.

Includes the necessary equipment, labor, materials, and incidentals for the Removal & Disposal of Existing Manholes to a depth of 5' per the construction drawings and City of Midland standards and specifications, including the removal and disposal of all drop structures, other structures, base, and appurtenances.

Measurement and payment to be made per each manhole removed.

Includes the necessary equipment, labor, materials, and incidentals for the Removal & Disposal of Existing Manholes at depths exceeding 5' per the construction drawings and City of Midland standards and specifications, including the removal and disposal of all drop structures, other structures, and appurtenances.

Measurement and payment to be per vertical foot of existing manhole removed below a depth of 5' measured from the lowest invert at the manhole flowline and rounded up to the nearest 0.5'.

Includes the necessary equipment, labor, materials, and incidentals for the placement of Flowable Fill for Existing Pipes Abandoned In Place (Portland Cement 2-Sack = 188 LBS/CY) per the construction drawings and City of Midland standards and specifications, including all plugging or caping the pipe to be abandoned, and appurtenances. Measurement and payment to be made per cubic yard volume of flowable fill placed in pipe abandoned in place.

Includes the necessary equipment, labor, materials, and incidentals for the Removal & Disposal of Existing Utility Mains per the construction drawings and City of Midland standards and specifications, including the removal and disposal of all pipes, fittings, and appurtenances. Measurement and payment to be made per linear foot measured along the ground surface following the pipe centerline through all valves, manholes, fittings, junctions, structures, and appurtenances.

W3

W4

W5

W6

W7

W8

W9

W10

W11

W12

W13

Includes the necessary equipment, labor, materials, and incidentals for the installation of a Fire Hydrant Assembly to a depth of 5' per the construction drawings and City of Midland standards and specifications, including all risers, embedment, gravel sump, thrust blocking, necessary testing, and appurtenances.

Measurement and payment to be made per each fire hydrant assembly installed.

Includes the necessary equipment, labor, materials, and incidentals for the installation of Ductile Iron Fittings per the construction drawings and City of Midland standards and specifications, including all embedment, wrapping, thrust blocking, joint restraints, and appurtenances. All fittings are to be C153 ductile iron compact fittings. Fitting weights are established from Tyler Union Quality Waterworks Products Catalog PC-U2014, December, 2014 and payment will be made at the standard compact weight. Nuts, bolds, glands, and other associated accessories are not included as part of the fitting weight and are considered subsidiary to the weight of the fitting. Any additional required fittings not shown on the drawings will be paid for at weights established in the Tyler Union Waterworks Catalog.

Includes the necessary equipment, labor, materials, and incidentals for the installation of a Water Service Connection per the construction drawings and City of Midland standards and specifications, including all brass goods from the corporation stop to the brass angle valve (inclusive), as well as the installation of a new meter box and all appurtenances. Measurement and payment to be made per each water service connection installed.

Includes the necessary equipment, labor, materials, and incidentals for the installation of Water Service Lateral pipe per the construction drawings and City of Midland standards and specifications, including all excavation, embedment, backfill, polyethylene service line or other pipe, and appurtenances. Measurement and payment to be made per linear foot measured along the ground surface following the pipe centerline through all valves, fittings, and appurtenances.

Includes the necessary equipment, labor, materials, and incidentals for the installation of a Dresser Coupling per the construction drawings and City of Midland standards and specifications, including all embedment, wrapping, thrust blocking, and appurtenances. Measurement and payment to be made per each dresser coupling installed.

Includes the necessary equipment, labor, materials, and incidentals to Connect to Existing Water Main per the construction drawings and City of Midland standards and specifications, including all fittings, repairs, and appurtenances. Measurement and payment to be made per each connection made.

Includes the necessary equipment, labor, materials, and incidentals for the installation of a Gate Valve & Box per the construction drawings and City of Midland standards and specifications, including all embedment, valve box, joint restraint, thrust blocking, concrete collar, and appurtenances. Measurement and payment to be made per each valve and box installed. Includes valves associated with tapping sleeves.

Includes the necessary equipment, labor, materials, and incidentals for the installation of an Air Relief Valve & Vault (Water Force Main) per the construction drawings and City of Midland standards and specifications, including all embedment, wrapping, joint restraint, thrust blocking, backfill, concrete collar, and appurtenances. Measurement and payment to be made per each valve installed.

Includes the necessary equipment, labor, materials, and incidentals for the installation of a Fire Hydrant Riser (> 5' Water Main Bury Depth) per the construction drawings and City of Midland standards and specifications, including all embedment and appurtenances. Measurement and payment to be made per vertical foot of riser below a water main bury depth of 5' measured from the water main invert and rounded up to the nearest 0.5'.

Includes the necessary equipment, labor, materials, and incidentals for the installation of a Gate Valve & Vault per the construction drawings and City of Midland standards and specifications, including all embedment, vault, joint restraint, thrust blocking, concrete collar, and appurtenances. Measurement and payment to be made per each valve and vault installed. Includes valves associated with tapping sleeves.

Includes the necessary equipment, labor, materials, and incidentals for the installation of a Tapping Saddle for a water service connection per the construction drawings and City of Midland standards and specifications, including all embedment, thrust blocking, and appurtenances. Measurement and payment to be per each tapping saddle installed.

W14

W15

W16

W17

W18

W19

W20

W21

W22

WW1

Includes the necessary equipment, labor, materials, and incidentals for Open Trenching of Water Main per the construction drawings and City of Midland standards and specifications, including all unclassified excavation, backfill not including flowable fill backfill, providing trench safety and protection for workers to install pipe, structures, and appurtenances. Measurement and payment to be made per linear foot measured along the ground surface following the pipe centerline through all structures, fittings, and appurtenances.

Includes the necessary equipment, labor, materials, and incidentals for a new Water Meter Installation as part of a new water service lateral installation per the construction drawings and City of Midland standards and specifications, including all appurtenances. The new water meter will be provided by the City of Midland.

Measurement and payment to be per each water meter set.

Includes the necessary equipment, labor, materials, and incidentals to set a new Water Meter and Meter Box for an existing water service lateral per the construction drawings and City of Midland standards and specifications, including all appurtenances. The new water meter will be provided by the City of Midland.

Measurement and payment to be per each water meter and meter box set.

Includes the necessary equipment, labor, materials, and incidentals for the installation of a Flushing Station per the construction drawings and City of Midland standards and specifications, including all excavation, embedment, backfill not including flowable fill backfill, polyethylene service line or other pipe, brass goods between the tapping saddle and flushing station, and all appurtenances. The flushing station will be provided by the City of Midland. Measurement to be per linear foot measured along the ground surface following the pipe centerline through all valves, fittings, structures, and appurtenances, and payment to be made per each flushing station installed.

Includes the necessary equipment, labor, materials, and incidentals for the installation of a Sampling Station per the construction drawings and City of Midland standards and specifications, including all excavation, embedment, backfill not including flowable fill backfill, polyethylene service line or other pipe, brass goods between the tapping saddle and sampling station, and all appurtenances. The sampling station will be provided by the City of Midland. Measurement to be per linear foot measured along the ground surface following the pipe centerline through all valves, fittings, structures, and appurtenances, and payment to be made per each sampling station installed.

Includes the necessary equipment, labor, materials, and incidentals for the installation of Wastewater Mains per the construction drawings and City of Midland standards and specifications, including all embedment, detector wire, tracer tape, necessary testing, and appurtenances. Measurement and payment to be made per linear foot measured along the ground surface following the pipe centerline through all structures and appurtenances.

Includes the necessary equipment, labor, materials, and incidentals to Replace Water Meter in Existing Vault per the construction drawings and City of MIdland standards and specifications, including all appurtenances.

The new water meter will be provided by the City of Midland. Measurement and payment to be per each water meter replaced.

Includes the additional necessary equipment, labor, materials, and incidentals for a Stand-Alone Water Service Connection Add-On per the construction drawings and City of Midland standards and specifications, including all excavation, embedment, backfill not including flowable fill backfill, polyethylene service line or other pipe, brass goods from the corporation stop to the brass angle valve (inclusive), meter box, and all appurtenances. Measurement and payment to be per each water service connection made that is stand-alone and not connected to a larger water improvement project.

Includes the necessary equipment, labor, materials, and incidentals for a Stand Alone Gate Valve & Vault Replacement / Installation Add-On per the construction drawings and City of Midland standards and specifications, including all saw-cutting, pavement removal, unclassified excavation, removal of fittings, removal of structures, embedment, vault, joint restraint, thrust blocking, concrete collar, and appurtenances.

Measurement and payment to be made per each valve and vault replaced or installed. Includes valves associated with tapping sleeves.

Includes the necessary equipment, labor, materials, and incidentals for a Stand-Alone Gate Valve & Box Replacement / Installation Add-On per the construction drawings and City of Midland standards and specifications, including all saw-cutting, pavement removal, unclassified excavation, removal of fittings, removal of structures, embedment, box, joint restraint, thrust blocking, concrete collar, and appurtenances.

Measurement and payment to be made per each valve and box replaced or installed. Includes valves associated with tapping sleeves.

WW2

WW3

WW4

WW5

WW6

P1

P2

P3

P4

P5

Includes the necessary equipment, labor, materials, and incidentals for Base Rock Pavement Repair including the installation of base rock backfill (City base+B144) per the construction drawings and City of Midland standards and specifications including all pavement, compaction, and appurtenances. Measurement and payment to be made per square yard measured along the ground surface.

ncludes the necessary equipment, labor, materials, and incidentals for Concrete Pavement Repair per the construction drawings and City of Midland standards and specifications, including all forming, placement, jointing, fiber or rebar reinforcement, sealing, finishing, and appurtenances. Curb repair is included with this bid item and pay note. Concrete pavement joints are to typically be 10'x10' joints, and are to be no larger than 15'x15' joints. Concrete pavement joints are to typically be saw-cut or expansion joints, and must all be sealed with TxDOT DMS-6310 SL-2 sealant. Curb joint spacing is to match adjacent concrete pavement joints or be no more than 10'. Curb joints are to be expansion joints between new and existing curb, saw-cut joints everywhere else, and do not have to be sealed. Measurement and payment to be made per square yard measured along the ground surface.

Includes the necessary equipment, labor, materials, and incidentals for Asphalt Pavement Repair per the construction drawings and City of Midland standards and specifications, including all pavement, compaction, prime coat, tack coat, and appurtenances. Asphalt may be Type "D" HMAC Asphalt with PG 70-22, or either Type "B" or "C" HMAC Asphalt with PG 64-22. All asphalt is assumed to be 110 LBS / SY at 1" thick. Prime and tack coats are to be Bituminois Prime Coat (MC-30, 0.20 GAL / SY), and Tack Coat (MC-30, 0.10 GAL / SY). Measurement and payment to be made per square yard measured along the ground surface.

Includes the necessary equipment, labor, materials, and incidentals for the installation of Fiberglass Manhole & Cover to a depth of 5' per the construction drawings and City of Midland standards and specifications, to the depth shown on the construction drawings and including all embedment, base, necessary testing, concrete collars, and appurtenances. Measurement and payment to be made per each manhole installed.

Includes the necessary equipment, labor, materials, and incidentals to Connect to Existing Manhole per the construction drawings and City of Midland standards and specifications, including all coring, grouting, sealing, repairs, and appurtenances. Measurement and payment to be made per each connection made.

Includes the necessary equipment, labor, materials, and incidentals to Connect to Existing Wastewater Main per the construction drawings and City of Midland standards and specifications, including all grouting, sealing, repairs, and appurtenances. Measurement and payment to be made per each connection made.

Includes the necessary equipment, labor, materials, and incidentals for Concrete Sidewalk Repair per the construction drawings and City of Midland standards and specifications, including all forming, placement, jointing, fiber reinforcement, finishing, and appurtenances. Concrete pedestrian access ramp repairs are included with this bid item

Includes the necessary equipment, labor, materials, and incidentals for Open Trenching of Wastewater Main per the construction drawings and City of Midland standards and specifications, including all unclassified excavation, backfill not including flowable fill backfill, providing trench safety and protection for workers to install pipe, structures, and appurtenances. Measurement and payment to be made per linear foot measured along the ground surface following the pipe centerline through all structures, fittings, and appurtenances.

Includes the necessary equipment, labor, materials, and incidentals for the installation of Fiberglass Manhole Additional Bury Depth (> 5' pipe invert bury depth) per the construction drawings and City of Midland standards and specifications, including all embedment and appurtenances. Measurement and payment to be made per vertical foot measured from the lowest flowlline invert at the manhole to 5' below the rim elevation.

Includes the necessary equipment, labor, materials, and incidentals for installation of Flowable Fill / 2-Sack Backfill (Portland Cement 2 Sack = 188 LBS/CY) per the construction drawings and City of Midland standards and specifications, including all reinforcement, placement, and appurtenances. Measurement and payment to be made per square yard of material placed measured along the ground surface.