About this file
This document is a Bid Schedule for project 25-8400 - Raw Water Booster Pump Station Improvements. The bid covers eight distinct project components, including mobilization/demobilization, general requirements, flow meter and piping replacement (with bypass pumping and demolition), wastewater subsurface disposal system cleaning and inspection, potable well and water main installation, pre-engineered metal building for a parking canopy, office space improvements, and restroom improvements. Each line item encompasses various mechanical, electrical, and in some cases plumbing work.
The bid total is currently listed at $0.00, with an additional Owner's Allowance of $100,000 allocated for unforeseen conditions or owner-directed work. Expenditures from this allowance will be processed through Change Orders and require detailed time and materials documentation. The bid schedule suggests a comprehensive infrastructure improvement project that involves multiple systems and infrastructure upgrades for a water booster pump station, with each component requiring specific technical and construction considerations.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ITEM NO. TOTAL
$0.00Bid Total
*Staff has allocated an Owner's Allowance for this project. The Owner's Allowance is $100,000. This allowance will be used only at the Owner's direction to accomplish work due to unforeseen conditions and/or as directed by the Owner. Expenditures of the Owner's
Allowance will be made through Change Order with proper documentation of Time and Materials supporting the change.
Bid Schedule for: 25-8400 - Raw Water Booster Pump Station Improvements
DESCRIPTION
Mobilization/Demobilization
General Requirements
Flow Meter and Piping Replacement, including Bypass Pumping and Demolition (Including Electrical)
Wastewater Subsurface Disposal System Cleaning and Inspection
Potable Well, 1" HDPE Water Main, Valves, and Reverse Osmosis (RO) System (Including Electrical)
Pre-Engineered Metal Building (PEMB) for Parking Canopy (Including Mechanical and Electrical)
Office Space Improvements (Including Mechanical and Electrical)
Restroom Improvements (Including Mechanical, Electrical, and Plumbing)
BID SHEET