This is a construction activities document for the Transit Bus Stop ADA Improvements project administered by Broward County Transit (BCT) and funded through FTA sources. The project requires contractors to install Americans with Disabilities Act (ADA) compliant landing pads and transit amenities, including benches, trash cans, and bike racks at bus stop sites throughout Broward County. Major work components include installation of sidewalks, bus stop landing areas, curbs, and related infrastructure. Contractors must maintain passenger access during construction, coordinate with BCT prior to commencing work, and invite BCT representatives to pre-construction conferences. The document specifies that contractors must provide BCT with construction manager contact information and establish temporary bus stop locations approved by the BCT Project Manager when necessary. All work must comply with the Americans with Disabilities Act requirements, and contractors are prohibited from removing bus stop signs without BCT authorization.

The project utilizes County Surtax Funding and requires compliance with FTA requirements and bonding provisions. Detectable warning surfaces for ADA ramps must meet FDOT Index 522 specifications and include a minimum five-year warranty in yellow color for uniformity. Acceptable materials include products from the FDOT Qualified Products List or specified alternatives including ADA Tactile System, Armor-Tile, Step Safe Concrete, Top Mark Thermoplastic, and Vangard ADA Systems. For retrofitting existing ramps, epoxies or thermoplastic mat products must be used, while new construction allows both tiles and epoxy products. Stamped concrete is not permitted. Vendors must submit responses electronically through BPRO by specified deadlines and must hold County/State licenses as required by the solicitation.

View the file

Other files

File Type Posted
1-Anti-Human Trafficking Affidavit.docx DOCX document
5-Surtax-Funded Agreement Contract Terms.docx DOCX document
7-FTA Funding Supplement Acknowledgement.pdf PDF
9-FTA Restrictions on Lobbying Certification (Loan Guarantees and Loan Insurance).pdf PDF
12-Bid Bonds, Performance and Payment Bonds, and Surety Qualification Requirements.pdf PDF
4-Litigation History.docx DOCX document
15-Insurance Requirement - TRN2132943B1.pdf PDF
21-Summary of Vendor Rights for Broward County Competitive Solicitations.docx DOCX document
3-Subcontractors-Subconsultants-Suppliers Requirement.docx DOCX document
23-Special Instructions to Vendors - TRN2132943B1.pdf PDF
22-FTA Funding Supplement 2026 - TRN2132943B1.pdf PDF
11-Vendor Questionnaire - Quotes and Bids.docx DOCX document
17-Specifications and Requirements - TRN2132943B1.pdf PDF
8-FTA Buy America Certification Iron, Steel, Non-Rolling Stock.pdf PDF
18-Additional Technical Specifications - TRN2132943B1.pdf PDF
16-Criminal History Screening Practices Certification.docx DOCX document
10-FTA Restrictions on Lobbying Certification.pdf PDF
2-Insurance Requirements - Quotes Bids.docx DOCX document
13-Basis of Estimates - TRN2132943B1.pdf PDF
14-Wage Determination - Construction 2026 - TRN2132943B1.pdf PDF
20-General Conditions - Quotes Bids.docx DOCX document
6-FTA Government-Wide Debarment Certification.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONSTRUCTION ACTIVITIES

Transit Bus Stop ADA Improvements (FTA)

A. CONSTRUCTION IMPACTS TO BUS OPERATIONS

1. The construction activities under this project will impact Broward County Transit (BCT) bus operations and bus stops. Timely communication and coordination with BCT and other affected transit agencies during preliminary project planning is essential in order to prevent potential conflicts. If possible, Contractors should make every effort to schedule their work to minimize impacts and the duration of impacts to transit operations and passengers.

2. For all road projects, construction plans will need to show existing and proposed bus stops.

In addition, Contractors should provide BCT with the name and telephone number of their construction managers prior to the commencement of all construction projects involving bus stops or bus route detours. Finally, a representative of BCT should be invited to the project’s pre-construction conference.

3. The following recommended construction activities will reduce conflicts, provide information for the Contractor, and guide agency coordination during the project’s construction phase:

3.1 Contact BCT for coordination and review requirements.

3.2 Maintain passenger access to and from bus stops during construction.

3.3 All work shall conform to the requirements of the Americans with Disabilities Act, including provisions for temporary access to and from bus stops.

3.4 If necessary, the Contractor shall work with BCT to establish an approved temporary bus stop location. Temporary bus stop will be relocated away from the work zone area.

Temporary bus stop location must be approved by the BCT Project Manager before construction work begins at bus stop.

3.5 Contractor may not remove any bus stop signs without prior authorization from BCT.

3.6 At bus stops, the Contractor is responsible for construction of an approved paved pedestrian access (landing pad) conforming to the provisions of the Americans with Disabilities Act for persons boarding or alighting a bus.

3.7 If right-of-way is available, Contractor is responsible for construction of the transit accessory pad on which bus stop furniture will be placed.

TYPICAL BUS STOP DIMENSIONS

3’

CURB CUTS

Curb cuts unit price includes all the elements required by the latest FDOT Index 522.

B. PROVISIONS AND CONSTRUCTION MATERIALS USED FOR TRUNCATED DOMES

1. Design of ADA Ramps:

The County will follow the latest FDOT provisions for Index 522.

2. Detectable Warnings Surface:

1. Color: For uniformity, the yellow color shall be used.

2. Warranty: A minimum of five (5) years.

3. Material/Products: Shall meet latest FDOT design standards, Index 522.

3. IN TILES:

Contractor shall use products in the FDOT Qualified Products List or any of the following products:

1. ADA Tactile System (www.adatile.com).

2. Armor-Tile Tactile System (www.armor-tile.com).

3. Step Safe Concrete Tactile Dome Safety Tile. (www.transpo.com).

4. IN EPOXIES/THERMOPLASTIC MAT:

Contractor shall use products in the FDOT Qualified Products List or any of the following products:

1. Top Mark Thermoplastic Detectable Warnings. (www.flintrading.com).

2. Armor-Tile Tactile Systems, applied surface (www.armor-tile.com).

3. ADA Tactile System (www.adatile.com).

4. Vangard ADA Systems (www.vanguard.stratumweb.com)

5. Dome Pattern: As recommended by FDOT ADA Coordinator.

1. On ramps perpendicular with curb line, the pattern shall be in line with the direction of travel.

2. On ramps intersecting Curbs on a Radius, the pattern shall be in line with the direction of travel to the Extent Practical.

6. Application/Construction:

1. Retrofitting existing ADA ramps, epoxies/thermoplastic/mat detectable warning products shall be used.

2. New construction; tiles or epoxies detectable warning products shall be used.

3. Stamped concrete is not allowed.

http://www.adatile.com/ http://www.armor-tile.com/ http://www.transpo.com/ http://www.flintrading.com/ http://www.armor-tile.com/ http://www.adatile.com/ http://www.vanguard.stratumweb.com/