This document provides the solicitation for a construction project to stabilize the Alcatraz Wharf located in the Golden Gate National Recreation Area. The project will repair and seismically strengthen the historic concrete wharf built in 1939, including repairing steel-cased concrete piles, beams, and slabs in fair to poor condition. Two new seismic resisting elements will be installed to bring the wharf up to Risk Category III standards. Concrete repairs and seismic improvements will occur in a single construction phase. Proposals are due by May 4th, 2022 and should be submitted electronically to the National Park Service contracting staff. The evaluation factors include key personnel, project experience, technical approach, schedule, management and safety, small business participation, and past performance. The award will be made to the best value offer considering technical merit over price.

View the file

Other files

File Type Posted
B09_amd_5_attach_23_2021_08_18___Supplemental_Information_Repairs_and_Seismic_Upgrades_to_Alcatraz_Wharf_0005.pdf PDF
Sol_140P2021R0143_Amd_0005.pdf PDF
SECTION_01_27_00___DEFINITION_OF_CONTRACT_LINE_ITEMS_0005.pdf PDF
20220509_-_ContractPriceSchedule_0005.xlsx XLSX spreadsheet
B09_amd_5_attach_24_GOGA_AlcatrazWharfPier_NMFSLetter_20210916_FINAL_LEJ_0005.pdf PDF
Sol_140P2021R0143_Amd_0004.pdf PDF
Sol_140P2021R0143_Amd_0003.pdf PDF
B09_Amd_2_sign_in_2_0002.pdf PDF
Sol_140P2021R0143_Amd_0002.pdf PDF
B09_Amd_1_Site_visit_sign_in_0001.pdf PDF
Sol_140P2021R0143_Amd_0001.pdf PDF
B08_Attach_9_Subcontracting_Plan.doc DOC document
B08_Attach_2_ALCA_Const_Dwgs_20220318.pdf PDF
B08_attach_1_ALCA_Specifications.pdf PDF
B08_attach_11_NHPA_Section_106.pdf PDF
B08_Attach_10_ALCA_USACE_Permit.pdf PDF
Sol_140P2021R0143.pdf PDF
B08_Attach_15_PLUMBING_INSPECTION.pdf PDF
B08_Attach_5_Certification.pdf PDF
B08_Attach_7__Past_Performance_Questionnaire.docx DOCX document
B08_Solicit_140P2021R0143.pdf PDF
B08_Attach_4_Memo.pdf PDF
B08_Attach_13_Geotechnical_Investigation_Report_Alcatraz_Wharf.pdf PDF
B08_Attach_12_2001_EIS_GOGA.pdf PDF
B08_Attach_3_WD.pdf PDF
B08_Attach_14_CH-2119_Alcatraz_Wharf_Report.pdf PDF
B08_Attach_8_General_References.doc DOC document
B08_Attach_6_Project_Experience_Questionnaire.docx DOCX document
B08_Attach_16_Signed_Acting_Deputy_Supt_D_Schifsky_12-27-21_ALCA_Wharf_NEPA_Consistency_Memo.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Location:

Golden Gate National Recreation

Area, Alcatraz Island, CA

Responses to questions during the site visit do not change the solicitation document

Changes to the solicitation document shall be made by formal written amendment only

Preproposal Conference/Site Visit meeting notes, attendance sheet, questions, and answers will be issued by a formal written amendment to the solicitation for information only

Preproposal Conference/ Site Visit- Tuesday, April 12, 2022

Request for Proposals No.

140P2021R0143

CO: Natasha DiPietro Natasha_dipietro@nps.gov

CS: Brian Tollensdorf brian_tollensdorf@nps.gov

QUESTIONS AFTER

PREPROPOSAL CONFERENCE

• Direct all questions to both Natasha DiPietro, Contracting Officer, and Brian Tollensdorf, Contracting Specialist. Please submit all questions not later than 4/24/2022.

• Questions directed to any other Government team member will be redirected to Ms. DiPietro or Mr.

Tollensdorf. No answers will be provided by any other team member.

All questions and answers will be provided to all prospective offerors by amendment to the solicitation.

• Request for Proposal (Solicitation Document) shall only be changed by formal amendment issued by the Contracting Officer at the website – www.SAM.gov

Award of a Contract:

Best Value Trade

Alternate proposals shall not be accepted or evaluated

The government intends to evaluate proposals and award a contract without discussions with offerors, therefore the offeror’s initial proposal should contain the offeror’s best terms from a cost or price and technical standpoint. The government reserves the right to conduct discussions if the CO later determines them to be necessary.

Stabilize Alcatraz Wharf, GOGA 215726 mailto:Natasha_dipietro@nps.gov mailto:brian_tollensdorf@nps.gov http://www.sam.gov/

52.211-10 Commencement, Prosecution, and Completion of Work - Commence work within 10 days after NTP. Complete not later than 1095 days after NTP.

52.211-12 Liquidated Damages – Construction - If contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $2,621.00 for each calendar day of delay until the work is completed or accepted.

Special Clause 2 – Key Personnel: Project Manager, Job-site Superintendent, Quality Control Manager, Project Safety Officer.

Prospective contractor shall not be allowed to change key personnel during the first 90 days of performance.

DIAR 1452.228-70 – Liability Insurance: The contractor shall procure and maintain during the term of this contract and any extension thereof liability insurance in form satisfactory to the CO by an insurance company which is acceptable to the CO. The amounts of insurance shall be not less than:

Construction $100,000 each person $500,000 each occurrence $1,000,000 property damage

52.225-11 Buy American – Construction Materials Under Trade Agreements – Refer to Clause for specific requirements

Clauses

Section L Instructions for the Submission of Offers

• Proposals Due May 4th May 5th 2022, 12:00MT

• Volume I – Non-Price Proposal

• Volume II - Business and Price Proposal

• Alternate proposals SHALL NOT be considered

• Government may award without discussion

• Send electronic proposals to:

CS_DSC_Proposal_Submission@nps.gov Brian_tollensdorf@nps.gov Natasha_dipietro@pgov

• Submissions shall contain the solicitation number, park-PMIS, and number of total emails (example in solicitation)

Evaluation Factors: The evaluation factors are correlated to the proposal preparation instructions.

Factors 1- 6 are listed in descending order of importance. Factor 7 is equal to factors 1-6 when combined.

Overall: All evaluation factors, other than price, when combined, are approximately equally important to price.

FACTOR 1 – KEY PERSONNEL AND

SUBCONTRACTORS

FACTOR 2 – PROJECT EXPERIENCE

FACTOR 3 – TECHNICAL APPROACH

FACTOR 4 – SCHEDULE

FACTOR 5 – MANAGEMENT AND SAFETY

FACTOR 6 – SMALL BUSINESS PARTICIPATION

FACTOR 7 – PAST PERFORMANCE

Refer to solicitation for specific information on submission requirements and evaluation

SUBMISSION AND EVALUATION

This project will make critical repairs to and seismically strengthen the concrete wharf on Alcatraz Island, a contributing feature of the Alcatraz Island National Historic Landmark District built in 1939. Work will include repair of the historic, steel-cased concrete piles, concrete beams, and concrete slabs. These elements are in fair to poor condition, with varying degrees of damage. Two new seismic resisting elements will be installed to bring the wharf up to a seismic Risk Category III structure. Concrete repairs and seismic improvements will be undertaken in a single phase of construction.

OVERVIEW OF PROJECT

mailto:CS_DSC_Proposal_Submission@nps.gov mailto:Brian_tollensdorf@nps.gov

QUESTIONS AFTER PREPROPOSAL CONFERENCE
• Direct all questions to both Natasha DiPietro, Contracting Officer, and Brian Tollensdorf, Contracting Specialist. Please submit all questions not later than 4/24/2022.
• Questions directed to any other Government team member will be redirected to Ms. DiPietro or Mr. Tollensdorf. No answers will be provided by any other team member. All questions and answers will be provided to all prospective offerors by amendment ...
• Request for Proposal (Solicitation Document) shall only be changed by formal amendment issued by the Contracting Officer at the website – www.SAM.gov
Stabilize Alcatraz Wharf, GOGA 215726
Project Location: Golden Gate National Recreation Area, Alcatraz Island, CA
Preproposal Conference/ Site Visit- Tuesday, April 12, 2022
Clauses
Submission and Evaluation
Overview of project