20220509_-_ContractPriceSchedule_0005.xlsx
XLSX spreadsheet 21 KB Posted
- Solicitation number
- 140P2021R0143
About this file
This price schedule template outlines pricing requirements for a construction contract to stabilize the Alcatraz Wharf. The contract includes 11 line items for base price work including repairs to steel-cased concrete piles, beams, slabs, and utilities. Pricing is to be provided by unit price and total price for unit priced items, or a lump sum total for lump sum items. The template also includes 7 option line items such as a movable landing and pile replacements. Offerors must provide pricing for all base and option line items. The total proposed price is the combined total of the base price and all option prices. Measurement and payment details are defined in Division 01 specifications.
The related federal contract opportunity is to stabilize the Alcatraz Wharf for the Golden Gate National Recreation Area. Work will repair and seismically strengthen the historic concrete wharf, including piles, beams, slabs damaged to varying degrees. Two new seismic resisting elements will be installed. Concrete repairs and seismic improvements will be undertaken in a single phase. The agency is the National Park Service National Office within the Department of the Interior.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Schedule Template
| Contract Price Schedule Template | |||||
| National Park Service (NPS) - Denver Service Center (DSC) | 3-13-18 | |||||
| Solicitation Number: | |||||
| PARK - PMIS: | GOGA - 215726 | ||||
| (Project Management Information System) | |||||
| Developed Area: | Alcatraz Island | ||||
| Project Title: | Stabilize Alcatraz Wharf | ||||
| Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all | |||||
| option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced | |||||
| line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related | |||||
| item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts | |||||
| govern. Round totals and extended prices to whole dollars. | |||||
| Contract Line Item Number (CLIN) | Contract Line Item (CLI) Title | Quantity | Unit of Measure | Unit Price | Total Price |
| 1 | Type 1 Beam Repair | 627 | Square Feet | $0.00 | |
| 2 | Type 2 Beam Repair | 3786 | Square Feet | $0.00 | |
| 3 | Type 1 Slab Repair | 1306 | Square Feet | $0.00 | |
| 4 | Type 2 Slab Repair | 2417 | Square Feet | $0.00 | |
| 5 | Type 1 Pile Repair | 1145 | Linear Feet | $0.00 | |
| 6 | Type 2 Pile Repair | 779 | Linear Feet | $0.00 | |
| 7 | Pile Replacement | 55 | Linear Feet | $0.00 | |
| 8 | Seismic Dolphins | 1 | Lump Sum | $0.00 | |
| 9 | Seismic Joint | 1 | Lump Sum | $0.00 | |
| 10 | Utility Replacement | 1 | Lump Sum | $0.00 | |
| 11 | Concrete Curb | 98 | Linear Feet | $0.00 | |
| TOTAL BASE PRICE (Contract Line Item Number 1 through 11) --------------------------------------------------------------------------------- | $0.00 | ||||
| 12 | Movable Landing | 1 | Lump Sum | $0.00 | |
| 13 | Replacement of Timber Piles | 1 | Lump Sum | $0.00 | |
| 14 | Reconstruct Cross Bracing and other Pier Timberwork | 1 | Lump Sum | $0.00 | |
| 15 | Steel Fender Pile | 1 | Lump Sum | $0.00 | |
| 16 | Hybrid Piles | 1 | Lump Sum | $0.00 | |
| 17 | Coating Portal Frames | 1 | Lump Sum | $0.00 | |
| 18 | Type 1 Pile Repair | 673 | Linear Feet | $0.00 | |
| TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 12 through 18) ----------------------------------------------------------- | $0.00 | ||||
| TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Number 1 through 18) -------------------------- | $0.00 | ||||
| All measurement and payment information is included in Division 01 Specifications Section 01 27 00 Definition of Contract Line Items. |
File details come from the government source that posted it. Updated .