A304_CHRI217021-244555PreProposalPresentation-SiteLogistics_0003.pdf

PDF 6 MB Posted

Attached to
Construct new bulkhead at Christiansted VI Federal contract opportunity
Solicitation number
140P2020R0054
Issued by
Department of the Interior National Park Service National Office

About this file

This document provides site logistics information for a pre-proposal meeting for the solicitation to construct a new bulkhead at the Christiansted National Historic Site harbor wharf in St. Croix, VI. The National Park Service is seeking to replace sections A through Z of the existing timber bulkhead with a new concrete structure. Site photographs depict existing conditions of the wharf sections and surrounding areas and detail information on site access, staging areas, and traffic patterns. Marine traffic within Christiansted Harbor is also addressed, including barge routes and small vessel movement. The pre-proposal meeting will provide offerors the opportunity to view the project site in advance of the anticipated March 1, 2021 through February 28, 2022 construction period.

View the file

Other files for this federal contract opportunity

Other files attached to Construct new bulkhead at Christiansted VI, newest first.
File Type Posted
501_B08_2020R0054-Amend05_0005.pdf PDF
502_Solicitation-14P2020R0054-CHRI 217021-244555-Bidder QA-AMEND05_0005.pdf PDF
504_52.247-64 _0005.pdf PDF
Sol_140P2020R0054_Amd_0005.pdf PDF
503_SpecialClause03-COVID19_0005.pdf PDF
Sol_140P2020R0054_Amd_0004.pdf PDF
2020R0054Amend04QandA_0004.pdf PDF
B08_2020R0054-Amend04_0004.pdf PDF
2020R0054CHRIPrepropMeetingRecord_0004.pdf PDF
Sol_140P2020R0054_Amd_0003.pdf PDF
A301_B08_Solit_PSP_Vol_I_PastPerf_R1_0003.docx DOCX document
A302_CHRI217021ContractingPreProposalPresentation_0003.pdf PDF
A303_CHRI217021-244555PreProposalPresentation-ProjectReqts_0003.pdf PDF
Sol_140P2020R0054_Amd_0002.pdf PDF
Sol2020R0054Am2_0002.docx DOCX document
B08_Amendment01_070620_0001.pdf PDF
03-CHRI-217021-244555_Contruction_Drawings_399-147281A_Unsigned-Unstamped.pdf PDF
14-CHRI_217021-244555_Bulkhead_Inspection_Report_Collins-Engineers_10-25-18.pdf PDF
07-Permit_Attachment_Turbidity_and_Water_Quality_Monitoring_Plan_NPS_05-2019.pdf PDF
11-CHRI_Wharf_Bulkhead_Finding_of_No_Significant_Impact-FONSI-NPS_09-2019.pdf PDF
08-Permit_Attachment_SeagrassandCoral_ SurveyandMitigation_Plans_NPS_05-2020.pdf PDF
02-CHRI-217021-244555_Contruction_Drawings_399-147281A_Signed-Stamped.pdf PDF
13-CHRI_217021-244555_Concrete_Bulkhead_Investigation_Memo_HDR_10-25-18.pdf PDF
16-CHRI_217021-244555_Concrete_Apron_Void_and_Rebar_Detection_Report-GPRS_09-10-18.pdf PDF
17-CHRI_217021-244555_Waterfront_Facility_Assessment-Moffatt-Nichol_09-17-2014.pdf PDF
06-Permit_Water_Quality_Certificate_WQC-19-006-LandW_USVI_DPNR.pdf PDF
Sol_140P2020R0054.pdf PDF
18-B08_Solit_PSP_Cover.docx DOCX document
22-B08_Solit_PSP_Vol_II_GenRefs.doc DOC document
15-CHRI_217021-244555_Wharf_Slab_Investigation_Memo_HDR_10-25-18.pdf PDF
09-Permit_Nationwide_ Permit-3-SAJ-2019-02388_USACE.pdf PDF
23-B08_Solit_PSP_Vol_II_SubKPlanForm_REQD.doc DOC document
12-CHRI_217021-244555_Final_Geotechnical_Report_Jaca-Sierra_07-17-18.pdf PDF
B08_Solicitation_140P2020R0054-CHRI 217021-S.pdf PDF
05-Permit_Federal_Consistency_Determination_CZX-1-19-FC-USVI_DPNR.pdf PDF
21-B08_Solit_PSP_Vol_II_Equals.doc DOC document
10-CHRI_Wharf_Bulkhead_Final_Environmental_Assessment_EA-NPS_05-2019.pdf PDF
25-B03_DOL-Wage_ Determination_Heavy.pdf PDF
19-B08_Solit_PSP_Vol_I_Exp_REQD.docx DOCX document
04-CHRI-217021-244555_Final_Statement_of_Structural_Tests.pdf PDF
24-B08_Solit-PSP_Vol_II_BidBond.pdf PDF
20-B08_Solit_PSP_Vol_I_PastPerf_REQD.docx DOCX document
01-CHRI-217021-244555_Technical_Specifications_Amended_06-2020.pdf PDF
Show all 43

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CHRI 217021-244555: WHARF

REPLACEMENT PROJECT

PRE-PROPOSAL MEETING

SITE INFORMATION

National Park Service | U.S. Department of the Interior Christiansted National Historic Site

Monday, July 20, 2020

SITE LOGISTICS

Access and Staging

Site Logistics

Christiansted National Historic Site

Site Logistics: Access and Staging

Site Logistics: Staging

Site Logistics: Access and Staging & Parking

Traffic Flow

Site Logistics: LocalTraffic Flow

Site Logistics: Site Traffic Flow

Access Staging/Parking

Site Logistics: Street Views

Site Logistics: Street View

Site Logistics: Access and Traffic

Site Logistics: Access and Traffic

Site Conditions : Traffic

Site Logistics: Marine Traffic Christiansted Harbor

Barge Traffic

Small Vessels

Site Conditions

Site Conditions: Boardwalk

Site Conditions : Boardwalk

A

Site Conditions: Wharf

Site Conditions : Wharf

B

C

C2

D

E

F

F2

G

H

H

I

J

K

L

M

M

N

O

P

Q

R

S

T

U

U

V

W

X

Y

Z

Site Conditions: Grounds aa

Site Conditions : Grounds bb

Site Conditions : Grounds cc