LITTLE SAHARA VISITOR CENTER CONSTRUCTION & DEMO
Solicitation number
140L5721R0001
Issued by

About this file

This document contains an amendment to a solicitation and related federal contract opportunity. The Bureau of Land Management (BLM) is seeking to award a firm-fixed price contract for construction of a new 3,100 square foot visitor center at the Little Sahara Recreation Area in Utah, along with demolition of the existing 2,800 square foot visitor center. The scope of work includes building construction, interior finishes, utilities installation, site work, landscaping, and a photovoltaic system. The period of performance is May 2021 through March 2022. This opportunity is 100% set aside for small businesses under NAICS code 236220 for commercial and institutional building construction. Davis-Bacon Act wage determinations apply. Interested vendors must register in the System for Award Management to be eligible for award. A pre-proposal site visit will be held as outlined in the solicitation.

View the file

Other files

File Type Posted
Sol_140L5721R0001_Amd_0006.pdf PDF
140L5721R0001 - Little Sahara VC Construction - Sol Sections B - M - Amendment 6_0006.pdf PDF
Sol_140L5721R0001_Amd_0004.pdf PDF
Little Sahara Visitor Center - Photos of Existing Building_0004.pdf PDF
101400 - Signage_0004.doc DOC document
088000 - Glazing_0004.doc DOC document
Questions and Answers Spreadsheet - Amendment 4_0004.pdf PDF
Added Drawing Sheet E104_0004.pdf PDF
Revised Drawing Sheets G002-AG501_0004.pdf PDF
Existing Visitor Center Floor Plan_0003.jpg JPG image
Little Sahara Visitor Center Statement of Work - Revised_0003.pdf PDF
271000 - Structured Cabling_0003.pdf PDF
013200 - Construction Progress Documentation_0003.pdf PDF
Little Sahara Visitor Center Pricing Worksheet - Revised_0003.pdf PDF
Site Visit Attendance Roster_0003.pdf PDF
Existing Visitor Center Elevations 1_0003.jpg JPG image
012000 - Unit Prices and Schedule of Values_0003.pdf PDF
Lay Down - Storage Area_0003.pdf PDF
Temporary Construction Fencing_0003.pdf PDF
L2047 Little Sahara Visitor Center ACM Report_0003.pdf PDF
E-101_Revised_2021-03-26-E-101_0003.pdf PDF
Questions and Answers Spreadsheet_0003.pdf PDF
140L5721R0001 - Little Sahara VC Construction - Sol Sections B - M - Amendment 3_0003.pdf PDF
Sol_140L5721R0001_Amd_0003.pdf PDF
Existing Visitor Center Elevations 2_0003.jpg JPG image
140L5721R0001 - Little Sahara VC Construction - Sol Sections B - M - Amendment 2_0002.pdf PDF
Sol_140L5721R0001_Amd_0002.pdf PDF
Sol_140L5721R0001_Amd_0001.pdf PDF
Little Sahara Visitor Center Pricing Worksheet.pdf PDF
Little Sahara Drawings.pdf PDF
Sol_140L5721R0001.pdf PDF
Little Sahara Visitor Center Statement of Work.pdf PDF
Little Sahara Geotech Report.pdf PDF
Davis Bacon Wage Determination UT20210084.pdf PDF
Little Sahara Specifications.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140L5721R0001 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

LUA

SALT LAKE CITY UT 84101

440 WEST 200 SOUTH, SUITE 500

BLM UT-STATE OFC ADM SVCS BR(UT952)

02/23/20210005

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

02/23/2021

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Little Sahara Visitor Center Construction & Demolition of Existing Visitor Center

Legacy Doc #: BLM

The purpose of this amendment is as follows:

1. Correct the period of performance dates reflected in amendment 4, as the changes made to the performance dates in amendment 3 did not carry through. Note the tiered completion dates outlined in clause 52.211-10, Amendment 3 and shown below:

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK April 1984 ALTERNATE 1 April

The Contractor shall be required to (a) commence work under this contract within 30

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Leslie B. Gunn

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140L5721R0001/0005 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the construction of the new visitor center, acceptable for occupancy as determined by the

Government, within 240 days of the issuance of the notice to proceed (estimated 12/31/2021), and complete the remainder of the contract work, including demolition of the existing visitor center, remaining site work, and final cleanup no later than 300 days after the issuance of the notice to proceed (estimated 3/1/2022).

The contract completion dates of 12/31/2021 and

03/01/2022 are based on the assumption that the successful offeror will receive the notice to proceed by 5/1/2021. The completion dates will be extended by the number of calendar days after

5/1/2021 that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer.

2. Provide the following information in response to market instability due largely to the COVID-19 pandemic:

As this is a firm fixed price requirement, the

Government will not pay for price increases on materials after contract award. The Government will make reasonable efforts to conduct the proposal evaluations as quickly as possible, while still in compliance with Federal Acqusition

Regulations and Sections L & M of this solicitation. Regarding contract delays due to material shortages, there are some excusable delays that could lead to a contract extension, however that is determined on a case-by-case basis by the Contracting Officer and based on documentation/proof provided by the contractor, and in accordance with Federal Acquisition

Regulations.

The date and time for submission of proposals has

NOT been extended. All other terms and conditions remain unchanged.

Period of Performance: 05/01/2021 to 03/01/2022