This amendment to a solicitation provides answers to questions from vendors regarding a requirements contract opportunity. The Bureau of Land Management seeks to award a firm-fixed price contract to construct a new 3,100 square foot visitor center at the Little Sahara Recreation Area in Utah, including demolition of an existing 2,800 square foot building, by December 2021. Work includes site utilities, landscaping, a photovoltaic system, and applicable wage rates. The estimated value is between $1 million and $5 million. Interested vendors must register in the System for Award Management and monitor the solicitation website for amendments. A pre-proposal site visit will be held and questions should reference solicitation number 140L5721R0001.

View the file

Other files

File Type Posted
Sol_140L5721R0001_Amd_0006.pdf PDF
140L5721R0001 - Little Sahara VC Construction - Sol Sections B - M - Amendment 6_0006.pdf PDF
Sol_140L5721R0001_Amd_0005.pdf PDF
Sol_140L5721R0001_Amd_0004.pdf PDF
Little Sahara Visitor Center - Photos of Existing Building_0004.pdf PDF
101400 - Signage_0004.doc DOC document
088000 - Glazing_0004.doc DOC document
Questions and Answers Spreadsheet - Amendment 4_0004.pdf PDF
Added Drawing Sheet E104_0004.pdf PDF
Revised Drawing Sheets G002-AG501_0004.pdf PDF
Existing Visitor Center Floor Plan_0003.jpg JPG image
Little Sahara Visitor Center Statement of Work - Revised_0003.pdf PDF
271000 - Structured Cabling_0003.pdf PDF
013200 - Construction Progress Documentation_0003.pdf PDF
Little Sahara Visitor Center Pricing Worksheet - Revised_0003.pdf PDF
Site Visit Attendance Roster_0003.pdf PDF
Existing Visitor Center Elevations 1_0003.jpg JPG image
012000 - Unit Prices and Schedule of Values_0003.pdf PDF
Lay Down - Storage Area_0003.pdf PDF
Temporary Construction Fencing_0003.pdf PDF
L2047 Little Sahara Visitor Center ACM Report_0003.pdf PDF
E-101_Revised_2021-03-26-E-101_0003.pdf PDF
Questions and Answers Spreadsheet_0003.pdf PDF
140L5721R0001 - Little Sahara VC Construction - Sol Sections B - M - Amendment 3_0003.pdf PDF
Sol_140L5721R0001_Amd_0003.pdf PDF
Existing Visitor Center Elevations 2_0003.jpg JPG image
140L5721R0001 - Little Sahara VC Construction - Sol Sections B - M - Amendment 2_0002.pdf PDF
Sol_140L5721R0001_Amd_0002.pdf PDF
Little Sahara Visitor Center Pricing Worksheet.pdf PDF
Little Sahara Drawings.pdf PDF
Sol_140L5721R0001.pdf PDF
Little Sahara Visitor Center Statement of Work.pdf PDF
Little Sahara Geotech Report.pdf PDF
Davis Bacon Wage Determination UT20210084.pdf PDF
Little Sahara Specifications.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140L5721R0001 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

LUA

SALT LAKE CITY UT 84101

440 WEST 200 SOUTH, SUITE 500

BLM UT-STATE OFC ADM SVCS BR(UT952)

02/23/20210001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

02/23/2021

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Little Sahara Visitor Center Construction & Demolition of Existing Visitor Center

Legacy Doc #: BLM

The purpose of this amendment is to post questions and answers relating to this solicitation. See section 11 of this form above for the amendment acknowledgement requirements. The date and time for submission of proposals has NOT been extended. All other terms and conditions remain unchanged.

Question 1: Could you please clarify the time for all items converted to daylight savings time. We switch on March 14th. Will the walk through be at 11:00 am MDT? It is currently listed at 11:00 am MT which would be 12 noon MDT.

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Leslie B. Gunn

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140L5721R0001/0001

Answer 1: The site visit will be held at 11:00 am MDT.

Question 2: Is this project tax exempt?

Answer 2: "Prime contractors and subcontractors shall not normally be designated as agents of the

Government for the purpose of claiming immunity from State or local sales or use taxes." -

Federal Acquisition Regulations (FAR) 29.303.

Offerors should not assume tax exemption for this specific project.

Question 3: Is there a woman owned preference?

Answer 3: No, this is a total small business set aside with no additional preference for woman-owned businesses.

Question 4: Is the site visit mandatory? If not, can pictures of the existing building (for demo) be provided?

Answer 4: No, the site visit is not mandatory, but vendors are expected to conduct all reasonable inspections/investigations of the site. See clause 52.236-3 - Site Investigations and Conditions Affecting the Work contained in the solicitation. Pictures alone would not be a substitute for that, however, the BLM will take a few photos of the existing building and post with the Q&As after the site visit and question submission deadline.

Question 5: Is there somewhere in the specifications that calls out the gauge of the steel studs?

Answer 5: See Specification Section 092216 -

Non-Structural Metal Framing.

Period of Performance: 05/01/2021 to 12/31/2021